TMV3 Requirements IMPORTANT Installer:

Similar documents
Issue date: July 2012 Issue 1

Issue date: April 2017

Installation Instructions and User Guide 15mm & 22mm Thermostatic Mixing Valve

Twin & Triple Control Concealed Thermostatic Shower Valve

THERMOSTATIC MIXING VALVES


Installation Instructions and User Guide

Self-help Temperature Adjustment

SEQUENTIAL SHOWER VALVE INSTRUCTION MANUAL PLEASE LEAVE THIS MANUAL WITH THE END USER

PEG402, PEG402UA & PEG402UAX TMV3 / TMV2 Combined

National Health Service Model engineering Specification

15/3 THERMOSTATIC MIXING VALVE PRODUCT MANUAL IMPORTANT

Intamix Thermostatic Mixing Valve

1. Introduction. The Easy Guide to TMV3 Approval

DB 61 Dolphin TMV3 Integrated Thermostatic Mixing Valve

HORNE 20 THERMOSTATIC MIXING VALVE TYPE H-2003

Installation Instructions and User Guide

SMV-001 Thermostatic Shower Mixer Valve Installation Instructions & Adjustment Settings

Installation Guide - C01202 & C01203 Thermostatic Mixing Valve TMV2

TEMPERATURE STABILISED THERMOSTATIC SHOWER PANEL

WHTM Supplement

PRODUCT MANUAL IMPORTANT

Scald Protection Three-Way Thermostatic Mixing Valve

In Line Thermostatic Controller. Copper x Copper

PRODUCT MANUAL IMPORTANT

Scald Protection 3-Way Thermostatic Mixing Valve

Deluge Optimo Shower valve and kit 10032CP

IHEA HFMC Stuart Lloyd. Managing Legionella: Achieving Best Practice. Legionella background

Installation, commissioning and servicing instructions. General

Installation, commissioning and servicing instructions

Rada Sense Shower T3 DMV PRODUCT MANUAL IMPORTANT

Tempering valve for solar and instantaneous applications Installation, commissioning and servicing instructions 2522HP series

Installation, commissioning and servicing instructions

Thermostatic Mixing Valves 61022CPB & 61028CPB Intamix Pro V

bathrooms.com Concentric Thermostatic Shower Mixers Cleaning and Care Installation Manual Contents

V12 THERMOSTATIC SHOWER VALVE PRODUCT MANUAL

MARKWIK SEQUENTIAL LEVER OPERATED THERMOSTATIC MIXERS. INSTALLER: After installation please pass this instruction booklet to user

THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

LEGIONELLA MANAGEMENT PROCEDURE

215 and 222 Series PRODUCT MANUAL

INSTALLATION, OPERATING AND MAINTENANCE GUIDE FOR EXPOSED AND CONCEALED MODELS MODERN, TRADITIONAL AND MINIMALISTIC

INSTALLATION INSTRUCTIONS

Horne Engineering Ltd

INSTALLATION INSTRUCTIONS. Markwik 21 Sequential lever operated thermostatic mixers

Atmos Low Pressure Thermostatic Bar Mixer Valve

Legionella Guidance. Property managers specialising in residential, apartment, block and estate management

OWNER S GUIDE DUAL CONTROL THERMOSTATIC SHOWER VALVE. Shower Control. may differ depending on choice of Model. Concealing Plate. Handles and ISSUE 01

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

WORCESTER GREENSTORE. Indirect Unvented Cylinder with Solar Coil FOR USE WITH WORCESTER GREENSTORE SYSTEM HEATPUMP ONLY GB/IE

Domestic Hot & Cold Water Services Log Book

MEGAFLO Eco. Technical data FOR THE ULTIMATE IN HOT WATER PERFORMANCE AND COMFORT

TECHNICAL DATA. Dry 132a. October 1, 2008

Blowdown vessels Meeting the requirements of HSE PM60

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Introduction. Legal Duties. Risk Assessment

Scalding Now a Healthcare Worry Legionella Cases on the Rise Aging Population Safety Issues Hidden Costs of Status Quo ASSE 1016 Update

INFORMATION NOTE No 353: MICROBIOLOGICAL TESTING

Spirax Compact FREME Flash Recovery Energy Management Equipment

320 c PRODUCT MANUAL IMPORTANT

215 SERIES. NSW Health approve the Rada 215 series TMV for use in healthcare buildings. PRODUCT MANUAL IMPORTANT

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

SHOWER FITTINGS INSTRUCTIONS AND MAINTENANCE GUIDE. Please read carefully before use

CAST IRON SAFETY VALVE TYPE 6301

HORNE T109A/306A/307A THERMOSTATIC SHOWER VALVE FOR SURFACE MOUNTING WITH TIMED FLOW CONTROL INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

CONTROL OF LEGIONELLA POLICY

Latvin Luxury Shower Panel. Telephone Product Specification. ~ Minimum Working Pressure 1.0 bar ~ Maximum Working Pressure 3.

Warm Water Systems A Practical Guide. Based on over 24 years experience

These instructions must be left with the user.

Thermocirc Installation and Maintenance Instructions

These instructions must be left with the user.

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Infection is caused by breathing in small droplets of water contaminated by the bacteria. The disease cannot be passed from one person to another.

MANAGEMENT PROCEDURE FOR LABORATORY VENTILATION

PRESSURE SYSTEMS POLICY

QuickHeat TM Packaged Heat Exchanger Solutions

Water Temperature Control - Groups of Fixtures

hydraulic valve 1 Introduction

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501).

Thermostatic Concentric Mixer Valve. with Exposed and Concealed Fitting Options. Fitting Instructions

Thermostatic Concentric Mixer Valves

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

Options Concentric Petite

AE50S Automatic Air and Gas Vent for Liquid Systems Installation and Maintenance Instructions

Instruction Sheet. SUPERSEDES: New EFFECTIVE: August 1, 2013

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

PIQCS HACCP Minimum Certification Standards

Recommendations on Checking Anaesthesia Delivery Systems

INSTALLATION, COMMISSIONING AND MAINTENANCE INSTRUCTIONS

553 Series.

SCA Series Inverted Bucket Steam Traps

Atmos Zone. Thermostatic Concealed Concentric Mixer Valve with Fixed Head. Fitting Instructions

INTERNATIONAL MARITIME ORGANIZATION

IMO REPORT OF THE MARINE ENVIRONMENT PROTECTION COMMITTEE ON ITS FORTY-NINTH SESSION

CORESTA RECOMMENDED METHOD N 6

AQUABLEND 2000 THERMOSTATIC MIXING VALVE

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

TROUBLESHOOTING GUIDELINES

Rada-Presto TF2020 and TF2020S

Pressure Regulators. Operating Instructions. Instrumentation

Lifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016

Transcription:

TMV3 Requirements IMPORTANT Installer: This Manual is the property of the customer and must be retained with the product for maintenance and operational purposes. 1 1173533-W2-C

General The information contained in this TMV3 Requirements Manual is supplementary to and must be read in conjunction with the Installation and User Guide (IUG) or Product Manual supplied with your thermostatic mixing valve. Where there is conflicting information (e.g. Maximum Temperature Setting) then you must follow the instructions laid down in this manual. Where products have been certified as a TMV3 approved valve for use in UK Healthcare premises, they shall only be used for applications covered by their approved designations. Refer to the IUG or Product Manual supplied with your valve to confirm the approved designation. Guide to Designations HP High Pressure LP Low Pressure S Shower B Bidet W Washbasin T44 Bath with fill temperature of 44 C maximum T46 Bath with fill temperature of 46 C maximum D44 Bath/Shower with Bath fill 44 C maximum, Shower 41 C maximum D46 Bath/Shower with Bath fill 46 C maximum, Shower 41 C maximum SE Shower having an Economy flow rate BE Bidet having an Economy flow rate WE Washbasin having an Economy flow rate Installation and commissioning must be carried out in accordance with these instructions, and must be conducted by designated, qualified and competent personnel. The installation must comply with the Water Supply Regulations 1999 (Water Fittings) or any particular regulations and practices, specified by the local water company or water undertakers. 1173533-W2-C 2

Type 3 Valves Table 1 - Normal Conditions of use for Type 3 valves High Pressure (HP) Low Pressure (LP) Maximum Static Pressure - Bar 10 10 Flow Pressure, Hot and Cold - Bar 1 to 5 0.2 to 1 Hot Supply Temperature - ºC 55 to 65 55 to 65 Cold Supply Temperature - ºC 5 to 20 5 to 20 Minimum Temperature Differential - ºC Refer to the IUG or Product Manual supplied with your valve Valves operating outside these conditions cannot be guaranteed to operate as Type 3 Valves. Application and Designation Table 2 - Mixed Water Temperature Mixed Water Temperature (at point of discharge) ºC Bidet (B) 38 Shower (S) 41 Washbasin (W) 41 Bath (44ºC fill) (T44) 44 Bath (46ºC fill) (T46) 46 Diverter Bath/Shower (D44) Diverter Bath/Shower (D46) Bath fill 44 max, Shower 41 max Bath fill 46 max, Shower 41 max TE 1: For washbasins, washing under running water is assumed. TE 2: Bath fill temperatures of more than 44 C should only be available when the bather is always under the supervision of a competent person (e.g. nurse or care assistant). TE 3: A thermostatic mixing valve having multiple designations (i.e. it is capable of satisfying the requirements of this specification for more than one application) should be re-set on site to suit its other designations. TE 4: A thermostatic mixer valve having a diverter designation (D) must be capable of changing and controlling the mixed water outlet temperature as defined above when the supply path is changed from bath to shower or shower to bath. If isolation valves are not integral to the valve then they must be fitted as close as practicable to the water supply inlets of the thermostatic mixing valve. 3 1173533-W2-C

Purpose Method for Commissioning Thermostatic Mixing Valves Since the installed supply conditions are likely to be different from those applied in the laboratory tests it is appropriate, at commissioning, to carry out some simple checks and tests on each mixing valve to provide a performance reference point for future in-service tests. Procedure Check that: a) The designation of the thermostatic mixing valve matches the intended application. b) The supply pressures are within the range of operating pressures for the designation of the valve. c) The supply temperatures are within the range permitted for the valve and in accordance with information on the prevention of legionella etc. See flow chart Audit of Supplies to Fittings. d) That isolating valves are fully open. e) That in-line strainers and check valves are clear. Adjust the temperature of the mixed water in accordance with the instructions within the IUG or Product Manual, and the requirement of the application and then carry out the following sequence (see flow chart Commissioning Test Stage 2 ): a) Record the temperature of the hot and cold water supplies. b) Record the temperature of the mixed water at the largest draw-off flow rate. c) Record the temperature of the mixed water at a smaller draw-off flow rate appromately 50%, which shall be measured. d) Isolate the cold supply to the mixing valve and monitor the mixed water temperature. e) Record the maximum temperature as a result of (d) and the final stabilised temperature*. * If there is no flow after 5 seconds then restore the cold water supply and verify that the final stabilised mixed water temperature is no more than 2 C above the temperature taken at b), and does not exceed the values in Table 1. If the final stabilised mixed water temperature is more than 2 C above the set temperature b) then the valve must be adjusted and re-commissioned. If after 5 seconds there continues to be a flow of water from the mixed water outlet then collect any water discharging into a suitably graduated measuring vessel for 60 seconds. 1173533-W2-C 4

The volume of water collected shall be less than 120ml. Note! The supply conditions whilst undertaking this test must be within the supply conditions stated in Table 1. Restore the cold water supply and record the stabilised mixed water outlet temperature and verify that the final stabilised mixed water temperature is no more than 2 C above the set temperature b). If the final stabilised mixed water temperature is more than 2 C above the set temperature b) then the valve must be adjusted and re-commissioned. Note! The final stabilised temperature should not exceed the values in Table 3. Table 3 - Guide to maximum stabilised temperatures recorded during site tests Application Mixed Water Temperature C Bidet 40 Shower 43 Washbasin 43 Bath (44ºC fill) 46 Bath (46ºC fill) 48 5 1173533-W2-C

Audit of Supplies to Fittings Cold, Less than 20 C in 2 Minutes Ensure Supply Pressures are Appropriate Hot, Greater than 55 C in 1 Minute Record Table State Supply Temperature (5 C to 20 C) Investigate System Issue +65 C Record Table State Supply Temperature (55 C to 65 C) Is the Supply Temperature Same as Previous Audit Implications to Terminal Fitting Is the Supply Temperature Same as Previous Audit Insignificant Change in Temperature. Less than 5 C Temporary Change of Known Cause Long Term or Permanent Change. Consider Re-commissioning of Thermo Fitting(s) No Action No Action. Re-test When Ccnditions Normalise Follow Manufacturer s Commissioning Instructions Go to Comissioning Test Stage 2 or In Service Flow Chart* Commissioning Test Stage 2 (example shown Washbasin Set at 41 C) Record the Supply Conditions Hot & Cold and note any change in Temperature for the Supplies Check the Supply Conditions Pressures: 0.2 to 5.0 bar Temperatures: 5 C to 20 C 55 C to 65 C Investigate Mixed Water Temperature 41 C (+0 / -2 C) Follow Manufacturer s Settings or Maintenance Instructions Re-set at 41 C (+0 / -2 C) Undertake the Commissioning Test as detailed, beginning Page 4 Fail Test Pass Accept Record Blend Temperature 1173533-W2-C 6

Purpose The purpose of in-service tests is to regularly monitor and record the performance of the thermostatic mixing valve. Deterioration in performance can indicate the need for service work on the valve and/or water supplies. The water supply conditions must be confirmed and compared with previous inservicetest audits or commissioning test results as the supply conditions will have an impact upon the results of the test. See flow chart Audit of Supplies to Fittings. Procedure In Service Testing Using the same measuring equipment or equipment to the same specification as used in the commissioning of the valve (see In-service flow chart), adjust the temperature of the mixed water in accordance with the instructions in section: Operation and the requirement of the application. Carry out the following sequence: a) Record the temperature and pressure of the hot and cold water steady state supplies. b) Record the temperature of the mixed water at the maximum available flow. c) Record the temperature of the mixed water at approximately 50% of the available flow. d) Isolate the cold water supply to the mixing valve and monitor the mixed water outlet. If there is no flow after 5 seconds then restore the cold water supply and verify that the final stabilised mixed water temperature is no more than 2 C above the temperature taken at b). If after 5 seconds there continues to be a flow of water from the mixed water outlet then collect any water discharging into a suitably graduated measuring vessel for 60 seconds. The volume of water collected shall be less than 120ml. Restore the cold water supply and record the stabilised mixed water outlet temperature and verify that the final stabilised mixed water temperature is no more than 2 C above the set temperature b). If the mixed water temperature has changed significantly from the previous test results (e.g. >1 C) record the change and before re-adjusting the mixed water temperature check: a) That any in-line or integral filters are clean. b) That any in-line or integral non return valves or other anti-back siphonage devices are in good working order. c) That any isolating valves are fully open. 7 1173533-W2-C

With an acceptable mixed water temperature, complete the following procedure: a) Record the temperature and pressure of the hot and cold water steady state supplies. b) Record the temperature of the mixed water at the maximum available flow. c) Record the temperature of the mixed water at approximately 50% of the available flow. d) Isolate the cold water supply to the mixing valve and monitor the mixed water outlet. e) Record the maximum temperature as a result of (d) and the final stabilised temperature. f) Record the equipment, thermometer etc. used for the measurements. If at step (e) the final mixed water temperature is greater than the values in Table 3 and/or the maximum temperature exceeds the corresponding value from the previous results by more than about 2 C, the need for service work is indicated. Note! In-service tests should be carried out with a frequency, which identifies a need for service work before an unsafe water temperature can result. In the absence of any other instruction or guidance, the procedure described in Annex F of D 08 may be used. In Service Test Water Supplies Same as Previous Audit or Temperature Change Less than 5 C Go to Audit of Supplies Stage 1 or Commissioning Test Stage 2 Record the Mixed Water Outlet temperature b) No Flow Undertake the In Service Test as detailed, beginning Page 7 Flow, Volume of Water Less than 120ml in 60 Sec Restore Cold Check the Mixed Water Outlet Temperature Deviation From Previous Results Greater than ±1 C Deviation From b) Less than 2 C Deviation From b) Greater than 2 C 1st Instance Reset, Follow Manufacturer s Setting Instructions Accept & Record Blend Temperature 2nd Instance Reset, Follow Manufacturer s Maintenance Instructions Go to Commissioning Test Stage 2 1173533-W2-C 8

Annex F of D 08 (informative) Frequency of In-service Tests General In the absence of any other instruction or guidance on the means of determining the appropriate frequency of in-service testing, the following procedure may be used: a) 6 to 8 weeks after commissioning carry out the tests detailed in Inservice Tests b) 12 to 15 weeks after commissioning carry out the tests detailed in Inservice Tests Depending on the results of the above tests, several possibilities exist: a) If no significant changes (e.g. 1 C) in mixed water temperatures are recorded between commissioning and 6 to 8 week testing, or between commissioning and 12 to 15 week testing, the next in-service test can be deferred to 24 to 28 weeks after commissioning. b) If small changes (e.g. 1 to 2 C) in mixed water temperatures are recorded in only one of these periods, necessitating adjustment of the mixed water temperature, the the next in-service test can be deferred to 24 to 28 weeks after commissioning. c) If small changes (e.g. 1 to 2 C) in mixed water temperatures are recorded in both of these periods, necessitating adjustment of the mixed water temperature, then the next in-service test should be carried out at 18 to 21 weeks after commissioning. d) If significant changes (e.g. >2 C) in mixed water temperatures are recorded in either of these periods, necessitating service work, then the next in-service test should be carried out at 18 to 21 weeks after commissioning. The general principle to be observed after the first 2 or 3 in-service tests is that the intervals of future tests should be set to those which previous tests have shown can be achieved with no more than a small change in mixed water temperature. 9 1173533-W2-C

Maintenance Planned Maintenance Malfunction of Thermostatic Mixing Valves is almost always progressive in nature and will be detected by the use of proper temperature checking and maintenance routines. Certain types of system can result in the valve having excessive dead-legs of pipework, or auxiliary cold water supply added to the mixed water from the valve Such systems can disguise the onset of thermostatic mixing valve malfunction and should not be used. We recommend a preventative maintenance procedure based on site conditions and the risk to the user. All results must be recorded in a log book. Healthcare Healthcare applications are hospitals, aged person facilities, residential care homes, etc. and any other applications where the user is similarly at risk. Ultimately, the user or attendant must exercise diligence to make sure that the delivery of warm water is at a stable, safe temperature. This is particularly important in such procedures as supervised bathing where patients are unable to respond immediately to unsafe temperatures. Commercial Check for correct blend setting every 6 months. Follow the In-Service Test Procedure every 12 months. Critical Components Irrespective of supply and usage conditions or the evidence of in-service tests, critical components should be replaced at intervals of no more than 5 years. Note! During the replacement of critical components, it may be necessary to replace other non-critical components. References National Health Service Model Engineering Specifications D08, Thermostatic Mixing Valves (Healthcare premises). HTM-04 (Health Technical Memorandum): The control of Legionella, hygiene, safe hot water, cold water and drinking water systems. 1173533-W2-C 10

Notes 11 1173533-W2-C

0844 571 5000 01242 282595 0844 571 1777 0844 472 3076 FM 14648 1173533-W2-C Kohler Mira Limited, August 2015 12