How does Wind affect Coal (Cycling, Emissions and Cost)

Similar documents
Ins$tu$onalize Reliability Improvement

Avoiding Short Term Overheat Failures of Recovery Boiler Superheater Tubes

COMPRESSORS WITH SIDE STREAM

Avoiding Short Term Overheat Failures of Recovery Boiler Superheater Tubes

2016 Electric Resource Plan Modeling Assumptions Update

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Coke drum Monitoring & Inspection for Fatigue Life and Safety Improvement

INSPECTION OF RECOVERY BOILERS

The Criticality of Cooling

HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS

Cycle Isolation Monitoring

FLEXIBILITY: KEY TO UNLOCKING POWER SYSTEM TRANSFORMATION

SAMSON SOLUTIONS Energy and Power (Critical Applications)

Inerting System Design for Medium Speed Vertical Spindle Coal Pulverizers TABLE OF CONTENTS

Safety and efficiency go hand in hand at MVM Paks NPP

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT

EVT * -Pro Electronic Valve Tester

Safety Engineering - Hazard Identification Techniques - M. Jahoda

FUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016

Best Practice RBI Technology Process by SVT-PP SIMTECH

Flexibility Enhancements for Gas Turbines

Vibration and Pulsation Analysis and Solutions

Business Plan Presentation

Corrugated Hose Loop Calculations

Introduction Case 1 : Benfield Stripper Control Valve. Case 3 : Hydrocracker 3-Way Control Valve Case 4 : Crude Heater Control Valves

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

MARKET OUTLOOK. Power Chemicals Petroleum Water/Wastewater Oil & Gas Pulp & Paper and more

Selecting Maintenance Tactics Section 4

CONTROL SOLUTIONS DESIGNED TO FIT RIGHT IN. Energy Control Technologies

ADVANCED CONTROL VALVE AND ACTUATOR: Selection, Calculations, Sizing, Applications, Operation, Diagnostic Testing, Troubleshooting and Maintenance.

Model EXAxt AV550G. Averaging Oxygen Analyzer

LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE)

LP Separator Level Control by Variable Speed and Multi Stage Brine Reinjection Pumps at Kawerau and Nga Awa Purua Geothermal Projects, New Zealand

Committee on NFPA 85

Hydro Plant Risk Assessment Guide

SF 6 Product Guide. Gas Analysis Instruments and Accessories

Acoustic Pulse Reflectometry Brings an End to Tube Inspection Sampling By Dr. Noam Amir, Chief Technology Officer, AcousticEye

A large Layer of Protection Analysis for a Gas terminal scenarios/ cause consequence pairs

Fuel Gas Pressure Control Solutions for Fired Heaters and Boilers

Recovery from a Process Saturation Condition. Benefits of Using DeltaV PIDPlus

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge]

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment

RECOMMENDED GOOD PRACTICE

Supercritical CO2 Power Cycles: Design Considerations for Concentrating Solar Power

Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance

CHAPTER FIVE COST VOLUME PROFIT ANALYSIS OF DELHI METRO

Barrier Development and Evaluation Methodology. D.S. Musgrave 1 1 Thermal Visions, Inc., Granville, USA

Best Practice Guidance for Assessing the Financial Performance of Fishing Gear: Industry-led gear trials

A hose layline contains important information for specifying the replacement assembly: manufacturer, hose trade name, working pressure and hose ID.

Portuguese Market Outlook up to 2040

Trace Environmental Systems

Flammability Chart. Gas Formula Ignition

PAC Injection Upgrades: Don t Live with Problem Systems

PRODUCTION AND OPERATIONAL ISSUES

Installation & Operation Manual Proven Quality since 1892

Operating Guidelines for PermSelect Modules Liquid Contacting

Hazard Operability Analysis

Bridging the Gap Using Gas Assisted Plunger Li5 (GAPL) Presented By: Todd Thrash Technical Data Provided By: Rusty Brown, P.E.

Automatic Non-freeze Valve NF6

Paper #: POWER

Challenges in Relief Design for Pilot Plants

MSF Distillers Lifetime Kuwait experience

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

Training Title IDENTIFY OPERATIONAL UPSETS, REVIEW & VALIDATE IN OIL & CHEMICAL PLANTS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Record of Assessment OFFICER IN CHARGE OF AN ENGINEERING WATCH

P-03 MAINTENANCE MECHANIC TRAINING SKILL DEVELOPMENT GUIDE

S-CO 2 Brayton Recompression Loop Design and Control


Table 6: Schedule of Operational Commitments

Dynamic Analysis of a Multi-Stage Compressor Train. Augusto Garcia-Hernandez, Jeffrey A. Bennett, and Dr. Klaus Brun

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

Permitted MSS Emissions Tracking, Recordkeeping, and Reporting. Presented by ACES April 24, 2008

Life Extension of Mobile Offshore Units

SV60 Safety valves. for use with steam, gas and liquids

API Piping Plan 62: A Reliable Quench System

Edward Valves Equiwedge Forged Gate Valve

What is pressure relief valve? Pressure relief valve

Reliability Engineering. Module 3. Proactive Techniques - Definitions

Simplicity in VRU by using a Beam Gas Compressor

Withstands Severe Treatment at Reverse Osmosis Facility

A Sub-Synchronous Vibration Problem: Trapped Fluid in Compressor Coupling Spacer. Diagnosis and Resolution

Preventive Maintenance

Performance Monitoring Examples Monitor, Analyze, Optimize

On-Stream Tightness Testing of Vacuum Process Installations

REDUCING EMISSIONS WHEN TAKING COMPRESSORS OFF-LINE

PSM TRAINING COURSES. Courses can be conducted in multi-languages

NORMAL OPERATING PROCEDURES Operating Parameter Information

OLGA. The Dynamic Three Phase Flow Simulator. Input. Output. Mass transfer Momentum transfer Energy transfer. 9 Conservation equations

HeatSponge.com Standard O&M Manual: Version 1.0 Page 1 of 20

Enbridge Pipelines Inc. PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT

CMC IMPLEMENTATION IN OBSOLETE ISKAMATIC TG CONTROL SYSTEM

Is Lime Souring Your Valve Operation?

Infrared Thermal Imaging, Inc.

Quantifying Thermal Transients in Heat Recovery Steam Generators

Transient Analyses In Relief Systems

Ballot ID: Action item Reference Number: Addition of common causes and susceptibility diagram to API RP 581, 3rd Edition, Section 12

Combining disturbance simulation and safety analysis techniques for improvement of process safety and reliability

EXAM # 2. First Name Last Name CIRCLE YOUR LECTURE BELOW: INSTRUCTIONS

Transcription:

How does Wind affect Coal (Cycling, Emissions and Cost)

Outline Analysis of cycling costs Why analyze cycling damage and costs Damage mechanisms of cycling Cycling costs Reducing cycling costs Loca9ng failures Cost of cycling es9mates Study scope with protocols(psco) Mi9ga9on strategies

Analysis of cycling costs What is cycling? This process is damaging to power genera9on equipment. A comprehensive analysis conducted on more than 150 coal fired units shows that the financial costs associated with cycling opera9on are very high. Analysis of selected older coal fired plants has found them to be more cost effec9ve to cycle than the newest combined cycle units. Even if a unit is designed for cycling, there are external factors that lead to cycling costs. Cycling units should be subjected to a thorough analysis of their cycling opera9ons to op9mize and determine the true cost of each opera9on.

Why analyze cycling damage and costs? Knowledge of opera9ng costs in real- 9me is cri9cal to the compe99ve power business. High profit 9mes and low power price periods. Passing the high cost to cycle power plants on to compe99ve u9li9es, by not cycling on/off or going to two- shiu opera9on for specific units with low cycling costs, is an effec9ve compe99ve strategy when cycling costs are analyzed. APTECH has analyzed the cycling costs in more than 300 power- genera9ng plants, Many of the units were being operated at or above the unit s maximum con9nuous ra9ng opera9on (MCR). Although running a plant above MCR may be costly, it can save a rapid costly start up on another unit in the fleet.

Damage mechanisms of cycling Defini9ons of cycling have varied from on/off starts, (normally defined as hot, warm, and cold starts) Hot starts 700 to 900F boiler turbine temperatures 8 to 12 hours offline. Warm starts 250 to 700F- - 12 to 48 hours offline. Cold starts- - <250F 48 to 120 hours offline. OUen the damage mechanism is fa9gue and corrosion of the boiler tubes. The 9me to failure from cycling in a new plant- 5 to 7 years; older plants- 9 months to 2 years auer start of significant cycling.

RelaAve damage caused by cycling steam plants; Courtesy: Intertek- Aptech

When plant loads change, the consequences are numerous All of these consequences can force the unit to operate away from the original design point. A few important material damage mechanisms are responsible for the majority of the financial impacts caused by opera9ng coal plants in flexible modes. Examples of these damage mechanisms follow: Thermal Fa9gue : This phenomenon can produce cracking in thick- walled components, especially cas9ngs such as turbine valves and casings. Cracked header. Cold feed water introduced to a hot header caused the crack in this economizer header; courtesy : EPRI

Tube- to- header cracking caused by thermal transients is shown in this photo. VariaAon in tube thermal expansion, caused by differences in tube length, increases stress in some tubes; Courtesy: EPRI Thermal expansion:several systems in a coal plant consist of components that undergo high thermal growth rela9ve to surrounding components. The most important example of this phenomenon is the large movement of boiler structures rela9ve to the cooler support framework

Two- shiuing, or any other opera9on that challenges the ability of a plant to maintain water chemistry, can lead to increased corrosion and accelerated component failure. Increased levels of dissolved oxygen in feed water can be the result of condenser leaks, aggravated by more- frequent shutdowns. Waterwall damage caused by corrosion faague is open found in steam generators.;courtesy: EPRI

Cycling Costs The overall range of cycling costs, compared with commonly assumed costs is shown in Figure: QuanAfying true unit cost per cycle This includes all types of cold, warm and hot starts for the units of the system.

The increased incremental costs agributed to cycling fall into the following categories: Ø Increases in maintenance and overhaul capital expenditures. Ø Forced outage effects, including forced outage 9me. Ø Cost of increased unit heat rate, long- term efficiency and efficiency at low/variable loads. Ø Cost of startup fuels, auxiliary power, chemicals and addi9onal manpower required for unit startup. Ø Long- term genera9on capacity costs increase due to a shorter unit life.

Reducing cycling costs The plant s signature data is analyzed during cycling opera9ons and recommenda9ons are made for Ø Opera9onal changes- include modifying temperature ramp rates of key components; to increase unit response and to decrease damage and costs, the ramp rate during cycling should be decreased. Ø Hardware modifica9ons- include short term monitoring of thermocouples and addi9onal monitoring of equipment; include longterm modifica9ons such as boiler tube supports, pump valves/orifices, pulverizer monitor.

LocaAng Failures Few conven9onal steam plants were designed to follow load, cycle from minimum to full load every day, or shut down and start up daily. The challenge for owners of plants required to operate in this way is to fully understand the effects on plant and component life expectancy, and the actual costs, of these new opera9ng profiles. If the actual costs are unknown, making a profit becomes a mager of luck rather than good management. In a compe99ve electricity market, not knowing the true genera9ng costs could place the plant or the company in economic jeopardy. For example, if the actual cost of cycling a unit is not included in the bid price, and the plant must cycle, not only there is no compensa9on for unknown damage to plant equipment, but also the plant is not being compensated for future maintenance and unplanned repair outages.

Common problems in cycling plants. A survey of 215 steam plants found many common equipment problems; Source: Intertek- Aptech

The following are examples provided to show magnitude of systems and components within a typical coal- fired plant designed for base load opera9on that are affected by cycling and load- following service. 1.Tube bending. Thermal forces bowed and permanently bent this boiler Super heater tubing, including the water- cooled support tube and clips; Courtesy:Intertek- Aptech

3. Bending corners. Boilers are typically rectangular boxes rather than round or spherical. This photo shows water wall corrosion faague damage at the lower furnace seal. It is an example of cycling damage at a corner or a change in shape. Courtesy: Intertek- Aptech 2.Corrosion faague damage in the steam- cooled wall in the heat recovery area is evident in this photo. The steam- cooled sidewall has a damaged economizer header penetraaon. Cycling caused differenaal thermal growth, and the penetraaon is badly damaged.

4. Leaky heaters. This HRSG feed water heater tube was one of many failures that resulted from cold- end corrosion during cycling. There were numerous leaks at the tube to header connecaon due to thermal cycling damage.

Cost of cycling esamates The Intertek- Aptech staff has developed two approaches to develop cycling cost es9mates, the top- down es9mate and the bogom- up es9mate. Top- down es9mate: Top- down es9mates use historical unit opera9ng data and historical cost data to determine the costs of cycling opera9ons. Ø The first step is to determine opera9ng costs that include the opera9ng, maintenance, and capitalized maintenance costs incurred by the unit, cost of fuel and chemicals for water treatment used for startups, and costs related to the increased outages caused by cycling. Ø These costs are then analyzed, processed, and tallied to create annual candidate cycling costs for the unit.

Ø The second step is to add cycling damage to the maintenance cost es9mates. The damage the unit accumulates from cycling is determined by examining the plant s opera9ng records. Specifically, the hourly average power output of the unit s generator is analyzed to count cycles (all types of cycling and load- following) and determine the historical damage that the unit has accumulated versus base load opera9on. Ø Finally, the accumulated damage and historical costs are taken to calculate a sta9s9cal best es9mate of the cycling costs and calculate the upper and lower bounds using sta9s9cal regression techniques.

Bogom- Up Es9mates: The other cost- es9ma9ng process is the bogom- up analysis. It is referred to as a bogom- up because it starts with the detailed work order history and a review of failure events and analysis completed earlier. Ø The bogom- up review includes seven to 10 years worth of plant work orders which include a detailed analysis of work orders by a subject mager expert (SME), Actual failure reports, overhaul records, and prior inspec9on reports are also checked to determine the root cause of previous failures so that the costs can be properly classified.

Psco s Study The study looks at two levels of installed wind on the PSCo system. Ø The 2GW case represents the approximate level of wind PSCo expects to have on the system by 2013 Ø A 3GW scenario was also studied to understand the cost of adding an incremental 1GW of wind to the PSCo system by the year 2020. The study period includes the years 2011 through 2025. Coal unit cycling costs were calculated for each level of installed wind under two cycling protocols

Protocol 1 Referred to as the Curtail Protocol: Ø All PSCo coal units are dispatched to follow changes in net load, where the net load is the obliga9on load minus wind genera9on. Each coal unit would be cycled down to its economic minimum before any wind genera9on is curtailed. Ø If the net load decreased below the aggregate coal fleet economic minimum capacity, curtailment of wind would be required to effec9vely increase the net load back to the economic minimum capacity.

Protocol 2 - Referred to as the Deep Cycle Protocol Ø Rather than curtail wind at this point if net load falls further, one or more coal units would be called upon to deep cycle. Ø Wind curtailments may s9ll be required if net load falls below the aggregate coal fleet minimum deep cycle level. Results: Ø The first result is that cycling costs do not change linearly with changes in wind penetra9on. Ø For a fixed level of wind, cycling costs are forecast to generally decline over 9me.

Larger levels of wind penetra9on increase the size of the wind wedge (the shaded area between the load and net load lines) in the chart which increases the size, intensity and frequency of cycling event.

Strategies to miagate cycling costs Opera9ng procedures Maintenance procedures Equipment upgrade Wind curtailment Energy storage Ø The first three listed above require extensive knowledge of the component history and most probable failure mechanisms. Ø Equipment upgrades cover a broad spectrum of op9ons based on ini9al design, current age and unit opera9ng mode. Ø Energy Storage helps reduce the rate of load change and variability over 9me.

Thank you!