Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Similar documents
Tonight is for you. Learn everything you can. Share all your ideas.

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Terwillegar Drive Expressway Draft Concept Plan

Major Bike Routes 102 Avenue Workshop April 21, 2015

Glebe Neighbourhood Cycling Plan

83 AVENUE PRE-CONSTRUCTION MEETING

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Dowling/Beaty Cycling Route

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Pre-Construction Meeting

CLOSED. Highlights of the Final Concept Design:

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

122 Avenue: 107 Street to Fort Road

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

Public Information Centre

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Richmond-Adelaide Cycle Tracks

Walterdale Bridge Replacement

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

POLICY: TRAFFIC CALMING

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

STONY PLAIN ROAD STREETSCAPE

Downey Road. Transportation Improvement Study

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Ottewell Traffic Shortcutting Pilot Project

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

WELCOME Public Information Centre

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

LANCASTER CITY BICYCLE NETWORK

Prince George s County plans, policies, and projects

Edenbrook Hill Drive Traffic Calming Study

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

Lincoln Neighborhood Corridor Plan The LiNC

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Pennsylvania Avenue (CR 484) Design Alternatives Study

Corydon-Osborne Neighbourhood Plan Recommendations

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

CURBSIDE ACTIVITY DESIGN

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Uptown West Neighbourhood Transportation Study

Building Great Neighbourhoods BONNIE DOON

NJDOT Complete Streets Checklist

Hospital Link Project Project Update September 2017

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave.

Complete Streets. Designing Streets for Everyone. Sarnia

Monroe Street Reconstruction

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

6.4 RECOMMENDED IMPROVEMENTS

Building Great Neighbourhoods QUEEN ALEXANDRA

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Duwamish Way-finding and CTR Report

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Bicycle Facilities Planning

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

5 Transit & Traffic. Overview

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Lawrence Avenue Streetscape Concepts August 30, 2011

Welcome. If you have any questions or comments on the project, please contact:

City of Wilsonville 5 th Street to Kinsman Road Extension Project

The Wiggle Route in Context

PEDESTRIAN ACTION PLAN

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Borough of Danville, PA Traffic Calming Program Guidelines

Meade Street Bridge Design Alternative Study

Chapter 3 BUS IMPROVEMENT CONCEPTS

Omaha s Complete Streets Policy

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

Chapter 5. Complete Streets and Walkable Communities.

Henderson Ave. Complete Streets Project

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

CHIEF PEGUIS TRAIL EXTENSION WEST

Draft North Industrial Area-Wide Traffic Plan

Ormsby Place Traffic Calming Pilot Project

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Why invest in the 1 Street S.W. Corridor?

Transportation Planning Division

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Neighborhood Pedestrian Safety and Traffic Calming Study

Building Great Neighbourhoods LANSDOWNE

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

September 2017 I City of New Westminster

Memorandum. Sunday, July 13, Saturday, July 19, 2014

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Transcription:

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project for your information. Thank you for joining us.

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Project The City of Edmonton will be undertaking roadway rehabilitation and shared-use path (SUP) widening along Saskatchewan Drive from 99 Street to 109 Street. The project will include the following changes to Saskatchewan Drive and the shared-use path: 1. Widened shared-use path and sidewalk 2. Curb extensions at selected crossings 3. Improved crossings 4. Modification of cross streets in coordination with Strathcona Neighbourhood Renewal 5. Reduction of the lane width to align with new City standards

Project Timeline May 2018 Report Back April 2018 June 2018 Initial Engagement (workshop, 1 to 1 meetings, survey) Café Conversations (with area business owners) July 28, 2018 Engagement Pop-Up Event August 2018 1 to 1 Meetings Subject to council funding September 26, 2018 Public Event (Release Concept Design) September 2018 Report Back Spring 2019 Public Event (Release Preliminary Design) Detailed Design (TBD) Constuction (TBD) Project next steps can be found on the following panel

Next Steps November 2018 December 2018 Early 2019 2019-2020 Concept Design Project presented to Preliminary Design begins Pending funding approval, Finalized Council for funding (additional details on construction will be staged and consideration as a part of design elements provided) may begin as early as 2020 the next Capital Budget Preliminary Plan shared Work would be coordinated with with the public adjacent Neighbourhood Renewal and Duggan Bridge Replacement

What We Heard Through our engagement events and activities in April, June, July and August, we received over 300 comments. Comments have been grouped into themes, and major themes are presented in the following panels. Survey Public Events One to One Meetings Pop-Up Event Comments related to Strathcona Neighbourhood Renewal have been shared with the appropriate project team.

What We Heard/What We Did WHAT WE HEARD WHAT WE DID Widen SUP + Pathway will be widened to better accommodate pedestrians and cyclists Separate Pedestrians and Cyclists + The feasibility of this was examined west of 104 Street (see What We Explored panel) but due to parking and the widths of the road right of way, fully separating pedestrians and cyclists is not possible + East of 104 Street, the existing road width cannot accommodate a separated bike lane Widen road from 104 to 109 Street and Duggan Bridge + Lane widths will be designed to meet current city standards Address traffic noise + Concern will be forwarded to Community Standards Improve traffic calming + Curb extensions are being added to 107 Street, 106 Street, and 105 Street. Traffic lane widths are being reduced where appropriate

What We Heard/What We Did WHAT WE HEARD WHAT WE DID Improve traffic control and change of speed limit + Concerns regarding enforcement have been forwarded to the Edmonton Police Service + Signage and traffic light times will be evaluated at detailed design phase + Posted speed on Saskatchewan Drive will remain at 50 km/hr. Due to location and road configuration, a change in speed limit is not desirable + Curb extensions and narrower driving lane width will be included to reduce speeds Need safer street crossings Improve access to river valley trail network and Saskatchewan Drive SUP + Improved crossings and enlarged pedestrian/ cyclist refuge areas will enhance pedestrian, cyclist and motorist safety comfort, and movement + Crossings at the following intersections will be re-configured to enhance safety: + 107 Street + 106 Street + 105 Street + 90 Avenue + 91 Avenue Improved access to the pathway will be provided at: + 107 Street (curb extension) + 106 Street (curb extension) + 105 Street (curb extension) + 90 Avenue (re-aligned crossing) + 91 Avenue (re-aligned crossing)

What We Heard/What We Did WHAT WE HEARD WHAT WE DID Create dedicated turning lanes Reconfigure 180 degree turn onto Queen Elizabeth Park Road Maintenance and garbage + No additional dedicated turning lanes within the project limits have been added due to road right-of-way constraints + Due to the constrained right-of-way and the required lane configuration, the 180 degree turn onto Queen Elizabeth Park Road will remain as-is + Concerns regarding existing issues have been shared with Roadway Operations and Roadway Maintenance + Opportunities for additional waste receptacles will be explored as part of preliminary design. Pedestrian and cyclist safety at 109 Street + + For the right turn onto Saskatchewan Drive, the private raised planter with shrubs blocks drivers sightlines of pedestrians. The City would work with the property owner to address this. Enlarged the refuge areas for pedestrians and cyclists at the Walterdale Hill/Saskatchewan Drive intersection median and adjusted the south curb-line to enhance turning movements

What We Heard/What We Did WHAT WE HEARD WHAT WE DID Eliminate boardwalk + Existing boardwalk SUP will be replaced with 4.2m concrete cantilever SUP Streamline signage + Wayfinding signage for cyclists, pedestrians and cars will be evaluated during detailed design + Size and height of SUP signage will be evaluated during detailed design Visibility of crosswalks + Street lighting improvements will be coordinated with EPCOR. Proposed curb extensions will provide improved conditions for visibility of pedestrians/cyclists at crosswalks Minimize construction impacts + Traffic accommodation plan and construction schedule will be addressed prior to construction Make Saskatchewan Drive two-way for vehicle traffic + Due to overall traffic network requirements, 109 Street to 104 Street will remain one-way eastbound

What We Explored The City must balance public feedback with important technical, safety and financial considerations. The project team explored alternatives to separating pedestrians and cyclists by providing a segregated SUP or dedicated on-street bike lanes. Either option would require removal of on-street parking, removal of travel lanes, or land acquisition along the Saskatchewan Drive. In discussion with property owners along Saskatchewan Drive, removal of on-street parking lanes is not supported. Due to high traffic volumes, particularly in the 109 to 104 Street area, removal of motor vehicle travel lanes is not possible. Due to proximity to the river valley, land acquisition would be required to accommodate separated facilities, which is not feasible due to costs and existing developments.