Golden s Plan. For the Highway 6 & 93 Corridor

Similar documents
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Route 29 Solutions Projects

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

3.9 Recreational Trails and Natural Areas

Giles Run Connector Road

TABLE OF CONTENTS. Executive Summary

Owl Canyon Corridor Project Overview and Summary

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017

APPENDIX A. GIS ANALYSIS FOR THE MRT

Executive Summary. September 3, 2014

7th Street Bridge Project. Public Presentation February 24, :30pm-8pm

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

ARLINGTON COUNTY, VIRGINIA

Tonight is for you. Learn everything you can. Share all your ideas.

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Fairfax County Parkway Widening Fairfax County

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18)

5.0 Roadway System Plan

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Non-Motorized Transportation 7-1

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles.

Iowa Highway 58 Corridor Improvement Study

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Brighton Boulevard Public Input Summary December 2015

Basalt Creek Transportation Refinement Plan Recommendations

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Bicycle Master Plan Goals, Strategies, and Policies

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

This page intentionally left blank.

TRANSPORTATION COMMISSION Agenda Staff Report

Electric Bicycles (E-Bikes)

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Clackamas County Comprehensive Plan

Joshua Jester, E.I., Florida Department of Transportation, District One

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Chapter 5 Future Transportation

CITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE

City of Memphis On-Street Parking Modification Guidelines

Third Street Bridge & Corridor Project

City of Novi Non-Motorized Master Plan 2011 Executive Summary

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

FALL 2014 WORKSHOPS TAKEAWAYS

Hennepin County Transportation Department

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Somerville Community Path Feasibility Study

San Jose Transportation Policy

Chapter 5. Complete Streets and Walkable Communities.

U.S. Route 45 (IL 132 to IL 173 and Millburn Bypass) Frequently Asked Questions

Application of a Complete Street

San Tomas Expressway

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate

El Paso County 2040 Major Transportation Corridors Plan

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

3.0 Future Conditions

Community engagement guide May 2018

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Terwillegar Drive Expressway Draft Concept Plan

Roundabouts are good for business

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

SUMMARY OF TRANSPORTATION INVESTMENTS

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Southcote Road Improvements Class Environmental Assessment Study

Living Streets Policy

St. Francis Drive through the City of Santa Fe Corridor Study

Project Description Form 8EE

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Borough of Danville, PA Traffic Calming Program Guidelines

STANLEY STREET December 19, 2017

Fields of St. Croix HOA Meeting. October 27, 2016

This page intentionally left blank.

North Coast Corridor:

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Lawrence Loop SWOT Analysis

Major Bike Routes 102 Avenue Workshop April 21, 2015

Recommendations for Chief Peguis Trail West Extension

CTH M Reconstruction

TRANSPORTATION & MOBILITY

West Rail Line Update FasTracks Bike Jeffco. September 13, 2011

List of Display Boards

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

5. RUNNINGWAY GUIDELINES

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Transcription:

Golden s Plan For the Highway 6 & 93 Corridor

Purpose of the Study Accommodate regional traffic needs on Highways 6 and 93, as defined by the Northwest Quadrant Feasibility Study. Find a solution that meets community goals and addresses community concerns. Keep costs reasonable ($35 million per mile or less). Study Process Realigned Highway 93 In August 2002, Golden hired Muller Engineering to study and develop improvements to Highways 6 and 93. All aspects of this study were centered around community input. The City sponsored nine public meetings to provide residents the opportunity to weigh in on the designs. Hundreds of citizens participated and generated over 2,300 documented comments which all factored into the final design. Citizen groups were also represented at design team progress meetings. The Project Timeline Fall 2002: Held three public open houses to solicit citizen input and establish project goals. Winter/Spring 2003: Developed design alternatives around public feedback. Summer 2003: Held two open houses to present design alternatives to the public for comment, which resulted in final recommendations. Late Summer 2003: Presented Recommended Preferred Alternative to Golden City Council. Held four open houses to present the Recommended Preferred Alternative to the public for comments. October 23, 2003: Golden City Council adopted the Recommended Preferred Alternative Golden s Plan by unanimous vote (7 to 0). Typical noise barrier and bike path to mitigate neighborhood impacts

Community Goals The community s overarching goal was to build a road that is consistent with Golden s natural, historic, and community characteristics. To that end, citizens agreed upon three primary community-related goals: Realigned U.S. 6 Transportation Goals The Northwest Quadrant Feasibility Study (NWQFS) outlined the set of regional transportation improvements needed to increase mobility in Northwest Jefferson County over the next 20 years. Golden s Plan for the Highway 6 and 93 Corridor was developed to illustrate the transportation facility required to meet the recommendations of the NWQFS for Highways 6 and 93, including: Widen the corridor to 4 lanes. Improve safety. Accommodate the traffic volumes anticipated in 2020. 50,000 vehicles per day on 6. 40,000 vehicles per day on 93. Make it easy to accommodate increased traffic volumes beyond 2020. Accommodate multiple modes of travel. 1. Minimize Noise Reduce average noise levels in yards adjacent to the highway to 55 decibels or less. (55 decibels is approximately the background noise level of two or three people having a friendly conversation in a living room.) Make the roadway design speed 45 mph. 2. Enhance Neighborhood Connectivity Make the corridor friendly to pedestrians and bicyclists. Connect neighborhoods, schools and parks that are currently separated by the highway. 3. Protect the Natural and Historic Beauty of the Mountain Backdrop Preserve views of the mountains and valley from the road. Reduce views of the highway from homes. Typical Transparent Noise Barrier to preserve views. Tunnel to ensure neighborhood connectivity. Typical Pedestrian Plaza at Grade-Separated Interchange (Highway is beneath pedestrian plaza).

Plan For US 6 To Black Hawk/ Central City To Boulder

TRAFFIC SIGNAL (POSSIBLE FUTURE GRADE SEPARATION AS TRAFFIC NEEDS DICTATE) TRAFFIC SIGNAL (POSSIBLE FUTURE GRADE SEPARATED INTERCHANGE AS TRAFFIC NEEDS DICTATE) PEDESTRIAN TRAIL ALONGSIDE TUCKER GULCH (UNDER SH 93) GRADE SEPARATED INTERCHANGE 580 FOOT TUNNEL TO ENSURE NEIGHBORHOOD CONNECTIVITY (IOWA STREET PASSES OVER TUNNEL) PEDESTRIAN BRIDGE To Denver SEE US 6 GRAPHIC EXISTING PEDESTRIAN BRIDGE (TO REMAIN) EXISTING PEDESTRIAN BRIDGE (TO BE RECONSTRUCTED)

WILDLIFE UNDERCROSSING TRAFFIC SIGNAL (POSSIBLE FUTURE GRADE SEPARATED INTERCHANGE AS TRAFFIC NEEDS DICTATE) To Boulder Plan For SH 93