Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Similar documents
Kentucky s Surface Transportation System

5. RUNNINGWAY GUIDELINES

Governor s Transportation Vision Panel

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Key Findings & Corridor Highlights

MOBILITY RESULTS AREA. Budgeting For Outcomes Council Presentation January 12, 2007

Transportation Day at the Capitol. Charlie Zelle Commissioner, MnDOT Feb. 16, 2017

We believe the following comments and suggestions can help the department meet those goals.

FUTURE MOBILITY IN TEXAS: The Cost of Meeting the State s Need for Safe and Efficient Mobility

Performance Criteria for 2035 Long Range Transportation Plan

APPENDIX C. Systems Performance Report C-1

Maryland State Highway Mobility Report. Morteza Tadayon

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Where Did the Road Go? The Straight and Narrow about Curves

Frequently Asked Questions

Closing Plenary Session

How would you like it if people drove their cars thru your office?

FLORIDA STRATEGIC HIGHWAY SAFETY PLAN

Appendix T 1: Additional Supporting Data

Most Important Part of any Plan

Route 7 Corridor Study

FUTURE MOBILITY IN RHODE ISLAND:

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

Rio Mills Rd/Berkmar Dr Extended Connection

Parks Highway: MP Lucus Road to Big Lake Road

THE I-79 CORRIDOR. I-79 provides motorists with connections to the following major highways: I-80, PA 358, PA 965 and PA 208.

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Hennepin County Transportation Department

Pedestrian Safety: A Federal Perspective. Emmett McDevitt Transportation Safety Engineer September 28, 2010

Findings. TSTC went line-by-line through the STIP and categorized projects into 15 categories:

2. Context. Existing framework. The context. The challenge. Transport Strategy

Project Update May 2018

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Executive Summary. September 3, 2014

Designing for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013

Engineering Your Community Safe

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

INDOT Complete Streets Guideline & Policy

Chapter 5 Future Transportation

WILMAPCO Public Opinion Survey Summary of Results

Street Smart - Regional Pedestrian Safety Campaign. Hopkins Grand Rounds July 16, 2014

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

Regional Transportation Needs Within Southeastern Wisconsin

Bicycle and Pedestrian Connectivity Study Phase 2

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Request for Authorization to Open Public Comment Period

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL

Manifesto for a safe, efficient and sustainable transport in NZ

ACTIVE TRANSPORTATION

Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016

Kentucky Highway District 7

6.8 Transportation Safety & Security

Welcome! Urban Work Zone Design. Training Course 0-1

AMATS Complete Streets Policy

Basalt Creek Transportation Refinement Plan Recommendations

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

Bicycle and Pedestrian Plans and Improvements

Annual Progress Report from VDOT on the Effect of the Aging Population on State Agencies

ARGYLE TRAFFIC STUDY Summary of Recommendations

North Shore Transportation Improvement Strategy

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

Institute of Transportation Engineers Safety Action Plan

SPEED MANAGEMENT FOR VISION ZERO

SUMMARY OF TRANSPORTATION INVESTMENTS

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Capital Beltway HOT Lanes - Frequently Asked Questions

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Appendix T-2: Transportation Facilities Inventory

Eliminate on-street parking where it will allow for a dedicated bus only lane %

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Welcome. Background. Goals. Vision

North Coast Corridor:

Providing an Efficient and Multi-modal Transportation System

Population Trends. MN 73 Corridor Performance

PEDESTRIAN ACTION PLAN

Non-Motorized Transportation 7-1

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Welcome! San Jose Avenue Open House August 25, 2015

Paoli Road Improvement Feasibility Study

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Regional Transportation Priorities Survey Results. Introduction

Outreach Sessions for the Transportation Plan Update. April 29, May 13, and May 20

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

South Carolina Department of Transportation. Engineering Directive

I-25 South Gap Project Monument to Castle Rock

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN

Legislative Update Williamsburg Residency

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

STUDY PROCESS & SCHEDULE

HSIP Project Selection Criteria

Transcription:

State Transportation Commission 2015 Twelve Year Program Development Regional results of the survey and public feedback from August thru November 2013 Shenango Valley MPO Version 01-2014

Mobility Concerns Total Visitors 8 Traffic congestion is growing and resources are limited to build additional capacity. As a result, transportation agencies are exploring ways to manage demand, operate efficiently, and improve capacity. Using a scale of 1-5, for each mobility concern, please rank how important each mobility concern is to you, with one being Not Important and 5 being Very Important. Signals Modernization of traffic signals streamlines traffic flow and reduces fuel costs for motorists. Responded With an Average Rank of 4.29 Congestion Relieve traffic congestion by addressing bottlenecks and other traffic relief measures. Responded With an Average Rank of 3.86 Freight Rail $500 billion in goods and services travel through PA each year. That investment would grow with upgrades to accommodate intermodal changes such as emerging needs from the natural gas industry and doublestack train access to our ports. Responded With an Average Rank of 3.57 Incident This legislation would allow for the safe, quick clearance of traffic incidents from the roadway. Responded With an Average Rank of 3.43 Airline Making upgrades to aviation infrastructure and technologies improves on-time performance. Responded With an Average Rank of 3.00 Transit Implementing new technologies improves service. Responded With an Average Rank of 2.71 Passenger Ridership on the Keystone Corridor has doubled since 2000 making it!mtrak s fourth-busiest route in the Rail nation. Rail infrastructure improvements are critical to timely service. Responded With an Average Rank of 2.43 Real T ime This involves the use of dynamic message signs, PennDOT s 511P!.com system and social media. Responded With an Average Rank of 2.43

Preservation and Renewal Strategies Transportation infrastructure is aging and investment in preservation has fallen short. As a result, transportation infrastructure owners have adopted a basic maintenance first in an attempt to keep bridges and roadways open Please rank the top THREE preservation and renewal strategies that are most important to you, from the most to the least important. Local Bridge Deficiencies on locally-owned bridges have continued to rise in recent years, as resources are limited. 8 100.00% of Responders Chose for Top Three With an Average Rank of 1.88 Reconstruct Pavement Our pavement condition has worsened over time. Fifty percent of Interstate highways have exceeded their design life. However, less than one-tenth of the needed roadway reconstruction is being completed each year due to limited funding. 7 87.50% of Responders Chose for Top Three With an Average Rank of 2.43 State Bridge Upgrades More bridges are expected to be posted with weight restrictions or closed as resources for repairs grow thin. 6 75.00% of Responders Chose for Top Three With an Average Rank of 1.67 Public Transit Passengers will experience delays and system reliability will decrease without addressing deteriorating vehicles, equipment and infrastructure. 1 12.50% of Responders Chose for Top Three With an Average Rank of 1.00

Safety Strategies Highway fatalities have been declining. PennDOT has set an aggressive goal of reducing fatalities and injuries by half over the next two years. Please rank the top THREE highway safety strategies you believe are most important to improve safety, from the most to the least important. Safety Improvements Safety projects include improving sight distance, clear zone, rumble strips and safety edge upgrades. 6 75.00% of Responders Chose for Top Three With an Average Rank of 2.00 Distracted/Aggressive Driving Strategies include education, enforcement, roadway strategies like rumblestrips, etc. 5 62.50% of Responders Chose for Top Three With an Average Rank of 2.20 Pedestrian Bicycle The majority of crashes occur in crosswalks in urban settings, but the majority of pedestrian fatalities occur in rural areas. Projects include upgrad- ing crosswalks or improving signs and pavement markings. 4 50.00% of Responders Chose for Top Three With an Average Rank of 1.50 Impaired Driving Alcohol-related crashes account for one-third of total traffic deaths. Priorities include programs on education, enforcement, ignition interlock systems, etc. 3 37.50% of Responders Chose for Top Three With an Average Rank of 2.33 Work Zone Safety The installation of cameras designed to improve work zone safety and reduce speed, crashes and fatalities. 3 37.50% of Responders Chose for Top Three With an Average Rank of 1.33 Vehicle Safety Performance Partnerships to improve vehicle design, new technologies (i.e. connective and autonomous vehicle technologies), etc. 1 12.50% of Responders Chose for Top Three With an Average Rank of 3.00

State Transportation Commission 2015 Twelve Year Program Development Regional survey and mapped comments from the public feedback August thru November 2013 Shenango Valley MPO Version 01-2014

Preservation and Renewal Strategies Transportation infrastructure is aging and investment in preservation has fallen short. As a result, transportation infrastructure owners have adopted a basic maintenance first in an attempt to keep bridges and roadways open Please rank the top THREE preservation and renewal strategies that are most important to you, from the most to the least important. Local Bridge Deficiencies on locally-owned bridges have continued to rise in recent years, as resources are limited. 8 100.00% of Responders Chose for Top Three With an Average Rank of 1.88 Reconstruct Pavement Our pavement condition has worsened over time. Fifty percent of Interstate highways have exceeded their design life. However, less than one-tenth of the needed roadway reconstruction is being completed each year due to limited funding. 7 87.50% of Responders Chose for Top Three With an Average Rank of 2.43 State Bridge Upgrades More bridges are expected to be posted with weight restrictions or closed as resources for repairs grow thin. 6 75.00% of Responders Chose for Top Three With an Average Rank of 1.67 We need to re-evaluate and streamline the process of bringing bridge projects to construction. We have experienced "document creep" or preparing more and more documents through the design phase costing several thousands more per project. If it takes changes in legislation to reduce the number of environmental related studies, then that should be pursued. Some type of blanket exception for bridges replace on existing alignments should be considered. Public Transit Passengers will experience delays and system reliability will decrease without addressing deteriorating vehicles, equipment and infrastructure. 1 12.50% of Responders Chose for Top Three With an Average Rank of 1.00

Safety Strategies Highway fatalities have been declining. PennDOT has set an aggressive goal of reducing fatalities and injuries by half over the next two years. Please rank the top THREE highway safety strategies you believe are most important to improve safety, from the most to the least important. Safety Improvements Safety projects include improving sight distance, clear zone, rumble strips and safety edge upgrades. 6 75.00% of Responders Chose for Top Three With an Average Rank of 2.00 Distracted/Aggressive Driving Strategies include education, enforcement, roadway strategies like rumblestrips, etc. 5 62.50% of Responders Chose for Top Three With an Average Rank of 2.20 Pedestrian Bicycle The majority of crashes occur in crosswalks in urban settings, but the majority of pedestrian fatalities occur in rural areas. Projects include upgrad- ing crosswalks or improving signs and pavement markings. 4 50.00% of Responders Chose for Top Three With an Average Rank of 1.50 Impaired Driving Alcohol-related crashes account for one-third of total traffic deaths. Priorities include programs on education, enforcement, ignition interlock systems, etc. 3 37.50% of Responders Chose for Top Three With an Average Rank of 2.33 Work Zone Safety The installation of cameras designed to improve work zone safety and reduce speed, crashes and fatalities. 3 37.50% of Responders Chose for Top Three With an Average Rank of 1.33 Vehicle Safety Performance Partnerships to improve vehicle design, new technologies (i.e. connective and autonomous vehicle technologies), etc. 1 12.50% of Responders Chose for Top Three With an Average Rank of 3.00

State Transportation Commission 2015 Twelve Year Program Development Regional mapped comments from the public feedback August thru November 2013 Shenango Valley MPO Version 01 2014

Country USA Shenango Valley MPO, Mercer County, PA BikePath Bridge Better share the road - 636-798 U.S. 322, Carlton PA 16311 ----- - 12 Ohl Street, Greenville PA 16125 Bridge MarkerBridge Bridge closure ----- - 12 Ohl Street, Greenville PA 16125 ----- - 2442 Kelly Road, Hermitage PA 16148 Bridge MarkerBridge Bridge in need of repair Bridge MarkerBridge Bridge weight -restricted Congestion Roadway ----- - 27 College Avenue, Greenville PA 16125 ----- - 95 Mill Road, Clarks Mills PA 16114 ----- - 2-16 Redfoot Road, Greenville PA 16125 ----- - 42-256 Parker Road, Jackson Center PA 16133 ----- - 503-667 Old Ash Road, Mercer PA 16137 ----- - 40 Oak Hill Road, West Middlesex PA 16159 Hate traveling on 80...too many trucks - Weber Lane, Grove City PA 16127 Narrow roadway, need better signal coordination - 422 Liberty Street, Grove City PA 16127 Need new signals with coordination possible new traffic patterns - 116-124 U.S. Route 19, Mercer PA 16137 ----- - 331-379 Folk Road, Fredonia PA 16124 Roadway MarkerRoadway Road in need of repair ----- - 1559-1647 South Center Saint Exd, Grove City PA 16127 ----- - 4540 State Route 158, New Wilmington PA 16142 Safety MarkerSafety Frequent speeding a concern ----- - 16-54 Wasser Bridge Road, Greenville PA 16125 ----- - 2580-3098 Lynnwood Drive, Hermitage PA 16148 Safety MarkerSafety Many crashes at this location ----- - 2-98 Old Barmore Lane, Grove City PA 16127 ----- - 100-198 Staffordshire Drive, Grove City PA 16127 Safety MarkerSafety Other WalkPath Poor sight distance at intersections- new road alignments needed.75 mile area - 1-63 South Spring Road, Mercer PA 16137 ----- - 1791-2199 North Keel Ridge Road, Hermitage PA 16148