Overview: Phase 3 Draft Development and Circulation Plans, White Bear Station

Similar documents
Highway Transitway Corridor Study

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Corridor Vision Workshop Summary James Madison Elementary February 22,2018

Delta Planning Workshop Team

Existing Pedestrian Conditions. PSAC February 8, 2011

Executive Summary Route 30 Corridor Master Plan

POLICY ADVISORY COMMITTEE

Beyond First First Last Last Mile Strategies. APA National Conference April 3, 2016 Chelsea Richer, AICP Fehr & Peers

Pocatello Regional Transit Master Transit Plan Draft Recommendations

METRO RTA TRANSIT MASTER PLAN. May 25-26, 2011

Major Bike Routes 102 Avenue Workshop April 21, 2015

Community Advisory Committee (CAC) Agenda Wednesday June 24, 2015, 6:00 8:00 pm East Side Enterprise Center 804 Margaret Street, Saint Paul, MN 55106

Characteristics from these programs were used to compare to and evaluate existing conditions in Howard County.

CONNECTING PEOPLE TO PLACES

Tonight is for you. Learn everything you can. Share all your ideas.

North Shore Transportation Improvement Strategy

Pedestrian Activity Criteria. PSAC March 8, 2011

Arterial Transitway Corridors Study. Ave

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Chapter 5 Future Transportation

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Sacramento Grid 2.0. The Downtown Transportation Study

A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Evaluation of Alternatives and Final Screening Results November 20 and 21, 2013

42nd Ave N Reconstruction

Bus Rapid Transit Plans

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim

Durham Region Long Term Transit Strategy

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

Greater Cleveland Regional Transit Authority

Vision. Goals and Objectives. Walking

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House

Rock Spring Kick-Off Meeting 09/01/15 Walter Johnson High School Break Out Table Summaries. Rock Spring Break Out Table Comments. Table 1: Strengths:

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

Ann Arbor Downtown Street Plan

Strategic Plan for Active Mobility Phase I: Bicycle Mobility

Liz Smith, P.E., PMP Manager of Long-Range Planning Strategic Planning & Analysis SEPTA. Norristown High Speed Line Extension Draft EIS

Cedar Avenue Transitway/ METRO Red Line Implementation Plan Update. Metropolitan Transportation Committee July 27, 2015

EXECUTIVE SUMMARY. Vision

ACTION TRANSMITTAL No

Hennepin County Bicycle and Pedestrian Planning

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Westside Transportation Access Needs Assessment - Short and Long Term Improvements

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

Intermodal Connections with Light Rail in Phoenix, AZ Wulf Grote, P.E. Director, Planning & Development

CHAPTER 1 INTRODUCTION

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Planning Regionally With Transit

Sixth Line Development - Transit Facilities Plan

Methodology for Linking Greenways and Trails with Public Transportation in Florida

Pedestrian Project List and Prioritization

Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Corridor Advisory Group Meeting #1 June 7, 2018

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

Building a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville

LINCOLN PARK LAKEVIEW

Central Jersey Transportation Forum. March 2007

The Impact of Placemaking Attributes on Home Prices in the Midwest United States

CHAPTER 3: Vision Statement and Goals

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

The Naples Park Community Plan DRAFT- MARCH 2003

Arlington s Master Transportation Plan

122 Avenue: 107 Street to Fort Road

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

PEDESTRIAN ACTION PLAN

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Regional Bicycle System Master Study. Preliminary Results Update

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Cranberry Area Transit Study Steering Committee Meeting

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

South King County High-Capacity Transit Corridor Study

Introduction Overview This document summarizes the Gateway Gold Line Bus Rapid Transit (Gold Line BRT) health impact assessment (HIA) process and reco

Perryville Transit Oriented Development & Greenway Plan

MASTER BICYCLE AND PEDESTRIAN PLAN

STUDY ADVISORY COMMITTEE. October 8, 2015

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project

Land Use and Transportation Town Hall September 17, 2018

AGENDA ITEM G-2 Public Works

Midtown Corridor Alternatives Analysis

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Access BART: TOD and Improved Connections. October 29, 2008

2018 Transportation Survey October 17, Prepared by:

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Speed Limits Study and Proposal. Public Input Session: 8/14/13

5 Transit & Traffic. Overview

Metropolitan Council Transportation Committee

TRANSIT-ORIENTED DEVELOPMENT POLICY. City Planning and Development Department Kansas City, Missouri

95 th Street Corridor Transportation Plan. Steering Committee Meeting

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Arterial Transitway Corridors Study. Sept. 26, 2011

Transcription:

Overview: Phase 3 Draft Development and Circulation Plans, White Bear Station This overview explains how to get more involved and provides information on the Phase 3 draft circulation and development plans that address the following: Safety: A highly visible and active station Connectivity: Walking and biking routes into the neighborhood and to shopping destinations Housing: Opportunities to increase affordable and market rate housing Jobs: Long-term, mixed-use commercial development south of Interstate 94 White Bear Station Area Objectives From community input in October 2017, the following objectives were identified for this station area: Create a safe station environment Consider a safe and direct extension of Hazel Street south to Suburban Avenue (I-94 undercrossing) Ensure safe walking and biking within the station area Maintain affordable housing Promote additional housing and development opportunities Get Involved Learn more about the issues and questions for this station and provide your feedback! Go to www.thegatewaycorridor.com/station-area-planning/, select this station, and then the online engagement link. The survey is open now through November 19, 2018. Learn more: Gold Line BRTOD information: www.thegatewaycorridor.com or GoldLinePartners@gmail.com Questions? The City of Saint Paul will be the main point of contact for Saint Paul residents and businesses for all Saint Paul Gold Line stations. Contact City Planner Bill Dermody, 651-266-6617, bill.dermody@ci.stpaul.mn.us. Website: TheGatewayCorridor.com Email: GoldLinePartners@gmail.com Page 1

White Bear Neighborhood Station Station typologies reflect the complementary role between stations along the corridor and inform the type and intensity of transit-oriented development that should be emphasized in each station s development plan. Station typologies respond to station-specific conditions, community desires, and adopted policies and plans while being consistent with best practices for transit-oriented development. Assigning a station typology to each station area considers site conditions, market conditions, and demographics. Based on these factors, each of the 10 stations along the corridor was assigned one of four types as described below: Neighborhood: Established residential areas with fewer opportunities for transit-oriented infill or development Mixed-use Neighborhood: Established residential areas with fewer opportunities for transit-oriented in fill or development Employment: Established employment centers that provide family-wage jobs and high transit ridership opportunities Commerce: Established commercial centers that serve the corridor and region The White Bear Avenue station is a Neighborhood station, providing: Improved station access to existing transit-dependent neighborhood New infill housing at the station, both affordable and market-rate Long-term BRTOD uses south of I-94, including employment, commercial, and housing Website: TheGatewayCorridor.com Email: GoldLinePartners@gmail.com Page 2

Station Location and Guideway Design Refinements (September 2018) At the White Bear Station, the proposed BRT route would be located along the north side of Interstate 94 and south of Old Hudson Road. The station would be located at Hazel Street, between White Bear Avenue and Ruth Street. As shown in the graphics, there would be new sidewalks and trails to support station access, and the BRT guideway would run under White Bear Avenue and Ruth Streets. Website: TheGatewayCorridor.com Email: GoldLinePartners@gmail.com Page 3

Phase 3 Draft Circulation Plan Based on stakeholder feedback and technical issues, the refined circulation plan for the White Bear BRT station area includes the following: Within 1/4 mile of the station a loop of walk and bike improvements to ensure safe and direct access between the station and shopping destinations south of I-94 along Suburban Avenue Within 1/2 mile of the station, walk and bike improvements connect the station to the neighborhood on Hazel Street and link destinations such as recreation centers and schools along 3rd Street, and Ruth Street A B Station access routes: 3 rd Street and Old Hudson Road bike lanes, and White Bear Avenue Bridge trail Corridor walk and bike trail, including crossing at Ruth Street City-designated existing and planned walk and bike routes These are described further on the following pages. Website: TheGatewayCorridor.com Email: GoldLinePartners@gmail.com Page 4

Station access route, Old Hudson Road bike lanes (A on the map above) New bike lanes and sidewalks provide primary east and west access to the station between White Bear Avenue and Ruth Street Station access route, White Bear Avenue bridge (A on the map above) Connects the BRT station to the corridor trail running along Suburban Avenue and destinations such as Target Website: TheGatewayCorridor.com Email: GoldLinePartners@gmail.com Page 5

Station access route, 3 rd Street bike lanes (A on the map above) Connects the BRT station to residential areas, Harding High School, and the Conway Recreation Center and the Sun Ray library Corridor walk and bike trail (B on the map above) Improvements along the south side of Suburban Avenue to support connections to Target, Aldi, Ha Tien Market, and other destinations, and to I-94 crossings at White Bear Avenue and Ruth Street Website: TheGatewayCorridor.com Email: GoldLinePartners@gmail.com Page 6

Corridor trail, Ruth Street bridge segment (B on the map above) Potential Ruth Street Bridge improvements include the walk and bike trail on the east side of bridge, connecting the BRT station to destinations south of I- 94 such as grocery stores and continuing on the corridor trail along Burns Avenue Website: TheGatewayCorridor.com Email: GoldLinePartners@gmail.com Page 7

Phase 3 Draft Development Plan The draft Development Plan identifies the location of land uses that support a safe and active BRT station environment, enhance BRT ridership, and capitalize on the station area s proximity to I-94 and access to BRT. Land uses and density of development are consistent with the City s adopted station area zoning. North side of I-94 at White Bear station (Hazel Street) New park Station oriented toward the park Apartment buildings (325-450 units) provide housing close to the station, and support transit ridership and a safe station environment South side of I-94 along Suburban Avenue A future Suburban Avenue Master Plan should guide redevelopment of this aging auto-oriented commercial corridor, and should consider: A new street grid to encourage walking and biking and reduce the scale of development Park and an open space amenity for potential housing and/or commercial uses Apartment buildings and townhomes to provide housing options close to the station and support transit ridership Employment and commercial uses to support additional employment and neighborhood-supporting goods and services Website: TheGatewayCorridor.com Email: GoldLinePartners@gmail.com Page 8