State of Maine Interstate 95 : Newport to Bangor, 1963

Similar documents
Secondary Road Program

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Congestion Management Report

Idaho Driver Education and Training

General Design Factors

(HIGHWAY GEOMETRIC DESIGN -1)

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Road Safety Facilities Implemented in Japan

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

Transportation Corridor Studies: Summary of Recommendations

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Design Criteria. Design Criteria

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route

INDEX. Geometric Design Guide for Canadian Roads INDEX

Route 29 Solutions Projects

NORTH HIGHLAND LAKE ROAD PROJECT

Chapter 4 Traffic Analysis

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

Congestion Management Report

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

HORN PROHIBITED NO PARKING NO STOPPING STRAIGHT PROHIBITED NO ENTRY

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 3: DESCRIPTION OF THE PROJECT

The Engineering Approach to Traffic Safety

Appendix B Existing ADOT Data Parameters

T A B L E OF C O N T E N T S

SECTION 12 ROAD MARKINGS AND DELINEATION

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

Bicycle Transportation Budget Plan: Lawrence, KS

Foothill Expressway Improvements Between El Monte and San Antonio

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

PENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)

APPENDIX L: COST ESTIMATING TOOLS

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Terwillegar Drive Expressway Draft Concept Plan

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

CTH M HIGHWAY PROJECT CTH Q to STH 113

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Roadside Safety Proven Countermeasures. Emmett McDevitt Transportation Safety Engineer Federal Highway Administration

PENNDOT HPMS DATA COLLECTION GUIDE

CHAPTER 7 CIRCULATION

Chapter 5 Future Transportation

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Transportation Impacts: Toronto York Spadina Subway Extension

County of Fairfax, Virginia. Department of Transportation

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS. Responsible Driving (Red book) NOTES & STUDY GUIDE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

Functional Classification of Roads and Streets

Kentucky s Surface Transportation System

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Legislative Update Williamsburg Residency

Maine Turnpike Authority Plan Holder List

A State Highway Traffic and Planning Division

Vermont Permit Test Flash Cards

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

American Association of State Highway and Transportation Officials

Pennsylvania Highway Statistics

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Boston Post Road Design Feasibility Study

Welcome to the Open House

Traffic Accident Data Processing

Hampton Roads Pedestrian and Bicycle Advisory Committee

ATTACHMENT NO. 18 GMI-C. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

3.0 PROJECT DESCRIPTION

FY 2006 TRANSPORTATION CAPITAL PROGRAM

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

Readington Road (C.R. 637) Construction

Owl Canyon Corridor Project Overview and Summary

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

Attachment No. 17 GMI No. 1. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Signs. signs, signals and road markings. in this chapter

3.0 Future Conditions

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

INTERSTATE 540 IMPROVEMENT STUDY

CHAPTER 1 STANDARD PRACTICES

Appendix 3 Roadway and Bike/Ped Design Standards

Beginning School Bus Driver Curriculum UNIT IX. FIELD TRIPS and TRAFFIC CONTROL DEVICES. Revised 09/2011 Revised 10/2013 (Instructional Content)

Identify the letter of the choice that best completes the statement or answers the question.

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Hampton Roads Pedestrian and Bicycle Advisory Committee

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

Transcription:

Maine State Library Digital Maine nterstate 95 Historical Collection 11-1-1963 State of Maine nterstate 95 : Newport to Bangor, 1963 Maine State Highway Commssion Follow this and additional works at: http://digitalmaine.com/interstate_95 Recommended Citation Maine State Highway Commssion, "State of Maine nterstate 95 : Newport to Bangor, 1963" (1963). nterstate 95 Historical Collection. 3. http://digitalmaine.com/interstate_95/3 This Text is brought to you for free and open access by Digital Maine. t has been accepted for inclusion in nterstate 95 Historical Collection by an authorized administrator of Digital Maine. For more information, please contact statedocs@maine.gov.

NTERSTATE 95 ssued By MANE STATE HGHWAY COMMSSON in observance of the opening of NTERSTATE HGHWAY 95 between NEWPORT and BANGOR November 1, 1963

The Governor of the State of Maine John H. Reed Executive Council Lester M. Hobbs, Chairman Robert E. Moore John L. Baxter, Jr. Clarence W. Parker T. Tarpy Schulten Nelson C. Hancock Donald W. Small Maine Congressional Delegation Margaret Chase Smith Senator Edmund S. Muskie Senator Clifford G. Mcintire Congressman Stanley R. Tupper Congressman

State Highway Commission David H. Stevens Chairman Perry S Furbush Member Carl M. Stilphen Member Harold B. Emery, Member 1951-58 Clarence S. Crosby, Member 1954-58 R. Leon Williams, Member 1958-63 Vaughan M. Daggett, Chief Engineer Bureau of Public Roads John A. Swanson Regional Engineer Robert D. Hunter Division Engineer

Dedication Ceremonies November 1, 1963 Newport 10:30 A.M. At the Route 100 interchange, northbound lanes Newport High School Band Directed by Gerald Brown Master of Ceremonies........................ David H. Stevens, Chairman, M.S.H.C. nvocation The Rev. Frederick W. Whittaker, President, Bangor Theological Seminary Dedicatory Remarks and Ribbon Cutting............ John H. Reed, Governor of Maine Motorcade drives over nterstate Highway to Bangor Bangor 11:30 A.M. At the U. S. Route 2 - ndustrial Spur interchange, southbound lanes Bangor High School Band............................. Directed by Manning Atherton Master of Ceremonies......................... David H. Stevens, Chairman, M.S.H.C. nvocation The Rt. Rev. Monsgr. Edward Ward, St. Mary's Catholic Church Dedicatory Remarks John H. Reed, Governor of Maine Ribbon Cutting Rex. M. Whitton, Federal Highway Administrator 12:15 P.M. Luncheon at Pilot's Grill by invitation Master of Ceremonies....................... David H. Stevens, Chairman, M.S.H.C. nvocation.......................... Rabbi A. H. Freedman, Beth srael Congregation ntroduction of Honored Guests Remarks.......................... Rex M. Whitton, Federal Highway Administrator Remarks............................ Members of the Maine Congressional Delegation Remarks Governor John H. Reed

Wide median provides scenic interest and safety Cold Brook Road interchange, Bangor

NOTE: DASHED LNE- U.S 2. - 100 ( FUTURE CONST) PALMYRA ~ ~ \ ~~ LEGEND - OpenToTro nterchange ~~E143 ~ ETHA The Route 25 miles of safety, comfort and convenience The Bangor to Newport section of nterstate 9 5 is the seventh and longest section of freeway to be opened to traffic in Maine since the beginning of major nterstate construction in 1956. The section is 25.4 miles long and extends rom the Route 100 interchange in Palmyra, just south of Newport, easterly to the Bulge interchange at the southerly entrance to Bangor. There are 6 interchanges along the section connecting the high-speed freeway with intersecting state highways, local roads and communities. These facilities are located at Route 100 in Palmyra, at Ridge Road in Newport, Route 7 in Plymouth, Route 143 in Etna, Route 69 in Newburgh and at Cold Brook Road in Hermon. Seventeen structures. along the section-9 single and 8 dual-carry the

' ROUTE 69 ~ ( fie NTERSTATE HGHWAY 95 NEWPORT TO BANGOR SCALE W N1LE3 STATE HGHWAY COMMSSON AUGUSTA, MANE November, 1963 1 j four-lane divided freeway over or under intersecting roads and railroads and over streams and rivers. The freeway is essentially twin, heavy-duty highways each carrying one-way traffic in opposite directions with north and southbound lanes separated by a wide median. Each roadway has a 24-foot pavement with 4-foot all weather shoulders on the inside, next to the median strip, and 10-foot shoulders on the outside. The pavement is composed of a top 3 inches of bituminous concrete on top of 5 inches of bituminous macadam which in turn rests on a thick bed of gravel. Shoulders are constructed of macadam. Pavement markings with special reflective traffic paint delineate the travel lanes. Traffic signs are also reflective and large enough for quick comprehension at highway speeds. Certain healthy trees and shrubs have been left in the median and along the slopes of the freeway to create interest and add variety to the passing scene. The carefully selected growth also reduces the cost of mowing vast expanses of grass, screens headlight glare, and in winter functions. as a snow barrier. The median is about 30 feet wide at the extreme ends of the section, in Newport and Bangor,. and widens to over 500 feet in the vicinity of Route 143. The first earth was moved on the section at the Newport end in November 1960. The State Highway Commission awarded contracts for the work to 14 prime contractors. There were 28 authorized sub-contractors. The total estimated cost of the 25.4 miles of freeway from Bangor to Newport is about $20.6 million.

HOULTON,: / ~SL AND FALLS,,, le HOWLAND FARFELD 5.,, ' WATERVLLE: U!TA eardner ' NEWPORT, MANE NTERSTATE SYSTEM LEGEND OPENED TO TRAFFC - TO BE COM PL ETEO -

nterstate System n Maine The official opening of the Bangor Newport section of nterstate 95 adds another 25 miles to that portion of Maine's designated nterstate System already in operation. This brings the total mileage in use today to 139 miles of safe, modem expressways-79 miles constructed by the State Highway Commission and 60 miles, which are a part of the Maine Turnpike. The first link in Maine's nterstate System, built by the SHC, was the 9 miles from Freeport to Brunswick, opened to traffic in November 1957. The ndustrial Spur in Bangor came next in 1959. The following year, three nterstate facilities were com- There's More To Corne Next fall, the 23.5 miles of nterstate 9 5 from the Route 201 interchange in Fairfield extending northeasterly to the Route 100 interchange in Newport is expected to be opened to traffic. The tentative schedule for opening sections of freeway to traffic in the northeastern part of the state is as fol- pleted-the 24 miles of prizewinning freeway from Augusta to Fairfield, the 4 miles. in Bangor from the Bulge to Hogan Road, and Tukey's Bridge in Portland. n 1961, the 8 miles of nterstate from Tukey's Bridge to the Yarmouth south interchange was opened to traffic. The next year, 1962, saw the short section from the Yarmouth south interchange to the Cousins River opened; this made a total of 54 miles of nterstate Highway operational in the State at that time. The designated nterstate System in Maine is 312 miles in length. When completed, the freeway will extend from Kittery at the southerly end of the State northerly to the Canadian boundary at Houlton, via Portland, Brunswick, Augusta, Waterville, Bangor, Medway and s1and Falls. The estimated cost of the finally completed nterstate facility in Maine, exclusive of the Maine Turnpike, including preliminary engineering, right of way and construction will come to approximately $206 million. nterstate projects are financed from 90 % Federal and 10% State funds. lows: 1965, the 23 miles from Stillwater Avenue, Orono to Route 155, Howland-1966, the 27 miles from Howland to Medway-The remaining 60 miles from Medway to the Canadian border at Houlton is expected to be fully completed and in operation by 1967 or 1968. n the southerly part of the State, the next large project expected to be added to the system would be the Portland Urban Loop, tentatively scheduled for traffic by 1970. The following year, the entire 25 miles from Brunswick to West Gardiner is expected to be opened, plus the 2-mile Saco Spur. This schedule will mean that the entire 312 miles of Maine's. nterstate System will be carrying traffic by 1971.

The National System of nterstate and Defense Highways The idea for a National System of nterstate and Defense Highways was conceived in the minds of highway engineers many years ago, but it wasn't until the Federal-aid Highway Act of 19 5 6 was passed that provisions were made for financing the construction. Highway users were asked to pay a little more in Federal taxes on gasoline, tires and other motor vehicle items. With these funds ear-marked for the nterstate, the Federal Government pays 90 % of the costs, and the states 10%. With financing assured, the 41,000 mile system moved out of the planning stages into the drafting rooms of state highway departments and then into the field. The multiple-lane freeways were designed to anticipate the traffic needs of 1975. The most recent survey of nterstate progress by the USBPR shows that across the Nation about 15,000 miles of the giant network is now carrying traffic, with over 5,000 additional miles under construction. When completed, in the early 1970's, the nterstate System will be the Nation's key highway network serving 90 % of all cities with over 50,000 population and carrying about 20% of all traffic on only 1.2% of the total U. S. road and street mileage. Nearly 40% of all motor vehicle owners in th country will make daily use of the system. Because of the superior safety and traffic carrying capacity of modern freeways, as compared to ordinary streets and highways, it has been estimated that the nterstate System will save motorists more than two cents a mile in urban sections, as a result of lower accident, fuel and vehicle maintenance costs, and about one cent a mile in rural sections. The accident reduction also means an annual saving of more than 5,000 lives when the entire system is completed.

Fact Sheet Length Date First Contract Let Construction Cost Right of Way Cost Number of Driving Lanes Width of Each Driving Lane Pavement Shoulders Access Speed Limit nterchanges Bridges Rest Areas 25.4 Miles November 9, 1960 $20,378,520 $286,500 4 12 Feet Bituminous Concrete Macadam Fully Controlled 70 Miles Per Hour 6 1 7 ( 9 Single, 8 Dual) Two Under Construction Contractors The Bridge Construction Corp. Callahan Bros., nc. Cianchette Bros. Constructors, nc. Thomas DiCenzo S. T. Griswold & Co., nc. W. H. Hinman, nc. Norman E. Jackson, nc. Main Line Fence Co. Elton N. Nason David Nassif Company Reed & Reed Frank Rossi & Sons, nc. H. E. Sargent, nc. One of the many overpasses which carry cross roads over the nterstate

Maine scenery a highlight along 95 To safely and swiftly carry motorists to their destination