Forth Ports Limited. Ruling Depths & Under Keel Clearances

Similar documents
Forth Ports Limited. Marine Procedures, Guidelines and Information.

Forth Ports Limited. Port of Dundee. Marine Guidelines and Port Information

Firth of Forth. Passage Plans

WEEKLY NAVIGATIONAL BULLETIN NO.26 FOR THE RIVER TEES, HARTLEPOOL AND TEES BAY. Issued by the Harbour Master on 02 November

Port Sections Guide Section 01

Current Survey. Not maintained. iso 10.4m. iso 10.4m 2018_H025. iso 10.3m 2018_H025. iso 11.6m 2018_H _H025. iso 11.6m. iso 11.

PILOTAGE INFORMATION

MARINER S GUIDE TO THE FORTH

APPROACH DEPTH(m) From East 15.0 From West From East 15.0 From West From East 15.0 From West ) ) From East 15.0 ) From West 16.

Harbourmaster s Office Tamaki River. Navigation Safety Operating Requirements 2014

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX

General Directions for Navigation in the Forth

GENERAL GUIDELINES FOR VESSELS TRANSITING RESTRICTED WATERWAYS OR PORTS

Pilotage Directions 2017

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND

UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION

Forth Ports Limited. Port of Dundee. Rig Move Guidelines

PORT INFO GENERAL BERTH INFO

POS 02 VTS Guidelines

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

Visiting Lake Macquarie

River Tay. Passage Plan

LIST OF CORRECTIONS. 14 / July /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters

Gorgon - Pilotage - Passage Plan Materials Offloading Facility (MOF) to PBG

FORTH PORTS LIMITED. Marine Rates and Charges

FORTH PORTS AUTHORITY FORTH BYELAWS

Port of Port Elizabeth Information

GREAT YARMOUTH PORT COMPANY GENERAL PORT AND PILOTAGE INFORMATION P16

SECTION II NM 11/13 NAVIGATION PUBLICATIONS COAST PILOT CORRECTIONS. Chapter 4 Paragraphs 85 to 86; read: (85)

LIST OF CORRECTIONS. 02 / January /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

Gorgon Pilotage Passage Plan - PBG to Gorgon Marine Terminal Primary Route

Admiralty Leisure Folio SC5601 East Devon and Dorset Coast, Exmouth to Christchurch

Gorgon - Pilotage - Passage Plan PBG to Materials Offloading Facility (MOF)

PORT OF IPSWICH PILOTAGE MANUAL. 52 o North 001 o East REVISED AUGUST Port of Ipswich Pilotage Manual

CHAPTER I SUEZ CANAL NAVIGATION FEATURES SECTION 1 APPROACHES

GENERAL LIMITATIONS AND RESTRICTIONS. Draft Restrictions

Gorgon - Pilotage - Passage Plan - Gorgon Marine Terminal to PBG Alternative Route

Marine Operations Manual Section 01

C C S Technical Information

WORK-REST REQUIREMENTS FOR PILOTS

Wexford Harbour. Yachting Guide. Navigation

Gorgon - Pilotage - Passage Plan - PBG to Gorgon Marine Terminal - Alternative Route

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)

IPSWICH. Port Safety Notice

ARRIVAL PACK. Page 1. Introduction to the Port and General Directions Bunkering Code of Practice Waste Management 8

All comments received will be taken into consideration before the proposed amendments are implemented.

5.0 Channel Design and Alternatives

NOTICE TO SHIPPING #1 NIAGARA REGION WELLAND CANAL GENERAL INSTRUCTIONS 1. HOLDING POSITION - 'HEAD OF THE LOCK'

ROYAL VANCOUVER YACHT CLUB

Port of Sunderland P.E.C Primer

Port of Sunderland P.E.C Information

GENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018)

ABP South Wales Towage Guidelines. Date of issue: January ABP South Wales and River Usk Towage Guidelines

Tees & Hartlepool Pilotage Co. Ltd. Effective from 1 st January Pilotage Charges. Tees and Hartlepool Pilotage District

Associated British Ports South East Wales And River Usk (Newport Harbour)

FORTH PORTS LIMITED. Marine Rates and Charges

Harbourmaster s Office Operation of Superyacht in the Auckland Region Navigation Safety Operating Requirements

U. S. Coast Guard Sector Boston Merrimack River Approach and Entrance, MA. Waterways Management Survey

FORTH PORTS LIMITED. Marine Rates and Charges. Operative from 1 st January

Tug regulations Port of Gothenburg 29/03/2018

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

MAC Transit Advisories as of April 30, 2018

Solent Pilotage Introduction Summary of Pilotage Requirements VTS Other References

Tug regulations Port of Gothenburg 01/07/2018

RNYC Sailing Directions Humber to Rattray Head Amendments from 2012 to 2017 Issued April 2017

PORT TALBOT BULK TERMINAL MOORING OPERATIONS MANUAL

This direction contains the requirements for the compulsory pilotage areas within the Auckland region. This

Berth Holder Application Pack

PORT INFORMATION PORT OF MARSDEN POINT NEW ZEALAND

NOTICE TO SHIPPING #1

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

Port of Burnie. Port Map. Burnie TASPORTS PORT INFORMATION. 5 Toll Shipping

Presentation Library for Inland ECDIS

TERMINAL INFORMATION BOOK

The addition of information about Transport Canada s Navigation Protection Program.

Marine Operations Manual Section 01

PORT OF PORT HEDLAND PORT USER GUIDELINES AND PROCEDURES

LIST OF NOTICES TO MARINERS 2017 PAC 201 JUAN DE FUCA STRAIT AND STRAIT OF GEORGIA, FIRST EDITION, 2012

Oil Tanker - VLCC. Yosu Inward Transit Monitoring (Entering into the Port of Yosu on a Loaded VLCC) LEG 1: APPROACHING ANCHORAGE AND PILOT STATION

PETERHEAD PORT AUTHORITY Tables of Dues to be levied at the Port of Peterhead From 1 January 2018 VESSEL DUES

a PORT OF IPSWICH PILOTAGE MANUAL REVISED APRIL o North 01 o East Port of Ipswich Pilotage Manual

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

DUKC DYNAMIC UNDER KEEL CLEARANCE

ABP South Wales and River Usk Towage Guidelines

Marine Guide for Ship Masters Contents

Marine Operations Manual Section 01. General Directions Document Author: Mike Stevenson. Document Owner / Approver: Steven Masters

Please note these Charts should be used only in conjunction with the appropriate navigational Charts. Admiralty Chart 1200 & 108 and Imray Y9

(Refer Slide Time: 0:25)

Wheatstone Marine Operations - Pilotage - Passage Plan - Onslow Port Limit to WMT

Chittagong, Bangladesh (Asia Region)

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc)

(Refer Slide Time: 00:32)

FORTH PORTS LIMITED. Marine Rates and Charges. Operative from 1 st January

SAFETY MANAGEMENT SYSTEM

NavRule Practice Exam, 70 Series Practice April 24, Labeled F (I received a reply from the testing service that all these answers were

Columbia River Pilots Vessel Movement Guidelines. Table of Contents

Transcription:

Forth Ports Limited - Forth Vessels are scheduled into / out of ports on the Forth & Tay in accordance with the under keel clearance criteria specified in this section of the Marine Guidelines & Port Information. Vessel operators who require increased under keel clearance margins, over and above those published in the Marine Guidelines & Port Information must ensure that these requirements are specified to FTNS at the time of booking the vessel s arrival / departure. This is to ensure that vessels are booked for the correct height of tide, and to ensure that delays / impacts to the shipping schedule are avoided. Agents are advised to ascertain vessel specific under keel clear requirements prior to making arrival / departure bookings through FTNS. - 1 -

GRANGEMOUTH - RULING DEPTHS AND UNDER KEEL CLEARANCE Data is based on a broad interpretation of current surveys and is only intended as a general guide. Original surveys should always be consulted especially for detailed operational planning. The following Ruling Depths apply to the berths, ports and approach channels. The depths indicated are the least depth in the channel or on the berth. Deeper water maybe available in certain parts of the channel and conversely shallower water may exist just outside of the channel. The depths given below are an indication of the least depth, which maybe encountered in the channel, however a close examination of the latest soundings should be made when preparing a passage plan. For areas not included in the tables below an under keel clearance of 10% of the vessels maximum draft with a minimum under keel clearance of 0.5m should be used. 1. Average Grangemouth Dock Density: 1020 2. Maximum Ship size normally accepted at Grangemouth: 187m * 27.4m. 3. All berths in Grange and Carron Dock average height of quay above waterline 1.0m 4. Outreach of #4 & #5 transporter cranes 34.5m, height from quay to gantry 30m. 5. Outreach of #3 transporter crane 37.03m, height from quay to gantry 29.2m 6. # 3 transporter crane parked 19 20 pole. Grangemouth Lock Dimensions Overall length Chamber Length Max LOA Width between fenders Outer 108m 90m 82m 29.1m Inner 129.6m 112m 104m Full 237.6m 187m Grangemouth Berth Dimensions North Grange 1-2 170m North Grange 3-7 440m Distance between #7 and #8 is 84m Tongue N 365m Grange 8-11 Tongue S 365m Grange 12-15 South Grange 630m East Wall 215m East Cut Width 36m West Cut Width 18.3m - 2 -

Location UKC RD Remarks Grangemouth Approach Channel 0.6m 6.3 m In Bellmouth Grangemouth Cill 0.6m 6.0 m EASTERN CHANNEL Common User Oil Jetty (Jetty 1 North) 0.3m 10.0 m Jetty E 1 0.3m 12.5 m Daughter vessel operations 11m Jetty E 2 0.3m 11.0 m Jetty J 2 0.3m 11.0 m Jetty J 3 0.3m 11.2 m Jetty J 4 0.3m 6.6 m EOL LPG Berth 0.3m 8.2 m East Cut Width = 36 metres GRANGE DOCK North Berths 1 7 7 and 21 pole out of use 0.5m 8.2 m NB maximum draft for Grange Dock determined by RD at East Cut and shallower patches N & S of Tongue and extending S from 3 Grange 0.3m 7.3 m 8.0 m Tongue North Berths 8 11 0.3m 6.7 m 8.2 m Tongue South Berths 12-15 0.3m 6.2 m 7.4 m - 3 - Depths vary as shown, consult latest survey for planning. Depths vary as shown, consult latest survey. Shallows to 6.1m West of 2 Pole Depths vary as shown, consult latest survey. 7.5m patch extends 50m South South 1 8 Pole 0.3m <8.0 m 7.5m patch 50m N of 8.5 pole shoals to <6m in corner 8-21 Pole 0.3m >8.0 m 7.5m in way of 12 pole. 7.5m in way of 9-10 poles. 7.7m in way of 15 pole. East Wall 1 4 pole 0.3m 7.6 m 8.2 m Western Channel Maximum ship normally 90m * 14m West Cut Width = 18.3m 0.5m 6.4 m 0.5m 6.2 m For vessels which exceed max. ship dimensions and for dead ship movements detailed planning is required including consultation between Duty Assistant Harbourmaster and Duty Pilot CARRON DOCK 0.3M 6.7 m Max. Ruling depth dictated by Western Channel North Rankins - no commercial traffic N/A Shallows at West End of Berth Amsterdam - no commercial traffic N/A Curries - no commercial traffic 0.3m 6.7 m Stevens 0.3m 6.7 m Cross Berth 0.3m 6.3 m (Between West Cut and Drydock) South Conveyor & Old Hoist 0.3m 6.7 m Watsons Lower 0.3m 6.3 m Watsons Middle 0.3m 5.6 m Watsons Upper 0.3m 4.8 m Not in use New Quay Wall Lower Tug Berth 0.3m 5.8 m New Quay Wall Upper 0.3m 4.6 m UKC = Under keel clearance RD = Ruling Depth Issued 3 April 2014 Replaces 29 April 2013

LEITH - RULING DEPTHS AND UNDER KEEL CLEARANCE The following Ruling Depths apply to the berths, ports and approach channels. The depths indicated are the least depth in the channel or on the berth. Deeper water maybe available in certain parts of the channel and conversely shallower water may exist just outside of the channel. The depths given below are an indication of the least depth, which maybe encountered in the channel, however a close examination of the latest soundings should be made when preparing a passage plan. For areas not included in the tables below an under keel clearance of 10% of the vessels maximum draft with a minimum under keel clearance of 0.5m should be used. 1. Data based on a broad interpretation of current surveys and is only intended as a general guide 2. Original surveys should always be consulted; especially for detailed operational planning 3. All Depths quoted are in metres 4. Average Dock Density: Leith 1015 (2006 : reported to be 1005) 5. Maximum size ship normally accepted at Leith 210m x 30m. Vessels out with these dimensions will be dealt with on a case-by-case basis. 6. Lockside is approximately 2m above MHWS 7. Quaysides are approx 2.2m above dock level and 1.5m at OT the Cruise Liner Berth Leith Lock Dimensions Overall length Width between fenders Short Lock 92m 31.6m Intermediate 159m Full 259m Leith Dock General Dimensions Imperial Passage Entrance width 31.6m Albert Passage Entrance width 18.2m Edinburgh Cut Entrance width 18.2m Harbour 4-6 150m Harbour 8-12 305m Cruise Liner Berth 375m Ocean Terminal 175m Length of usable quayside ahead of Britannia Imperial Dry Dock 167.6 x 21.3 x 7.3m Edinburgh Dry Dock 91.4 x 12.2 x 5.6m - 4 -

Caution: this table is a general summary only. Original sounding surveys are to be consulted for navigation and passage planning. Location UKC RD Remarks Port of Leith Sill height 6.71m below ACD Leith Approach Channel 1.0m 6.7m Depths reduce to the west of lock approach Leith Berths 0.5m Common User Oil Jetty 9.9m Alongside timber structure, otherwise 9.8m. Depths reduce to 8.2m towards Old Imperial Passage Imperial Passage 10.0m Imperial Dock North 9.7m Fenders may be required for maximum draft vessels Imperial Dock South 9.5m Imperial Silo 9.4m Cross Berth Old Lock 9.5m 8.8m patch at Southern End 8.0m Gantry Clearance 20m (boom down) Maximum length of vessel 110m. Width = 20.3m, Beam = 19m 8-12 Harbour 9.9m Reduces to 9.5m at knuckle between 6 and 8 Harbour. Sounding of 9.3m at No. 98 bollard; fenders required for deep draft vessels. 6 Harbour 8.0m 4 Harbour 4.3m Small vessel layby Western Harbour 10.2 to 10.6m East of: South End of West Wall to corner of Ranks and CLB 6.6 to 6.9m East of the two Red Buoys Cruise Liner Berth (Ocean Quay) 10.2m Reduces 30m from east end Ocean Terminal 6.7m 6.9m between bollards 3 and 7.5 Ranks 10.0m No vehicles allowed on wharf. Max Beam = 25m West Wall 9.1m Albert Dock North 8.1m Reduces towards west end Albert Dock South 7.2m Albert Dock East Wall 7.4m Edinburgh Dock South side 145m 7.0m Max LOA = 100m Edinburgh Dock West Wall 90m 7.0m Max LOA = 100m Edinburgh Dock East Wall 80m 7.0m Max LOA = 100m Edinburgh Dock South Arm 280m 8.1m Max LOA = 100m Edinburgh Dock North Arm 440m UKC = Under keel clearance RD = Ruling Depth Issued 7 th October 2013 Replaces July 2011 7.1m Obstruction at 240m from E End otherwise 7.5m - 5 -

ROSYTH & FIFE PORTS RULING DEPTHS AND UNDER KEEL CLEARANCE The following Ruling Depths apply to the berths, ports and approach channels. The depths indicated are the least depth in the channel or on the berth. Deeper water maybe available in certain parts of the channel and conversely shallower water may exist just outside of the channel. The depths given below are an indication of the least depth, which maybe encountered in the channel, however a close examination of the latest soundings should be made when preparing a passage plan. For areas not included in the tables below an under keel clearance of 10% of the vessels maximum draft with a minimum under keel clearance of 0.5m should be used. 1. Data based on a broad interpretation of current surveys and is only intended as a general guide 2. Original surveys should always be consulted; especially for detailed operational planning 3. All Depths quoted are in metres. Rosyth Height of quayside above CD is 7.522m Maximum length normally accepted at the North Wall is 250m. Vessels out with these dimensions, and for all other berths, will be dealt with on a case-by-case basis. Mean spring tide range is 5.0m and neap tide range 2.5m. Maximum airdraft under the bridge is 49.2m minus the height of tide. A further allowance is made for a maintenance gantry reducing the allowable airdraft by a further 2.7m. The gantry can be removed given sufficient notice. North Wall 540m 450m fendered at 15m intervals from the west end. White rectangle painted at 530m mark. T Berth 220m Ferry berth with Links-span 143m of quayside ahead of the linkspan Fixed Fenders Protrude 3.7m to seaward and 2m above quayside. Floating fenders are 2 m wide. S 160m Requires fenders, quayside inside ISPS zone. R 180m )Leased to FCBC Forth Replacement Crossing. Q 145m )Contractors. P East and West Fingers 160m ) O 170m Dredged to 5.0m but approach is shallower. Burntisland Entrance to harbour between breakwaters is 76m wide. Maximum size ship normally accepted at the East Dock 100m x 16m. Vessels out with these dimensions will be dealt with on a case-by-case basis. Maximum beam of barge for West Dock normally accepted = 27m. Berth Width Remarks Entrance to East Dock 18.2m Sill height 3.09m below CD Entrance to West Dock 29.5m Sill height 0.81m below CD - 6 -

Methil Main Entrance to No.2 Dock is 15.2m wide Maximum size vessel normally accepted is 100m x 14.0m beam. Vessels out with these dimensions will be dealt with on a case-by-case basis. Dock gates normally open three hours before high water. Depth over the outer sill is 2.6m below chart datum (No.1 dock is 1.22m above the sill at No.2) Number 2 Dock Cross berth 85m No.1 (Hard Pad) 130m No.2 (Central Farmers)* 82m NE Corner No.6 213m Travelling crane Distance across dock between Hard Pad and South side is 121m Distance across dock between Central Farmers and South side is 109m Number 1 Dock South side 173m North side 136 + 58m West (North) 43m West (South) 43m East side 82m Distance across dock North to South side is 103m Energy Park Fife Berths owned by Scottish Enterprise Maximum sized barges/vessels dictated by draft For further information, please refer to latest edition of Energy Park Fife Quayside Regulations. East Quay 1 184m West Quay 2 160m Under Construction (2012) Kirkcaldy Main entrance is 15.2 wide. Maximum size vessel normally accepted is 85m x 14m. Vessels outwith these dimensions will be dealt with on a case by case basis. Port Side is the preferred side alongside at Carrs Milling. The berth is a NAABSA Berth (Not Always Afloat but Safely Aground). Pilot will board HW-1. Lock gates are no longer in use. Sill height 0.65m below Chart datum. NE Berth Max Vessel 85m - 7 -

Inverkeithing Berths in Inverkeithing are managed by either RM Recycling or Forth Bridge Stevedoring Limited. Max sized vessels accepted at Stone Berth LOA = 110m. All berths designated NAABSA by berth operators. All arrivals and sailing are calculated using Leith HW-1 hour, subject to vessels draft. Deepwater Berth 130m NAABSA No 1 Berth 140m NAABSA No 2 + No 3 Berths Berths not used for commercial traffic Stone Berth 30m Face consists of 2 separate berths Old Sea Plane Bearth Berth not used for commercial traffic East Ness Berth 20m NAABSA Berth, max vessel LOA = 110m Preston Hill Quay Berth not used for commercial traffic - 8 -

Caution: this table is a general summary only. Original sounding surveys are to be consulted for navigation and passage planning. Location UKC RD Remarks Rosyth Approach Channel 7.9m Depths reduce to 7.4m in the area to the south and west of No 3 buoy. Port of Rosyth 0.5m All berths (alongside) North Wall 8.3m Berth Box = 35m wide. White rectangle at 530m. T Berth 7.3m S Berth 4.8m PQR 4.0m R Berth has 100m x 40m Box, RD = 5.5m. O Berth 5.1m Depth in approaches 1.8m. Rosyth Babcock 0.6m N.B. UKC for warships = 1.0m. NTB 10.0m Basin maintained C/D + 4.2m. Refer to Babcock H/M for details. Middle Jetty N 5.0m Middle Jetty S 5.0m From East to West: 0 to 180m 5.0m; 180m to 260m reduces to 4.5m; shoals from 260m westwards. South Arm 8.0m Fenders required to find deepest water. Approaches to Direct Entrance 6.7m Sills (Lock and Direct Entrance) 6.57m Burntisland 0.5m East Dock 2.8m West Dock 0.5m Methil Approaches 1.0m 2.4m Methil Berths 0.5m Cross Berth 1.5m #1 (Hard Pad) 1.8m #2 (Central Farmers) 1.9m North East Corner 1.9m #6 1.6m Methil (Energy Park Fife) 0.5m East Berth (Quay 1) on 55m 0.5m 3.0m With stand-off fendering. Distance given from 55 184m 0.5m 4.0m northern end of East Berth Quay 1. West Berth (Quay 2) Under construction (2012). Kirkcaldy Approaches 0.7 * 0.0m Area subject to siltation latest sounding chart to be consulted. NE Berth 0.4 0.0 NABSA Berth PST preferred alongside. Inner Harbour 0.4 0.0 Inverkeithing Approaches 0.5m 0.2m Deep Water Berth * 2.0m Restricted to 0.2m owing to approaches: consult sounding chart for depths alongside berth. Vessels 80m with a bowthruster may berth PST otherwise SST. No 1 * -1.0m Shoals 20m north of berth, UKC sailing = 0.1m. Nos 2 & 3 No soundings. Stone Berth * 0.3m Consult latest sounding chart. Old Sea Plane Berth Facing in very poor condition Pilots are not to berth/unberth. East Ness Berth * -0.2m Maximum LOA 110m. Preston Hill Quay No soundings. * Vessels usually take bottom and stated to be Not Always Afloat But Safe Aground (NAABSA) by the berth operators. UKC = Under keel clearance RD = Ruling Depth Issued June 2014 Replaces October 2013-9 -

Hound Point Location UKC RD Remarks HP 1 and HP2 1.9m 18.4m See marine guidelines & Port Information for calculating maximum draft. Braefoot Location UKC RD Remarks 2.0m 10.0m East Out 2.5m 10.5m West Out See Braefoot Tide tables. Crombie Location UKC RD Remarks South Jetty 1.0m 12.0m Reported by DSND Crombie North Jetty 1.0m 7.5m - 10 -