COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

Similar documents
COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

CCR Fugitive Dust Control Plan

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

FUGITIVE DUST CONTROL PLAN

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

CCR Fugitive Dust Control Plan

Closure Plan for CCR Surface Impoundments

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

CCR Closure Plan Ash Impoundment

2018 Annual Inspection Report

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

D.B. Wilson Station CCR Landfill

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

Amended Written Closure Plan

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

2017 Annual Inspection Report

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

Coal Combustion Residuals Closure Plan

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

Mine Dust Management Plan

2016 Annual Inspection Report

2016 Annual Inspection Report

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

Notice of Intent to Close Inactive CCR Surface Impoundments

What I ve Learned About Dam Safety Good, Bad and Ugly

CSU Channel Islands Lead Operations and Maintenance Program

PRESSURE SYSTEMS POLICY

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

2018 INSPECTION REPORT

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Holding Pond Annual Inspection Report

Seed Treatment Safety and Regulations Crop Protection Perspective. Chip Witcher / Staff Industrial Hygienist / Syngenta Crop Protection

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

OSHA s Proposed Silica Rule Randy Nicholls Northwestern Energy

REVISION RECORD. Revision Number. Date Sections Affected/Reason 0 04/17/2017 Creation of Initial EAP

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Sr. No. General points CPCB Comments 1. Print option, acknowledgement of submission for CPCB OCEMS Protocol

SCHEDULE 08 Public Safety Plan

Holding Pond Annual Inspection Report

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

LABORATORY FUME HOOD SPECIFICATION AND MAINTENANCE PROGRAM

POSITION DESCRIPTION City of Monett

Hazardous Materials Management Guidelines

SILICA EXPOSURE CONTROL PLAN

6A.004 SCBA MAINTENANCE. Policy Number. Page 1 of 5 SCOPE

Tiered Permitting Checklist Summary of Violations

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

Pressure Vessel Program

HISTORY OF CONSTRUCTION

Inerting System Design for Medium Speed Vertical Spindle Coal Pulverizers TABLE OF CONTENTS

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE

Removal of Lead-Based Paint

STRUCTURAL STABILITY ASSESSMENT

Energy Control Procedures Lockout/Tagout 29 CFR

PRINTED COPY IS NOT CONTROLLED Page 1 of 22

University of Vermont Department of Physical Plant Personal Protective Equipment Program

McIlvaine Company Hot Topic Hour. April 9, Dry Sorbent Injection Options and Issues

Vermin, Insects and Scavenging Birds Management Plan

O&M MANUAL HIGHLIGHTS

Secondary Aluminum NESHAP 40 CFR Part 63 Subpart RRR. Example Malfunction Plan for Plant ABC

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

Model EXAxt AV550G. Averaging Oxygen Analyzer

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

Transcription:

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN Plant Gaston October 2015 Professional Engineer Certification: Based upon my knowledge, information, and belief that the content in the attached is accurate, I hereby certify that this meets the requirements of 40 CFR 257.80(b)(1)-(7) (Coal Combustion Residuals Rule). Wyman Turner, PE No. 30102, 12-31-15 Date: 10-08-15 Name, P.E. License No., Expiration Date Page 1 of 5

AMENDMENT SUMMARY Date Amendment # Comments I Notes Page 2 of 5

1.0 PURPOSE The purpose of this guideline is to demonstrate compliance with the fugitive dust requirements in 40 CFR 257.80(a) and 257.80 (b)(1) through (7). 2.0 SCOPE This fugitive dust plan identifies and describes the Coal Combustion Residuals (CCR) fugitive dust control measures that Alabama Power Plant E.C. Gaston will use to minimize CCR from becoming airborne at the facility, including CCR fugitive dust originating from CCR units, roads, and other CCR management and material handling activities. Coal combustion residuals are generated from the burning of coal to produce electricity and are defined as fly ash, bottom ash, boiler slag, and flue gas desulfurization (FGD) materials. 3.0 REFERENCES 40 CFR 257.53, 257.80, 257.105(g)(2) 4.0 GENERAL INFORMATION EPA defines fugitive dust as solid airborne particulate matter that contains or is derived from CCR, emitted from any source other than through a stack, or chimney. 40 CFR 257.53. 5.0 PROCESSES 1) Identify the CCR units on plant site that are subject to the requirements in 257.80 to minimize CCR from becoming airborne. Ash Pond Gypsum Pond 2) Identify and describe the fugitive dust control measures that are applicable and appropriate to minimize CCR from becoming airborne at the units listed in Section 5.0 (1) of this plan. Page 3 of 5

Ash Pond Fugitive dust control measures associated with Ash Pond: 1. Dry ash is handled using a closed-loop system in closed transport vehicles. 2. Dry ash that is not handled in the closed loop system is conditioned with water to minimize fugitive dust emissions. 3. Vehicle traffic on the main ash stack is restricted. Vegetation has been established by hydro seeding on the main stack. 4. Ash which is not handled dry maintains adequate moisture content throughout the dewatering and stacking process. 5. The working areas are watered to promote the re-formation of surface crust on the ash and minimize dust generation. 6. Ash that is harvested for off-site operation is maintained with adequate moisture content and is covered or tarped in transport vehicles for off-site shipment. 7. Plant personnel conduct routine inspections for fugitive dust; plant CCR personnel are notified if fugitive dust generation is observed and action is taken. 8. Areas in the wet portion of the pond are wet or vegetated to control erosion and minimize dust. Gypsum Pond Fugitive dust control in the gypsum pond area includes the following: 1. Gypsum is transported wet directly to the surface impoundment. 2. Regular use of the existing sprinkler system on an as needed basis. 3. Plant personnel conduct routine inspections for fugitive dust; plant CCR personnel are notified if fugitive dust generation is observed and action is taken. 4. Access to the gypsum impoundment is restricted to personnel required to conduct operations, maintenance, and inspections. 3) Explain how the control measures described in Section 5.0 (2) of this plan are applicable and appropriate for site conditions related to each CCR unit. The fugitive dust control measures identified and described in this plan were adopted and implemented based upon an evaluation of site-specific conditions, engineering site visits and subject matter expert input. Conditioning CCR where needed, containing CCR where appropriate, controlling access to CCR areas, and inspecting CCR areas in the manner described in Section 5.0 (2) are determined to be applicable and appropriate dust control measures for the listed CCR units. The evaluation included assessing the effectiveness of the fugitive dust control measures for each CCR unit. Consideration was given to various factors such as site conditions, weather conditions, moisture content and physical condition of the CCR, as well as operating conditions within the CCR units. 4) Describe the process to emplace CCR as conditioned CCR for any CCR landfill listed in Section 5.0 (1) of this plan. The plant does not operate any dry CCR landfills. Measures to address dry areas within the pond are described in Section 5.0 (2). 5) Describe the fugitive dust control measures to minimize CCR from becoming airborne on roads and at other CCR management and material handling activities. Page 4 of 5

Dust accumulation is prevented by washing down or vacuuming work areas, employing closed systems and covered trucks, wetting areas with vehicle traffic, and reducing speed of vehicles in active work areas. Vehicle access is restricted or minimized within the Ash Pond and Gypsum Pond and speed limits are posted and observed within each CCR unit. The CCR unit roads and facility roads are watered, as needed, on a routine basis to minimize fugitive dust emissions. See discussion of CCR units in Section 5.0 item 2) of this plan. 6) Describe the process to periodically assess the effectiveness of the fugitive dust control measures described in this plan. Plant personnel will perform periodic CCR fugitive dust inspections. Based on these observations, the frequency, location and amount of dust suppression activities and processes discussed in this Plan will be adjusted to prevent dust emissions. Plant personnel understand the importance of minimizing CCR fugitive dust generation and the requirement that any CCR fugitive dust observations should be promptly addressed. 7) Describe the process to log citizen complaints received involving CCR fugitive dust events at the facility. When a complaint is received regarding a CCR fugitive dust event at the facility, the complaint is documented and investigated. Appropriate steps are taken including any appropriate action, if needed. Page 5 of 5