SUSTAINABILITY INITIATIVES BY STUDENT ORGANIZATIONS FUNDING PROPOSAL $42,940 TBD $42,940

Similar documents
GREEN RFP PROGRAM STUDENT ORGANIZATION SUSTAINABILITY INITIATIVE FUNDING PROPOSAL

Campus Development Committee Meeting

BIKE PARKING PLAN. Office of University Planning Parking & Transportation

Bicycle Master Plan Goals, Strategies, and Policies

University of Leeds Travel Plan

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

CAMPUS GUIDE TO BIKE SHARE. h o w t o p l a n a n d l a u n c h a s u c c e s s f u l u n i v e r s i t y b i k e s h a r e p r o g r a m

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Appendix C 3. Bicycle / Pedestrian Planning

Bike Rack Occupancy on the University of North Texas Campus

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Campus Bike Parking Overhaul Phase I: Request for Funding. Facilities and Services February 15, 2012

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

2017 Florida Commuter Transportation Summit

Section 9. Implementation

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

T1-A - Service Reduction (Re-sizing)

MASTER BICYCLE AND PEDESTRIAN PLAN

Welcome! Public Open House on UBC s Transportation Plan

An Assessment of Potential Greenhouse Gas Emissions Reductions from Proposed On Street Bikeways

Bicycle and Pedestrian Connectivity Study Phase 2

Parallel Workshop: Avoid

WALK- AND bike-friendly TURLOCK

Active Transportation Infrastructure Investment A Business Case

CAP Meeting Notes: Community Meeting Feedback December 2, 2009, Hayward, CA I. Transportation

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

Solana Beach Comprehensive Active Transportation Strategy (CATS)

BUILDING THE BOILERMAKERS BIKING INFRASTRUCTURE

Vision Public Workshop: Findings

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

Bicycle Parking Guidelines: Campus Accomodations. Campus parking 4/9/2013. An APBP Webinar Series

WELCOME. City of Greater Sudbury. Transportation Demand Management Plan

About Us. Boulder B-cycle is a community nonprofit (501c3) formed in May 2011 to implement, own and operate a public bikesharing system in Boulder.

City of Lima Bicycle Parking Guide

DIRECTION REGARDING WEHO PEDALS BIKE SHARE PROGRAM AND DOCKLESS BIKE SHARE PILOT MAYOR PRO TEMPORE JOHN D' AMICO COUNCILMEMBER LAUREN MEISTER

Site Improvements

EVAN GLASS. Montgomery County Council District 5

CPC Parking Lot Riverside Drive. Transportation Rationale

MTP BICYCLE ELEMENT UPDATE. November 2017

Bike share success factors

LEEDS BECKETT UNIVERSITY. Transport Strategy

Public Information Centre

January Project No

Bicycle and Pedestrian Access in Transit Oriented Developments. Bruce Wright Chairman, Fairfax Advocates for Better Bicycling April, 2009

Encouragement. Chapter 4. Education Encouragement Enforcement Engineering & Facilities Evaluation & Planning. Encouragement Chapter 4

Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Providence County

SUPPORTING DOCUMENTATION PROPOSED TRAILS DEVELOPMENT AND IMPLEMENTATION PLAN

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

El Centro Mobility Hub

NUMBER PROJECT TITLE ESTIMATED COST

Proposed Amendment to the City-Wide Trails Plan

CAMPUS MASTER PLAN UPDATE

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Public Works AGENDA ITEM D-2 STAFF REPORT

Hennepin County Bicycle and Pedestrian Planning

cyclingincities opinion survey ABOUT THE STUDY WHO DID WE ASK? WHAT DID WE DO?

2. Context. Existing framework. The context. The challenge. Transport Strategy

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Proposed White Flint Separated Bike Lane Network September 2015

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

1.0 EXECUTIVE SUMMARY

Seattle Transit Master Plan

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

DOE Climate Change Proposals

TRANSIT & NON-MOTORIZED PLAN DRAFT FINAL REPORT Butte County Association of Governments

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

LONDON s. system TRANSFORMING THE WAY LONDON MOVES

Catalyst for Change:

Chicago Safe Routes to High School (SRHS) Kelly High School Recommended Improvements

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

COMMUNITY PARTICIPATION CHAPTER 8

Transportation Master Plan Advisory Task Force

The Spoke: Extended Hours & Mobile Shop. Project Proposal

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Balboa Area Transportation Demand Management

Mumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

Active Transportation on the Rise

Virginia Tech Parking & Transportation Master Plan

1.0 FOREWORD EXECUTIVE SUMMARY INTRODUCTION CURRENT TRENDS IN TRAVEL FUTURE TRENDS IN TRAVEL...

Regional Transportation Needs Within Southeastern Wisconsin

Reflections on our learning: active travel, transport and inequalities

BICYCLE INFRASTRUCTURE COMPONENT REMOVE II PROGRAM GUIDELINES, POLICIES, AND PROCEDURES

Standing Committee on Policy and Strategic Priorities. Potential Granville Bridge Connector Public Engagement

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

OCTOBER 2018 EXECUTIVE SUMMARY

2016 Updates to the Downtown bicycle parking map (pg 5) and bicycle parking capacity (pg 7) located in Appendix A on page 11.

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

CHAPTER 3: Vision Statement and Goals

TRANSPORTATION FACILITIES AND THEIR IMPACT ON HEALTH

Transportation-Demand Management Community Presentation

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Transforming Traffic Signals to Support Sustainability: Applications, Ideas, & Research

CONNECTING PEOPLE TO PLACES

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Downtown Davidson Pedestrian and Bicycle Safety Plan

Transcription:

SUSTAINABILITY INITIATIVES BY STUDENT ORGANIZATIONS FUNDING PROPOSAL Part I - General Information Name of Student Organization Contact/Responsible Person Contact Office Held/Title Contact Email Address Contact Telephone Number Alternative Transportation Internship Program Meghan Hekl Alternative Transportation Intern mehekl@vt.edu 703-424-1486 Part II - Project Cost Information Estimate Cost of this Proposal Estimated Savings Net Cost of this Proposal $42,940 TBD $42,940 See Part III.C See Part III.D Part III - Supporting Information A. Please describe your sustainability initiative and attach supporting documentation. Additional Bike Racks for the Academic Side of Campus The Alternative Transportation Center is requesting funding for the installation of 38 additional 5-loop bicycle racks (190 Loops) on the Virginia Tech campus. Two specific areas, designated as District 10 and District 15, have been appointed as being the highest priority locations for additional bike parking on the academic side of campus. Virginia Tech has experienced a significant increase in the number of cyclists on campus in the past several years. This surge in bicycle use as a prominent mode of transportation can easily be seen with the increased of bikes parked around the academic side of campus. Bike racks near many of the academic buildings are consistently overcrowded and it can sometimes be difficult for commuters to find adequate space to lock up their bicycles. Due to the lack of available bike parking, students can often times be seen securing their bikes to rails, signs and trees. These types of practices can damage infrastructure and hinder foot traffic. If students are confident in the availability of adequate bike parking on which they can safely secure their bike, it will strengthen the incentive to bike rather than drive to campus. By installing additional bike racks in locations noted as high priority, the University will not only be providing convenient parking for cyclists but also will be promoting the continued use and growth of alternative transportation among the Virginia Tech community. The Virginia Tech bike parking master plan and communications with the Alternative Transportation Office revealed that the highest priority locations on the academic side of campus in need of bike parking. The highest priority zone, designated as District 10, is the area encompassing the GLC, Squires Student Center, and Newman Library. The second most prioritized area, designated as District 15, serves the ICTAS Building, Lavery hall, Randolph Hall, and Hancock Hall. The prioritization of these areas, enumerated in the Bicycle Parking Master Plan, is based off the theoretical number of bike loops required to service the surrounding buildings according to building use/type. The VT approach for quantifying the necessary number of bike loops integrates standard LEED and APBP (Association of Pedestrian and Bicycle Professionals) methodology. The tables showing the building use and corresponding bicycle parking needs for each building within Districts 10 and 15 are provided in Appendix A. It has been noticed that the building use and number of work stations used in the calculation of bike requirements for Newman Library may be out-of-date due to recent renovations within the building. Therefore, because the number of work stations for students has increased, the calculation may be an underestimate for buildings bicycle loop shortage. Additionally, many bicycles secured to the covered bike racks within District 10 seem to be there for long-term storage, eliminating possible spaces for daily

commuter space. In order to support the calculated values of bike parking shortage, maps of the encompassed zones are provided in Appendix B. The District 10 map contains pictures depicting the overcrowded bicycle racks servicing the surrounding buildings. B. How does this initiative help to achieve the goals of the Virginia Tech Climate Action Committee Resolution and Sustainability Plan? Policy Point #1 - Virginia Tech will be a leader in Campus Sustainability. Adding additional bike parking on campus will increase the ease and convenience of cycling around campus as well has enhance Virginia Tech s bicycling culture. By doing so, the university s reputation for sustainability commitment will be solidified. Policy Point # 3 - Virginia Tech will establish a target for reduction of campus GHG emissions to 80% below 1990 emissions level by 2050. Additional bicycling facilities on campus will help to encourage more people to commute by bike. An increase in students engaging in sustainable transportation options reduces greenhouse gas emissions, such as carbon dioxide and nitrogen oxides from vehicular sources. Policy Point # 10 - Virginia Tech will engage students, faculty and staff through education and involvement to reduce consumption of energy, water, and materials in facilities. Both increasing the ease and convenience of cycling on campus and enhancing the university s bicycle culture with additional bike parking will help normalize bicycling as a primary method of transportation. This will encourage more students, faculty, and staff to use sustainable modes which will assist the university in decreasing energy use and greenhouse gas emissions, significantly reducing the University s overall carbon footprint. Policy Point #11 - Virginia Tech will improve transportation energy efficiency on campus through parking, fleet, and alternative transportation policies. Alternative transportation use will increase from the current level of 45%, to a goal of 54% in 2015, and 60% in 2020. An easy to reach, conveniently located bike hub in one of the most heavily trafficked areas on campus will serve to encourage and reinforce modes of alternative transit such as cycling. C. What is the cost of your proposal? Please describe in adequate detail the basis for your cost estimate. The alternative The requested costs are based off a price quote from Renaissance Site Furnishings for the bike 5-loop bicycle rack (Appendix B) and the cost of a concrete pad from Virginia Tech Facilities Operations. 5 - Loop Bicycle Rack $500.00 Concrete Pad (7 X15 ) Cost/ft 2 $6.00/ft 2 Area of Concrete Pad 105 ft 2 Individual Concrete Pad Cost $630.00 Total Cost per Rack $1,130.00 District 10 Loop Shortage 97 Loops # of 5 Loop Racks 20 Racks District 10 Cost $22,600.00 District 15 Loop Shortage 90 Loops # of 5 Loop Racks `18 Racks District 15 Rack Cost $20,340.00 Total Project Cost $42,940.

D. Will your proposal produce cost savings for the University? If so, how much? Please describe in adequate detail the basis for your savings estimate. While it can be assumed that increased bicycle infrastructure will encourage more people to take advantage of alternative transportation methods and increase the university s bicycle culture, there has not been sufficient analysis conducted within universities to quantify the cost savings of an increased bike culture. Some indirect cost benefits of a well-supported cyclist community stem from a decrease in vehicular traffic on, and arriving to campus. This will reduce wear and tear on the roads and parking infrastructure of the campus. In turn, the cost of maintenance of vehicular infrastructure will decrease. Eventually, if the vehicular traffic on campus remains stagnant or even decreases, the need for constructing large, costintensive parking and vehicular transportation infrastructure is eliminated. E. Is this funding request an Ongoing or One-Time change (please check one)? One-time Ongoing F. Is funding available for this request from another source? If yes, describe the funding (source, amount, etc.) There is currently no other additional source of funding for this request. SUSTAINABILITY INITIATIVES BY STUDENT ORGANIZATIONS FUNDING PROPOSAL Meghan Hekl 11/15/2015 Prepared By (Name of Contact for Student Organization) Date Mackenzie Jarvis 11/15/2015 Reviewed By (Name of Appropriate University Official) Date Denny Cochrane 11/20/2015 Reviewed By (Name of Office of Energy and Sustainability Representative) Date VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY An equal opportunity, affirmative action institution

Appendix A - Bicycle Parking Requirements by District From the Bicycle Parking Master Plan DISTRICT 10 Building Use and Bicycle Parking Requirements Squires Student Center Bicycle Parking: Office 85 5% PO 3 1.5 1606 10% 161 80.5 Dining Seats 246 10% 25 12.5 TOTAL 1937 189 94.5 53-41.5 Newman Library & University Bookstore Bicycle Parking: Office 93 5% PO 4 2 834 10% 83 42 TOTAL 927 87 44 57 +13 Graduate Life Center Bicycle Parking: USER GROUP #PERSONS %BICYCLES #BICYCLE S #REQUIRED Office 71 5% PO 3 1.5 951 10% 95 47.5 Dinning Seats 350 10% 35 17.5 Residential 218 20% 44 22 TOTAL 1590 177 88.5 20-68.5 District Totals: Required Loops: 227 / Existing Loops: 130 / Shortage: 97

DISTRICT 15 Building Use and Bicycle Parking Requirements ICTAS Hall Bicycle Parking: Office 124 5% PO 7 3.5 134 10% 13 6.5 TOTAL 258 20 10 6-4 Lavery Hall Bicycle Parking: Office 11 5% PO 1 1 396 10% 40 20 Dining Seats 833 10% 83 41.5 TOTAL 1240 62.5 31-31.5 Randolph Hall Bicycle Parking: Office 228 5% PO 9 4.5 1,493 10% 149 74.5 TOTAL 1,721 158 79 52-27 Hancock Hall Bicycle Parking: Office 24 5% PO 1 0.5 625 10% 63 31.5 TOTAL 649 64 32 5-27 District Totals: Required Loops: 183.5 / Existing Loops: 94 / Shortage: 89.5

Appendix C Bike Rack Quote 2 8 0 7 M a r y L i n d a A v e n u e - R o a n o k e, V a 2 4 0 1 2 P : 5 4 0 3 4 2 1 5 4 8 / F : 3 4 2 1 4 1 7 W : R e n a i s s a n c e S i t e F u r n i s h i n g s. c o m October 1, 2013 Bike Rack Quote The BK-2224, 5-Loop bike rack in Mineral Bronze is specially priced for Virginia Tech at $499.00 each. This price includes transportation to the Blacksburg campus. Thanks for the inquiry, and please let me know if you have any questions. Thank you, Neil Conner Director of Sales