SWING SEAT Item Description Qty Specifications 1 Swing Seat Strap or Infant * 1 2 8mm S Hook * 2 Materials: 3 Swing Chain Senior or Junior * 2 Colour: Optional TO FIX TO OVERHEAD D Shackles M12 2 Finish: Powdercoat Bolts M12 2 Locknuts M12 2 checked and retightened, if necessary, 1 week after installation. Safety Area 1. Secure Swing Seat to swing chain using S Hooks. 2. Ensure that the S Hooks are fully closed and secure. 3. Height of swing seat surface is minimum 455mm & maximum 600mm. Please Note: Once an S Hook has been closed, never open and reuse it. They must be replaced. VERY IMPORTANT: Do not hang Swing Chains/ Seats until pit has been back filled with approved softfall. Doc No. F-01B Age Groups:
JUNIOR DOUBLE SWING Item Description Qty Specifications 1 Swing Overhead 1 2 Swing Legs 4 Materials: 3 M12 Gal D-Shackle * 4 4 Swing Hanger Nylon Bush (Fitted) 4 5 8mm S-Hook * 8 Colour: Optional 6 M12x70mm H/T 8.8 Z/P Hex Head Bolt * 4 7 M12x90mm H/T 8.8 Z/P Hex Head Bolt 8 Finish: Powdercoat 8 M12 S/Steel Nyloc Nut 12 9 M12 S/Steel Flat Washer 16 10 Swing Chain (See Doc. F-01-6) * 4 11 Various Swing Seat (See Doc. F-01b) * 2 Doc No. F-02J Motion Ride 1. Locate on the plan the position of the swing. 2. Bolt the Swing Legs (1) to the Swing OverheadS (2) using M12x90mm Hex Head bolts (7) with M12 Washers (9) under bolt heads and M12 Nyloc Nuts (8). (Refer Detail A) 3. Dig footings for the swing legs at the locations. (Refer Doc: GENI001 Type A) 4. Lower assembled Swing Legs and Overhead into footing holes. Check that the height from the bottom face of the Swing Overhead Beam (2) will be 1817mm above finished Softfall Level. 5. Tighten all bolts and pour footings. Once concrete has cured backfill footing holes then fill & level pit with certified softfall. 6. Only once softfall is level, hang Swing Seats (11) and Chains (10). Using 8mm S-Hooks (5) connect the Swing Seat Chain (10) to the M12 D-Shackle (3) over the Swing Hanger on the Overhead with M12 x70mm H/T 8.8 bolt (6) and M12 Nyloc Nut (8). (Refer Detail B) 7. Ensure all bolts are tight and all S-hooks are fully closed (metal-to-metal) before use. checked and retightened, if necessary, 1 week after installation. Safety Area: Age Group:
SENIOR DOUBLE SWING Item Description Qty Specifications 1 Swing Overhead 1 2 Swing Legs 4 Materials: 3 M12 Gal D-Shackle * 4 4 Swing Hanger Nylon Bush (Fitted) 4 5 8mm S-Hook * 8 Colour: Optional 6 M12x70mm H/T 8.8 Z/P Hex Head Bolt * 4 7 M12x90mm H/T 8.8 Z/P Hex Head Bolt 8 Finish: Powdercoat 8 M12 S/Steel Nyloc Nut 12 9 M12 S/Steel Flat Washer 16 10 Swing Chain (See Doc. F-01-6) * 4 11 Various Swing Seat (See Doc. F-01b) * 2 Doc No. F-02S Motion Ride 1. Locate on the plan the position of the swing. 2. Bolt the Swing Legs (1) to the Swing OverheadS (2) using M12x90mm Hex Head bolts (7) with M12 Washers (9) under bolt heads and M12 Nyloc Nuts (8). (Refer Detail A) 3. Dig footings for the swing legs at the locations. (Refer Doc: GENI001 Type A) 4. Lower assembled Swing Legs and Overhead into footing holes. Check that the height from the bottom face of the Swing Overhead Beam (2) will be 1817mm above finished Softfall Level. 5. Tighten all bolts and pour footings. Once concrete has cured backfill footing holes then fill & level pit with certified softfall. 6. Only once softfall is level, hang Swing Seats (11) and Chains (10). Using 8mm S-Hooks (5) connect the Swing Seat Chain (10) to the M12 D-Shackle (3) over the Swing Hanger on the Overhead with M12 x70mm H/T 8.8 bolt (6) and M12 Nyloc Nut (8). (Refer Detail B) 7. Ensure all bolts are tight and all S-hooks are fully closed (metal-to-metal) before use. checked and retightened, if necessary, 1 week after installation. Safety Area: Age Group:
PLAYVILLE FOOTING DETAILS STRUCTURE: MIRACLE: TYPE A Allow for extra 300mm in - ground depth if Freestanding TYPE B Doc No. GENI001