Eastern Kentucky University and Chemical Stockpile Emergency Preparedness Program

Similar documents
Annual Emergency Response and Evacuation Procedures Exercise. Background Information (Chemical Stockpile Emergency Preparedness Program)

Annual Emergency Response and Evacuation Procedures Exercise. Background Information (Chemical Stockpile Emergency Preparedness Program)

Annual Emergency Response and Evacuation Procedures Exercise. Background Information (Chemical Stockpile Emergency Preparedness Program)

HAZMAT Hazardous Material Release or Spill. HAZMAT Hazardous Material Release or Spill EMERGENCY ACTION. Evacuate the release or spill area

RICHMOND CAMPUS. Date Implemented: December 17 th, Date Revised: May 2 nd, Originally Produced By: EKU Emergency Management

GRAND CAMPUS EMERGENCY ACTION PLAN

BUILDING EMERGENCY ACTION PLAN ALUMNI COLISEUM

EMERGENCY ACTION PLAN

BaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full

patient education program 4156 South 52 nd Street, Omaha, NE ChildrensOmaha.org/HomeHealthcare

Lab rotation on vacuum techniques and thermal imaging

Nordson AP-300/600 Plasma Systems Operational Manual July 2017

Building Supervisor Meeting Agenda 10/18/14 CALL NON EMERGENCY TO TELL THEM NOT TO DISPATCH FIRE ON ALARM MAKE ANNOUNCMENT TO ALL FACILITY

A Guide to Relocating Hazardous Materials

Document Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE

Tilghman Elementary School Facility Utilization Committee Meeting Talbot County Education Center Meeting Minutes November 20, 2017

RICHMOND CAMPUS. Date Implemented: July 28 th, Date Revised: May 1 st, Originally Produced By: EKU Emergency Management

EMERGENCY ACTION PLAN

GIRLS ON THE RUN NYC 5k JUNE 4, 2017 VOLUNTEER HANDBOOK

Liquid Nitrogen (LIN) Supply and Safety Plan. May 30, 2018

INSTALLATION INSTRUCTIONS

EMERGENCY ACTION PLAN

MECHANICS & TECHNIQUES 3PO

Instructions for use. turbomax pro 24 E 28/2 E

BUILDING EMERGENCY ACTION PLAN NEW RESIDENCE HALL

EMERGENCY ACTION PLAN

Fume Hood User Guidelines

Fatality 3 or more hospitalizations due to one incident Inpatient hospitalizations (Overnight stay) Amputations Loss of an eye

Note: Other Divisions (ex: Research Operations) may have additional or more stringent requirements in addition to this procedure.

STANDARD OPERATING PROCEDURE TEMPLATE

UNIVERSITY OF SOUTHERN INDIANA PERSONAL SAFETY AND PRECAUTIONS

Classroom Reverse Evacuation Guidance

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field

EMERGENCY ACTION PLAN MEADOWBROOK FARM

Rev B Medivators Inc.

USTA Atlanta Combo Doubles Registration Information Play begins in late April

Emergency Response Plan

Opportunity for Public Participation. Plain Language Summary

Swim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan

November 11, Worldwide ERC would like to thank today s sponsor: 2014 Worldwide ERC

STIOffice Summer School Grade Setup and Entry

EMERGENCY ACTION PLAN

EMERGENCY ACTION PLAN

VAN NUYS CAMPUS EMERGENCY REPAREDNESS AND RESPONSE PLAN

Hot Work Policy and Procedures

Lab Pilot Fermenter Type LP351, 75 Liters OPERATING INSTRUCTIONS

ADAMS HOUSE EMERGENCY ACTION PLAN

AUTOMATED EXTERNAL DEFIBRILLATOR (AED) PROTOCOL

EARTHQUAKE PREPAREDNESS

Plain Language Summary

PMI Advanced Media Bubble Point Tester

Revision: 05/20/15. To provide procedures for the safe and effective use of technical rope rescue equipment during emergency operations.

WA270 Water Broom Important Safety Instructions Assembly Operation Maintenance Service Information

Anne Arundel County R&P/GLAAAC 2017 Official Girls Lacrosse Rules

Gema s OptiColor System

BUILDING EMERGENCY ACTION PLAN CLOYS HOUSE (VETERAN HOUSING)

2018 Southeast 6 Destination Imagination Regional Tournament

OFFICIAL RULES FIELD:

European Roulette Game Rules

Coach's Manual. North Shore Girls Softball League 2007

RICHMOND CAMPUS. Date Implemented: February 16 th, Date Revised: April 30 th, Originally Produced By: EKU Emergency Management

RICHMOND CAMPUS. Date Implemented: December 7 th, Date Revised: April 30 th, Originally Produced By: EKU Emergency Management

RULES. Dates. Saturday, March 3rd - Sunday, March 4th. Address. API 740 Route 3 South Gambrills, MD Phone: (410) Parking.

Emergency Procedures Northeastern State University

USTA Northern California Junior Team Tennis Section Championship Rules (Updated as of 8/1/16)

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

Site Timeline. Crew Pregame Minutes Minutes. Pregame, dress, stretch

SPARC Match Rules v1.2

ESF #5 Emergency Management Annex (1.0)

2016 AWWA/WEA Spring Conference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016

RICHMOND CAMPUS. Date Implemented: December 16 th, Date Revised: April 26 th, Originally Produced By: EKU Emergency Management

Tubing Group Guide. Wilmot Mountain Tubing, a Vail Resorts Company Fox River Rd. Twin Lakes, WI 53181

REEDSBURG YOUTH FOOTBALL, INC. Program Rules & Regulations

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

A AAA A A. BreakAway Speed Sports Training. Soccer Coaching Clinic. 2l Warm Up: 1) General Practice Tips:

Weber State. University Davis. Campus Emergency. Plan. May 2018

What Is a Home Chemical Emergency, and a Major Chemical Emergency?

Visit Leader Emergency Action Card

Fayetteville Parks and Recreation Adult Co-Ed Indoor Volleyball League Rules

Installing the ACT D MAND KONTROLS Systems

OPERATIONS CHALLENGE 2017

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

Demonstrate the adequacy of vehicles, equipment, procedures, and personnel for transporting contaminated, injured, or exposed individuals.

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

Shooters Handbook ALABAMA. June 18, 2016 Cavern Cove Competition Range

Mechanics Addendum. Ground Balls in the Infield

Exposure Control Plan

!! 1st/ 2nd Grade. 3rd Grade

SMALL SIDED FOOTBALL 2012

OPERATING GUIDELINES Registration Scheduling Pre-season In-season 8:00am on Thursday of the week before Instructional Draft Procedures

INDOOR FLAG FOOTBALL RULES. Play clock is 25 second from the time the official whistles ready for play. Warning will be given at ten second left only.

Animals (Teaching or Research)

Finger Lakes Community College Emergency Action and Response Plan. Finger Lakes Community College

DEUTSCHER LEICHTATHLETIK-VERBAND INDOOR MATCH U20 GER FRA ITA WINTER THROWING MATCH U20/U23 GER FRA ITA. HALLE/SAALE - Saturday, 04 March 2017

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC

Wyoming Valley Youth Soccer Association February 12, 2017 Meeting Minutes

Emergency Action Plan

Technical Documentation

Topic Sheet No. 5 Safe rigging of rope access equipment

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Transcription:

Buildings and Cllective Prtectin Systems (CPS) and Chemical Stckpile Emergency Preparedness Prgram Madisn Cunty is divided int znes, s that prtective actin recmmendatins and decisins can be made in the specific areas affected by a chemical incident at the Blue Grass Army Dept. is primarily lcated within tw znes. Richmnd Campus nrth f the EKU By-Pass is lcated in Zne 2E and Richmnd Campus suth f the EKU By-Pass is lcated in Zne 2D. Other EKU facilities in Madisn Cunty include Meadwbrk Farms lcated in Zne 1C and Madisn Airprt lcated in Zne 3D. In the event f a chemical release, mdeling sftware is used t determine the path f the release. Any znes that are affected in the mdel are recmmended t shelter-in-place until the chemical agents have dissipated. The affected areas are then relcated (evacuated) accrding t set prtcls by Madisn Cunty EMA/CSEPP. The CSEPP prgram has mdified certain campus buildings t be used as Enhanced Shelter-in- Place (ESIP) buildings. These buildings have had sensrs placed n the drs as well as an autmated system that shuts dwn the HVAC system and clses all the dampers in the building. The ESIP/CPS Cntrl Panels can be fund in the fllwing lcatins: Alumni Cliseum - 2 nd Flr Rm 208 Cmbs Building - 1 st Flr NE Clset Mdel Gymnasium - Lwer Level Rm 151 Perkins Building - First Level Main Lbby Thmpsn Hall - 1 st Flr Laundry Rm 107 University Building - 3 rd Flr by 323A Whitlck Building - 1 st Flr Rm 151 Instructins fr perating the Cllective Prtectin Systems (CPS) in these buildings include: Mve everyne int the prtected area when ntified that a hazardus event has ccurred. Please assist individuals with functinal and access needs t the shelter areas. Manually clse and latch all perimeter drs and windws. Start the ESIP/CPS system by pushing the red start buttn n the face f the cntrl panel. Any individual may activate the system when needed. EKU Public Safety fficials may nt be in yur ESIP building. Keep all drs and windws clsed. Remain in the prtected area until ntified that the hazard has been cleared. After being ntified that the hazard has cleared, stp the ESIP/CPS system by pushing the red start buttn again. Any individual may deactivate the system when the all clear rder is given. EKU Public Safety fficials may nt be in yur ESIP building. Perimeter drs may nw be pened. Exit utside. Individuals may be directed t relcate ut f the affected area. In the event that ne f the Richmnd Campus Znes, 2E r 2D, is affected by a chemical incident, the prtective actin decisin will be applied t bth Richmnd Campus Znes 2E and 2D. Page 1 f 11

Buildings and Cllective Prtectin Systems (CPS) If yu can read this sign, yu are inside the Cllective Prtectin System (CPS) Prtected Area. Belw is a picture f an Cntrl Panel. Page 2 f 11

Alumni Cliseum Cllective Prtectin System (CPS) 1.1.2 E 1.8 Alumni Cliseum 2.19 1.14.17 Buildings and Cllective Panel Prtectin n the 2 nd Flr Systems Rm 208 (CPS) 1.10 1.7 1.9 1.15 1.11.12.13 2.18 2.20 2.16 2.22 Cntrl Clse Drs and Windws During Emergency System Operatin Chemical Emergency Occupant Lad 4955 1.3.4 Perimeter Drs Level and Dr #s 1.1.2 = First Level Drs 1 & 2 2.24 = Secnd Level Drs 24 EKU Emergency Management 11-4-2011 2.23 2.21 2.24 Prtective Actin Decisins (PADs) are issued by the Madisn Cunty Emergency Management Agency (EMA) is primarily lcated in Zne 2E and Zne 2D Shelter-In-Place (SIP) (Until the immediate danger passes) Evacuatin (If there is enugh time befre the danger arrives) Relcatin (When it is safe t cme ut f Sheltering-In-Place) Mve all persnnel int the prtected area when ntified that a hazardus event has ccurred. Please assist special needs individuals t the shelter areas. Manually clse and latch all perimeter drs and windws. Start the ESIP prtectin system by pushing the red start buttn n the face f the cntrl panel. Keep all drs and windws clsed and remain in the prtected area Page until 3 ntified f 11 that the hazard has been cleared. After being ntified that the hazard has been cleared, stp the ESIP prtectin system by pushing the red start buttn again. Perimeter drs may nw be pened. Exit utside. Persnnel may be directed t relcate ut f the affected area. 1.5.6 Hazardus

Cmbs Building Enhanced (ESIP) Cntrl Panel n the 1 st Flr NE Clset Clse Drs and Windws During Emergency System Operatin Chemical Emergency Occupant Lad 5672 Cmbs Building Eastern Kentucky 4-18-2011 University Enhanced Enhanced Shelter In Place (ESIP) (ESIP) Buildings and Cllective Prtectin Systems (CPS) Cllective Prtectin System (CPS) 1.5.6 1.7.8 B.11 Cntrl Panel Elevatr Enhanced Aut Tggle Shuld be Up During Operatin Manual - Test B.9 (X4) B.12 Perimeter Drs Level and Dr #s B.9 = Basement Level Dr 9 R.13 = Rf Level Dr 13 B.10 R.13 1.1.2 1.3.4 Prtective Actin Decisins (PADs) are issued by the Madisn Cunty Emergency Management Agency (EMA) is primarily lcated in Zne 2E and Zne 2D Shelter-In-Place (SIP) (Until the immediate danger passes) Evacuatin (If there is enugh time befre the danger arrives) Relcatin (When it is safe t cme ut f Sheltering-In-Place) Mve all persnnel int the prtected area when ntified that a hazardus event has ccurred. Please assist special needs individuals t the shelter areas. Manually clse and latch all perimeter drs and windws. Start the ESIP prtectin system by pushing the red start buttn n the face f the cntrl panel. Keep all drs and windws clsed and remain in the prtected area until ntified that the hazard has been cleared. After being ntified that the hazard has been cleared, stp the ESIP prtectin Page 4 system f 11 by pushing the red start buttn again. Perimeter drs may nw be pened. Exit utside. Persnnel may be directed t relcate ut f the affected area. Hazardus

Mdel Gymnasium Cllective Prtectin System (CPS) Mdel Gymnasium Cntrl Panel n Lwer Level Rm 151 Clse Drs and Windws During Buildings and Cllective Prtectin Systems (CPS) Emergency System Operatin Chemical Emergency Occupant Lad 1340 Hazardus 11-11-2010 Prtective Actin Decisins (PADs) are issued by the Madisn Cunty Emergency Management Agency (EMA) is primarily lcated in Zne 2E and Zne 2D Shelter-In-Place (SIP) (Until the immediate danger passes) Evacuatin (If there is enugh time befre the danger arrives) Relcatin (When it is safe t cme ut f Sheltering-In-Place) Mve all persnnel int the prtected area when ntified that a hazardus event has ccurred. Please assist special needs individuals t the shelter areas. Manually clse and latch all perimeter drs and windws. Start the ESIP prtectin system by pushing the red start buttn n the Page face 5 f f the 11 cntrl panel. Keep all drs and windws clsed and remain in the prtected area until ntified that the hazard has been cleared. After being ntified that the hazard has been cleared, stp the ESIP prtectin system by pushing the red start buttn again. Perimeter drs may nw be pened. Exit utside. Persnnel may be directed t relcate ut f the affected area.

Perkins Building Cllective Prtectin System (CPS) First Level Secnd Flr Perkins Building Cntrl Panel n First Level Main Lbby Clse Drs and Windws During Emergency System Operatin Chemical Emergency Occupant Lad 5536 Buildings and Cllective Prtectin Systems (CPS) B.1 B.2 2.24 B.3.4 B.5 Perimeter Drs Level and Dr #s B.1 = Basement Level Dr 1 A 1.22.23 1.6.7 1.8.9 B C 1.20.21 Cntrl Panel Main Lbby 1.18.19 1.10.11.12.13.14.15.16.17 12-6-2010 Prtective Actin Decisins (PADs) are issued by the Madisn Cunty Emergency Management Agency (EMA) is primarily lcated in Zne 2E and Zne 2D Shelter-In-Place (SIP) (Until the immediate danger passes) Evacuatin (If there is enugh time befre the danger arrives) Relcatin (When it is safe t cme ut f Sheltering-In-Place) Mve all persnnel int the prtected area when ntified that a hazardus event has ccurred. Please assist special needs individuals t the shelter areas. Manually clse and latch all perimeter drs and windws. Start the ESIP prtectin system by pushing the red start buttn n the Page face 6 f the 11 cntrl panel. Keep all drs and windws clsed and remain in the prtected area until ntified that the hazard has been cleared. After being ntified that the hazard has been cleared, stp the ESIP prtectin system by pushing the red start buttn again. Perimeter drs may nw be pened. Exit utside. Persnnel may be directed t relcate ut f the affected area. Hazardus

Thmpsn Hall Cllective Prtectin System (CPS) Thmpsn Hall Cntrl Panel 1 st Flr Laundry Rm 107 Buildings and Cllective Prtectin Systems (CPS) Clse Drs and Windws During Emergency System Operatin Chemical Emergency Occupant Lad 2876 Laundry 107 Bizzack Lbby 11-11-2010 Prtective Actin Decisins (PADs) are issued by the Madisn Cunty Emergency Management Agency (EMA) is primarily lcated in Zne 2E and Zne 2D Shelter-In-Place (SIP) (Until the immediate danger passes) Evacuatin (If there is enugh time befre the danger arrives) Relcatin (When it is safe t cme ut f Sheltering-In-Place) Mve all persnnel int the prtected area when ntified that a hazardus event has ccurred. Please assist special needs individuals t the shelter areas. Manually clse and latch all perimeter drs and windws. Start the ESIP prtectin system by pushing the red start buttn n Page the face 7 f f 11 the cntrl panel. Keep all drs and windws clsed and remain in the prtected area until ntified that the hazard has been cleared. After being ntified that the hazard has been cleared, stp the ESIP prtectin system by pushing the red start buttn again. Perimeter drs may nw be pened. Exit utside. Persnnel may be directed t relcate ut f the affected area. Hazardus

University Building Buildings 2 and Cllective 1 Prtectin Systems (CPS) 8 3 University Building Cntrl 3Flr Panel n 3 rd Flr Clse Drs During Emergency Ventilatin System Operatin Legend Elevatr 3Flr 4 University Building Cntrl Panel n the 3 rd Flr by 323A Clse Drs and Windws During Emergency System Operatin Chemical 5 Emergency Occupant Lad 1057 Stairs Nrth Stairwell #8 Open Unlck Drs Frm Stairwell Leading In t 3 rd and 4 th Flrs During System Operatin T Shelter 7 6 09-27-2010 Prtective Actin Decisins (PADs) are issued by the Madisn Cunty Emergency Management Agency (EMA) is primarily lcated in Zne 2E and Zne 2D Shelter-In-Place (SIP) (Until the immediate danger passes) Evacuatin (If there is enugh time befre the danger arrives) Relcatin (When it is safe t cme ut f Sheltering-In-Place) Mve all persnnel int the prtected area (The University Building) when ntified that a hazardus event has ccurred. Please assist special needs individuals t the shelter areas. Manually clse and latch all perimeter drs and windws. Start the ESIP prtectin system by pushing the red start buttn n the Page face 8 f the 11 cntrl panel. Keep all drs and windws clsed and remain in the prtected area until ntified that the hazard has been cleared. After being ntified that the hazard has been cleared, stp the ESIP prtectin system by pushing the red start buttn again. Perimeter drs may nw be pened. Exit utside. Persnnel may be directed t relcate ut f the affected area. Hazardus

Whitlck Building Cllective Prtectin System (CPS) Whitlck Building Cntrl Panel n the 1 st Flr Rm 151 Eastern R.28 Kentucky = Rf Level University Dr 28 Buildings and Cllective Prtectin Systems (CPS) Clse Drs and Windws During Emergency System Operatin Chemical Emergency Occupant Lad 5181 Perimeter Drs Level and Dr #s B.1 = Basement Level Dr 1 1.9.10 1.7.8 1.11.12 1.4 1.5.6 B.2 1.13 B.1 / R. 27 1.26 R.28 1.3 EKU Emergency Management 9-20-2011 1.14.15.16.17 1.18.19.20.21 1.22 1.23 1.24.25 Prtective Actin Decisins (PADs) are issued by the Madisn Cunty Emergency Management Agency (EMA) is primarily lcated in Zne 2E and Zne 2D Shelter-In-Place (SIP) (Until the immediate danger passes) Evacuatin (If there is enugh time befre the danger arrives) Relcatin (When it is safe t cme ut f Sheltering-In-Place) Mve all persnnel int the prtected area when ntified that a hazardus event has ccurred. Please assist special needs individuals t the shelter areas. Manually clse and latch all perimeter drs and windws. Start the ESIP prtectin system by pushing the red start buttn n the face f the cntrl panel. Keep all drs and windws clsed and remain in the prtected area until Page ntified 9 f that 11 the hazard has been cleared. After being ntified that the hazard has been cleared, stp the ESIP prtectin system by pushing the red start buttn again. Perimeter drs may nw be pened. Exit utside. Persnnel may be directed t relcate ut f the affected area. Hazardus

Burrier CDC Cllective Prtectin System (CPS) Burrier CDC Cntrl Panel in the Basement G-14 Buildings and Cllective Clse Prtectin Drs and Systems Windws (CPS) During Emergency System Operatin Chemical Emergency Occupant Lad 208 11-11-2010 Prtective Actin Decisins (PADs) are issued by the Madisn Cunty Emergency Management Agency (EMA) is primarily lcated in Zne 2E and Zne 2D Shelter-In-Place (SIP) (Until the immediate danger passes) Evacuatin (If there is enugh time befre the danger arrives) Relcatin (When it is safe t cme ut f Sheltering-In-Place) Mve all persnnel int the prtected area when ntified that a hazardus event has ccurred. Please assist special needs individuals t the shelter areas. Manually clse and latch all perimeter drs and windws. Start the ESIP prtectin system by pushing the red start buttn n the Page face 10 f the f cntrl 11 panel. Keep all drs and windws clsed and remain in the prtected area until ntified that the hazard has been cleared. After being ntified that the hazard has been cleared, stp the ESIP prtectin system by pushing the red start buttn again. Perimeter drs may nw be pened. Exit utside. Persnnel may be directed t relcate ut f the affected area. Hazardus

Buildings and Cllective Prtectin Systems (CPS) Mre infrmatin abut the EKU and the CSEPP Prgram can be fund at: http://emergency.eku.edu/hazardus-materials-csepp-chemical-stckpile-emergencypreparedness-prgram http://emergency.eku.edu/insidelk/ekus-vital-signs-knwing-what-d-emergency-0 http://madisncuntyema.net/ Page 11 f 11