REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

Similar documents
Rules for Classification and Construction Ship Technology

SLOP RECEPTION AND PROCESSING FACILITIES

DYNAMIC POSITIONING SYSTEMS

Dynamic Positioning Systems

Assessment of Ships and Managers for the Acceptance of Extended Interval Between Bottom Surveys in Dry-Dock

Guidelines on Surveys for Dynamic Positioning System

Return to Session Menu DYNAMIC POSITIONING CONFERENCE QUALITY ASSURANCE SESSION. The Meaning of LIFE. Richard Purser GL Noble Denton

GAS FUELLED ENGINE INSTALLATIONS

Electrical Shore Connections

RULES FOR CLASSIFICATION. Yachts. Part 5 Ship types Chapter 3 Passenger yachts. Edition October 2016 DNV GL AS

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS

BMA INFORMATION BULLETIN No. 96

SILENT CLASS NOTATION

RULES FOR CLASSIFICATION Yachts. Part 5 Ship types Chapter 3 Passenger Yachts. Edition December 2015 DNV GL AS

GUIDELINES FOR VESSELS WITH DYNAMIC POSITIONING SYSTEMS ***

DYNAMIC POSITIONING SYSTEMS

GAS FUELLED ENGINE INSTALLATIONS

ANNUAL DYNAMIC POSITIONING TRIALS FOR DYNAMICALLY POSITIONED VESSELS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

STABILITY AND WATERTIGHT INTEGRITY, CLOSING APPLIANCES

AIR VENT HEADS STANDARD FOR CERTIFICATION DET NORSKE VERITAS. No. 2.9 Type Approval Programme No OCTOBER 2008

Rules for Classification and Construction Additional Rules and Guidelines

STABILITY AND WATERTIGHT INTEGRITY

AMENDMENTS TO THE GUIDELINES FOR VESSELS WITH DYNAMIC POSITIONING (DP) SYSTEMS (MSC/CIRC.645) Proposed amendments to the Guidelines

LNG BOIL-OFF RE-LIQUEFACTION PLANTS AND GAS COMBUSTION UNITS

Part 3 Hull Chapter 2 General arrangement design

Reliability Analysis Including External Failures for Low Demand Marine Systems

IMO HIGH SPEED CRAFT CODE

PERIODICAL SURVEY REQUIREMENTS

10 December 2010 GUIDANCE FOR WATERTIGHT DOORS ON PASSENGER SHIPS WHICH MAY BE OPENED DURING NAVIGATION

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

OFFICIAL MESSAGE CIRCULAR

Application Research for DP Enhanced Notation

RULES PUBLICATION NO. 119/P

REGULATION on life boats operated from land, No 123/1999 CHAPTER I. General provisions Article 1

TYPE APPROVAL CERTIFICATE

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 7 General information and documentation requirements for submarines

Doors in watertight bulkheads of cargo ships and passenger ships

Subj: USE OF DYNAMIC POSITIONING (DP) BY OFFSHORE SUPPLY VESSELS (OSVs) FOR OIL AND HAZMAT TRANSFERS

OIL & GAS. MTS DP Committee. Workshop in Singapore Session 4 Day 2. Unwanted Thrust

IMCA DP Station Keeping Bulletin 03/18 August 2018

ShipRight Design and Construction. Procedure for Assigning SRtP Descriptive Note

NAVAL LANDING CRAFT HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT RULES FOR CLASSIFICATION OF DET NORSKE VERITAS

Rules for Classification and Construction Additional Rules and Guidelines

Part 7 Fleet in service Chapter 2 Inclining test and light weight check

DP Station Keeping Event Bulletin

THE APPLICATION OF SPECIAL PURPOSE SHIP (SPS) REQUIREMENTS TO OFFSHORE SUPPORT VESSELS

SHIPS FOR NAVIGATION IN ICE

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL

Record of Assessment OFFICER IN CHARGE OF AN ENGINEERING WATCH

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL

NAUTICAL SAFETY HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT RULES FOR CLASSIFICATION OF DET NORSKE VERITAS

Part 4 Machinery and systems Chapter 6 Piping systems, pumps and compressors

CHEMICAL CARRIERS SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 4

HYDRAULIC CYLINDERS STANDARD FOR CERTIFICATION DET NORSKE VERITAS. No. 2.9 Type Approval Programme No OCTOBER 2009

M-06 Nitrogen Generator (Nitrogen Making Machine)

SHIPS FOR NAVIGATION IN ICE

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Rules for Classification and Construction Ship Technology

N.I.V. Bluestar Plus

OFFSHORE SUPPORT VESSELS 2015

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the. IGF Code

Advisory Circular (AC)

TECHNICAL INFORMATION BOLLARDPULL TRIALCODE. ForTugs with SteerpropPropulsion. Steerprop

IACS History File + TB

LIQUEFIED GAS CARRIERS

Part 3 Structures, equipment Chapter 1 Hull design and construction, general

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge]

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 15 Stability. Edition October 2015 DNV GL AS

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

Accident Report. San Constanzo Flooding approximately 35 miles east of Gisborne on 18 January 2004

ADMINISTRATIVE INSTRUCTION No. STCW-14 QUALIFICATION / CERTIFICATION REQUIRED FOR OPERATION OF A DOMESTIC VESSESL

IMCA DP Station Keeping Bulletin 04/18 November 2018

GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER SHIPS CONSTRUCTED BEFORE 1 JANUARY 2014 *

CHEMICAL CARRIERS SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 4

REGASIFICATION VESSELS

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

Introduction. 1. Large oil-free screw compressor, Emeraude ALE series

Hydraulic (Subsea) Shuttle Valves

ATL R/V Atlantis AUXILIARY PLANT OPERATION APPENDIX OPERATING PROCEDURES

IMO EXPLANATORY NOTES FOR THE APPLICATION OF THE SAFE RETURN TO PORT REQUIREMENTS

LIQUEFIED GAS CARRIERS

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

Testing Procedures of Watertight Compartments

PIPING SYSTEMS HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT RULES FOR CLASSIFICATION OF DET NORSKE VERITAS

Electrical, electronic and control engineering at the operational level

Hydro Plant Risk Assessment Guide

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary

IST-203 Online DCS Migration Tool. Product presentation

.3 the correct operation of the communications medium between the navigation bridge and the steering gear compartment.

Challenges in Ship Design to Maintain Thrusters inside Ship

Solenoid Valves used in Safety Instrumented Systems

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

ICE LOADS MONITORING SYSTEMS

Significant Change to Dairy Heat Treatment Equipment and Systems

RESOLUTION MSC.94(72) (adopted on 22 May 2000) PERFORMANCE STANDARDS FOR NIGHT VISION EQUIPMENT FOR HIGH-SPEED CRAFT (HSC)

Transcription:

RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2 REDUNDANT PROPULSION JANUARY 1996 CONTENTS PAGE Sec. 1 General Requirements... 5 Sec. 2 System Design... 7 Veritasveien 1, N-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11

CHANGES IN THE RULES General The present edition of the Rules includes additions and amendments decided by the Board as of December 1995, and supersedes the January 1990 edition of the same chapter. The Rule changes come into force on 1st of July 1996. This chapter is valid until superseded by a revised chapter. Supplements will not be issued except for an updated list of minor amendments and corrections presented in the introduction booklet. The introduction booklet is normally revised in January and July each year. Revised chapters will be forwarded to all subscribers to the Rules. Buyers of reprints are advised to check the updated list of Rule chapters printed Pt.0 Ch.1 Sec.1 to ensure that the chapter is current. Main changes Sec.2 SystemDesign The current Rules for redundant propulsion require two engine control rooms for the RPS notation. However, the rules do not require any engine control station. The control stations may be the bridge and an engine control room or engine room. The changes are entered in D101 and D102. An amended guidance note to D102 is included. Corrections and Clarifications In addition to the above stated rule amendments, some detected errors have been corrected, and some clarifications have been made in the existing rule wording. Comments to the rules may be sent by e-mail to rules@dnv.com For subscription orders or information about subscription terms, please use distribution@dnv.com Comprehensive information about DNV and the Society's services is found at the Web site http://www.dnv.com Det Norske Veritas Computer Typesetting (FM+SGML) by Det Norske Veritas PrintedinNorwaybyGCSAS. If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such person for his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum compensation shall never exceed USD 2 million. In this provision "Det Norske Veritas" shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of Det Norske Veritas.

Pt.6 Ch.2 Contents Page 3 CONTENTS SEC. 1 GENERAL REQUIREMENTS... 5 A. Classification...5 A 100 Application...5 A 200 Class notations...5 B. Documentation...5 B 100 Submission of plans and information...5 C. Certification...5 C 100 General...5 D. Tests...5 D 100 Survey and test upon completion...5 D 200 Survey for maintenance of class notation...5 D 300 Survey and test of system alterations...6 SEC. 2 SYSTEM DESIGN... 7 A. General...7 A 100 Redundancy concept...7 A 200 Failure modes...7 B. System Configuration... 7 B 100 General...7 B 200 Power generation...7 B 300 Power distribution...7 B 400 Power plant control...7 C. Auxiliary Systems... 8 C 100 General...8 C 200 Fuel oil...8 C 300 Lubrication oil system...8 C 400 Cooling water...8 C 500 Compressed air system...8 D. Propulsion Control System... 8 D 100 General...8 D 200 Control system redundancy...8 D 300 Control system power supply...8 E. Steering Gear and Control System... 8 E 100 Steering gear redundancy...8 F. Separation Requirements for RPS... 8 F 100 General...8

Pt.6 Ch.2 Contents Page 4

Pt.6 Ch.2 Sec.1 Page 5 SECTION 1 GENERAL REQUIREMENTS A. Classification A 100 Application 101 The rules in this Chapter apply to vessels where the propulsion machinery is to comply with the requirements for a fully redundant propulsion system and steering system. 102 The requirements of these rules are supplementary to the main class rules. In particular it is referred to relevant sections of: Pt.3 Ch.3 Hull Equipment and Appendages Pt.4 Ch.2 Rotating Machinery, General Pt.4 Ch.6 Piping Systems Pt.4 Ch.8 Electrical Installations Pt.4 Ch.9 Instrumentation and Automation A 200 Class notations 201 Vessels built and tested in compliance with the requirements of this document and the requirements of the main class rules may be assigned one of the following additional class notations: RP - Redundant Propulsion RPS - Redundant Propulsion and Separate. 202 Class notation RP is applicable to vessels where the propulsion system is of a redundant design such that at least 50% of the propulsion power can be restored after any single failure in the propulsion system, before the vessel has lost steering speed. 203 The propulsion system power capacity is to be such that 50% thereof, as recovered after any failure, will enable the vessel to maintain a speed of not less than 6 knots while heading into BF 8 weather conditions with corresponding wave conditions. The requirement is to be documented by computations where relevant wave spectrum is utilised. The time allowed for recovery of the propulsion power is linked to the steering capability with the object of allowing more time whenthevesselisattransitspeedinopenwatersthanwhenthe vessel is proceeding at reduced speed in congested waters or narrow passages, or is in a manoeuvring situation. This implies that systems which are not continually available shall be prepared for service before entering critical situations where the recovery time otherwise would be too long in view of external hazards. 204 The steering system is to be of redundant design, consisting of 2 rudders and steering gears, where each system is to be in compliance with main class rules. 205 Class notation RPS is applicable to vessels where the propulsion system is of a redundant design such that at least 50% of the propulsion power can be restored after any single failure in the propulsion system, including failures which are caused by fire and flooding incidents, before the vessel has lost steering speed. 206 For RPS, steering capability is to be available after any single failure including incidents of fire and flooding in relevant areas. 207 For both RP and RPS, it is required that the vessel shall be able to proceed at 50% propulsion power for a period of at least 72 hours. 208 For vessels built for a specific service where the duration of a sea voyage is less than 72 hours, the built-in endurance at 50% propulsion may be limited to the duration of the maximum crossing time. B. Documentation B 100 Submission of plans and information 101 The propulsion system is to be documented according to main class requirements. 102 For instrumentation and automation, including computer based control and monitoring, see Pt.4 Ch.9 Sec.1. 103 A Failure Mode and Effect Analysis, FMEA, for the complete propulsion system with its auxiliaries is to be submitted for approval. The FMEA shall show that redundancy requirements are fulfilled where relevant. 104 A test procedure for the final sea trial of the completed propulsion system is to be submitted for approval. C. Certification C 100 General 101 All equipment is to be certified according to main class requirements. 102 Computer based propulsion control system is to be certified according to Pt.4 Ch.9 Sec.1. 103 Electric motors for propulsion, and for pitch and azimuth control of propulsion thrusters, are considered as essential motors, and are to be certified according to main class. 104 Semiconductor converters for propulsion are to be certified. D. Tests D 100 Survey and test upon completion 101 For initial issue of class notation upon completion, the propulsion system is to be subjected to final tests at sea trials in compliance with the requirements for main class. 102 Additional tests are to be carried out to verify the ability of the system to maintain at least 50% of propulsion power after any single failure within the propulsion system. 103 Additional tests are to be carried out to verify the redundancy of the propulsion system. The Failure Mode and Effect Analysis should be used to determine the extent of such tests. 104 It is not required that the 72-hour period of ensured operation is demonstrated. However, time-critical resources are to be substantiated by adequate tests of rate of consumption and depletion. 105 The complete scope of testing is to be presented in a test program. D 200 Survey for maintenance of class notation 201 Survey and tests are to be carried out at the intervals determined by the Society, see Pt.7 Ch.2.

Pt.6 Ch.2 Sec.1 Page 6 D 300 Survey and test of system alterations 301 If systems of importance to one of the class notations of these Rules are modified or extended, the Society is to be notified, whereupon the need for survey and test will be evaluated.

Pt.6 Ch.2 Sec.2 Page 7 SECTION 2 SYSTEM DESIGN A. General A 100 Redundancy concept 101 The redundancy concept shall ensure the ability of the system to remain in operation for at least 72 hours, alternatively maximum crossing time, with the defined propulsion capacity and steering after the occurrence of any single failure. A 200 Failure modes 201 For the RP notation, the defined failure modes include all cases of component breakdown and operational malfunctions, but excludes the effects of fire and flooding. Thus, it is acceptable that redundant components are installed in a common area or compartment. Main Class differentiates between active and passive components, and passive components are not required to be redundant. I.e., the reliability of passive components is assumed adequate to prevent component failures. This philosophy is applied also for all of the above notations, but a number of components which are normally considered to be passive are defined as active. E.g., all pumps, coolers, filters, and motorised valves are to be considered as active components. Fuel oil tanks are also considered to be active because the quality of the contents can deteriorate relatively rapidly. 202 For the RPS notation, the failure modes include all those defined for RP, in addition to any failure in the propulsion and steering systems that will result from incidents of fire and flooding. Hence, redundant components and systems are to be separated by watertight or fire proof bulkheads as relevant. See separation requirements in F100. B. System Configuration B 100 General 101 The basic requirement of maintaining at least 50 % of propulsion power may be realised by installation of two mutually independent propulsion systems of equal capacity. «At least 50% propulsion power» is simply to be understood as the nominal output of one propeller at maximum continuous rating. I.e. the deviations in thrust output caused by changes in vessel speed and propeller RPM at loss of one propulsion system need not to be considered. The systems are to be independent all the way, including the propeller. Hence, the typical configuration will consist of two propellers, alternatively two azimuth thrusters. Two independent engine systems geared onto one propeller are not considered equivalent. 102 The redundancy in steering function shall be realised by the installation of two mutually independent steering systems, each consisting of one rudder and steering gear. Each system, with steering controls and actuators, is to comply with the main class rules for steering systems. The redundancy requirement may alternatively be met by the installation of a minimum of two azimuth thrusters at the stern, provided there is full independence of the rotation controls and actuators. Other designs will be considered on a case-by-case basis. 103 Configurations consisting of more than two independent sub-systems are acceptable. The configuration may contain systems which are not in normal use, but would be required to maintain 50% propulsion power after any single failure. Such arrangements will be accepted upon evaluation of the start-up time of the systems that are to be brought into operation, and the recovery time of those that were in operation. 104 With more than two sub-systems in the configuration, the sub-systems may be of unequal capacities, provided the 50% requirement can be maintained after the occurrence of any single failure. B200 Powergeneration 201 For diesel engine propulsion systems, the propulsion power is produced directly by the main diesel engines. The power for machinery systems and steering is to be generated by a power plant according to main class, with additional regard to redundancy requirements for the actual notation. 202 For electric propulsion systems, the propulsion power is produced by diesel generators and/or turbo generators. The power for machinery systems and steering may be produced by the same generators, and distributed integrated with the propulsion power system. Alternatively, auxiliary power may be produced by other generators in a separate power system, where all redundancy requirements will be applicable. B 300 Power distribution 301 When power for propulsion or its auxiliaries is supplied from one switchboard, the bus-bars of the switchboard are to be arranged for automatic separation into at least 2 sections, with the circuits for propulsion units and auxiliaries distributed between the sections. Automatic separation is to take place when short circuit currents are detected on the main bus-bars. 302 When the switchboard is divided into sections as described 301, the auxiliary propulsion systems are to be arranged so that each section of the propulsion system can be operated independently of the other sections. 303 For RPS notation, the switchboard sections must be separated by A-60 protection. The switchboard sections may be connected by bus-tie breakers, which are to be installed one at each side of the A-60 partition. 304 The power distribution system is to be arranged so that power supply can be maintained or restored for necessary auxiliary services with a minimum down-time. The time needed to restore power supply after a total black-out will be included in the acceptable recovery time as stated in Sec.1. 305 The steering function is to be maintained by emergency power upon loss of main power. B 400 Power plant control 401 The power plant control system is to be arranged so that a single failure therein will not jeopardise the propulsion redundancy concept.

Pt.6 Ch.2 Sec.2 Page 8 C. Auxiliary Systems C 100 General 101 The auxiliary systems shall be arranged so that 50% propulsion power can be maintained after any defined single failure in these systems. The 50% capacity may be realised by 100% of one propulsion unit or partial operation of both/all sub-systems. 102 Failure is to be considered for all active components as specified in A201. Fixed piping may be shared by redundant components for the RP notation. 103 For the RPS notation, separate piping systems are to be arranged for redundant systems. Cross-over pipes are accepted provided these can be closed from both sides of separating bulkheads. C 200 Fuel oil 201 There are to be at least two service tanks, which are to serve dedicated sub-systems. Cross-over facilities may be arranged, but are intended to be kept closed in normal operation. 202 For RPS, the service tanks are to be installed one in each of the separate engine rooms. 203 The transfer and fuel oil pre-treatment systems and tank arrangements shall be able to support 50% propulsion capacity for at least 72 hours, alternatively maximum crossing time, after any single failure. Fuel pre-treatment is to be understood as all equipment for purification, filtering, heating, and measuring fuel oil. 204 If the fuel system requires heating, the heating system is to comply with redundancy requirements C 300 Lubrication oil system 301 Each propulsion system is to have an independent lubrication oil circulation system. 302 The lubrication oil storage and purification system is to be able to support 50% propulsion for at least 72 hours, alternatively maximum crossing time, after any single failure. C 400 Cooling water 401 Cooling water systems for RP and RPS notations are to comply with main class rules, also taking into consideration the requirements for component redundancy given in Sec.1 A201. 402 Fresh water cooling systems are to be arranged with full separation between redundant systems, in view of the risk of severe loss of water or accumulation of gas due to leakage. C 500 Compressed air system 501 The starting air system is to comply with main class for RP.ForRPS, an equivalent system will be accepted when the compressors and air receivers are adequately distributed on both sides of fire/flooding partitions. 502 The control air system is to be considered in view of the actual use of compressed air for control functions. If control air is found necessary for essential functions in the propulsion and steering system, full redundancy requirements will apply. D. Propulsion Control System D 100 General 101 The propulsion control system in each engine room is to be arranged according to main class. 102 For RPS notation, the propulsion control system is to be arranged in two separate control stations with A-60 separation. One of the stations may be located in the engine control room, if arranged, and one on the bridge provided the bridge control system is independent of the engine control room. Alternatively one of the stations may be located in one engine room and one on the bridge provided the bridge is independent of the engine room containing the control station for the other engine. D 200 Control system redundancy 201 The remote propulsion control system is to be redundant, so that any single failure in the common parts of the system will not prevent continued normal control of the complete propulsion system. 202 Redundancy is not required for parts of the control system that are dedicated to control of a single propulsion unit. 203 At failure of control of one propulsion unit, this unit may be stopped, as an alternative to remain in operation at fixed thrust. 204 If a centralised control system is arranged for auxiliary systems, failure within this system shall not cause disruption of the total propulsion system. The portion affected is to be consistent with the redundancy concept for propulsion. D 300 Control system power supply 301 If the control system is powered by uninterruptible power supplies (UPS), an alternative power source is to be arranged to secure operation after the battery back-up has been exhausted. A bypass or change-over switch may be adequate. 302 Control power sources are to be selected/duplicated so that all equipment that has not lost the main power source due to a partial black-out can be operated. 303 Upon total black-out, power supply for an adequate part of the auxiliary services, is to restored within 30 seconds. E. Steering Gear and Control System E 100 Steering gear redundancy 101 The steering gear is to be redundant, consisting of two identical steering gear systems, each in compliance with main class rules. 102 Failure of one steering gear is not to affect the other. At maximum failure of one propulsion system, steering capability as required for main steering gear is to be available at the maximum achievable speed. See Pt.3 Ch.3. F. Separation Requirements for RPS F 100 General 101 Redundant equipment is to be separated by fire-proof and/or watertight bulkheads as relevant. Watertight bulkheads must be strong enough to withstand one-sided flooding. 102 Cabling to redundant equipment is not to run along the same route. When this is practically unavoidable, cables running together within an A-60 cable duct or equivalent fire protection, are accepted. This alternative is not accepted in high fire risk areas, e.g. engine rooms and fuel treatment rooms.

Pt.6 Ch.2 Sec.2 Page 9 103 Separation of steering gears shall be done with consideration of actual risk of damaging fire or flooding of the steering gear compartment. 104 The propulsion control panel on the bridge is accepted as a non-separable panel for both/all propulsion systems. Other redundant components of the central control system which do not need to be located together for operational reasons are to be separated by A-60 partitions. The degree of separation is to be consistent with the system redundancy concept. 105 Local control of propulsion and steering is to be possible according to main class requirements. Such means are to be operable after any failure of the central bridge installation by reliable means of separation of remote and local control.

Pt.6 Ch.2 Sec.2 Page 10