Procedure: Pressure equipment safety

Similar documents
Procedure: Work health and safety reporting

Australian/New Zealand Standard

PRESSURE SYSTEMS POLICY

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Procedure: Safety signage

STS 650 PRESSURE EQUIPMENT

Procedure: Work health and safety hazard management

Accreditation for In-Service Inspection of Pressure Systems/Equipment

Approved Code of Practice for. Pressure Equipment. (Excluding Boilers)

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

Pressure Systems Safety Regulation

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

Pressure Vessel Program

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

AS/NZS :2013. Training and certification of occupational divers AS/NZS :2013. Part 2: Surface supplied diving to 30 m

Procedure: Confined space safety

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

Health & Safety Policy & Plan. Rightway Roofing.

Competency type. positions. All workers (including contractors), higher degree students and volunteers

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

NZQA registered unit standard version 2 Page 1 of 7. Conduct a conformity assessment of explosion-protected apparatus

Australian/New Zealand Standard

Policy Redesign Project. Plant Safety Policy. Table of Contents

Work Health and Safety Risk Management Procedures

BCGA GUIDANCE NOTE 17

Standard Pneumatic Test Procedure Requirements for Piping Systems

SOP. Working in Confined Spaces

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

Distribution Connection Forms

IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

AS/NZS :2013. Training and certification of occupational divers AS/NZS :2013. Part 5: Dive supervisor. Australian/New Zealand Standard

THE PRESSURE NEWS GASKET FAILURE DURING HYDROSTATIC TEST IN THIS ISSUE: OVERPRESSURE PROTECTION FOR FIRE PROTECTION SYSTEMS SPRINKLER TANKS

SOUTH AFRICAN NATIONAL STANDARD

RUPTURE HAZARD OF PRESSURE VESSELS

CONTRACTOR SAFETY INDUCTION HANDBOOK

WHS record keeping - general (Local areas responsible for keeping these records)

SWMS No 009 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 4

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

Australian/New Zealand Standard

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

NZQA registered unit standard version 1 Page 1 of 5. Meet requirements for Approved Filler Test Certificate for refrigerants

AS/NZS 1596:2014. The storage and handling of LP Gas AS/NZS 1596:2014. Australian/New Zealand Standard. Superseding AS/NZS 1596:2008

Gas Safety Management Policy

Working safely with air receivers

Australian/New Zealand Standard

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents

NZQA registered unit standard version 3 Page 1 of 6

MSC Guidelines for Pressure Vessels

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

Annex B To Loughborough University Facilities Management Health and Safety Policy

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

TLILIC2001 Licence to Operate a Forklift Truck

Gas and Carbon Monoxide Safety

GUIDE 2002 HEALTH AND SAFETY FOR ARTIFICIAL CLIMBING STRUCTURES AND OPERATIONS FOR DESIGNERS, MANUFACTURES, SUPPLIERS, OPERATORS AND USERS

A. Evaluation of the written program

Corporate Standard Hazardous Substance Management HB#625157

LADDERS FIXED AND PORTABLE

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

Australian/New Zealand Standard

Marine Education Society of Australasia HAZARD MANAGEMENT POLICY

QUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7

NZQA registered unit standard version 1 Page 1 of 8. Conduct detailed inspection of electrical installations for explosive atmospheres

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

Annex to the Accreditation Certificate D-IS according to DIN EN ISO/IEC 17020:2012

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

LOCKOUT SYSTEM AND POLICIES

Isolation Standard - Tags

Examples of pressure systems and equipment are:

Contractor OHS Induction. AOHS-05-GUI September 2016

SOP #: Pressure Vessels

Work Health Safety Record Management Guidelines. October, 2014

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

Isolation Lockout and Tagging

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

1.0 PURPOSE 2.0 SCOPE 3.0 DEFINITIONS. ANSI: American National Standards Institute. CCC: Chemical Control Centre

Pressure Relief Device Investigation Testing Lessons Learned

Health and Safety Inspection Procedure

Transmission Connection Forms

Removal of Lead-Based Paint

PRINTED COPY IS NOT CONTROLLED Page 1 of 22

GUIDELINES. Systems. Pressure

NZQA registered unit standard version 3 Page 1 of 7. Plan electrical installations for explosive atmospheres

Gas Safety Code of Practice

Lifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016

Working in Gas Hazard Areas

ISSUING AGENCY: New Mexico Department of Game and Fish. [ NMAC - Rp, NMAC, 01/01/2018]

MERCHANT SHIPPING (DIVING SAFETY) REGULATIONS 2005 BR 1 / 2005 MERCHANT SHIPPING ACT : 35 MERCHANT SHIPPING (DIVING SAFETY) REGULATIONS 2005

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

Transcription:

Procedure: Pressure equipment safety Purpose The purpose of this procedure is to define the method for safe operation and inspection of pressure equipment and the collection and recording of associated data and documentation at the Australian National University (University) to ensure compliance with the Work Health and Safety Act 2011 (Cth), the Work Health and Safety Regulations 2011 (Cth) (WHS Regulations) and the University s Work Health & Safety (WHS) Management System. This procedure is linked to the Australian National University s Work health and safety policy and is one of the Safe Work Procedures within the WHS Management System. Definitions Boiler refers to a steam generating device including associated pressure parts, controls and pipework that is designed to AS/NZS (Australian Standard/New Zealand Standard) 1228:2006 Pressure equipment Boilers. Design registration is where the WHS Regulations 2011 (Cth) requires the design of certain classes of pressure equipment to be registered with Comcare. High risk licence holder is person licensed to work on boiler equipment. In-service inspector is an independent party (accredited with Comcare) who is able to inspect pressure equipment and provide an inspection report in line with AS/NZS 4343:2014 Pressure equipment hazard levels. Local area means a College, Research School or Service Division of the University. NDT means non-destructive testing. Pressure equipment is an enclosed vessel (boiler, pressure vessel, pressure piping and ANSI / API 620 or equivalent storage tank) that is not open to atmosphere and is designed to AS 2971:2007 Serially produced pressure vessels. WHS Regulations means the Work Health and Safety Regulations 2011 (Cth). Procedure: Pressure equipment safety Page 1

Procedure Scope 1. This procedure applies to all types of Pressure defined in AS/NZS 1200:2015 Pressure equipment owned and operated by the University. For a complete list of pressure equipment types refer to AS/NZS 1200:2015 Pressure equipment. Examples of pressure equipment in use at the University include: boilers; clarifiers; air receivers; steam drums; compressors; steam pipes; compressed air lines; pressure relief valves; and safety valves. Responsibilities Local area 2. Local areas must maintain records of all registered pressure equipment in their respective areas detailing: 3. registration certificates; inspection reports; maintenance work; correspondence; and hazard assessments. Local areas must ensure the safe monitoring and inspection of pressure equipment in their area in accordance with AS/NZS 3788:2006 Pressure equipment - In-service inspection. 4. Local areas must ensure that any boilers and pressure vessels which have a hazard rating of A, B or C per the criteria in AS 4343:2014 Pressure equipment Hazard is registered with Comcare. Procedure: Pressure equipment safety Page 2

5. Local areas must ensure all pressure equipment is registered in the University s MAXIMO maintenance system with all relevant information recorded. 6. Local areas must ensure that all Comcare registered pressure equipment within their area of responsibility is inspected by a competent in-service inspector in accordance with the established inspection programme. 7. Local areas must ensure that any new pressure equipment installed that has a hazard rating of A or B for piping and pressure relief devices is inspected in accordance with AS/NZS 3788:2006 (Pressure equipment - In-service inspection). 8. Local areas must ensure that Comcare is notified when registered pressure vessels are sold or removed from service. (The registration certificate and maintenance records must accompany the pressure vessel if it is sold). 9. Local areas must arrange maintenance when pressure equipment is due for service. As a condition of plant registration, the local area must notify Comcare that the item of plant is being maintained in a safe condition and is safe to operate. The notification must be submitted to Comcare every 12 months during the five year registration period. Refer Notification of Schedule Maintenance form (Comcare form WHS-PIR002). 10. Local areas must ensure the safe use of pressure equipment at all times in their area in accordance with AS/NZS 3788:2006 Pressure equipment - In-service inspection. 11. Local areas must ensure all unregistered pressure equipment is inspected on a regular basis by either University in-house maintenance personnel or a contracted in-service inspector. In-service inspector: 12. The in-service inspector will: maintain and update a database of all registered pressure vessels in the respective plants in consultation with the local area; complete the in-service inspection in accordance with the requirements of AS/NZS 3788:2006; and submit inspection reports and recommendations to the local area. Duration of registration 13. A registration for an item of plant is valid for five years. 14. Before the term expires, Comcare will send a reminder that the registration is due to expire. The local area is responsible for renewing the item Procedure: Pressure equipment safety Page 3

registration. An application for renewal of the item must be submitted to Comcare before the existing registration expires. Purchasing of pressure equipment 15. All documentation required by legislation will be included in the purchasing package. The pressure equipment supplier is responsible for the relevant design registration certificate and support documentation. If the equipment supplier is unable to obtain design registration on behalf of the University (i.e. if the equipment was sourced from overseas), the local area representative must obtain this registration prior to equipment commissioning. Installation 16. The pressure equipment will be transported, installed and commissioned in accordance with the manufacturer s recommendations to avoid damage to the equipment. 17. A registered inspector must make a statutory acceptance inspection to ensure that the pressure vessel or boiler is fit for operation once installed. The inspection report must be submitted to Comcare to obtain a plant item registration number. 18. Inspection of pressure piping will be carried out by a competent person.. Commissioning 19. Commissioning of the pressure equipment must be in line with the manufacturer s recommendations. Prior to being placed into service, an inspection must be carried out. This inspection is required to ensure that work has been properly executed, all necessary documentation has been completed and the pressure equipment is safe to operate. Plant item registration 20. New pressure equipment must be registered as plant with Comcare when it is first installed. Local areas will record the plant item registration number from Comcare in the local area pressure equipment register. 21. The following information is required from the equipment supplier: type of pressure equipment (pressure vessel, boiler, pressure pipe); plant item (or pressure equipment) design registration number and support documentation; design pressure; Procedure: Pressure equipment safety Page 4

design temperature; volume (or capacity); contents; hazard levels; certificate of inspection from a registered boiler or pressure vessel inspector; and manufacturer s model number, serial number, and year of manufacture. Inspection and testing 22. A commissioning inspection by a high risk licence holder (refer to Licensing of high risk work procedure) must be conducted prior to the equipment s first operation. 23. The scope of the inspection will be as per AS/NZS 3788:2006 Pressure equipment In-service inspection. Commissioning documentation 24. The pressure equipment commissioning documentation will include a complete project close-out check sheet and nominated pressure equipment documentation, inspection, and testing records as specified above in AS/NZS 3788:2006 Pressure equipment In-service inspection. Record keeping 25. Comcare requires comprehensive records to be maintained for all registrable pressure equipment installed on the University. The records must be retained and stored by the local area until the asset is decommissioned and removed. 26. Records should also be retained for pressure equipment that does not require design registration. 27. The list of documentation required to be maintained includes: drawings; design calculations; design evidence (pipe stressing, installation notes, design and installation codes); design and plant item registration; equipment data sheets; Procedure: Pressure equipment safety Page 5

28. final signoff copies of the relevant inspections test plans; and. final quality assurance package, including items such as material test certificates, weld procedures, qualifications, heat treatment, and hold points in the process. The local area must keep vessel registration certificates and inspection summary reports as proof of current inspection. Equipment lifespan 29. The serviceable life of pressure equipment is generally limited to 25 years. A remaining life assessment is required to be undertaken prior to the conclusion of the year for the equipment to remain in a safe operating condition and fit for service. 30. A remaining life assessment can also be performed at any stage over the life of the pressure equipment if the equipment s fitness for service is questioned due to defects found during the equipment, planned inspections, or incident investigation event inspections. First yearly inspections 31. Some pressure equipment requires an additional inspection one year after commissioning. This requirement is dependent on equipment type and Hazard Level. 32. The scope of the inspection or actions that could be taken to defer the first year s inspection are stipulated in AS/NZS 3788:2006 Clause. A work order will be developed to identify the inspection scope for each pressure equipment. 33. These inspections will be conducted by a high risk licence holder. All nominated non-destructive testing (NDT) shall be carried out by a certified NDT inspector. Periodic inspections 34. The scope of the inspection is stipulated in AS/NZS 3788:2006. A work order will be developed to identify the inspection scope for each item of pressure equipment. The document shall be reviewed and approved by the inspector as an offline service. 35. These inspections will be conducted by a high risk licence holder. Remaining life and integrity assessment 36. The scope of the inspection is stipulated in AS/NZS 3788:2006. Procedure: Pressure equipment safety Page 6

37. A work order shall be developed to identify the inspection scope for each piece of pressure equipment. The document will be reviewed and approved by the inspector. 38. A remaining life assessment can also be performed at any stage over the life of a piece of pressure equipment, should the fit for service inspection of the equipment be questioned due to a defect found during equipment (internal or external) inspection or incident investigation. 39. The maximum interval between pressure equipment remaining life assessment inspections and evaluation should be set to the design life of the equipment, which is typically 25 years. Pressure equipment repairs 40. Repairs to pressure equipment are made to rectify defects and to maintain the unit in a safe operating condition at its existing design capacity. 41. The repairs and repair assessment inspections must comply with AS/NZS 3788:2006 Pressure equipment In-service inspection and pressure equipment design standards and the Isolation and danger tagging procedure. 42. The high risk licence holder and/or inspector will provide guidance on required post-repair testing: visual; non-destructive; and hydrostatic. Pressure equipment incidents 43. All workers must report incidents, injuries and hazard associated with pressure equipment at the University immediately to their supervisor and via the Workplace online safety incident and hazard reporting tool, as per the WHS Incident management procedure. Sources Legal and other requirements Work Health and Safety Act 2011 (Cth) Work Health and Safety Regulations 2011 (Cth) AS/NZS 1200:2015 Pressure equipment AS/NZS 1228:2006 Pressure equipment - boilers Procedure: Pressure equipment safety Page 7

AS/NZS 2971:2007 Serially produced pressure vessels AS/NZS 3788:2006 Pressure equipment In-service inspection AS/NZS 4343:2014 Pressure equipment hazard levels Comcare Guide for Applicants WHS014 Plant registration Safe Work Australia Guide to High Risk Work Licences Procedure: Pressure equipment safety Page 8

Document information Title Document Type Document Number Pressure equipment safety Procedure ANUP_018015 Version 3 Purpose Audience Category Topic Subtopic To define the method for safe operation and inspection of pressure equipment and the collection and recording of associated data and documentation at the Australian National University (University) Staff Administrative Health, Safety & Environment Occupational Health & Safety Effective Date 22 May 2018 Review Date 21 May 2021 Responsible Officer Director, Human Resources (director.hr@anu.edu.au) Approved By Contact Area Authority Chief Operating Officer (chris.grange@anu.edu.au) Human Resources Division (director.hr@anu.edu.au) National Self-Insurer WHS Audit Tool Work Health & Safety Act 2011 Work Health and Safety Regulations 2011 Printed On 16 Nov 2018 Please ensure you have the latest version of this document from the Policy Library website before referencing this.