Disinfection procedure for water mains and services

Similar documents
PHYSICAL FACILITIES Consultant s Handbook Division 33 Utilities 1300 Disinfecting Underground Potable Water Piping.

Watermain Replacement and Connection Procedure

Portable Dosing Unit

Watermain Replacement and Connection Procedure

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

Water Hygiene Chlorination Water Treatment Legionella Control

Watermain Replacement and Connection Procedure

DW Module 8: Distribution Answer Key

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems

Hawai'i Rural Water Association Water Course Listing updated 10/4/18 HRWA COURSE TITLE COURE LENGTH (HRS) WBOC APPROVED CEU'S

INFORMATION NOTE No 353: MICROBIOLOGICAL TESTING

Contents. Foreword. Acknowledgements. General Introduction

The World s Largest Inflatable Water Slide A Public Health Nightmare. Presenters: Megan Savill - EH Team Leader Michelle Speek - Senior EHO

Technical Service Bulletin March 2015 TSB142.01

OREGON HEALTH. Systems Public Water Supply Systems Community Water Supply Systems Source Water Protection

WATER QUALITY REPORT 2017

LEGIONELLA POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

Gas Injection Systems

TOPLINE ELECTRONICS LTD CO2 CONTROL UNIT MANUAL

HOW TO DO STUFF: CHAPTER I WATER WELLS CHECKING GRAVEL PACKING DISINFECTING WATER WELLS

Construction Water Safety Plan

Approved Installation Method (AIM)

Section 15. Well Disinfection

CODE OF PRACTICE AND GUIDELINES RELATING TO PREVENTION OR CONTROL OF LEGIONELLOSIS INCLUDING LEGIONNAIRES DISEASE

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

SECTION PRESSURE TESTING OF PIPING

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4

G.B. Collins Engineering, P.A. Comments to Proposed Code Modification SW7074-A1

Waste Management System.

Associated Hazard (outcome) Control Measures. Reduction of water supply

OWNER S MANUAL NMB SERIES

ph monitoring of the generated Chlorine Dioxide solution to ensure correct conditions for maximum conversion efficiency

Existing Rule Language Compared to Proposed Rule Language

Change to Chloramines. Teresa Rogers Texas Commission on Environmental Quality Water Supply Division - Utilities & Districts Section

Design Requirements for Eyewash and Safety Shower Units

ELKHART COUNTY SWIMMING POOL ORDINANCE. An ordinance to protect and promote public health; to

Disinfecting Water Mains

LAVO 12 SODIUM HYPOCHLORITE

SECTION DOMESTIC WATER PIPING

9:00 AM Sign-In & Welcome 9:15 AM Introduction to our program 9:30 AM Rules & Reasons for closure 10:00 AM Incident Reports & Operating Records

Transmission Connection Forms

Ligature Resistant Head

HYDRANT/WATER POINT INSPECTION AND MAINTENANCE

Saskatchewan Health S A WHIRLPOOL DESIGN/OPERATIONAL T C H E W STANDARDS. Updated 02/00

Supplementary Installation and Operating Instructions. Variable Area Flow Meters SGK-1 Ex SGK-2 Ex SGK-3 Ex. Category: II 2G Ex IIC II 3G Ex IIC

Water Main Break Response Protocols for Chlorinated Systems (In Development Version )

105 CMR MINIMUM STANDARDS FOR BATHING BEACHES STATE SANITARY CODE, CHAPTER VII

Chlorination Manual. I. Before going to the field. II. In the field. Sierra Leone

LEGIONELLA MANAGEMENT PROCEDURE

Product Manual B-Safety ClassicLine & PremiumLine Emergency Eyewash and Eye/Face Wash Equipment

WELCOME! Water Board Basics: Disinfection

Installation, Operation and Maintenance Instructions for Direct Hot Water Storage Vessels

Disinfection Overview

Biosecurity Protocol for Field Survey Work

Accu-Tab Systems 2000 P Series by Axiall Corporation

Cooling Tower Legionella Risk Assessment Checklist

Energy Control Procedures Lockout/Tagout 29 CFR

Amoeba Response Protocol. Safe Drinking Water which has the Trust of Consumers

DISINFECTION CHLORINE GAS CHLORINE POWDER CHLORINE BLEACH

These variables can be accessed by holding the UP button for 5 seconds.

Specification For Water Meters. Pr10068

Procedure: Pressure equipment safety

Swimming Pool/ Spa Safety Plan

Alberta Health. Pool Standards July 2014 (Amended January 2018)

Page 2. Introduction Page 3. Who Should Be Testing Their Pools? Page 4. Which Tests Should You Test For? Page 4. How to Arrange Everything Page 6

ADVERSE WEATHER AT PUBLIC SWIMMING POOLS

Best Practice in the Breeder House

Saskatchewan Health S A WATER THEME FACILITY DESIGN/OPERATIONAL T C H E W STANDARDS. Updated 02/00

Accu-Tab Systems 1000 Series by Axiall Corporation

WVU Environmental Health and Safety Pool/Spa Audit Report

DEP Notification, Precautionary Boil Water Notices and Incident Reporting

WATER DISINFECTION METHODS Advantages and Disadvantages. MS. ELAINE M. LAVISTE Head, Water Quality Division Dasmariñas Water District

Deluge Optimo Shower valve and kit 10032CP

RULES AND REGULATIONS ARTICLE IX LIFEGUARDS, BATHING PLACES, BATHING BEACHES, HOT TUBS AND SPAS

Model B-1 Pipe Line Strainer 3, 4, 6 & 8 Inch (DN80, DN100, DN150 & DN200) 175 psi (12,1 bar) General Description. Technical Data

Work Smarter...Not Harder!

Commandant United States Coast Guard

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

Pipe Thread Connection 1/2 inch NPT. Friction Loss Refer to Figure 3

Safety Standards for Canadian Swimming Pools and Waterfronts Swimming Pool Standard

SW Hydrostatic Pressure Testing Water Mains Version B Feb 2017

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE COMMUNICATION PIPE REPAIRS

To ensure compliance to WorkSafeBC Regulation Part 9 Confined Space Entry which states:

Pool and Spa Operator Handbook, Highlight

Health risks posed by unregulated Water Park Installations in NSW

FECAL/VOMITUS INCIDENT RESPONSE IN RECREATIONAL WATER FACILITIES

Approved Installation Method

GENO -Flushing Compressor Product Data Sheet F 02

Fundamental Pool Water Chemistry Chapter 5 8 6/27/2011 Disinfection: (book definition on page 49)

McLane / Black Lake Fire Department Policy & Procedural Guideline PPG #

Operation and Maintenance manual Issue No: 1 Issue Date: 4th September 2007

WATER MANAGEMENT & CONTROL OF LEGIONELLA POLICY Policy PROV 53 July 2010

Accu-Tab PowerBase 3012AT by Axiall Corporation

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Drinking Water Safety Plans, Disinfection of Drinking Water & Revised EPA Disinfection Manual

OPERATING PROCEDURES

The Refurbishment of Filtration & Chemicalisation Systems On A Recent Project

Policy No: 45. Legionella Emergency Action Plan

Clear up confusion between the requirements for confined spaces and grain storage structures.

Transcription:

Disinfection procedure for water mains and services The information below is the recommended procedure under the Connection Code for disinfection (chlorination and bacteriological tests) of all new reticulated pipework. Methods differing from those detailed in the Connection Code may only be used with written approval from Services Development. Test procedure - disinfection Pathogenic (disease causing) organisms live in the soil and the disinfection of water mains is a vital preventative step for the supply of safe drinking water. An independent certifying consultant must certify as witness to the below procedures. 1. A chlorination test must be conducted and results recorded. The constructor may conduct the chlorination test in accordance with the below method, using calibrated chlorine testing equipment. 2. An accredited National Association of Testing Authorities lab must be contacted to conduct the bacteriological tests. Power and Water project officer and/or auditors need to be notified a minimum of two working days prior to all testing and collection of test samples. 3. Constructor to ensure that the connection to the existing main is installed prior to construction of the new reticulated pipework. At no stage must any contractor remove the valve lock or in the event where there is no valve lock, operate the sluice valve of any live water main. Power and Water employee will open the sluice valve on the existing water main only after acceptance of the new reticulated pipework. For services larger than 50mm - Power and Water personnel must install a valve lock on the sluice valve to the new water service. 4. Ensure pipework and fittings are cleaned (e.g. remove mud, spray pipe fittings and materials with hypochlorinated water) prior to constructing new water service. 5. Pressure and chlorination testing can be combined to reduce time taken for commissioning. Sodium hypochlorite solution should contain 12% chlorine by weight. This concentration will degrade with time and high temperatures. Use sodium hypochlorite only and ensure that it is less than a month old. 6. Flush the new water pipework at high-flow using mains water through an approved Power and Water meter with the appropriate backflow prevention device to remove debris. NOTE: The constructor can flush with potable water from Power and Water s reticulated water mains through an existing fire hydrant or through an existing property service connection, using a construction water meter with a backflow prevention device connected. 7. Combine and evenly mix the required amount of water and chlorine into the new water pipework to achieve a minimum chlorine concentration of 25mg/L (ppm) and maximum concentration of 100mg/L (ppm). The apparatus used to mix must be disinfected prior to use. For services between 20mm and 50mm Chlorine levels need to be measured to confirm concentration in the new water service. Chlorination is only required to be held for the duration of the pressure test. Ensure pipework is flushed out after the test. For services larger than 50mm and subdivision mains A full 24 hour chlorination test needs to be conducted (Steps 8 to 14). 8. Collect a sample of the chlorinated water being used to super chlorinate the new pipework. This water sample will need to be tested for chlorine and the test result recorded. 9. Leave mixed chlorinated water in the new pipework for a period of 24 hours. 10. Collect a sample of the chlorinated water pipework after 24 hours. This water sample will need to be tested for chlorine and the test result recorded.

11. Ensure that at least 10mg/L (ppm) of chlorine is achieved after the 24 hour period. If the test does not achieve the minimum chlorine levels, repeat method from step 6. NOTE: Clean pipework will not degrade chlorine to less than 10mg/L. For services larger than 50mm - The chlorine levels must be tested again by the same certifier to confirm concentration level is achieved. Test procedure - bacteriological tests and de-chlorination (services larger than 50mm and subdivisions) 12. After successful completion of chlorination process, adequately flush the new water main at high flow as per step 6 until chlorine residuals are equivalent to town water (less than 1 mg/l). Power and Water must be notified a minimum of 24 hours prior to flushing. The certifying consultant must collect and deliver the water sample for bacteriological test. The table below is the water quality parameter limits of a bacteriological test. WATER QUALITY PARAMETER LIMITS Water quality parameters Unit Acceptance range ph - 6.8 8.5* Chlorine (free) mg/l 0 2.0 Total coliform count cfu/100ml 0 Faecal coliform count of E. coli count cfu/100ml 0 Heterotrophic plate count cfu/ml 0-10 For cement mortar lined mains an upper level ph of 9.2 is acceptable. 13. The consultant must provide the successful pressure, chlorination and bacteriological results to Power and Water prior to the handover meeting. The chlorine results will only remain valid for a maximum period of 30 days from date of testing. 14. Once tests have been completed and to the satisfaction of Power and Water requirements, the chlorinated water must be discharged to prevent damage to pipe lining or prevent corrosion to the new pipework. The environment to which the chlorinated water is to be discharged must be inspected and approved by the relevant authorities. If chlorinated discharge may damage/affect the environment, neutralising chemicals must be used. (After completion and acceptance of works, Power and Water will remove the valve lock and make live the new water service.) NOTE: The following table can be used to calculate with 12% Sodium hypochlorite solution.

WATER AND SODIUM HYPOCHLORITE TABLE - WATER (H²0) IN KILOLITRES (KL), SODIUM HYPOCHLORITE (NaCLO) IN LITRES (L) Pipe Length (metres) Pipe Size DN DN20 DN25 DN50 DN100 DN150 DN225 DN300 H²0 NaClO H²0 NaClO H²0 NaClO H²0 NaClO H²0 NaClO H²0 NaClO H²0 NaClO 10 0.003 0.003 0.005 0.004 0.02 0.02 0.1 0.1 0.2 0.1 0.4 0.3 0.7 0.6 20 0.006 0.005 0.010 0.008 0.04 0.03 0.2 0.1 0.4 0.3 0.8 0.7 1.4 1.2 30 0.009 0.008 0.015 0.012 0.06 0.05 0.2 0.2 0.5 0.4 1.2 1.0 2.1 1.8 40 0.013 0.010 0.020 0.016 0.08 0.07 0.3 0.3 0.7 0.6 1.6 1.3 2.8 2.3 50 0.016 0.013 0.025 0.020 0.10 0.08 0.4 0.3 0.9 0.7 2.0 1.7 3.5 2.9 60 0.019 0.016 0.029 0.024 0.12 0.10 0.5 0.4 1.1 0.9 2.4 2.0 4.2 3.5 70 0.022 0.018 0.034 0.029 0.14 0.11 0.5 0.5 1.2 1.0 2.8 2.3 4.9 4.1 80 0.025 0.021 0.039 0.033 0.16 0.13 0.6 0.5 1.4 1.2 3.2 2.6 5.7 4.7 90 0.028 0.023 0.044 0.037 0.18 0.15 0.7 0.6 1.6 1.3 3.6 3.0 6.4 5.3 100 0.031 0.026 0.049 0.041 0.20 0.16 0.8 0.7 1.8 1.5 4.0 3.3 7.1 5.9 200 0.063 0.052 0.098 0.081 0.39 0.33 1.6 1.3 3.5 2.9 8.0 6.6 14.1 11.7 300 0.094 0.078 0.147 0.122 0.59 0.49 2.4 2.0 5.3 4.4 11.9 9.9 21.2 17.6 400 0.126 0.104 0.196 0.163 0.79 0.65 3.1 2.6 7.1 5.9 15.9 13.2 28.3 23.5 500 0.157 0.130 0.245 0.204 0.98 0.81 3.9 3.3 8.8 7.3 19.9 16.5 35.3 29.3 600 0.189 0.156 0.295 0.244 1.18 0.98 4.7 3.9 10.6 8.8 23.9 19.8 42.4 35.2 700 0.220 0.183 0.344 0.285 1.37 1.14 5.5 4.6 12.4 10.3 27.8 23.1 49.5 41.1 800 0.251 0.209 0.393 0.326 1.57 1.30 6.3 5.2 14.1 11.7 31.8 26.4 56.5 46.9 900 0.283 0.235 0.442 0.367 1.77 1.47 7.1 5.9 15.9 13.2 35.8 29.7 63.9 52.8 1000 0.314 0.261 0.491 0.407 1.96 1.63 7.9 6.5 17.7 14.7 39.8 33.0 70.7 58.7 For more information: Visit powerwater.com.au/waterconnection Email waterdevelopment@powerwater.com.au Phone 1800 245 092

Water Test Report Sender To Power and Water Corporation - Water Services Street Address Suburb Digital Chlorine Test Meter Type Chlorine Test Meter Serial No Chlorine Test Meter Calibration Initial Chlorine Test Second Chlorine Test Final Chlorine Test (After Flushing) CALL US 1800 245 092 EMAIL customerservice@powerwater.com.au ADDRESS GPO Box 3596 Darwin NT 0801 1 / 2 powerwater.com.au

Declaration I hereby certify that the above measurements are true and correct and test results have been obtained as per method outlined in PWC Customer Information Handout 5: Disinfection of Subdivisions & Water Service Connections from 20mm and Greater. Certifying Engineer Name Company Signed CALL US 1800 245 092 EMAIL customerservice@powerwater.com.au ADDRESS GPO Box 3596 Darwin NT 0801 2 / 2 powerwater.com.au