S110 Steel Level Panel Installation Instructions

Similar documents
FairwayRailing.com


The slots for 7V4-5 have two predrilled holes. Locate them and connect them with a line. These will be at rib #1,3,4,6.

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

HOW TO INSTALL STAIR HANDRAIL EPUB

FITNESS, SAFETY & MEDICAL SUPPLIES

A-FRAME RESIN IN & OUT FLIP UP LADDER

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Model: 5100 OmniSteel Volleyball System

Advantage Lockers & Bike

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

INSTRUCTIONS 360 Y-DROP HAGIE STS 2015

INSTALLATION INSTRUCTIONS

FLEXI GATE WITH SMALL PET DOOR READ ALL INSTRUCTIONS BEFORE ASSEMBLY AND USE OF GATE. KEEP INSTRUCTIONS FOR FUTURE USE.

Assembly Instructions. -Cantilever Boat Lifts

Model: 7200 Collegiate Volleyball System

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

VISIT THE LIFETIME WEB SITE: **U.S. and Canada customers ONLY** IF ASSISTANCE IS NEEDED, COPY

STOL CH 701. STOL CH 701 Bubble doors Rear view. Front view Right door. Revision 1.0 (10/03/2003) 2003 Zenith Aircraft Co

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

TUBE SIGN POST PRODUCTS

SECTION 23iS/U: SIDE SKINS

VOLLEYBALL SPIKE TRAINER. Assembly Instructions. Owner s Manual. Model # VST-400. Club Volleyball Gear

INSTALLATION INSTRUCTIONS

GP100 SERIES ENDURANCE PLAYGROUND SYSTEMS. Installation and Assembly Instructions. Gared Holdings, LLC 9200 E. 146th St. Noblesville, IN 46060

ZODIAC 601 XL. Position the main spar parallel to the edge of the workbench. Raise the wing skeleton on steel beams or spacers.

Ramp Hand-railing System. Complies with Building Regulations. Lockinex. ea i, ea u i

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

Bike-Shell Model 301P

To address this issue, Ariens Company has developed two cradle plates kits:

INSTALLATION INSTRUCTIONS

Troyer s Gourd Rack 8 unit F R H O P

F-1279-R UPPER RIGHT SKIN F-1280-R RIGHT SIDE SKIN F-1281-R LOWER RIGHT SKIN F-1208-R FUSELAGE FRAME

TRUELINE. RAILing. Professional Railing Experts

RUDDER KIT INSTRUCTIONS

42 inch Mower for TimeCutter Z Riding Mowers. Note: Determine the left and right sides of the machine from the normal operating position.

SCOUT DECK ANCHOR 3 1/4" BONDING SCREW

(PLEASE CONTACT YOUR LOCAL DEALER or CUSTOMER SERVICE FOR WARRANTY INFORMATION)

Datasheet liniled Handrail 48.3 V1017 IK10 IP68. F RoHS IP40/IP65 FROST CLEANING AGENTS RESISTANT UV RESISTANT

C75-RA-2 Rudder Skin

#59114 Rola 2-Bike Rack Carrier (Shown Assembled) (A) (C) (B)

BALL STOP INSTALLTION GUIDE

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

WHY COLOR GUARD IS YOUR FIRST CHOICE

OWNER'S MANUAL LOCK-N-LOAD BULLET FEEDER (PISTOL)

SUGGESTED SLIDE INSTALLATION PROCEDURE

VISIT THE LIFETIME WEB SITE: **For U.S. and Canada Customers ONLY:** IF ASSISTANCE IS NEEDED,

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS

INSTALLATION INSTRUCTIONS

CIRRUS AIRPLANE MAINTENANCE MANUAL

Model: LG IP CL ADULT SUPERVISION REQUIRED

SETTING UP THE MODEL 210B SRA

ROCKSOLID SINGLE POST ANCHOR

ROCKSOLID DUAL POST ANCHOR

WHY COLOR GUARD IS YOUR FIRST CHOICE

Installation Instructions for the AlphaDeck Staging System

Halsey Taylor Owners Manual STOP!

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

RBI Solar One-Piece Ground Mount Solution GM-GS

SECTION 10iS: TAILCONE

BICYCLE ACCESS RAMP INSTALLATION INSTRUCTIONS. Customer Service all4cycling.com.au

Tapped Hole (.375) Tapped hole 15 (.594) (.391±.004) Frame 19±0.2 (.750±.008) 12.7±0.2 (.500±.008) 19±0.2 (.750±.008) R S 4 x Ø 5.4 (.

Retractable Security Cover for a Swim Spa

GV Standard X-Vent. Setup, Commissioning & Installation Guide

Instruction Manual for ZY-021 Height adjustable Acrylic Backboard with Chain net

Rudder Kit Assembly Instructions for Quest 13

HARDWARE. Push / Pulls... A Pivots... A Hinges, Locks and Cylinders... A Handles, Locks and Accessories... A4...

MAINTENANCE FOR THE MODEL 210B-2 SRA

Santa Fe Cycles Assembly Guide Introduction

Air Intake Snorkel Kit

(PLEASE CONTACT YOUR LOCAL DEALER or CUSTOMER SERVICE FOR WARRANTY INFORMATION)

This document to be used with Hurley traditional Davits

MODEL TRIPEX PULLEY SYSTEM

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

SHEET 2: VERTICAL INSTALLATION

Parts & Installation Instructions SV & SV 2 8.5, 9.5 & 10.5 and SVLD 7.5 Snow Plow

RUDDER KIT INSTRUCTIONS

STERN MOTOR FOOT CONTROL KIT For use with the Torqeedo 403 Ultralight

PRO-III & IV (916) (800) Parts: 80000, 80020, & G Trade Center Drive Rancho Cordova, CA 95742

USER MANUAL. DM65 Manual Flush/Tilt Combo Mount

Boat Boat Loader Fitting Instructions

E-trike Li Assembly Guide

V-PLOW. ACCUFLO Conveyor Belt Cleaning System MAX SYSTEMS GUIDE. Engineering. LIB-CP-SYS-01-E Rev.9. Page 1

DELUXE LOW PROFILE 18 & 30 STARTING PLATFORMS

Page 1. Single Scull Car Rack Assembly and User s Manual " "

CONVERTIBLE PET YARD READ ALL INSTRUCTIONS BEFORE ASSEMBLY AND USE OF PRODUCT. KEEP INSTRUCTIONS FOR FUTURE USE.

15000 Series Exhausting Arm - Wall Mount Models: 15076/15106/15146

Product Name: Alligator Guardrail System

INSTALLATION INSTRUCTIONS

IMPORTANT: If you have questions on the use, care, or suitability of this equipment for your application, contact DBI/SALA.

ALTERNATOR RACKS 135, 170 & 190 INSTRUCTIONS

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

NICROS-GRANITPANELS INSTALLATION MANUAL

ATD /8 x 50 Retractable Air Hose Reel Owner s Manual

Per foot Prices. Chain Link. Iron Fence BUDGET FENCE COMPANY. us: (702) Gates (702) ' tall 8' tall. Automatic Gate Openers

Cabinet Free Cover Rest Instructions

REPAIR PART NUMBER NUMBER DESCRIPTION 0137 ELE 0136 ELE 12 VOLT SOLENOID

TSX1600L Rite-Lock Power Arm Kit, left Stowing W/One Top Mount Pivot W/20" Base & 27" Upper

In-Ground Basketball System Owners Manual

Transcription:

S110 Steel Level Panel Installation Instructions NOTE: Fairway Architectural Railing Solutions will not be held liable for incorrect or unsafe installations by installer. It is the installer s resposibility to secure proper building permits, review local codes and safety needs and meet or exceed them. The instructions provided by Fairway are a guide and may not account for every special circumstance. The installer must identify and execute the installation approach that is appropriate for every application STEP 1 - Install S110 Flanged Steel Post* for Wood and Composite Decking, and Concrete Surface (S110 steel flanged post, cap & trim kit sold separately from level panel.) Determine placement of post on deck or concrete surface. Set post in place and mark mounting holes. Mount post to surface using one of the options and suggested mounting hardware pictured below. NOTE: Installer must determine the proper mounting hardware (sold separately) based on application. Check fit of rail between mounting surfaces. NOTE: Wood posts can be substituted for steel posts. (Installation instructions not included.)

STEP 2 Measure and Cut Steel Rail Panels NOTE: Never cut material on deck surfaces. To prevent rust stains, remove all metal shavings from the cut area; including the deck, post base cover, post and panel. Measure distance between finished posts or mounting surfaces. Mark panel to correct length if cutting is required. Ensure there is equal maximum distance from baluster on both ends. NOTE: Minimum 1-1/2 end spacing is required for installation of brackets. If panel length was adjusted, deburr cut edges and coat with zinc-based touch-up paint (item #306090) to prevent corrosion to prevent corrosion. STEP 3 - Install Steel Panel NOTE: Be sure to clean-up and remove all metal shavings from the cut area; including the deck, post base cover, post and panel, to prevent rust stains. Slide a bracket over the end of each rail. Make sure that all set screw holes face the desired direction. Cut two (2) support blocks to desired rail sweep measurement and place rail assembly on support blocks between posts. Slide brackets to post and mark screw locations. Set rail assembly aside. Predrill 3/16 pilot holes at marked screw locations. Place rail assembly between posts and install brackets using provided T-25 screws. Use low speed setting on drill. Predrill pilot holes and secure rails with provided set screws on the side of each bracket. 2018 FAIRWAY ARCHITECTURAL RAILING SOLUTIONS.

S110 Steel Adjustable Stair Panel Installation Instructions NOTE: Fairway Architectural Railing Solutions will not be held liable for incorrect or unsafe installations by installer. It is the installer s resposibility to secure proper building permits, review local codes and safety needs and meet or exceed them. The instructions provided by Fairway are a guide and may not account for every special circumstance. The installer must identify and execute the installation approach that is appropriate for every application STEP 1 - Install S110 Flanged Steel Post* for Wood and Composite Decking, and Concrete Surface (S110 steel flanged post, cap & trim kit sold separately from stair panel.) Determine placement of post on deck or concrete surface. Set post in place and mark mounting holes. Mount post to surface using one of the options and suggested mounting hardware pictured below. NOTE: Installer must determine the proper mounting hardware (sold separately) based on application. With post secured to surface, check post with a level. If the post needs to be adjusted for plumb, loosen mounting bolts and adjust with ¼ shims (sold separately). Tighten mounting bolts. Install optional post trim at this time. NOTE: Wood posts can be substituted for flanged steel posts. (Installation instructions not included.)

STEP 2 Line Up Stair Panel Using support blocks on the top and bottom step to ensure proper rail sweep height, set bottom rail onto support blocks and rake panel so that the balusters are parallel with post. Using quick clamps, clamp top rail to each post. Balance out baluster end spacing to ensure equal and maximum distance from post to first baluster. STEP 3 Mark Cut and Drill Locations Hold brackets on post next to the rail and mark rail at all bracket locations. Mark post plate hole locations on post. Remove clamps and set rail panel aside. Find post center line and transfer plate hole location to center of post.

STEP 4 Cut Rails and Pre-Drill Posts NOTE: Never cut material on deck surfaces. To prevent rust stains, remove all metal shavings from the cut area; including the deck, post base cover, post and panel. Cut the rails at all marks, parallel to the end of the rail. Deburr cut edges and coat with two (2) coats of zinc-based touch-up paint (item #306090). Pre-drill bracket hole locations on posts using 3/16 drill bit. Remove hinge pin from stair bracket assemblies. Attach all bracket plates to post using provided T-25 screws. Slide brackets onto the end of the rails. STEP 5 Install Rail Panel and Secure Brackets Set panel in place using support blocks from previous step. Line up brackets with bracket plate and replace hinge pin. Check fit of panel and adjust as necessary. Pre-drill using 3/16 drill bit at rail screw location on side of bracket. Install Provided T-25 screw. 2018 FAIRWAY ARCHITECTURAL RAILING SOLUTIONS.