Schedule for Culvert Works in or on the Bed or Bank of a Watercourse PLEASE READ THIS PAGE BEFORE COMPLETING THE APPLICATION FORM

Similar documents
Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

THE DON DISTRICT SALMON FISHERY BOARD RIVER DON DRAFT GRAVEL MANAGEMENT PLAN NEWE DAM

Appendix A - Management of the CMA Recommended Changes and section 32AA assessment

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Part 9 Specific Land Uses - Foreshore & Waterway Development

RESOURCE CONSENT APPLICATION FOR B & R MCKENZIE MOETAPU BAY. Our Ref: Date: November2015. Our Ref:

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

U.S. Army Corps of Engineers Sacramento District

QUEENSTOWN LAKES DISTRICT COUNCIL ROAD NAMING POLICY 1 AUGUST 2016

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

Interim Guidance Fish Presence Absence

JAP Additional Information Sheet

Minimal Impact Rescue Code ASF Australian Cave Rescue Commission

Union Pacific Railroad

Restricting Access to Your Swimming / Small Heated Pool Information / Checklist

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

Part B Assessment of Environmental Effects

STREAM SURVEY File form No..

NOTIFICATION OF IMPENDING COMMENCEMENT OF KARNBACH POERUA POSSUM CONTROL OPERATION Vector Free Marlborough Limited (VFML) has been engaged by TBfree

Anglers Notice Review

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Friends of the Detroit River Habitat Restoration Project Update

6.7 Aircraft Protection

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass?

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

Fish Friendly Crossings- Examples from Nash Stream

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Trout Buffer Variance

Submission on the proposed New Zealand Coastal Policy Statement 2008 Sections 49 and 57 of the Resource Management Act 1991

Environmental Review and Permitting for Wild Trout

Waikanae River Environmental Strategy. 12. Arapawaiti/Otaihanga Reach

APPLICATION FOR ROAD NAME/S. Application Guide and Form

Final Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project

Determination 2018/047 Regarding the code compliance of barriers to a pool at 32 St Andrews Drive, Hikuai

F4. Coastal Mooring Zone and moorings outside the Coastal Mooring Zone

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverte

Illinois State Water Survey

Tips for Using & Printing Spreadsheets

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

Provisions for Moorings

Information for File # SEW

3 Natural Environment

Much Wenlock Neighbourhood Plan Land and Premises Availability Assessment

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

Annex E Bridge Pier Protection Plan

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

Request Number IR1-12: Flow Passage. Information Request

SINGLE LONG TERM MOORING AGAINST PRIVATE RESIDENTIAL LAND

Great Lakes Stream Crossing Inventory Instructions

TOWN OF AURORA. Pool Enclosure Permit Guide. PLANNING AND BUILDING SERVICES Building Division

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

QLDC Council 29 October Report for Agenda Item: 3

CALIFORNIA SALMONID STREAM HABITAT RESTORATION MANUAL APPENDIX IX-A CULVERT CRITERIA FOR FISH PASSAGE INTRODUCTION

DECEMBER 2003 Instream habitat assessment for the Waikanae River

I418 Kingseat Precinct

WORKING WITH COMMUNITIES AND INTEREST GROUPS

SIGNS - RULES Signs - Rules Structure of the Rules Section Activities Discretionary Activities

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

PALMERSTON NORTH CITY PALMERSTON NORTH SIGNS AND USE OF PUBLIC PLACES BYLAW Administration Manual

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

City of Pittsfield Harbormaster APPLICATION FOR AN INDIVIDUAL MOORING PERMIT

Climate Change Adaptation and Stream Restoration. Jack Williams;

Developing a. Guidance for operators who need to develop a. specified limits plan

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

Creek Trash Assessment (CTA) Methodology (Demonstration: Mill Run Creek, Cheltenham, Pa.)

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction

Agenda Item 7.1 For Information. Council CNL(10)24. Annual Report on Actions Taken Under Implementation Plans USA

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Stream Assessment Cut-block: For: Island Timberlands Limited Partnership, Cameron Operation

CFH Boise City Parks and Recreation

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

Waimakariri Land and Water Solutions Programme

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants

* 1 I am a person representing a relevant aspect of the public interest; or

Massachusetts Stream Crossing Case Studies

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Proposed Shuswap River Boating Regulations Open House

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Geotechnics, Face and Stockpile Operations

Does DFO Need to Review My Project?

A5.1 Permitted activities

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy

Micro Hydropower and Fish.

Understanding the Impacts of Culvert Performance on Stream Health

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Presented by Fred Halterman, URS Jennie Agerton, URS

Melbourne Water s Guidelines for Approval of Jetties

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

River Semington West Lavington

Developing a programme to make Taranaki predator-free

POOL FENCING A Guide to the Fencing of Swimming Pools Act 1987

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

EXTENT OF OBSERVATION

Isar Plan in Munich,Bavaria Flood Protection, Restoration, Recreation

Annex B: Range Specification Requirements

Transcription:

10A Schedule for Culvert Works in or on the Bed or Bank of a Watercourse This form is to be used for applications to use, erect, place, extend, alter or replace a culvert in or on the beds or banks of lakes or rivers, which are unable to meet Permitted Activity Rules 13.2.1.7, 13.3.1.2 or 13.5.1.3 of the Regional Plan Water PLEASE READ THIS PAGE BEFORE COMPLETING THE APPLICATION FORM In order for any consent application to be processed efficiently in the minimum time and at minimum cost, it is critical that as much relevant information as possible is included with the application. Form 1 and Schedule 10A, when properly completed, may provide an adequate Assessment of Effects on the Environment (AEE) where the adverse effects of culvert works are not significant. Guidance to answering the questions appear at the end of this schedule. Details of information required in an AEE are included in the Fourth Schedule of the Resource Management Act 1991 appended to Form 1: Resource Consent Application. However this can only be determined on application. If for any reason the scale of the culvert works or scale of its potential effects is significant, a report by a professional advisor in support of your application may be required. If all the necessary information is not supplied with the application then the Otago Regional Council may return your application, request further information or decline your application. This will lead to delays in the processing of your application and may increase processing costs. If the effects of the proposed culvert works are considered minor and written approvals are gained from all parties that may be adversely affected by the disturbance, then your application will proceed under non-notified consent provisions. If you are unable to supply the necessary written approvals from the affected parties, or if the effects of the culvert works are more than minor, then Council must limited notify or fully notify the application. Such applications take longer to be processed than non-notified applications and may incur additional processing costs. Details of consultation required are presented in this document. *Which of the following activities are you seeking to undertake* Erect or place a new culvert Extend an existing culvert Alter an existing culvert Replace an existing culvert Part A - Location of Proposed/Existing Culvert (For Office Use Only) Consent No.: Job No: A.1 What is the name of the water body(s) in which you propose to erect / place / extend / alter / replace / reconstruct the culvert? (If the water body is unnamed then please note this and give the name of the water body to which it flows in to) A.2 Describe the property on which the proposed/existing culvert is located (if the proposed/existing culvert is located on Crown Riverbed, please note on (d) below) (a) Full name(s) of owner(s) (b) Address/Location (c) Legal Description(s) (as shown on Certificate of Title) Schedule 10A / Issue 2 1

Lot DP Sec Survey District (SD) Other (specify) Council will obtain a Certificate of Title to confirm details, if necessary. (d) Is the proposed/existing culvert located on Crown Riverbed: Yes No If Yes, give the legal description of the property adjacent to the proposed/existing culvert A.3 Map reference of the proposed/existing culvert in NZTM 2000 (New Zealand Transverse Mercator): NZTM 2000: E N A.4 Please include a plan showing the location of the proposed/existing culvert A.5 Include with this application form labelled colour photographs (6 x 4 minimum size) of the site in its present form which include: Any existing structures at the site. The view of the waterway downstream of the site. The view of the waterway upstream of the site. A cross section at the site Cross sections 50 metres upstream and downstream of the site A.6 Please describe the current nature of the waterway at the proposed site for the works: Width of watercourse: Approximate maximum depth of water: Bed material (e.g., rocky, sandy, silty): Flows (estimates of minimum and maximum): Water colour/clarity: Bank material (weathered rock, clay): Vegetation: Erosion: Fish and invertebrate life: Catchment characteristics (for example, steep, forested catchment, easy pastoral catchment) A.7 Does the site of the proposed/existing culvert (including the area 100 m upstream and downstream) have any of the following values? (a) Obvious signs or known aquatic biota? Yes No Unknown (b) Areas where food is gathered from the water body? Yes No Unknown (c) Natural Wetlands? Yes No Unknown (d) Waste discharges (e.g., dairy sheds, industrial, sewage)? Yes No Unknown (e) Recreational activities (e.g., swimming, fishing, canoeing?) Yes No Unknown (f) Areas of special aesthetic value (e.g. waterfalls)? Yes No Unknown Schedule 10A / Issue 2 2

(g) Areas or aspects of significance to Iwi? Yes No Unknown (h) Other water takes? Yes No Unknown If you have answered yes to any of the above, please describe below: A.8 What is the catchment area upstream of the proposed location for the works, if known? (If unknown please ensure that the location of the works is marked clearly on an enclosed plan or map) hectares / acres / square kilometres (please circle the units you use) Part B Design of the Proposed/Existing Culvert B.1 Please describe the purpose of the culvert or other works: B.2 What is the proposed/existing culvert made of? B.3 What is the length of the proposed/existing culvert? For existing culverts, what is the length of the culvert after alteration or extension? B.4 What is the proposed fill material to be used over the culvert? B.5 At what gradient will the culvert be laid in the stream bed? (If at same gradient as existing stream bed then please state this.) B.6 If a secondary flow path is included in the design then please describe: B.7 Please fill in the dimensions shown on the cross-sectional diagram in the list below. (If the culvert design is different from that shown below please include a diagram showing all dimensions.) Of New/Altered Culvert (as it is proposed to be installed, or if existing, as it is proposed to be altered to) Of Existing Culvert (that is proposed to be altered) 1. Length of culvert approach: 2. Diameter of culvert (if circular): 3. If box culvert: width: height: m m 4. Bed width of original stream channel: 5. Top width of original stream channel: 6. Depth of fill over culvert: Schedule 10A / Issue 2 3

7. Depth of culvert base below original stream bed level: 8. Secondary flow path dimensions: width: depth: B.8 If there are engineering plans of the proposed culvert please enclose a copy with the application. Please include your own diagram on a separate page, if this will assist in describing the proposal, and attach it to this application form. B.9 Please provide hydrological and hydraulic design details and calculations (Use a separate sheet if necessary) Part C Works Associated with the Proposed/Existing Culvert C.1 Please describe how the culvert will be placed in the bed of the watercourse, or otherwise extended or altered, including: (a) Machinery to be used: Schedule 10A / Issue 2 4

(b) Where the machinery will be operated from: (c) The extent of any bed disturbance that will occur: (d) The duration of the proposed works (e.g. 12 hours, 5 days): (e) The timing of the proposed works (e.g. 8 am 5 pm Mon-Fri, Dec-Jan): (f) Will the works be undertaken in flowing water, or will the water be diverted in any way to provide a dry working area: (g) Other: C.2 Please comment on the extent of bank disturbance required to undertake the works, including road/track construction C.3 Please describe the extent of vegetation removal from the banks of the watercourse to be undertaken in relation to this proposal: C.4 Have any alternatives been considered when planning the proposal? Yes (Please explain why the proposed site was chosen) No (Please state why no alternatives have been considered) C.5 What term of consent is sought to undertake these works? _ Part D - Types of Resource Consent Sought D.1 Which aspect of permitted activity Rules 13.2.1.7 or 13.3.1.2 of the Regional Plan: Water does the erection, placement, extension, alteration, replacement or reconstruction of the culvert not comply with? upstream catchment exceeds 50 hectares Schedule 10A / Issue 2 5

placement will cause flooding or erosion site will not be left tidy upon completion culvert will not be replaced or reconstructed in same location as original scale, nature or function of culvert will change will comply with permitted activity rule not applicable (specify why): D.2 Which aspect of permitted activity Rule 13.5.1.1 of the Regional Plan: Water does the disturbance of the bed of the watercourse associated with the erection, placement, extension, alteration, replacement or reconstruction of the culvert, not comply with? bed disturbance wider than general area of culvert will cause flooding or erosion time to undertake the work will exceed 10 hours sediment discharge associated with bed disturbance will result in a conspicuous change in colour or water clarity 250 m downstream a lawful water take will be adversely affected site will not be left tidy upon completion will comply with permitted activity rule not applicable (specify why): D.3 Will there be any discharge of sediment or cement or any other contaminant to water, as a result of the culvert works? Yes No (specify why) D.4 Will water be diverted as a result of the culvert works? Yes No D.5 If you answered yes to question D.4, does the diversion comply with permitted activity Rules 12.3.2.1 or 12.3.2.3 of the Regional Plan: Water? Yes No (specify why) the course of water will not remain within the bed of the watercourse the course of water will not be returned to its normal course the diversion will occur for more than one month a lawful water take will be adversely affected Schedule 10A / Issue 2 6

a wetland identified in Schedule 9 or above 800 m will be affected the diversion will cause erosion, land instability, sedimentation or property damage Part E - Assessment of Environmental Effects of Culvert Works and Mitigation Measures Culvert works have the potential to affect a number of matters listed below. Some typical solutions to avoid, remedy or mitigate these adverse effects have been provided below. If you intend on using these typical solutions, check the box provided. If the typical solutions are not relevant to your application, please state this. If you are proposing an alternative solution, please provide detail (and on a separate sheet if required). Note that all actual and potential adverse effects must be addressed. E.1 Water Quality Fuel storage tanks and machinery working and stored in the construction area shall be maintained at all times to prevent leakage of oil and other contaminants into water, and no refuelling of machinery shall occur within the watercourse. All machinery shall be water-blasted prior to being brought on site, to reduce the potential for pest species being introduced to water. At no time during the proposed works shall machinery be washed within the bed of the watercourse. All reasonable steps shall be taken to minimise the release of sediment to water by undertaking the following methods (please list): sediment traps undertaking work when flows are low / watercourse is dry diverting water from the working area Other (please specify) Where wet cement may be used in the waterway: Avoid flowing water coming into contact with the concrete until the concrete is firmly set. Use boxing or other similar devices to contain wet cement during construction. Ensure that the handling of cement is undertaken in a manner that does not result in spillage into any watercourse. No equipment used in the pouring of concrete shall be washed out on site. If you have answered NO to any of the measures above, you MUST explain why: Schedule 10A / Issue 2 7

E.2 Bed/Habitat Disturbance Works shall be undertaken when flows in the watercourse are low. Works shall not be undertaken between certain months avoid disturbing spawning habitat (please specify months: ) Fish passage will be provided for. Bed disturbance will be limited only to the extent necessary to carry out the works. Machinery used to undertake the works shall not be operated from the wet bed. If you have answered NO to any of the measures above, you MUST explain why: E.3 Erosion Damage to riparian vegetation shall be minimised when undertaking culvert works. Any damage to the stream banks, including riparian vegetation, as a result of culvert works will be reinstated within one month. Where permanent diversions of water are undertaken: All reasonable measures will be undertaken to promote bank stability of any new channel as rapidly as possible. There shall be no reduction in the surface flow of the watercourse as a result of the diversion If you have answered NO to any of the measures above, you MUST explain why: E.4 Other Water Users Lawful water takes downstream of the proposed culvert will be adversely affected Recreational users of the watercourse will be affected by the proposed culvert Schedule 10A / Issue 2 8

If lawful water takers or recreational users will be affected, please provide measures to avoid, remedy or mitigate adverse effects on them: E.5 Other Waterway Values Amenity and natural character of the watercourse will not be significantly affected by the proposed culvert The site shall be tidied upon completion of works. Public Access to the watercourse will not be impeded by the proposed culvert Hours of work shall be between 7.00 am to 7.00 pm, Monday to Friday, and shall not be undertaken on Public Holidays. If hours of work to differ from that given, please state here: If koiwi tangata (human skeletal remains), Maori artefact material, or archaeological material that predates 1900 is found, work will stop until an inspection by the appropriate authorities can be made If you have answered NO to any of the measures above, you MUST explain why: Heritage values will be affected by the proposed culvert Cultural values will be affected by the proposed culvert If heritage or cultural values will be affected, please provide measures to avoid, remedy or mitigate adverse effects on them: E.6 Other Are there any other effects of the proposed culvert works that could adversely impact on water quality, not identified above? Please list and discuss any proposed measures to avoid, remedy or mitigate those effects: Part F - Consultation Schedule 10A / Issue 2 9

F.1 - Please comment on any consultation undertaken with those persons/parties who may be interested in, or potentially affected by your proposal. (e.g., other water users, neighbours, The Department of Conservation, The Otago Fish and Game Council, Aukaha, Te Ao Marama (for activities located south of the Clutha River/Mata-Au)). F.2 - Please attach any written approvals obtained using Council s standard Form 1 - Resource Consent Application. Part G - Is Your Application Complete? In order to provide a complete application have you remembered to: (a) Fully complete this schedule and Form 1 (Resource Consent Application) (b) Include a location / site plan? (c) Include labelled colour photographs (d) Include any technical plans or drawings of the culvert (e) Attach any appropriate additional information? Schedule 10A / Issue 2 10

Notes to Provide Guidance on Completing Schedule 10A Part A: Location of the Proposed Culvert Question A.1 If you are unsure of the name of the water body, please contact an Otago Regional Council staff member who will be able to assist you. In many instances tributaries to larger water bodies do not have official (or legally recognised) names. If this is the case describe the water body as an unnamed tributary of.. If the water body has an unofficial local name you could continue to write locally known as.. You can determine if a name is legally recognised by seeing if it is written on published topographic maps, or if any road bridges crossing it state the name of the water body (i.e. Transit or Automobile Association signs). Question A.2 Please provide the name and address of the owner of the land where the culvert is to be installed, or if owned by the Crown (i.e. Crown riverbed), the land adjacent to it. Question A.3 NZTM maps are generally available from Public Libraries or may be purchased from Government Book Shops or you may use a GPS to determine the location of your activity. Question A.4 A plan the location of your proposed culvert should be provided so Otago Regional Council can clearly identify where you propose to install your culvert. Question A.5 Colour photographs will assist Otago Regional Council Engineers to make an assessment of your application. Question A.6 and A7 Record your observations of the site. Question A.8 The catchment area upstream of the proposed culvert is important to determine if the culvert is appropriately designed to pass expected flood flows. Part B: Design of the Proposed Culvert Question B.1 Please state why you are proposing to install a culvert - what it will be used for, by whom, how often, and any other relevant details. Question B.2, B.3, B4 What material is the culvert constructed from (e.g. concrete, steel)? What will the total culvert length be? What type of fill material will be placed over top of the culvert? Describe each of these components as accurately as possible. Questions B5, B6, B7 and B9 Please respond to the questions as accurately as possible. Question B9 What flows has the culvert been designed to pass? How were these calculated? Part C: Works Associated with the Proposed Culvert Questions C1, C2 and C3 How do you propose to undertake work to install the culvert? Please describe to each question as accurately as possible. Question C4 What alternative options were considered? E.g. a bridge or ford? Or any alternatives to completing the works? Question C5 Schedule 10A / Issue 2 11

What term of consent will allow you to undertake the works? If works will only take 2 weeks to complete, there may be unforeseen delays with contractors or weather conditions, therefore a 4 month term of consent may be sought to ensure enough time to fully complete the works. Part D: Types of Resource Consent Sought Questions D1 to D5 Two consents may typically be needed to install a culvert a land use consent to erect a structure and disturb the bed, and a discharge permit to discharge contaminants (sediments or concrete) to water. However, if works instream are minimal, a discharge permit may not be required. Sometimes a consent to divert water may be needed. By answering questions D1 through to D5 Otago Regional Council staff can determine what consents are needed for you. Part E: Assessment of Environmental Effects Questions E1 to E5 Culvert works typically has a limited range of adverse environmental effects, and a typical set of measures to ensure those effects are avoided, remedied or mitigated. These have been provided as tick boxes to check if you intend to undertake these measures. However, if you do not intend to undertake these measures, you must state why (they may not be relevant to your application, or you may be undertaking work in an atypical manner and proposing an alternative method to avoid, remedy or mitigate those effects). In addition, if you can think of any other effects of culvert works you should list them in the space provided, and methods to avoid, remedy or mitigate them. Part F: Consultation Questions F1 and F2 Council can advise you of those parties considered to be potentially adversely affected by your proposed activity and can also instruct you regarding Iwi consultation. In some instances it may be appropriate for you to submit your application and let Council determine who they think may be adversely affected by your proposal particularly as the rule in the Regional Plan: Water for culvert works is a restricted discretionary activity, and that written approval from affected parties may not be required. However, bed disturbance is a full discretionary activity, and written approvals from affected parties are still required (if any are identified). Because Council charges time on an hourly basis, you may choose to consult these parties and seek their written approval to your application yourself, or you may choose for Council to pursue this for you. However, if an application is submitted without written approvals of potentially affected parties, the application goes on hold until these written approvals have been received. Part G: Is Your Application Complete? A complete application will assist Otago Regional Council in efficiently processing your application. If information is missing or inadequate your application may be returned to you or declined. Applications that are incomplete or do not provide sufficient information will be delayed and will cost more. If you have any queries relating to information requirements, please contact the Otago Regional Council Offices: Dunedin Office Alexandra Office Queenstown Office 70 Stafford St Dunorling St Cnr Shotover & Camp St Private Bag 1954 PO Box 44 PO Box 958 Dunedin Alexandra Queenstown Phone 03 474 0827 Phone 03 448 8063 Phone 03 442 5681 Fax 03 479 0015 Fax 03 448 6112 Fax 03 442 5682 Freephone: 0800 474 082 Website: www.orc.govt.nz Schedule 10A / Issue 2 12