CHAPTER 7.0 IMPLEMENTATION

Similar documents
IMPLEMENTATION CHAPTER Identifying Priorities 7.2 Maintenance 7.3 Funding 7.4 Education and Enforcement IMPLEMENTATION

Vision. cultural identity, income group, neighborhood identity, or mobility level. Rendering by Robin Chiang

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Living Streets Policy

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Berkeley Strategic Transportation Plan A-76

Bicycle Master Plan Goals, Strategies, and Policies

AMATS Complete Streets Policy

Perryville TOD and Greenway Plan

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

PEDESTRIAN ACTION PLAN

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Hennepin County Bicycle and Pedestrian Planning

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Ann Arbor Downtown Street Plan

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Transportation Master Plan Advisory Task Force

Section 9. Implementation

ACTIVE TRANSPORTATION

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Intro Strategic Plan SFTP TDM Facilities Transit Bicycle Pedestrian Taxi BICYCLE UPDATE. Presented by Timothy Papandreou, Strategic Planning & Policy

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

TRANSPORTATION NEEDS ASSESSMENT

Active Transportation Infrastructure Investment A Business Case

FINAL PLAN APPENDIX D CITY OF BERKELEY BIKE PLAN D-1

2014 Bellingham Bicycle Master Plan

PEDESTRIAN ACTION PLAN

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

A Complete Streets Policy for Saratoga Springs. Presented By: Shared Access Saratoga

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

VISION ZERO: ELIMINATING TRAFFIC DEATHS BY 2024 MARCH 2015

IMPLEMENTATION STRATEGIES

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

Welcome. If you have any questions or comments on the project, please contact:

City of San Diego Vision Zero Draft Strategic Plan FY 2017

2017 Florida Commuter Transportation Summit

EXECUTIVE SUMMARY. Vision

EVAN GLASS. Montgomery County Council District 5

2. Context. Existing framework. The context. The challenge. Transport Strategy

Living Streets response to the Draft London Plan

The previous chapters in this plan have established the value of this plan (Chapter 1), the

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Environment and Public Works Committee Presentation

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

CONNECTING PEOPLE TO PLACES

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

NEWMARKET UPHAM S CORNER

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Welcome. Background. Goals. Vision

Pathways to a Healthy Decatur

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Vision to Action Community Coalition February 14, 2014 Briefing

El Centro Mobility Hub

Implementation Maintenance 263

VISION ZERO: What will it take?

WELCOME. City of Greater Sudbury. Transportation Demand Management Plan

7 Complete Streets & Roadway Aesthetics

Arlington s Master Transportation Plan

Appendix C 3. Bicycle / Pedestrian Planning

PEDESTRIAN ACTION PLAN

MTP BICYCLE ELEMENT UPDATE. November 2017

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Omaha s Complete Streets Policy

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

The Florida Bicycle and Pedestrian Partnership Council

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input


WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

First Mile, Last Mile: Plans for all Shapes and Sizes. Hannah Lindelof, Principal Planner San Francisco Bay Area Rapid Transit September 18, 2017

Speed Limits Study and Proposal. Public Input Session: 8/14/13

9. Parking Supporting Statement

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Vision Public Workshop: Findings

BUILDING THE CASE FOR TRAVEL OPTIONS IN WASHING TON COUNTY. Image: Steve Morgan. Image: Steve Morgan

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

Clackamas County Comprehensive Plan

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Nomination. Halton Region in Context

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

T1-A - Service Reduction (Re-sizing)

Launceston's Transport Futures. Greater travel options for the people of Launceston

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

5. Pedestrian System. Accomplishments Over the Past Five Years

1. Engineering: An Inviting Network of Bicycling Facilities for Cyclists of All Ages and Abilities and Destinations that Support Bicycling

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Transcription:

CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time.

CHAPTER 7.0 IMPLEMENTATION 7.1 Identifying Priorities 7.2 Maintenance 7.3 Funding 7.4 Enforcement 7.5 Education and Awareness

CHAPTER 7: IMPLEMENTATION 230 B E T T E R S T R E E T S P L A N

7.0 IMPLEMENTATION 7.0 IMPLEMENTATION Implemenation strategies and recommendations in this chapter will be developed in the coming months as part of the on-going Better Streets Plan process The Better Streets concepts presented in this document will not happen overnight: they require time and money to build, an understanding of which areas or conditions should be prioritized for improvement, and a plan for on-going management and maintenance of streetscape and pedestrian features. To implement the vision of the Better Streets Plan, the City must consider how to make these improvements happen, and how to sustain improvements over time. Identifying desired street design concepts is merely the first step to making them real; the City must also identify strategies for on-going funding, efficient and effective maintenance practices, education and awareness campaigns, and enforcement of traffic and parking regulations to benefit pedestrians. This chapter describes specific topics to be covered and preliminary ideas about implementing Better Streets improvements. These strategies and policies will be developed in the coming months as part of the Better Streets Plan process. Other next steps, such as building demonstration (pilot) projects, and conducting a study of institutional change relating to street design, are described in Section 1.3: Moving Forward. In addition, some specific proposed next steps are called out in Chapter 3: Goals and Policies. Guerrero Street (courtesy of San Jose/Guerrero Coalition B E T T E R S T R E E T S P L A N 231

CHAPTER 7: IMPLEMENTATION 7.1 Identifying Priorities To help implement the Better Streets Plan, the City should identify priority criteria for pedestrian and streetscape improvements. The list below represents a preliminary set of priority criteria, based on existing City policies in the San Francisco General Plan and elsewhere. This list will be refined and expanded as the plan progresses. Areas with especially high collision/crash rates: Pedestrian safety is a prime objective of the Better Streets Plan. Areas with high incidences of pedestrian safety issues should be prioritized for improvement. Transit Hubs: San Francisco is a Transit First city, with large volumes of commuters, visitors and residents traveling around the city on public transit. Pedestrian volumes are concentrated at major transit hubs (stations, bus stops, transfer points, transit centers, and regional transit facilities), and stress levels are often high as complex transit connections are often made. Improvements should be prioritized at and around key transit locations to enhance the experience and safety of walking to a transit trip, supporting the City s Transit-First Policy.. Schools, child care centers and senior centers: The areas around these facilities are more likely to be populated by pedestrians of age-specific vulnerability. Application of Better Streets Plan recommendations in these areas will help ensure that the vulnerability and exposure of these populations is given more attention, and encourage walking as a safe mode of travel by these populations. Neighborhoods with sub-standard infrastructure: As neighborhoods develop at different rates and with differing land uses, certain neighborhoods are in greater need of high-quality infrastructure investment than others. Streetscape and pedestrian improvements should be prioritized in these areas to ensure more equitable distribution of resources, both geographically and economically. Areas with high population densities and/or intense mixes of land use: Areas of concentrated land use and population, such as downtown or commercial areas, generally produce higher numbers of pedestrian volumes, as more people are inclined to walk as a primary mode of travel.. Areas with significant regional and local destinations: Similarly, people are attracted to large centers of regional and local activity, such as tourist destinations, recreational facilities, large institutions and cultural attractions in San Francisco. These institutions are often dependent on the pedestrian networks that link them to transit facilities and/or concentrated points of origin, and often these people are unfamiliar with local travel patterns and the city s overall landscape. Areas of ecological connection or concern: Streets can serve as green corridors through the city, connecting larger parks and open spaces with a swath of green, and providing habitat for small wildlife. Particular areas may also be prone to flooding or other environmental issues. Streets that provide these connections or have significant environmental issues should be prioritized for improvements. Streets that are important to the city pattern: The San Francisco General Plan identifies streets that contribute to the city pattern streets that are most useful in creating a distinctive urban design and recognizable image for San Francisco, clarifying routes for travelers, and contributing to the overall legibility of the city as a whole. Opportunities to leverage other projects: The City has limited funding to make streetscape and pedestrian improvements. This funding should be leveraged by piggy-backing on existing capital infrastructure projects, such as re-paving projects or utility upgrades. 7.2 Maintenance When contemplating the pieces that must come together to make great streetscapes a reality, it is easy to overlook the more intangible functions of management and maintenance. Yet those twin functions will determine San Francisco s ability to not only deliver streetscape improvement but also sustain them into the future. Many of the streetscape design concepts described in this plan go beyond the standard streetscape treatment given to San Francisco streets today, requiring different or additional maintenance than current practice provides. This is not to say such features are difficult or impossible to maintain indeed, the concepts shown in this document are used by cities throughout the country today. Rather, the City must consider its maintenance practices as a whole to incorporate new desired street designs, and explore innovative maintenance practices to address them. This section identifies potential areas of investigation to develop innovative maintenance approaches. Maintenance recommendations will be further developed in the coming months. Primary areas of investigation will include: identifying and developing alternative funding sources for street maintenance, such as community benefit districts, parking benefit districts, private adopt-a-street sources, and the like exploring and developing community stewardship models and programs clarifying streetscape and sidewalk maintenance responsibilities between property owners and the City, and exploring programs that enable the City to take on maintenance of these features to take advantage of economies of scale considering life-cycle costs of streetscape materials and designs, and accounting for full costs and benefits of streetscape improvements. For example, 232 B E T T E R S T R E E T S P L A N

7.0 IMPLEMENTATION stormwater management features may add routine maintenance in the short-term, but may require less infrastructure costs to the City in the long-term. exploring opportunities for long-term, dedicated maintenance funding associated with capital projects minimizing deferred maintenance so as to spend more on routine maintenance than on rehabilitation or reconstruction. Experience has shown that it is usually most cost-effective to allocate funding to routine maintenance; this extends the life of infrastructure while helping to delay or prevent the need for more costly rehabilitation or reconstruction. 7. 3 Funding In order to implement the ideas of the Better Streets Plan in a systematic manner across the city, a commitment to fund street improvement projects must be made, a significant investment in our streets must be a priority for the City, and a continuous funding source should be identified. Capital planning efforts must account for Complete Streets projects, taking into account all travel modes, ecological, and design features. The City should aggressively pursue federal and state grant opportunities for Better Streets projects. New funding sources, such as public/private partnerships, developer requirements, bond measures, and others, should be considered. 7.4 Enforcement Effective enforcement of applicable regulations is a key component of ensuring that Better Streets Plan ideas can be effectively implemented, to promote pedestrian safety and sidewalk accessibility. The term enforcement includes traffic and pedestrian safety laws (found in the California Vehicle Code and San Francisco Transportation Code), with a focus on speeding, pedestrian right-of-way violations, and sidewalk parking, as well as Planning Code and Public Works Code violations such as sidewalk obstructions, required front yard landscaping, and others... Working with the San Francisco Police Department and other agencies as appropriate, the Better Streets Plan will develop enforcement strategies and recommendations in the coming months. 7.5 Education and Awareness Finally, education and awareness campaigns regarding pedestrian safety and activity are key to successfully implementing Better Streets Plan ideas. Strategies and recommendations should address the unique populations within San Francisco. Many off-the-shelf materials address a national audience and may exclude different cultural populations, or simply not feel relevant. Education policies and campaigns should: continue to build community capacity of neighborhood and community groups to advocate for pedestrian improvements in their neighborhoods and citywide through mini-grants and technical assistance, especially as the long-term recommendations from the Better Streets Plan come into fruition use media campaigns as an adjunct to communitybased awareness campaigns, rather than as stand-alone tools. Media campaigns can help change and reinforce community norms and values, in the context of ongoing education and policy interventions that have visible community support secure long-term funding streams for educational and encouragement efforts need in order to conduct longrange efforts involve community groups, activists, residents and public agencies. Long-term involvement by these groups is necessary for priorities to be set, plans implemented, interventions reviewed and problems resolved. Specific education and awareness recommendations and strategies will be further developed in the coming months. The City should also look for opportunities to combine and create synergies among capital street improvement projects, such as by matching curb ramp funds with curb extension projects, merging traffic calming, greening, and stormwater projects, or prioritizing streetscape improvements when major capital work (e.g. sewer upgrade, repaving) will take place. Funding concepts and strategies will be further developed in the coming months. focus on conditions which affect high-risk populations, which in San Francisco especially include seniors, children and the disabled, as well as on streets and routes which carry heavy and speeding traffic, including many streets in low-income residential areas focus on schools by developing a comprehensive Safe Routes to School Program. Safe Routes to School is a national and international movement to create safe, convenient, and fun opportunities for children to bicycle and walk to school. Safe Routes to School provides a variety of important benefits to kids and their communities, including improved health, reduced traffic congestion, better air quality, and enhanced neighborhood safety. B E T T E R S T R E E T S P L A N 233