Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents

Similar documents
Concept 305 P. Pre-installation Guide IMPORTANT!

Large Diameter TECTITE Installation and Specifications Manual

INSTALLATION INSTRUCTIONS

Down and Out Mount Assembly & Installation Directions

USEFUL POINTS TO REMEMBER

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work

APCF1 Model Tripod.

Kennecott Utah Copper Corporation Safety and Health Standards

BaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full

The. Guidelines: Printing. Instructions: Model Parts: print on both. every-day printer. prefer to print on. (each have their own preferences).

Black Brant Vb. Please read and understand all instructions before building!

WORKSTATIONS mysite User Guide. mysite Workstation System User Guide

SPARC Match Rules v1.2

URGENT MEDICAL DEVICE RECALL : /29/ C Z

LIGHTING & POWER UNIT TYPE LPU57

USTA Atlanta Combo Doubles Registration Information Play begins in late April

Cantilever Beam Bending of Soft Tissue

MODELS. 2 & 4 Versions. SUITABLE FOR WET LOCATIONS in the following locations or unclassified locations:

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field

How to Install a Toilet By See Jane DrillTM Copyright 2013, All Rights Reserved

Crusader Senior Girls Summer Workout Program:

Instructor Guide. Counter Sinking. Flush Riveting

Fume Hood User Guidelines

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

Gema s OptiColor System

Disinfection and decontamination

Slim Down and Out Swivel Mount Assembly & Installation Directions

UCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD.

Wabo Crete FlexFoam Armorless closed-cell joint seal and elastomeric concrete expansion joint system

Official Competition Rules for 2017

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

Complex Care Hub Manual: High Flow Nasal Prong (HFNP) Oxygen Therapy

Method statement for the erection of temporary inflatable structures that do not require a Temporary Structure Licence

Official Competition Rules for 2017

Installing the ACT D MAND KONTROLS Systems

Nordson AP-300/600 Plasma Systems Operational Manual July 2017

Content. Support Pack. Support Pack

Rev B Medivators Inc.

RESQ TRAINING INTERNATIONAL. Rev 0 - July 2012 USER INSTRUCTIONS. User Instructions for TED Training Emergency Dummy by RESQ-Gear.

Recreational Sports Racquetball Rules

Technical Data Sheet EW1 Top coats

EDS Instruction Manual

Official Competition Rules for 2017

Levels of Play, Skill Goals & Coaching Guides: T-Ball:

BURNINGTREE STUMPS WITH

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

OPERATIONS CHALLENGE 2017

SOUTH DAKOTA FUTSAL LAWS OF THE GAME SPEARFISH TOURNAMENT POLICIES & RULES

YMCA OF GREATER LOUISVILLE AGE 3 YOUTH SOCCER, RULES Updated August 2016

SAMPLE COMPETITIVE PRO BY TOM SAUDER FAST BREAK SOCCER

Technical Documentation

Check the medication record to see what medicine is due at that time;

Core Measure: Functional Gait Assessment (FGA)

European Roulette Game Rules

YKC FLYBALL QUALIFIER REGULATIONS

Fundamentals of Successful Pole Vaulting Anthony Bertoli University of Northern Iowa

Technical Data Sheet DW1 Undercoats

Coach's Manual. North Shore Girls Softball League 2007

The information in this document supersedes the Pairs Skating Calling Clarifications for Juvenile, Intermediate and Novice.

Come Back to Ground! 1. Introduction

Swim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan

SAIT Recreation Outdoor Soccer Rules

Modified ISL Playing Rules

Users Requirements Statement

Softball Umpire Fitness Testing Protocols. Softball Umpire Fitness Testing Protocols

Let s explore and find what works!

ASHE ESWP ASCE. Softball Hat Tournament Rules GENERAL TEAMS WAIVER OF LIABILITY SPORTSMANSHIP WEATHER POLICY

Athletics Rules. New Hampshire

How to set your saddle height in under 23 minutes without the guesswork

All Students MUST fly with the assistance of a Club approved Instructor until such time as he/she has passed his/her Wings Test.

Plain Language Summary

Badminton. Introduction. Origin

Arterial and Venous Patient Training Arm

Modified ISL Playing Rules

INDOOR FLAG FOOTBALL RULES. Play clock is 25 second from the time the official whistles ready for play. Warning will be given at ten second left only.

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013

SMALL SIDED FOOTBALL 2012

Tubing Group Guide. Wilmot Mountain Tubing, a Vail Resorts Company Fox River Rd. Twin Lakes, WI 53181

Bike Handling, Safety, Comfort, and Group Riding Bike and Build Workshop, June 4, 2004

Playground Safety. Site Selection and Layout. Equipment Selection

GHSA Scoring Instructions and Rubric

TYPE 1 BEARINGS. The spherical knuckle allows the bearing to self-align while the rudderstock rotates within the bearing.

Autoclear Superior 250

Lab rotation on vacuum techniques and thermal imaging

patient education program 4156 South 52 nd Street, Omaha, NE ChildrensOmaha.org/HomeHealthcare

Autoclear Superior Pack

!! 1st/ 2nd Grade. 3rd Grade

Espa Pumps (UK) Ltd Riverside Avenue West Lawford, Manningtree Essex CO11 1UN

Fatality 3 or more hospitalizations due to one incident Inpatient hospitalizations (Overnight stay) Amputations Loss of an eye

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature

Development of Fundamental Movement: Locomotor Skills

Field Instruction. Covers laid for mechanical protection of cables must always be removed by hand.

More than one measurement shall be obtained at the 2018 MCAC if either of the following conditions exists:

2018 Dance Camp Chicago Rules

Activity 2: The Incredible Journey

Recreational Games. Ladder Ball

RBC Canadian Open. Practice Facility. RBC Canadian Open. 1 Championship Manual

Winthrop University - Safety in the Chemistry Laboratory

Policy and Procedures

Transcription:

Installatin Manual fr VersaScreen Pr and VersaScreen IceBlaster Gutter Prtectin Prducts Table f Cntents VersaScreen/VersaScreen Pr Installatin p. 2-4 VersaScreen IceBlaster p. 5-7 IceBlaster RE p. 5-6 IceBlaster DE p. 6-7 IceBlaster Pr p. 7 Revised 4/14/14

Install Guide VersaScreen Pr VersaScreen Pr -.040 thickness fr use with 5 r 6 gutters, mre rigid - may need sme custmizing. VersaScreen Pr installatin prcess is very simple requiring nly a tin snips, hand brake, battery pwered screw gun, 1/4 hex drive fr zip screws, safety glasses, glves, and a tape measure. A siding brake is als helpful t custmize the VersaScreen t specific cnditins. Gutters shuld be clean and free f debris. On existing gutters, reseal miters, utlets and end caps. Make sure the gutter is prperly pitched and has adequate dwnsputs fr prper drainage. 3x4 inch rectangular r 4 inch rund dwnsputs are recmmended. Imprperly pitched gutters can result in standing water in the gutter and fine debris nt being washed ut f the gutter. Gutters with t much pitch can result in the gutter being t lw n the rf line. Additinal dwnsputs shuld be installed t crrect this prblem. While the installatin f VersaScreen Pr will strengthen the gutter assembly, it is als recmmended that adequate gutter straps/hangers be used and any lse fasteners be replaced r repaired. Wrking frm ladders r elevated surfaces can be dangerus. Cautin shuld be exercised and all applicable guidelines and laws shuld be fllwed. VersaScreen Pr (figure 1) is installed by sliding the back leading edge underneath the starter curse (r between the starter curse and first curse shingle) at the rf edge and fastening the frnt edge t the gutter lip using self tapping screws. The back f the drip lip must be firmly seated against the tp lip f the gutter s that the leading edge f the VersaScreen Pr hangs past t create a drip lip. This allws fr water t drip ff rather than flw dwn the frnt f the gutter. Failure t extend this drip lip past the frnt f the gutter may reduce the ability f the VersaScreen Pr t minimize tiger striping r staining n the gutter. A minimum f fur self tapping screws (included) must be used (n a full piece), but an additinal screw may be used if necessary. Additinal pieces are added in an verlapping fashin (@1/8-1/4 verlap). Alternately, VersaScreen Pr may be installed withut verlapping leaving a 1/16 gap between the pieces. Cautin - Installing VersaScreen Pr withut an verlap can result in FIGURE 1 sme streaking at the gap n the face f the gutter. VersaScreen Pr is designed t have the frnt drip lip lay flat n the tp f the gutter lip. This requires little r n mdificatin n rf pitches f 4/12 thrugh 8/12. If the drip lip des nt lay flat n the lip f the gutter, it will be necessary t perfrm a back leg bend n the VersaScreen Pr. This upward bend shuld be in plane with the rf and allw fr the VersaScreen Pr t sit flat n the gutter with a slight frward pitch. If VersaScreen Pr is installed incrrectly, runff can versht the gutter. 2

End Caps. (FIGURE 2) VersaScreen Pr des nt require separate pieces fr end caps r miters. Simply cut an angle n the end that allws fr the end f the screen t be flded dwn and tuck inside f the end cap. Optinally, an end cap may be made ut f black aluminum trim cil and fastened t the end cap. Inside Miter. (FIGURE 3A & 3B) Remve the frnt lip equal t the width f the gutters, i.e. 5 fr a 5K gutter. Slide end t ppsite gutter back. Trim @ 1 f the drip ff f the ppsing piece. Install with slight verlap. (FIGURE 4) Miter inside crner at slid drip prtin. A zip screw may be used t fasten verlap tgether. A diverter may be installed using a cut ff f VersaScreen Pr. The use f diverters will cause debris t build up and may effect the verall perfrmance f the gutter prtectin system. This shuld be discussed with the custmer. Outside Miter. (FIGURE 5) Outside miters are fabricated using a tab and verlap methd. The angle is determined frm the tp the fascia t the utside lip f the gutter. Measure fr length r start with a full piece. Add ¾ t make a tab. Starting frm the ppsite directin, cut the angle and verlap the tabbed prtin. (FIGURE 6) 3

Back Leg Bend. VersaScreen Pr is designed t have a frward pitch t assist in the shedding f debris. This angle is the result f the frnt drip lip laying flat n the frnt lip f the gutter. Exceeding this angle can result in run ff vershting. VersaScreen Pr may be installed n rf pitches up t 8/12 with little r n adjustments being necessary. Steeper rf pitches require a back leg bend in plane with the rf. The pint at which VersaScreen Pr is bent is identified as B n FIGURE 7. That pint is the area at which the rf planes thrugh the VersaScreen. This shuld be bent t match the pitch f the rf while allwing VersaScreen t maintain its frward pitch. If the frnt lip f the gutter falls belw the plane f the rf, additinal dwnsputs shuld be cnsidered. If additinal dwnsputs cannt be added, fllw the bends n FIGURE 7a). This will allw fr the angle f the VersaScreen t be adjusted up and then the back leg t be bent t accmmdate the pitch f the rf. If the angle created between C and B is t steep, vershting may be a prblem. This shuld be cnsidered when installing VersaScreen Pr in this fashin. Fascia Munt Fastening. VersaScreen Pr may be mdified when it is necessary t fasten the rf side f the VersaScreen Pr t the fascia. This may be the case with metal rfs, wd shake/shingle, tile, and flat rfs (rubber, tp, etc.). FIGURE 8 T mdify, measure the distance frm the fascia t the frnt lip f the gutter and add 1 1/8 t this measurement. Make sure t measure at a slight upward angle t allw fr the VersaScreen Pr t sit prperly n the frnt lip f the gutter. Sheer r therwise remve any extra material. Using a brake r ther suitable bending tl, turn 3/4 up n the back side shy f 90 degrees t create a fastening leg. Fasten the VersaScreen Pr t the frnt lip and then t the fascia underneath/belw the rfing materials. This lip can als be turned dwn ¾ and fastened t the fascia first and then t the frnt lip f the gutter. FIGURE 9 4

The VersaScreen IceBlaster installatin prcess is very simple requiring nly a tin snips, hand brake, battery pwered screw gun, pwered circular r cut ff saw, safety glasses, glves, and a tape measure. A siding brake is als helpful t custmize the VersaScreen t specific cnditins. Fr the heat cable installatin instructins, please see the heat cable manufacturer s instructins. Gutters shuld be clean and free f debris. On existing gutters, reseal miters, utlets and end caps. Make sure the gutter is prperly pitched and has adequate dwnsputs fr prper drainage. 3x4 inch rectangular r 4 inch rund dwnsputs are recmmended. Imprperly pitched gutters can result in standing water in the gutter and fine debris nt being washed ut f the gutter. Gutters with t much pitch can result in the gutter being t lw n the rf line. Additinal dwnsputs shuld be installed t crrect these prblems. While the installatin f VersaScreen Pr will strengthen the gutter assembly, it is als recmmended that adequate gutter straps/hangers be used and any lse fasteners be replaced r repaired. Wrking frm ladders r elevated surfaces can be dangerus. Cautin shuld als be exercised while wrking with pwer tls and sharp materials. All applicable guidelines and laws shuld be fllwed. Cnsult the VersaScreen Pr Installatin Guide fr prper installatin f the VersaScreen Pr. This guide cvers the installatin f the Rf Edge (RE) extrusin and the Drip Edge (DE) estrusin that cmprise the IceBlaster installatin. Using nly UL apprved self regulating heat cables supplied with the system r supplied by an apprved manufacturer. Care must be exercised s that fasteners d nt pierce the self regulating heat cables. Any damaged heat cables must be remved and replaced r repaired using UL apprved splice kits. Fllw all guidelines supplied by the manufacturer fr the installatin f self regulating heat cables. VersaScreen IceBlaster RE RE Extrusin. Slide the RE extrusin under the starter curse (r alternately, between the starter and first curse) shingles. (Figure 10) Leave the RE extrusin ut @ 1 frm the rf edge t allw fr the installatin f the self regulating heat cables. Only apprved self regulating heat cables may be used with VersaScreen IceBlaster. The use f cnstant wattage heat cables is prhibited in cnnectin with VersaScreen IceBlaster Prducts. Clean ut any debris that may fall int the heat cable channel. The heat cables may be temprarily held in place by small spring clips. Once the self regulating heat cables have been prperly psitined and ruted, seal the heat cable in place using 2 aluminized tape and slide the RE extrusin int place with the bttm channel f the RE extrusin abutting the rf edge. (Figure 12) The RE extrusin shuld be installed with a sealant adhesive r butyl tape applied under the extrusin in several places. Next, slide the VersaScreen Pr between the shingles and the RE extrusin. 5

Back Leg Bend. The VersaScreen Pr may need a back leg mdificatin t match the rf pitch and allw the upper prtin f the VersaScreen Pr t rest n the RE extrusin. FIGURE 7 & 7a It is imprtant fr the functin f the VersaScreen IceBlaster that the VersaScreen Pr be firmly and flatly seated against the RE extrusin. The pressure f the rfing material may be sufficient t achieve this dwnward pressure. If nt, wafer head r flat head fasteners (nt supplied) may be used t securely fasten the VersaScreen Pr t the RE extrusin under the shingles. Failure t seat the VersaScreen Pr against the RE extrusin will minimize the transfer f heat energy t the VersaScreen Pr, lessening the effectiveness in minimizing ice dams and icicle frmatins. Inside/Outside Crners and Ends. The RE extrusin shuld be stpped 2-3 inches shrt f the crner r end t allw fr the self regulating heat cable t lp dwn int the gutter. FIGURE 11 Any cuts t the RE extrusin shuld have all burrs r sharp edge filed t prevent damage t the heat cable. Fllw the heat cables shuld be ruted and taped int place. FIGURE 12 Include heat cables in gutter bttm and extending dwn dwnsputs/leaders. It is nt recmmended that the RE extrusin be used under wd shakes/shingles, metal rfing, synthetic slate/shakes, slate, tile r ther material that wuld limit the heat transfer thrugh the rf. Fr these applicatins, the Drip Edge (DE) installatin shuld be used. The DE installatin can als be used with asphalt r ther materials. VersaScreen IceBlaster DE IceBlaster DE. Install the self regulating heat cable in the gutter bttm and in all attached dwnsputs first. Leave enugh extra heat cable t install n tp f the VersaScreen Pr fr the DE installatin. Install the VersaScreen Pr as directed in the VersaScreen Pr install guide with the exceptin that the VersaScreen Pr shuld nt be screwed in place. This will allw fr the installatin f the DE flashing withut having t remve any zip screws. Rute the remaining heat cable n tp f the Versa Screen Pr. The heat cable shuld be installed at an angle in the frnt area f the VersaScreen Pr t allw fr prper installatin f the DE Extrusin (see DE rendering). Install the DE flashing using #8 x ½ zip screws (included). FIGURE 13 Extreme cautin shuld be exercised s as nt t drive any fasteners thrugh the self regulating FIGURE 13 heat cables. 6

Inside/Outside Crners and Ends. When it is necessary t rute arund a crner r lp int a gutter at an end, a slt must be cut in the frnt channel area f the VersaScreen Pr where the heat cable nests. This shuld be @ 5/8 wide (slightly wider than the heat cable itself) and 2-3 inches lng. The edges shuld be prtected by a layer f electrical r similar tape t prevent any sharp edges frm damaging the heat cable. After the heat cable is installed,the DE flashing will cmpletely cver this area. On the DE extrusin, crners shuld be mitered fr appearance. VersaScreen IceBlaster Pr IceBlaster Pr. IceBlaster Pr cmbines bth the RE and the DE versins f VersaScreen IceBlaster. This versin can be used in areas where greater melting capacity is desired r necessary. This allws fr tw heat cables t be n tp f the IceBlaster and nly ne is necessary in the bttm f the gutter. Fllw the installatin instructins fr the RE extrusin and then allw fr the installatin f the DE extrusin fllwing thse installatin instructins. Layut f heat cable shuld be cnsidered fr the best path and ruting t minimize splices and dubling back. It is best t install the heat cable in the gutter bttm and dwnsput first, then in the RE extrusin. The VersaScreen Pr is then installed fllwed by the heat cable at the frnt edge with the DE flashing. Heat Cable Installatin Principles: Heat cable layut shuld be planned prir t the installatin beginning Cnsider a layut that minimizes r eliminates the use f Tee Splices If Tee Splices are used, plan s they are used efficiently Tee Splices shuld be lcated where they will nt sit in water Cnfirm all measurements befre cutting heat cable t length Fllw all instructins prvided by the heat cable manufacturer Use prper grund fault prtectin as required by the manufacturer Failure t fllw manufacturer s instructins will vid all warranties. Failure t fllw manufacturer s instructins may result in the system nt perating prperly and culd lead t dangerus cnditins resulting in injury r death Repair r replace any damaged cable immediately 7