US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Similar documents
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

APPENDIX D COST SUMMARY TABLES

I-290 Phase I Study Village of Forest Park November 9, of 25

section 4 Existing Conditions, Issues, and Options

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Basalt Creek Transportation Refinement Plan Recommendations

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

APPENDIX E Evaluation of Improvement Alternatives

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Design Criteria. Design Criteria

Route 29 Solutions Projects

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Appendix D: Concept Screening

Project Description Form 6V

Station 1: Street & Sidewalk Upgrades

Short and Long Term Needs

Freeway ramp intersection study

Tonight is for you. Learn everything you can. Share all your ideas.

1. Provide a dedicated westbound approach bus lane at the intersection;

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68)

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Welcome to the Sellwood Bridge Project Open House!

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Maywood Town Hall Meeting. May 4, 2016

Welcome to the Open House

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Comments EXECUTIVE SUMMARY

City of Moorhead Committee of the Whole Meeting

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Transportation Improvement Plan SECTION2

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

July 13, Commissioner Richard Sullivan Department of Conservation and Recreation 251 Causeway Street Boston, MA RE: EOEA ENF 13777

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

3.0 PROJECT DESCRIPTION

TRANSPORTATION COMMISSION Agenda Staff Report

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

Application of a Complete Street

Financial Project ID No(s).: and ETDM No(s).: and 14181

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Transportation Corridor Studies: Summary of Recommendations

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Columbia Pike Implementation Team (CPIT) Meeting

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

4.0 ACCESS CONTROL PLAN - SH 14 (JEFFERSON STREET/RIVERSIDE AVENUE)

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Duwamish Way-finding and CTR Report

Blair/Williamson Intersection Expressed Needs

Thank you for attending

Recommendations. Central Salem Mobility Study

Freeway System Considerations

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

CHAPTER 3.0: TRANSPORTATION IMPACTS

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Henderson Ave. Complete Streets Project

Project Description Form 8EE

TRANSPORTATION STANDARDS

ADA TRANSITION PLAN 2013

Creating the Future Bruce B Downs Blvd

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

YELLOWHEAD TRAIL / 149 STREET INTERCHANGE

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Pedestrian Safety at Interchanges

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

City Council Briefing March 18, Draft Working Ideas for Confirmation of Direction

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

5. RUNNINGWAY GUIDELINES

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

What Is a Complete Street?

ROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Diamond Springs Parkway Project

Terwillegar Drive Expressway Draft Concept Plan

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Project Application. Project Location: Salem Drive (Federal Route 1101)

Route 28 Corridor Safety and Operations Study

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Transcription:

US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1

Background 1991 IDOT Study Recommendations Build Elgin O Hare Expressway from North Avenue (former East Bartlett Road) to York Road Design based on Year 2010 traffic forecast Plan re aligned US 20 (Lake Street) near North Avenue Add curbed medians along US 20 from Shales Parkway to North Avenue 2

Background 1991 Study Western Terminus Elgin O Hare Western Terminus US 20 Re alignment North Avenue 3

Background 2012 IDOT Study Recommendations Initial Construction Plan (2013 2025) Design Based on Year 2040 Traffic Forecast IL 390 IL 390 Western Access Source: EOWB Newsletter, March 2012 Improve existing Elgin O Hare (renamed IL 390) from US 20 to I 290 Extend Elgin O Hare (IL 390) from I 290 to Western Access Construct Western Access with connections to I 90, IL 390, and I 294 4 Elgin O Hare western terminus (west of US 20) remained unchanged

Background Village of Hanover Park Comprehensive Plan Hanover Park Village Center Plan designed to be compatible with the Western Terminus. As proposed, Village Plan would create 40k new daily trips. 5 Development area has direct access to the Western Terminus and IL 390

Study Area US 20 (Shales Parkway to Greenbrook Blvd) US 20 ARTERIAL IMPROVEMENTS SHALES PARKWAY POTENTIAL INTERCHANGE IL 390 WESTERLY EXTENSION POTENTIAL NEW ALIGNMENT

Study Purpose Re evaluate Elgin O'Hare Western Terminus Local Land Use Planning Updated Traffic Forecasts Evaluate US 20 Improvements Connection to Elgin O Hare Western Terminus Match ongoing study to the west Determine if IDOT Phase I Study should follow 7

Transportation Need * * * LEGEND. Mobility Safety * Intersection Safety

IL Route 390 Extension Travel Desire 9

Concept Recommendations Re Align Oak Street LEGEND 4 Lanes with Median 6 Lanes with Median New Interchange New IL Rte 390 Westerly Extension 10 New Alignment

Typical Cross Sections PR ROW 10 ft & varies 4 Lanes with Median 10 ft & var PR ROW PR ROW 10 ft & var 6 Lanes with Median 10 ft & varies PR ROW 11

US 20 Improvement Concept Villa Street/Shales Parkway Grade Separated Interchange ELGIN x LEGEND Arterial Ramp Pedestrian/bike facilities Bridge Removal Existing right of way Proposed right of way Eliminate at grade signalized intersection between US 20 and Shales Parkway Create new interchange that maintains direct access to Villa Street and Shales Parkway Improve Connectivity between Villa Street and Gifford Road 12 Alternatives to be studied as part of new interchange

US 20 Improvement Concept East of Shales Parkway thru Lambert Lane ELGIN STREAMWOOD BARTLETT x 13 LEGEND Arterial Ramp Pedestrian/bike facilities Bridge Removal Existing right of way Proposed right of way Provide local road connection between IL 19 and US 20. Improve geometry slightly thru curves and improve roadside treatment.

US 20 Improvement Concept Naperville Road thru IL 59 Interchange STREAMWOOD x LEGEND Arterial Ramp Pedestrian/bike facilities Bridge Removal Existing right of way Proposed right of way BARTLETT 14 Provide 3 thru lanes each direction between Naperville Road and IL 59. Reconstruct Naperville Road intersection to provide three thru lanes each direction and provide dual westbound turn lanes.

US 20 Improvement Concept Oak Avenue to Park Avenue STREAMWOOD BARTLETT 15 Increase US 20 to 3 lanes each direction from approximately Park Avenue to the IL 390 Extension. Convert Park Avenue intersection approach to dual left turn lanes and right turn lane. x LEGEND Arterial Ramp Pedestrian/bike facilities Bridge Removal Existing right of way Proposed right of way

US 20 Improvement Concept Park Avenue to IL 390 Extension STREAMWOOD HANOVER PARK x LEGEND Arterial Ramp Pedestrian/bike Bridge Removal Existing right of way Proposed right of way BARTLETT STREAMWOOD Provide 3 lanes each direction between Park Avenue and IL 390 extension. IL 390 Extension would connect with Mark Thomas Lane. 16 North Avenue relocated south within existing state right of way to tie to IL 390 extension

IL 390 Westerly Extension (formerly Elgin O Hare Western Terminus) Alternatives Considered 4 Lane arterial 2 Lane arterial 4 Lane arterial with overpasses at major intersections and railroad 4 Lane Arterial with modified westbound transition from tollway to local road, and overpasses at Devon Avenue and railroad 17

IL 390 Westerly Extension Objectives Improve transition to an arterial Consider future land use, the Hanover Park Village Center Plan Buffer existing land uses Evenly distribute traffic 18

IL 390 Westerly Extension Recommended Concept STREAMWOOD IDOT owned right of way HANOVER PARK Hanover Park Village Center 19 BARTLETT IDOT owned right of way x LEGEND Arterial Ramp Pedestrian/bike facilities Bridge Removal Existing right of way Proposed right of way IDOT owned right of way

County Farm Road to Devon Avenue Initial Staging Concept STREAMWOOD HANOVER PARK IDOT owned right of way Hanover Park Village Center BARTLETT IDOT owned right of way 20 IDOT owned right of way x LEGEND Arterial Ramp Pedestrian/bike facilities Bridge Removal Existing right of way Proposed right of way

Benefits of Recommended Concept US 20 Corridor Shales Parkway interchange Improved Mobility 6 Lane sections where needed to eliminate bottlenecks Intersection improvements Side paths to provide for non motorized travel Improved Safety Protected turning phases at signalized intersections Curbed medians 21

Benefits of Recommended Concept IL 390 Westerly Extension Mobility and Safety Provides safe transition from tollway to arterial system Improves local access and circulation Provides parallel arterial relief (US 20, Greenbrook Blvd) Incorporates sidewalks and bike paths for non motorized travel Protected turning phases at signalized intersections Curbed medians 22

Preliminary cost opinion not including right of way Improvement Description Costs (2015$) US 20 Interchange at Shales Parkway US 20 Arterial Improvements IL 390 Westerly Extension $51 Million $86 Million $80 $96 Million Total $217 $233 Million The IL 390 Westerly Extension initial staging concept is estimated at $30 $35 Million, not including new right of way 23

Next Steps Coordinate with communities adjacent to the corridor Complete Feasibility Study Initiate IDOT Phase I Study if appropriate 24

Thank You! US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) 25