Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7 $51.2 Congestion Management set aside $51.4 $65.6 $81.1 1st Bridge Golden Glades Multi-modal Facility Upgrade Golden Glades Multimodal Terminal I-95 (NB) Ramp to Turnpike/SR 826 Miami Beach Intermodal Center over Miami River 63rd Collins US-1 Tri-Rail/MDT Terminal 87th West Bay Drive Bridge replacement Capacity improvement, including a pedestrian overpass to connect Golden Glades intermodal center to business park west of CSX tracks 1,000 space deck, intermodal center with improved bus circulation and improved ADA, Replace multiple existing pedestrian bridges with a single-level bridge Add 1 auxiliary/ acceleration lane New North Beach bus transfer station $13.9 $96.5 $0.9 $3.2 $2.7 $20.4 $1.8 $18.0 $3.4 C-28 Miami-Dade Metropolitan Planning Organization
NW 14th NW 25th NW 25th NW 25th Viaduct NW 87th NW 87th extension NW 107th NW 107th NW South River Drive Parking expansion at Opa-Locka Tri-Rail station Civic Center NW 89th Court NW 89th Court SR 826 NW 36th NW 58th NW 41st 1000ft N of NW 122nd NW 19th Opa-Locka Tri-Rail Station Biscayne Boulevard HEFT SR 826 NW 87th Court NW 58th NW 95th NW 25th Okeechobee Road NW 23rd Widen to 3 lanes (2 to 3) $0.3 $1.3 $0.2 $0.2 $0.4 Traffic signal improvements; improve intersections to $5.0 $3.0 $20.2 accommodate truck movements. $64.7 Phase 2 - construction of Viaduct from SR $128.7 826 to NW 87th Court $0.8 $2.4 $13.6 $0.1 $0.3 $0.7 Extend to connect the freight hubs of $3.5 $3.0 $10.1 $0.3 $0.7 $1.7 Doral and Medley $0.8 $5.0 $12.5 $0.1 $0.3 $0.6 Widen bridge over Miami Canal $5.9 $0.1 $0.1 $0.1 Widen Tamiami Swing Bridge to 4 lanes Opa-Locka Tri-Rail station parking improvements $2.2 $44.6 $0.1 $0.1 $0.2 $0.4 $2.6 C-29 Miami-Dade Metropolitan Planning Organization
Port of Miami South Beach bus transfer station SR 25/Okeechobee Road SR 823/NW 57th /Red Road SR 823/NW 57th /Red Road SR 823/NW 57th /Red Road SR 823/NW 57th /Red Road SR 860/NW 186th /Miami Gardens Drive SW 137th SW 137th SW 264th SW 264th/SW 268th St at NW 154th W 19th Okeechobee Road W 53rd W 23rd NW 97th SW 136th SR 94/ Kendall Drive US-1 SW 24th US-1 SW 147th Ave W 23rd W 19th W 65th W 46th I-75 Kendall Drive SR 90/SW 8th SW 184th SW 8th SW 147th SW 112th Construct parking garage - intermodal hub capacity New South Beach bus transfer station Traffic signals Widen to 5 lanes (4 to 5) New 4 lanes New 2-lane Roadway improvements $10.5 $1.8 $1.9 $31.5 $15.4 $25.9 $43.2 $2.2 $15.8 $10.9 $12.36 $46.89 $52.9 $28.8 $0.6 $8.5 $0.1 $0.3 $0.7 $0.1 $0.5 $2.5 $0.1 $0.1 $0.2 $1.3 $4.1 $20.7 $0.4 $0.9 $2.2 C-30 Miami-Dade Metropolitan Planning Organization
SW 320th / Mowry Drive SW 328th / North Canal Drive Truck Parking Improvement Truck Parking Improvement West 24th Downtown/Port Access I-95 S. Dixie Highway W 52nd Golden Glades SW 187th US-1 Okeechobee Road W 76th Broward County Line with continuous left turn lanes (2 to 4) $3.6 $4.6 $18.2 $0.1 $0.3 $0.7 Intersection improvements - $0.1 $0.1 $0.5 $0.1 $0.1 $0.1 add turn lanes Provide a location in the area of Okeechobee and the HEFT for longterm $0.3 $1.3 $1.7 truck parking and staging. Develop a truck staging area near NW 36th and NW 37th $0.4 $1.2 $2.7 for the Port of Miami River. Widen to 5 lanes (2 to 5) $0.4 $13.2 $0.6 $0.7 $1.7 Construct I-95 NB Slip Ramp on NW 6th St; Implement NE/NW 5th/6th St/Port Blvd. $2.4 $0.1 $43.3 improvements for access between POM and I-95 slip ramp Special use lanes (managed lanes) $105.1 MIC Loan Repayment $93.0 C-31 Miami-Dade Metropolitan Planning Organization
SR 821/HEFT Eureka Drive Kendall Drive @ 67th SR 836/Dolphin SR 886/Port Bridge SR 924/Gratigny Parkway Extension (west) SW 127th SW 152nd Venetian Causeway Bridge Farmlife Roadway Expansion SR 836 NW 12th SR 826/I-75 SW 120th SW 147th Bayshore Drive SW 312th (Campbell Drive) NW 87th on I-75 Ramp to I-95 HEFT SW 144th SW 157th Purdy SW 328th (Lucy ) Widen to 8-, 10-, 12-lanes plus auxiliary lanes Special use lanes improvements - reconstruct as SPUI interchange Ramp to I-95 Repairs to bascule rail and vehicle bridge Limited access facility providing a connection between HEFT, I-75, SR 924, SR 826 New 4 lanes / Bridge replacement with left turn lanes $550.3 $13.9 $87.3 $68.3 $24.5 $143.7 $184.5 $42.2 $79.2 $371.8 $1.5 $5.7 $0.1 $0.2 $0.6 $2.5 $12.2 $0.2 $1.0 $0.7 $11.5 $0.1 $0.6 $4.9 $185.9 $0.2 $1.2 $4.4 $5.5 $22.1 $0.2 C-32 Miami-Dade Metropolitan Planning Organization
Freight Rail Safety and Security I-395 East of I-95 Medley Bridge/ Canal Improvement Program NW 82nd NW 97th NW 170th Perimeter Road NW 121 Way, NW 116 Way, NW 105 Way, NW 79 Ave NW 8th NW 58th HEFT NW 20th MacArthur Causeway Bridge NW 12th NW 74st NW 97th NW 57th Safety and security enhancements of freight transportation system, including grade crossing improvements and signal upgrades $12.2 $60.8 Major capital improvement $210.9 $397.5 $795.0 Improve the connections between Okeechobee Rd and Medley through a combination of bridge widening and canal improvements (NW 121 Way, NW 116 Way, NW 105 Way, NW 79 Ave) New 4 lanes New 4 lanes / New 6 lanes $2.0 $8.2 $2.4 $0.4 $39.8 $0.3 $4.4 $21.8 $0.2 $13.6 $17.0 $67.8 $1.2 $5.9 $29.7 $0.8 C-33 Miami-Dade Metropolitan Planning Organization
South Florida Rail Corridor SR 5/US-1/ Biscayne Boulevard SR 823/NW 57th /Red Road (EB) to I-95 (NB) @ 57th (NB) (EB) to NW 167th SR 836/Dolphin SR 874/Don Shula Ramp Connector SR 924/Gratigny Parkway Extension (east) North of Hialeah Market W 65th Okeechobee Road SW 136th NW 32nd North of MIC W 84th NW 103rd NW 87th SR 874 I-95 Double tracking of the remaining single track of Tri-Rail $8.4 $13.2 $41.6 Expand SB left turn lane for trucks $0.4 $2.2 entering Port $33.2 Operational improvement within the $3.5 $35.1 Golden Glades Improvements - reconstruct as $28.7 $169.2 SPUI interchange Addition of 1 auxiliary lane $1.4 $14.0 Operational improvement within the $35.1 Golden Glades improvement $189.5 Ramp connection to SW 136th $32.0 $25.9 $302.3 Limited access facility providing E/W mobility to I-95 $62.1 $108.0 $238.3 $316.4 C-34 Miami-Dade Metropolitan Planning Organization
SR 985/SW 107th Truck By-Pass SW 8th North of SW 8th SR-5/US-1 SW 296th Along Flagler / Civic Court SW 328th (Lucy ) 2.754 5.122 8.151 10.626 Flagler 2.754 SW 328th (Lucy ) SW 136th NW 6th SW 296th 5.122 8.151 10.626 14.184 $18.7 $76.3 $43.0 (2 to 4 ) New 2 lanes (Companion project with Krome widening SW 328th to SW 296th ) (2 to 4) (Companion project with Krome truck bypass) $91.0 $190.4 $130.1 $28.5 $152.3 $48.8 $72.8 $57.9 $82.4 C-35 Miami-Dade Metropolitan Planning Organization
SW 72nd / Sunset Drive SW 104th / Killian Parkway SW 157th SW 157th SW 200th SW 312th / Campbell Drive SW 312th / Campbell Drive SW 117th SW 160th SW 8th SW 184th US-1 SW 152nd SW 157th SW 167th SW 42nd SW 216th Quail Roost Drive SW 137th New 4 lanes / New 4 lanes / New 2 lanes Turnpike access ramps (west-tonorth and southto-west) with left turn lanes $3.8 $63.4 $2.0 $0.5 $2.1 $6.9 $0.1 $1.0 $8.7 $16.2 $2.5 $1.8 $0.4 $28.6 $0.3 $1.5 $23.4 $0.8 $3.1 $15.6 $0.1 $4.1 $5.2 $20.6 $0.5 C-36 Miami-Dade Metropolitan Planning Organization
SW 312th / Campbell Drive US-1 (Busway) US-1 (Busway) West NW 14th SW 176th SW 88th SW 88th North of Lincoln Road SW 197th Ave HEFT Florida City Florida City South of 18th Additional parkand-ride lots at selected locations Bus signal priority New connector bridge $3.5 $8.6 $67.5 $0.6 $5.9 $42.5 $50.1 $52.7 $0.5 $1.8 $1.5 $5.3 $4.7 $0.1 Partially Funded Projects SR 826/ Palmetto East-West/Dolphin Corridor Premium Transit* FEC Corridor* Additional Tracks at Miami Intermodal Center** I-75 Golden Glades MIC Vicinity of FIU Downtown Miami Miami Intermodal Center Broward County Line Add Special Use Lanes Premium transit service Passenger rail on the FEC corridor Construct passenger rail tracks to allow Amtrak service at the MIC and/or commuter rail *Preliminary phases (Planning,, and/or ROW) funded in TIP (Priority 1) **Illustrative project $73.6 C-37 Miami-Dade Metropolitan Planning Organization
SR25/Okeechobee Rd/US 27 79th Krome Conversion - Construct Grade Separated Overpasses at Major Intersections $43.5 Metrorail North Corridor Extension* SW 82 Ave* SW 102 Ave* SR 836/Dolphin SR 836/I-95 Corridor Martin Luther King Jr. Metrorail station Tamiami Canal Tamiami Canal NW 42nd / NW 27th West of NW 17th NW 215th St/ NW 27th Ave NW 17th /NW 57th I-95 Premium transit service along NW 27th Ave Bridge Construction Bridge Construction EB Auxiliary Lane from NW 42nd Avnuee to NW 17th ; WB Auxiliary Lane from NW 27th to NW 57th and associated interchange improvements at NW 42nd and NW 27th Corridor Improvements $55.9 $128.2 *Preliminary phases (Planning,, and/or ROW) funded in TIP (Priority 1) C-38 Miami-Dade Metropolitan Planning Organization
SR 836/Dolphin SR 836/SR 112 Interconnector HEFT SR 836/ Lejeune interchange SR 826/836 SR 112/37th interchange SR 836/SR112 SR 826 I-95/I-395 Connect 4Xpress SR 836 Southwest Extension* SR 5/US-1 SR 25/Okeechobee Road Central Miami-Dade County NW 137th Ave Dadeland South SR 826 North Miami- Dade County SW Miami- Dade I-95 Krome Conversion of general purpose lanes to managed lanes Express connection between SR 836 and SR 112 in the general alignment of 37th/42nd avenues Conversion of general purpose lanes to managed lanes Limited access N/S facility connecting the northern and central portion of the County. Multimodal Corridor Multi-modal transportation corridor Corridor improvements and managed lanes Conversion to limited access toll facility $30.7 $100.2 $1.1 $112.3 $100.0 $117.0 $60.8 *Preliminary phases (Planning,, and/or ROW) funded in TIP (Priority 1) C-39 Miami-Dade Metropolitan Planning Organization
Dadeland US-1 Busway Florida City Managed Lanes $65.1 South SR 821/HEFT SR 836 I-75 Widen to 10-lanes $3.0 SR 821/HEFT I-75 $28.6 Modification Turnpike SR 821/HEFT I-75 Widen to 8-lanes $0.2 Mainline Biscayne Dr SR 821/HEFT Campbell Dr Widen to 6-lanes $0.9 (SW 288th St) SR 821/HEFT Golden Glades Biscayne Dr (SW 288th ) SR 826 (EB) I-75 SR-826 NW 103rd SW 216th I-95 (NB) Broward County Line I-75 Widen to 8-lanes $2.3 Ramp Improvements to provide direct system to system connection Add special use lanes and provide an envelope for future transit service Provide transit envelope for future transit service $5.6 $24.7 $20.1 $1.3 C-40 Miami-Dade Metropolitan Planning Organization