Rationale for FAC September 2017 August 2018

Similar documents
System Operating Limit Definition and Exceedance Clarification

System Operating Limit Definition and Exceedance Clarification

Questions & Answers About the Operate within Operate within IROLs Standard

Monitoring of Real-Time SOL and IROL Exceedances

Monitoring of Real-Time SOL and IROL Exceedances

sdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmqw ertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklzx

Project Single Points of Failure

Reliability Coordinator Procedure

Notes Assess Transmission Future Needs SDT Project

Consideration of Comments Summary

Connection Engineering Study Report for AUC Application: Fortis Okotoks 678S and High River 65S Upgrades

Violation Risk Factor and Violation Severity Level Assignments Project Generator Verification

Conference Call Notes for Project Real-Time Operations SDT

MIL-STD-883G METHOD

3. Real-time operation and review of complex circuits, allowing the weighing of alternative design actions.

Policy for Evaluation of Certification Maintenance Requirements

SERTP - 1 st Quarter Meeting

Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal

AMERICAN ACADEMY OF ACTUARIES MEDICARE SUPPLEMENT WORK GROUP SUBTEAM REPORT ON LOSS RATIO CURVES FOR REDETERMINATION OF REFUND BENCHMARKS

TESTIMONY OF ROBERT C. KOTT ON BEHALF OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

Comments of the California Energy Storage Alliance (CESA) on the FRACMOO Phase 2 Working Group Meeting October 10, 2017

4.0 TRAFFIC IMPACT STUDIES

Operating Committee Strategic Plan

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Aeronautical studies and Safety Assessment

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Meeting Notes Project Definition of Bulk Electric System Standard Drafting Team

STATE OF NEW YORK PUBLIC SERVICE COMMISSION. At a session of the Public Service Commission held in the City of Albany on August 20, 2003

Voltage Stability IROL Monitoring

TRAFFIC IMPACT STUDY CRITERIA

Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed)

CHAPTER 28 DEPENDENT FAILURE ANALYSIS CONTENTS

TRAFFIC STUDY GUIDELINES Clarksville Street Department

DOCUMENTATION OF IRB DISCUSSIONS AND DECISIONS ( IRB MINUTES)

Possible Management Approaches to Address Historical Fisheries

4 COMMUNITY SAFETY ZONES WALTER SCOTT PUBLIC SCHOOL AND ROSELAWN PUBLIC SCHOOL TOWN OF RICHMOND HILL

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines

ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017

Safety Analysis: Event Classification

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

STCP 01-1 Issue 008 Operational Switching

Notes Project Assess Transmission Future Needs SDT

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

ASERCOM guidelines for the design of multiple compressor racks using frequency inverters

VI.D AIR DISCONNECT SWITCHES

South King County High-Capacity Transit Corridor Study

Subject: Structural Certification Criteria Date: 10/11/18 Policy No: PS-AIR for Antennas, Radomes, and Other External Modifications

APPENDIX J REQUIRED NAVIGATION PERFORMANCE IMPACTS EVALUATION REPORT

Installation of Traffic Signals and Pedestrian Crossings

DESIGN BULLETIN #66/2010

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy

This test shall be carried out on all vehicles equipped with open type traction batteries.

SUBJECT: Board Approval: 4/29/04

Calibration Requirements for Direct Reading Confined Space Gas Detectors

Title: Standard Operating Procedure for Elemental and Organic Carbon (EC and OC) using Non-Dispersive Infrared Detection (NDIR)

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

City of Vestavia Hills Traffic Calming Policy for Residential Streets

T R A N S P O R T A T I O N M E M O R A N D U M

A Novel Approach to Evaluate Pedestrian Safety at Unsignalized Crossings using Trajectory Data

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

OBJECTIVE 22: EMERGENCY WORKERS, EQUIPMENT, AND VEHICLES - MONITORING AND DECONTAMINATION

MINIMUM STANDARDS FOR STRUCTURAL COLLAPSE RESCUE

Every things under control High-Integrity Pressure Protection System (HIPPS)

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

ACCESS MANAGEMENT PLAN: BLUFFTON PARKWAY BLUFFTON PARKWAY: PHASE FOUR TOWN OF BLUFFTON & BEAUFORT COUNTY, SC

Meeting Notes Project Coordinate Interchange Standards Drafting Team Meeting September 4-5, 2013

Drilling Efficiency Utilizing Coriolis Flow Technology

Canadian Electrical Code, Part I Full Impact Assessment

Zlatko Krstulich, P.Eng. City of O9awa

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Proposed amendments to the League Constitution and Playing Conditions

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Presented to the Israel Annual Conference on Aerospace Sciences, 2009 RISK-ANALYSIS A SUPPLEMENT TO DAMAGE-TOLERANCE ANALYSIS

Report on the Assessment of proposed FTL tables for Air Taxi and Emergency Medical Services Operations

TRAFFIC MANAGEMENT PLAN

APC Implementation for Depropaniser column 1

Minimum Approach Distances (MAD)

Workshop Information IAEA Workshop

Mississippi Prepaid Affordable College Tuition Plan Pricing Report for the 2018/2019 Academic Year

RESOLUTION MSC.137(76) (adopted on 4 December 2002) STANDARDS FOR SHIP MANOEUVRABILITY

RELIABILITY OF ENERGY SYSTEMS

Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program

Atlantic States Marine Fisheries Commission

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

Tournament Operation Procedures

DISTILLATION PRESSURE CONTROL TROUBLESHOOTING THE HIDDEN PITTFALLS OF OVERDESIGN

Transit Signal Preemption and Priority Treatments

ADA TRANSITION PLAN 2013

UNIVERSITY OF WATERLOO

MICROPHONE WIND SPEED LIMITS DURING WIND FARM NOISE MEASUREMENTS

TRAFFIC MANAGEMENT PLAN

Auto-Zero Calibration Technique for Pressure Sensors

RESPONSIVE ROUNDABOUTS MYTH OR REALITY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

IWR PLANNING SUITE II PCOP WEBINAR SERIES. Laura Witherow (IWR) and Monique Savage (MVP) 26 July

Pokémon Organized Play Tournament Operation Procedures

Control System Nur Istianah-THP-FTP-UB-2014

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

Transcription:

Rationale for FAC-015-1 2018 Requirement R1 Each Planning Coordinator, (PC) and each of its Transmission Planners (TPs), when developing its steadystate modeling data requirements, shall implement a process to ensure that Facility Ratings used in its Planning Assessment of the Near Term Transmission Planning Horizon are equally limiting or more limiting than those establishedthe owner provided Facility Ratings used in accordance with its operations per the Reliability Coordinator s (RCs) System Operating Limit (SOL) Methodology. If The process may allow the Planning Coordinator usesuse of less limiting Facility Ratings than the Facility Ratings established in accordance with its Reliability Coordinator s SOL methodology, the Planning Coordinator shall provide a technical justification to its Reliability Coordinator.if: The Facility has higher Facility Ratings as a result of a planned upgrade, addition, or Corrective Action Plan, Facility Rating differences are due to variations in ambient temperature assumptions, The PC provided a technical rationale for using a less limiting Facility Rating to each affected TP and RC, or The TP provided a technical rationale for using a less limiting Facility Rating to each affected PC and RC. Rationale R1 Requirement R1 was drafted to ensure the appropriate use of applicable Facility Ratings in planning models. Analysis of these models determines System needs, potential future transmission expansion, and other Corrective Action Plans for reliable System operations. Therefore, it is imperative that the System is planned in such a way to support the successful operation of facilities when they are placed in service. Requirement R1 provides a mechanism for the coordination of Facility Ratings in planning models to those established in accordance with the Reliability Coordinator s (RC s) System Operating Limit ( SOL) Methodology. Since the analysis of planning models determines what facilities are constructed or modified, Facility Ratings used in these analyses should be equally limiting or more limiting than those established in accordance with the RC s SOL Methodology. Otherwise, operators could be unduly limited by thermal constraints that were not identified in preceding planning studies. Reliability Standard MOD 032 requires the modeling data in a Planning Coordinator (PC) area be coordinated between the PC and applicable Transmission Planners (TPs).TP. It is the opinion of the standard drafting team (SDT) that the resulting coordination is the appropriate means to ensure Facility Ratings included in planning models are equally limiting or more limiting than the Facility Ratings

established in accordance with the RC s SOL Methodology, since Planning Assessments and Corrective Action Plans are developed based on analysis of these models (TPL 001). The Near Term Transmission Planning Horizon is specified because planning assumptions tend to be more certain earlier in the Planning Horizon. Additionally, construction activities or other Corrective Action Plans are more likely to be finalized in this period. The intent of Requirement R1 is not to change, limit, or modify Facility Ratings determined by the equipment owner per FAC 008. The intent is to utilize those owner provided Facility Ratings such that the System is planned to support the reliable operation of that System. This is accomplished by requiring the PC and each of its TPs to use the owner provided Facility Ratings that are equally limiting or more limiting than those established in accordance with the RC s SOL Methodology. If less limiting Facility Ratings are used by the PC, a technical justification This is requirednot intended to be documented and provided toimply the RC. This does not give the RC has authority over the PCPCs and TPs planning a portion of the RC area in the development of the Planning Assessment. It does, however, facilitate communication between planning and operating entities so that analysis of the System by these entities are coordinated. The SDT recognizes there are instances where it may be appropriate for planning models to have less limiting Facility Ratings than those established in accordance with the RC s SOL Methodology. Requirement R1 explicitly allows for the following exceptions: The Facility has higher Facility Rating as a result of a planned upgrade, addition, or Corrective Action Plan, Facility Rating differences are due to variations in ambient temperature assumptions, The PC provided a technical rationale for using a less limiting Facility Rating to each affected TP and RC, or The TP provided a technical rationale for using a less limiting Facility Rating to each affected PC and RC. It is not the SDT s intent to unduly burden planning entities with documentation requirements to justify or explain Facility Ratings that result from the implementation of Corrective Action Plans or the use of ambient temperature assumptions in seasonal planning models versus those assumptions used in operational analyses and monitoring in real time. However, the SDT s intent is to require that planning entities not use shorter duration Emergency Ratings than what the RC s SOL Methodology allows absent a documented rationale. Requirement R2 Each Planning CoordinatorPC and each of its TPs shall implement a process to ensure that System steady state voltage limits used in its Planning Assessment of the Near Term Transmission Planning Horizon are equally limiting or more limiting than the System Voltage Limits establishedused in accordance with its Reliability Coordinator soperations per the RCs SOL Methodology. IfThe process may allow the Planning Coordinator usesuse of less limiting System steady state voltage limits than the System Voltage Limits established in accordance with its Reliability Coordinator s SOL methodology, the Planning Coordinator shall provide a technical justification to its Reliability Coordinator.if: 2018 2

The PC may use less limiting System steady state voltage limits if it providesd a technical rationale for using a less limiting System steady state voltage limit to each affected TP and RC. The TP may use less limiting System steady state voltage limits if it providesd a technical rationale for using a less limiting System steady state voltage limit to each affected PC and RC. Rationale R2 The purpose of TPL 001 is to develop a Bulk Electric System (BES) that will operate reliably over a broad spectrum of System conditions and following a wide range of probable Contingencies. Because the Planning Assessment (including the Corrective Action Plan) is the primary output of TPL 001, planning criteria used in developing the Planning Assessment should support the eventual operation of BES Facilities. Requirement R2 was drafted to ensure the use of appropriate System steady state voltage limits when performing studies in support of developing the Planning Assessment. These studies determine System needs, potential future transmission expansion, and other Corrective Action Plans for reliable System operation. Therefore, it is imperative that the System is planned in such a way to support the successful operation of facilities when they are placed in service. Since the analysis of planning models determines what Facilities are constructed or modified, the application of System steady state voltage limits used in studies that support the development of the Planning Assessment should be equally limiting or more limiting than those established in accordance with the RC s SOL Methodology. Otherwise, operators could be unduly limited by voltage constraints that were not identified in preceding planning studies. Requirement R2 provides a mechanism for the coordination of System steady state voltage limits evaluated in planning studies with the System Voltage Limits established in accordance with the RC s SOL Methodology. The Near Term Transmission Planning Horizon is specified because planning assumptions tend to be more certain earlier in the planning horizon. Additionally, construction activities or other Corrective Action Plans are more likely to be finalized in this period. The intent of Requirement R2 is to supplement Requirement R5 of TPL 001 4 which states, Each Transmission Planner and Planning CoordinatorTP and PC shall have criteria for acceptable System steady state voltage limits, post Contingency voltage deviations, and the transient voltage response for its System. For transient voltage response, the criteria shall at a minimum, specify a low voltage level and a maximum length of time that transient voltages may remain below that level. When determining the criteria for System steady state voltage limits in accordance with TPL 001 4 Requirement R2, the PC ispcs and TPs are required to implement the process described in FAC 015 1 Requirement R2. 2018 3

Requirement R2 requires the PC and each of its TPs to use System steady state voltage limits that are equally limiting or more limiting than the System Voltage Limits established in accordance with the RC s SOL methodology. If less limiting System steady state voltage limits are used by the PC, a technical justification is required to be documented and provided to the RC. This does not give the RC authority over the PCPCs and TPs for planning a portion of the RC area in the development of the Planning Assessment. It does, however, facilitate communication between planning and operating entities so that analysis of the System by these entities are coordinated. The SDT recognizes there are instances where it may be appropriate for planning models to have less limiting System steady state voltage limits than the System Voltage Limits established in accordance with the RC s SOL Methodology. Requirement R2 explicitly allows for the following exceptions: The PC provided a technical rationale for using a less limiting System steady state voltage limit to each affected TP and RC. The TP provided a technical rationale for using a less limiting System steady state voltage limit to each affected PC and RC. Requirement R3 Each Planning CoordinatorPC and each of its TPs shall implement a process to ensure the stability performance criteria used in its Planning Assessment of the Near Term Transmission Planning Horizon are equally limiting or more limiting than the stability performance criteria establishedused in its Reliability Coordinator soperations per the RC s SOL methodology. If the Planning Coordinator usesmethodology. The process may allow the use of less limiting stability performance criteria than the stability performance criteria specified in its Reliability Coordinator s SOL methodology, the Planning Coordinator shall provide a technical justification to its Reliability Coordinator.if: The PC may use less limiting stability performance criteria if it providesd a technical rationale for using a less limiting stability performance criterion to each affected TP and RC, or The TP may us less limiting stability performance criteria if it providesd a technical rationale for using a less limiting stability performance criterion to each affected PC and RC. Rationale R3 The purpose of TPL 001 4 is to develop a Bulk Electric System (BES) that will operate reliably over a broad spectrum of System conditions and following a wide range of probably Contingencies. Because the Planning Assessment (including the Corrective Action Plan) is the primary output of TPL 001 4, planning criteria used in developing the Planning Assessment should support the eventual operation of BES facilities. Requirement R3 was drafted to ensure the use of appropriate stability performance criteria when performing studies in support of developing the Planning Assessment. These studies determine System needs, potential future transmission expansion and other Corrective Action Plans for reliable System 2018 4

operation. Therefore, it is imperative that the System is planned in such a way to support the successful operation of facilities when they are placed in service. Since the analysis of planning models determines what facilities are constructed or modified, the application of stability performance criteria used in studies that support the development of the Planning Assessment should be equally limiting or more limiting than the criteria specified in the RCsRC s SOL Methodology. Otherwise, operators could be unduly limited by stability constraints that were not identified in preceding planning studies. Requirement R3 provides a mechanism for the coordination of stability performance criteria evaluated in planning studies with the Reliability Coordinator src s SOL Methodology. The Near Term Planning Horizon is specified because planning assumptions tend to be more certain earlier in the Planning Horizon. Additionally, construction activities or other Corrective Action Plans are more likely to be finalized in this period. The intent of Requirement R3 is to address the stability performance criteria used by PCs and TPs when performing the required stability analysis per TPL 001. When the PC performspcs and TPs perform the relevant stability analyses in accordance with TPL 001, they are required to implement the process in FAC 015 1 Requirement R3, which requires the PC and each of its TPs to use stability performance criteria that are equally limiting or more limiting than the criteria established in accordance with the RC s SOL Methodology. If less limiting stability performance criteria are used by the PC, a technical justification is required to be documented and provided to the RC. This does not give the RC authority over the PCPCs and TPs for planning a portion of the RC area in the development of the Planning Assessment. It does, however, facilitate communication between planning and operating entities so that analysis of the System by these entities are coordinated. The SDT recognizes there are instances where it may be appropriate for planning studies to utilize less limiting stability performance criteria than those established in accordance with the RC s SOL Methodology. Requirement R3 explicitly allows for the following exceptions: The PC provided a technical rationale for using a less limiting stability performance criterion to each affected TP and RC. The TP provided a technical rationale for using a less limiting stability performance criterion to each affected PC and RC. Requirement R4 Each Planning Coordinator shall provide the Facility Ratings, System steady state voltage limits, and stability performance criteria for use in its Planning Assessment to its Transmission Planners and to requesting Planning Coordinators. Requirement R5 2018 5

Each Transmission Planner shall use Facility Ratings, System steady state voltage limits, and stability performance criteria in its Planning Assessment that are equally limiting or more limiting than the Facility Ratings, System steady state voltage limits, and stability criteria provided by its Planning Coordinator. Rationale R4 and R5 Requirements R4 and R5 provide for the explicit coordination between PCs and TPs of Facility Ratings, System steady state voltage limits, and stability performance criteria used to develop Planning Assessments of the PC area. Additionally, Requirement R4 provides a mechanism for other PCs to obtain this same information, as needed. Requirement R5 also allows the TP to use more conservative Facility Ratings, System steady state voltage limits, and stability performance criteria than those the PC provides where the TP deems appropriate These requirements supplement TPL 001 4 Requirements R1, R5, and R6 by ensuring Facility Ratings, System steady state voltage limits, and stability performance criteria are consistently applied in Planning Assessments of the PC area. Requirement R6 Each Planning CoordinatorEach PC and each TP shall communicate any instability, Cascading or uncontrolled separation identified in either its Planning Assessment of the Near Term Transmission Planning Horizon or its Transfer Capability assessment (PC only) to each impacted Reliability Coordinator and RC, Transmission Operator. (TOP), Transmission Owner (TO) and Generator Owner (GO). This communication shall include: 64.1 The type of instability identified (e.g., voltage collapse, angular instability, transient voltage dip criteria violation); 64.2 The associated stability criteria used as part of determining the instability; 64.3 The associated Contingency(ies) which result(s) inand any Facilities critical to the instability, Cascading or uncontrolled separation; 6.44.4 A description of the studied System conditions when the instability, Cascading or uncontrolled separation was identified; 4.5 Any Remedial Action Scheme action, under voltage load shedding (UVLS) action, under frequency load shedding (UFLS) action, interruption of Firm Transmission Service, or Non Consequential Load Loss required to address the instability, Cascading or uncontrolled separation; and 4.6.5 Any Corrective Action Plan associated with the instability, Cascading or uncontrolled separation. Rationale R6R4 IRO 017 1 Requirement R3 requires PCs and TPs to provide their Planning Assessments to impacted RCs. However, Requirement R2 Part 2.4 and Requirement R4 in TPL 001 4, which outline the Stability analysis portion of the Planning Assessment, do not provide for the level of detail prescribed in FAC 015 1 Requirement R6R4. Therefore this requirement was drafted to ensure the appropriate details regarding 2018 6

potential instability, Cascading, or uncontrolled separation identified in the Stability portion of the Planning Assessment for the Near Term Transmission Planning Horizon are provided to impacted RC and Transmission Operators (TOPs).. The information itemized in Requirement R6R4 is a key consideration for RCRCs and TOPs in the establishment of SOLs. Of particular importance is the identification of potential risks of instability, Cascading conditions and uncontrolled separation that warrant establishment of an IROL by the RC. The details required by Requirement R6R4 will supplement the severe System conditions identified Requirementsin Requirement R4 Parts 4.4 &and 4.5 of TPL 001 4. Requirement R4 Part 4.3 also supports the proposed changes made in the CIP 002, CIP 014, and FAC 003 that require the PC and TP to provide information regarding instability, Cascading, and uncontrolled separation to the TO and GO. Of particular importance is the identification of Facilities that are elements of a Contingency event or are otherwise critical to the instability, Cascading, or uncontrolled separation. The TO or GO may consider those Facilities for higher levels of cyber protection, physical security, or vegetation management. The changes to CIP 002, CIP 014, and FAC 003 and the material discussed below uses the term System instability to clarify that the focus for the TO and GO is on Facilities that impact the BES, and not necessarily on a single generation unit instability. The applicable Facilities for cyber security, physical security, and vegetation management do not have to be the same. Examples of Facilities that might be relevant to the TO and GO for higher levels of cyber protection, physical security, and vegetation management include: The Contingencies that result in System instability, Cascading, or uncontrolled separation A SVC that, if compromised, would result in a more severe System response to the Contingency event The line(s) identified as the first lost by Cascading Examples of Facilities that may not be relevant to the TO and GO for higher levels of cyber protection, physical security, and vegetation management include: An individual generator that experiences unit instability All generators within the area impacted by System instability, Cascading, or uncontrolled separation All the lines that are impacted by Cascading A phase shifter that, while impacted by the event, does not significantly change the System s response to the event Part 4.5 and Part 4.6 are intended to identify those measures that were employed in the planning studies to mitigate or prevent instability, Cascading, or uncontrolled separation. For example, a study might indicate that instability was avoided through the implementation of an operational measure, Remedial Action Scheme (RAS) or a UVLS. i.e., if the operational measure, RAS or the UVLS were not employed, the 2018 7

study would indicate instability in response to the associated Contingency. This information is critical for operator awareness of any automatic or manual actions that are required to prevent the instability, Cascading, or uncontrolled separation. Without this information, operators may be unaware of these risks and the measures required to address them. 2018 8