NATIONWIDE PERMIT ACTIONS OCTOBER - DECEMBER Action Type Project Name Closure Method County State SPA NWP

Similar documents
NATIONWIDE PERMIT ACTIONS JULY - SEPT 2016

Roadway Project Recommendations:

DROWNINGS IN NEW MEXICO

Deer Canyon Ranch 5,469 +/- Deeded Acres, 640 Acres NM State Lease, 6,109 Total Acres+/- Harding and San Miguel Counties, New Mexico

DA Number Action Type Project Name End Date Closure Method County Cowan Canal (San Mateo U.S. Route 101): Restoration of Hydraulic Capacity

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

CDOT Region 5 Announces 2015 Construction Program

TRANSPORTATION & MOBILITY

2019 Federal Transportation Improvement Program

VIII. Project Prioritization & Implementation

3.9 Recreational Trails and Natural Areas

COLORADO DEPARTMENT OF EDUCATION

The Animas below Durango Version June 2014

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Quay County, New Mexico 160 deeded acres; (MOL) $420,000

Roadway Project Recommendations: PROJECT COST IN $000 TYPE IMPROVEMENT. $16,000-$20,000 (higher estimate in total - below)

NEW MEXICO TRAFFIC CRASH INFORMATION

WELCOME. to the meeting for the. Westside Avenue Action Plan Gateway to Revitalization

TREASURE VALLEY WEST industrial park

State Route 160 (Blue Diamond Highway)

COLORADO PUBLIC ADMINISTRATORS Judicial District Public Administrator Deputy Public Administrator 1 st Judicial District Jefferson Gilpin

REACTIVATION AND RIPARIAN RESTORATION PROJECT THREE CREEKS CONFLUENCE OPEN SPACE: PRELIMINARY DESIGN CONCEPT #1 J O R D A N R I V E R 900 WEST

NEW MEXICO TRAFFIC CRASH INFORMATION

School Name Recommendation 0020 Adams 12 Five Star Schools (Northglenn-Thornton) Number

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report

Lawrence Loop SWOT Analysis

St. Francis Drive through the City of Santa Fe Corridor Study

FDOT Treasure Coast Traffic Report

Highway Construction

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Culpeper District. Albemarle County Monthly Report October, 2011

APPENDIX D COST SUMMARY TABLES

FDOT Treasure Coast Traffic Report

UTOC - Day 1: Buena Vista - > Moffat DISTANCE: mi LOCATED: Buena Vista, Colorado

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

8 th Annual Spring Transportation. April 9, 2010

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

RECEIVED. Colorado Secretary of State. t iu. Initiative #22 ORIGINAL TEXT. Be it Enacted by the People of the State of Colorado:

CITY OF SOUTH DAYTONA

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

NEW MEXICO DISTRICT ATTORNEYS DIRECTORY

Up Your Creek! The electronic newsletter of the Alameda Creek Alliance

Giant Traveling Map Lesson

Cross-Vane Plan View FIN-UP Habitat Consultants, Inc. 220 Illinois Avenue Manitou Springs, CO (719) P.

US287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

FY Regional Transportation Improvement Program

Planning Committee STAFF REPORT

Roadway Project Recommendations: PROJECT COST IN $000 TYPE IMPROVEMENT. Road Reconstruction - paving, widening, shoulders, drainage improvement

A: PLANNED P ROJECTS PROJECTS

A.G. Wright Middle School Map 100 Wood Drive, Stafford, VA 22556

Bicycle Count Data. December 2008

ITEM 3 ATTACHMENT A RESOLUTION NO

EMERY GAP RANCH UNION COUNTY, NEW MEXICO LAS ANIMAS COUNTY, COLORADO 8,342 ± DEEDED ACRES 3,302 ± NM STATE LEASE ACRES

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Applications for Funding

REVISION 2 Prioritized by NWRTPO

Appendix B. Summary of Public Comments Tri County Health Department Comments

COAL CREEK PARKWAY CULVERT/BRIDGE CITY OF BELLEVUE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Scott L. Carpenter Recent Project List

NOT OFFICIAL - PREPARED FOR THE NEW MEXICO LIBRARY ASSOCIATION BY JOE SABATINI

Engineering - Bicycle and Pedestrian

US287 Asset Inventory Loveland. Figure 6-1 Loveland Bridges and Traffic Signals

FDOT Treasure Coast Traffic Impact Report

SDForward.com/networks PHASE YEAR (IN ALL NETWORK CONCEPTS) ESTIMATED CAPITAL COSTS ($2018) MILLIONS* PROJECT NAME

Castro Valley Municipal Advisory Council March 19, 2018

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

2040 Long Range Plan Projects Draft October 2011

3 Day ~ 4 Night Fishing Trip at the JUNIPER CABIN in Chama, NM. with LAND OF ENCHANTMENT GUIDES DAYS & DESCRIPTIONS

Southeast Colorado Hunting Guide

San Tomas Expressway

section 4 Existing Conditions, Issues, and Options

ENERGY SECTOR COORDINATION

La Crescent Township Zoning Ordinance

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Culpeper District. Albemarle County Monthly Report September, 2011

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Welcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting.

State Route 28 Shared Use Path & Safety/Stormwater Enhancements Public Information Meeting

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Transportation 2040 Update - Financial Strategy Balancing

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

3.0 Future Conditions

Appendix B - Street Sections

'Tis the Season...for Construction Multi Modal Project Updates

Rain Barrel Distributors

Searsville Dam Removal

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

Welcome to the Sellwood Bridge Project Open House!

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Transcription:

NATIONWIDE PERMIT ACTIONS OCTOBER - DECEMBER 2014 DA Number Action Type Project Name Closure Method County State 00446 Rio Grande Headwates Restoration Project Phase IV Outcalt Verified Without Special Conditions Alamosa CO 00445-SCO Poncha Estates - Utility Crossing Verified Without Special Conditions Chaffee CO 00447-SCO Bank Stabilization, 28909 Ramsour Rd., Arkansas River, Buena Vista, Colorado Verified Without Special Conditions Chaffee CO 00393 Rocky Mtn. Estates Bridge Replacement Verified Without Special Conditions Conejos CO 00087-SCO I-25 North Design Build Improvements, Highway Corridor btw Gleneagle and USAFA, Colorado Springs, El Paso County, Colorado Verified Without Special Conditions El Paso CO 00157 Tesla culvert replacement and stabilization phase 2, El Paso County, Colorado Verified Without Special Conditions El Paso CO 00266-SCO Erosion Control Sutherland Creek, 7 Sandra Lane, Manitou Springs, El Paso County, Colorado Withdrawn El Paso CO 00450-SCO Marksheffel South Road Project, Colorado Springs, El Paso County, Colorado Verified With Special Conditions El Paso CO 00469-SCO Midland Trail Pedestrian Bridge, Fountain Creek, Colorado Springs, Colorado Verified Without Special Conditions El Paso CO 00509 Maxwell Trailhead Bank Improvements, El Paso County, Colorado Verified Without Special Conditions El Paso CO 00510 Hansen Trailhead Reconstruction, El Paso County, Colorado Verified Without Special Conditions El Paso CO 00513-SCO Colorado Springs Utilities - Highline Transmission Main, Phase 2 Verified Without Special Conditions El Paso CO 00513-SCO Colorado Springs Utilities - Highline Transmission Main, Phase 2 Verified Without Special Conditions El Paso CO 00477-SCO Sewer Main Replacement, Cucharas River, La Veta, Huerfano County, Colorado Verified Without Special Conditions Huerfano CO 00500-SCO 00500-SCO 00500-SCO

00500-SCO 00495 La Garita Ranch Bridge Verified Without Special Conditions Mineral CO 00471-SCO Arkansas River Levee Improvement Project Verified With Special Conditions Pueblo CO 00471-SCO Arkansas River Levee Improvement Project Verified With Special Conditions Pueblo CO 00511 Fountain Creek Bank Stabilization, Pueblo County, Colorado Verified Without Special Conditions Pueblo CO 00534-SCO CDOT Intersection Improvement Project, US Hwy 50, Pueblo County, Colorado Verified With Special Conditions Pueblo CO Eddy County Roadway Improvement Project - 00444-LCO 00526-LCO County Road 725 Verified Without Special Conditions Eddy NM City of Carlsbad; San Jose Blvd Road Improvements - Flood Repair Verified Without Special Conditions Eddy NM The Construction of a Pedestrian Bridge Over Carrizo Creek in the Village of Ruidoso, Lincoln Withdrawn Due To No Permit County, New Mexico Required (NPR) Lincoln NM Repair and Channel Restoration Work in Bull Creek Canyon at the Location of a Union Pacific Railroad Bridge in the Tucumcari Subdivision, Quay County, New Mexico Verified With Special Conditions Quay NM 00425-ABQ Repair of Potable Water Line Break in Pajarito 00503-ABQ Canyon Verified Without Special Conditions Los Alamos NM El Paso Natural Gas - Line 1200 Erosion Repair 00273 Project Verified Without Special Conditions McKinley NM El Paso Natural Gas - Line 1200 Erosion Repair 00273 Project Verified Without Special Conditions McKinley NM 00410 El Paso Natural Gas Project (Severe Erosion Repair) Verified Without Special Conditions McKinley NM 00410 El Paso Natural Gas Project (Severe Erosion Repair) Verified Without Special Conditions McKinley NM 00410 El Paso Natural Gas Project (Severe Erosion Repair) Verified Without Special Conditions McKinley NM 00409-ABQ El Vado Reservoir State Park Grassy Point Boat 00101-ABQ Ramp Extension Verified With Special Conditions Rio Arriba NM 00236-ABQ La Laja Campground Boat Ramp Improvements Verified Without Special Conditions Rio Arriba NM

00237-ABQ Ridge Rock Campground Boat Ramp Construction Verified Without Special Conditions Rio Arriba NM 00431-ABQ Trunk-K Pipeline Re-burial Project Verified Without Special Conditions Rio Arriba NM 00512-ABQ Piling Revetment With Wire Fencing Bank Stabilization Madera Arroyo Verified Without Special Conditions Rio Arriba NM SPA-2011-00433-DR BP America, Bank Stabilization in La Manga Canyon, San Juan County, New Mexico Verified Without Special Conditions San Juan NM 00258 San Juan River Habitat Secondary Channel Habitat Restoration Verified Without Special Conditions San Juan NM 00411 Animas River Bank Stabilization & Boat Ramp Project Verified Without Special Conditions San Juan NM 00411 Animas River Bank Stabilization & Boat Ramp Project Verified Without Special Conditions San Juan NM 00465 Bunny Et Al #1 Stream Restoration Project Verified Without Special Conditions San Juan NM 00466 Charles Et Al #2E Bank Stabilization Verified Without Special Conditions San Juan NM 00474 Vision Energy's Hogback Vibroseis Project Withdrawn San Juan NM 00481-ABQ Navajo Reservoir Pine Marina Expansion Verified Without Special Conditions San Juan NM 00485 Glade Arroyo Verified Without Special Conditions San Juan NM 00485 Glade Arroyo Verified Without Special Conditions San Juan NM 00486 New Project Butler Arroyo Verified Without Special Conditions San Juan NM 00487 New Project Katherine Arroyo Verified Without Special Conditions San Juan NM 00487 New Project Katherine Arroyo Verified Without Special Conditions San Juan NM 00487 New Project Katherine Arroyo Verified Without Special Conditions San Juan NM 00488 New Project Porter Arroyo Verified Without Special Conditions San Juan NM 00488 New Project Porter Arroyo Verified Without Special Conditions San Juan NM 00427-ABQ 18 & 20 Calle Chamisa Driveway Crossing, Placitas, NM Verified With Special Conditions Sandoval NM

00149-ABQ 00149-ABQ 00404-ABQ 00514-ABQ 00228 00228 00228 00228 00228 Buffalo Thunder Resort Stomwater Retention Pond Project at the Pueblo of Pojoaque in Santa Fe County, New Mexico Verified With Special Conditions Santa Fe NM Buffalo Thunder Resort Stomwater Retention Pond Project at the Pueblo of Pojoaque in Santa Fe County, New Mexico Verified With Special Conditions Santa Fe NM Nambe Pueblo Water Control Facility Berm Breach Near Pond Repair, FEMA-4152-DR-NM Verified Without Special Conditions Santa Fe NM Nambe Pueblo Pines Access Road Embankment Streambank Replacement Verified Without Special Conditions Santa Fe NM NM 1 Reconstruction and Emergency Installation of 00508-ABQ Bank Protection structures within Crawford Hollow Draw at MP 21, Socorro County Verified With Special Conditions Socorro NM 00441-LCO Bridge Maintenance - Texas Department of Transportation - Pine Canyon Bridge Verified Without Special Conditions Culberson TX 00459-LCO Pipeline Maintenance Culberson County TX Verified Without Special Conditions Culberson TX 00470-LCO Texas Department of Transportation - US 90 Rehabilitation Verified Without Special Conditions Culberson TX