Non-Motorized Overpass at SR 5/US1

Similar documents
section 4 Existing Conditions, Issues, and Options

FY 2006 TRANSPORTATION CAPITAL PROGRAM

DUNBOW ROAD FUNCTIONAL PLANNING

Design Criteria. Design Criteria

Comments EXECUTIVE SUMMARY

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River

Blair/Williamson Intersection Expressed Needs

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

STUDY PROCESS & SCHEDULE

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Operational & Geometrical Analysis Technical Memorandum

Highway 111 Corridor Study

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

List of Exhibits...ii

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Harrah s Station Square Casino

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Detailed Description of Work

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Access Routes from US 101 to the Richmond San Rafael Bridge

3.9 Recreational Trails and Natural Areas

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Giles Run Connector Road

FOR SALE SOMI LAND DOWNTOWN SOUTH MIAMI MIXED-USE DEVELOPMENT SITE EXCLUSIVELY PRESENTED BY:

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Traffic Management Guidelines for Structure Rehabilitation Projects

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

Joshua Jester, E.I., Florida Department of Transportation, District One

10 th STREET BRIDGE REPLACEMENT Schedule 'C' EA: Phase 3 Presentation to Council Recommended Design Alternatives City of Owen Sound August 27, 2018

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

5. RUNNINGWAY GUIDELINES

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Traffic Impact Statement

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Route 29 Solutions Projects

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

Technical Advisory Committee (TAC)

TRAFFIC SIGNAL WARRANT STUDY

THIS PAGE LEFT BLANK INTENTIONALLY

List of Display Boards

Duke Street (Route 236) Over I Bridge Plan & Elevation

Information for File # SEW

This page intentionally left blank.

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

MUTCD Part 6: Temporary Traffic Control

Clay Street Realignment Project Traffic Study

APPENDIX L. Design Criteria

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Financial Project ID No(s).: and ETDM No(s).: and 14181

Glenn Avenue Corridor Traffic Operational Evaluation

Downtown Redevelopment Project Update

Basic Road Design. If you don't know where you are going, any road will get you there. Lewis Carroll

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

C.A.R.S. Project Design Report.

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Donahue Drive Corridor Traffic Operational Evaluation

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Ottawa Beach Road Study

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

I-105 Corridor Sustainability Study (CSS)

South King County High-Capacity Transit Corridor Study

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Transcription:

Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com

Non-Motorized Overpass at SR 5/US1 and SR 97/SW th Street (Bird Road) (FM No. 153-3-1-1) EXECUTIVE SUMMARY Project Description: Concept and Feasibility Analysis for a non-motorized overpass for pedestrian and bicycles to support the Underline adjacent to US-1 at SW th Street (Bird Road). Purpose: The Department requested a conceptual and feasibility analysis to identify, evaluate, and recommend potential alignments for a non-motorized overpass. This conceptual analysis consisted of: Typical Section Analysis Horizontal and Vertical Geometric Analysis Traffic Control Analysis Background: The study was conducted at US 1 at th Street adjacent to the Underline, a proposed 1 mile signature linear park and urban trail. The Underline will serve as a gateway to the adjacent communities, by improving physical access from north to south running from underneath the Metrorail line and parallel to US1. Need: At this specific location, the traffic congestion is impacting the safety of pedestrians and bicyclists crossing SW th Street. Methodology: The feasibility study included the following tasks; Field review of existing conditions Analyze existing Right of Way Maps and Survey (topography) Obtain aerial images of the proposed study area Performed horizontal and vertical geometric analysis Coordination with local companies that manufacture pre-fabricated bridges to obtain preliminary cost estimates and engineering specifications Performed a conceptual Right of Way cost analysis of the adjacent properties within the study area Development of design criteria Development of concept alternatives including typical section, plan and profile. Existing Conditions: US 1 at SW th Street is a skewed intersection approximately. miles southwest of the Coconut Grove Metrorail station. There are pedestrian signals and high visibility pedestrian crossings on the south approach of US-1, and on the west approach on SW th Street. There is also a pedestrian crossing on Hibiscus St. adjacent to the intersection. There are no bicycle lanes on the streets and arterials. Proposed Improvements: 1

Non-Motorized Overpass at SR 5/US1 and SR 97/SW th Street (Bird Road) (FM No. 153-3-1-1) The proposed alternative is a non-motorized overpass for pedestrians and bicyclists, with grades not exceeding 3%, that will require a 7 foot long prefabricated bridge consisting of spans ranging from 115 feet to 1 feet in length (See Appendix A, Sheets 1 thru ). The abutment located at the begin bridge location will be placed on the south side of SW th Street, at least 1 feet from the edge of pavement. There is a need to provide a bridge pier at the existing Metrorail pier protection between WB and EB on SW th Street. The remaining bridge piers and the abutment for the end bridge location will be constructed between the Metrorail tracks and US-1. The bridge will extend to just north of the US-1 SB right turn lane due to the lateral constraint between the Metrorail tracks and the existing edge of pavement. LOCATION MAP: SW TH ST (BIRD ROAD) The remainder of the pedestrian overpass will be constructed using retaining walls and gravity walls with bicycle railings on the wall copings. Gravity walls will be used at the approaches to the Underline at the ground level on both sides. The south portion of the overpass will be constructed south of the Metrorail tracks, within the Metrorail right-ofway. The north portion of the overpass will be constructed between the Metrorail tracks and US-1, within the Metrorail right-of-way.

Non-Motorized Overpass at SR 5/US1 and SR 97/SW th Street (Bird Road) (FM No. 153-3-1-1) Traffic Control: The construction of the pier located on SW th St will be done by closing the inner lanes on each direction on the west leg of the intersection of SW th St and SR5/US1 using standard temporary concrete barrier wall to separate the work zone from the travel lanes. The construction of all the bridge piers on the north leg of the intersection will be done by closing the SB RT lane and/or by closing the outermost SB lane using temporary concrete barrier wall. For the construction of the bridge pier south of SW th St, the construction of the retaining walls, gravity walls and shared-use path, no lane closures are required. Only very short duration closures may be expected to provide access to construction equipment. Closures on SB US1 will be required in order to erect the bridge superstructure north of SW th Street and night operations are recommended. Mounting/assembling of the bridge superstructure over the EB and WB SW th St. will require a temporary detour, and closing SW th St. NW 37th Ave can be used as a detour route. Also, lane closures on SB US1 will be required, and night operations are preferred. 3

Non-Motorized Overpass at SR 5/US1 and SR 97/SW th Street (Bird Road) (FM No. 153-3-1-1) Right of Way Availability: Based on our analysis, for proposed improvements an estimated area of approximately 15, square feet from the property belonging to Miami Dade County (Metrorail) will have to be transferred to the Department. Miami Dade Transit Concerns: In consultation with Miami Dade Transit, 5 of clearance from the drip edge of the Metrorail structure to the proposed overpass structure is feasible, however, there are a number of concerns. The proximity of the 75 kv electrified third rail which is next to the Metrorail tracks. Noise level from the Metrorail will be significant to the pedestrians and bicyclists, therefore, further analysis of the noise will be required. The proximity of the existing Metrorail foundations to the proposed overpass foundations. Any construction near their foundations have a time restriction from 1am to am. Schedule PEDESTRIAN OVERPASS AT US 1 AND BIRD ROAD No. Activity Description Design (Working Days) Construction (Working Days) 1 1'X1' TRUSS ( Spans) 5 17 APPROVAL OF DRAWINGS 3 3 SUBSTRUCTURE 9 15 ROADWAY (WALLS AND PATH) 1 Schedule Total Days (Calendar Days) 5 3 Cost Estimate: The total estimated construction cost is $5,,3.. The estimate is based on the Master Pay Item List (January 1 to June 1 Area 13). The cost estimate for the pre-fabricated bridge was obtained from the manufacturer. Fatal Flaws: No fatal flaws were identified; however, a more detailed analysis is recommended. Recommendations: Based on this study s findings, the non-motorized overpass improvement is recommended for further design development as a safety project under the Highway Safety Program.

Non-Motorized Overpass at SR 5/US1 and SR 97/SW th Street (Bird Road) (FM No. 153-3-1-1) APPENDIX A 5

CURVE DATA C1 PI STA. = 11+.17 CURVE DATA C11 PI STA. = 1+53. POT STA. 1+. T =.9 L = 7.95 R = 1. R = 1. PC STA. = 11+19.9 PT STA. = 1+7. PT STA. = 1+93.53 1 11 119.9 T = 5.5 L =.9 PC STA. = 1+7. PC STA. 11+19.9 PI STA. 11+.17 UNDERLN I E C1 PRC STA. 1+7. 1 C11 PI STA. 1+53. PRC STA. 1+93.53 13 BEGIN PEDESTRIAN OVERPASS BEGIN S 1+7. END S BEGIN S +93.53 PEDESTRIAN OVERPASS 1 1.' CLEAR N True North 1 Feet MetroRail S N Direction of Travel 15 CURVE DATA C1 PI STA. = 1+9. C1 1 15+53. T =.5 L = 79.5 R =,53.5 PC STA. = 1+93.53 PT STA. = 11+9.1 3 3 3 3 3 1 1 1 1 1. BEGIN PEDESTRIAN OVERPASS BEGIN PI +7., EL. 1.95 END BEGIN PI +93.53, EL..53 (+).1% (+) 3.% (+) 3.% (+) 3.% PEDESTRIAN/BICYCLE RAILING GROUND LINE 1+ 11+ 1+ 13+ 1+ 15+ 3 3 3 3 3 1 1 1 1 1 REVISIONS MARLIN ENGINEERING, INC. 17 NW Ave., Ste. 1 Plantation, FL 33313 (35) 77-7575 C.A. No. 1 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SR-5 MIAMI-DADE 153-3-1-3 ROADWAY PLAN & PROFILE BIRD ROAD OVERPASS SHEET NO. 1 rlagos //17 3:53: PM K:\155.1 NonMotorizedPedBikeUS1\153313\roadway\PLAN\PLANRD1.dgn

N True North 1 15+53. 1 CURVE DATA C1 PI STA. = 1+9. PI STA. 1+9. SR-97/SW th STREET/BIRD ROAD END S BEGIN PEDESTRIAN OVERPASS BRIDGE +7.7 17 1 1.' CLEAR C1 19 BRIDGE PIER +.3 PEDESTRIAN OVERPASS PEDESTRIAN OVERPASS BRIDGE 11 Feet S N MetroRail Direction of Travel BRIDGE PIER +.3 PT STA. 11+9.1 111 111+1.9 T =.5 L = 79.5 R =,53.5 PC STA. = 1+93.53 PT STA. = 11+9.1 SR-5/S. DIXIE HIGHWAY 3 3 3 3 3 1 1 1 1 1 PI +7.7, EL 1.7 PEDESTRIAN/BICYCLE RAILING GROUND LINE END PEDESTRIAN OVERPASS BRIDGE BEGIN PEDESTRIAN OVERPASS BRIDGE (+) 3.% (+) 3.% (+) 3.% +7.7 EL. 1.7 19.1 19.9.3.75 1.3 1.9.1.53.9 3.5 3.57 3..13.3.57.75.91 MINIMUM 17.5' VERTICAL CLEARANCE GROUND LINE 1+ 17+ 1+ 19+ 11+ 111+ 371' V.C. 3 3 3 3 3 1 1 1 1 1 REVISIONS MARLIN ENGINEERING, INC. 17 NW Ave., Ste. 1 Plantation, FL 33313 (35) 77-7575 C.A. No. 1 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SR-5 MIAMI-DADE 153-3-1-3 ROADWAY PLAN & PROFILE BIRD ROAD OVERPASS SHEET NO. rlagos //17 3:53:5 PM K:\155.1 NonMotorizedPedBikeUS1\153313\roadway\PLAN\PLANRD.dgn

True North N 111+1. BRIDGE PIER +.3 PEDESTRIAN OVERPASS 3 BRIDGE PIER +1.3 METRORAIL TRACK METRORAIL TRACK MetroRail S N Direction of Travel 11 113 11 115 11 PEDESTRIAN OVERPASS BRIDGE BRIDGE PIER +1.3 1.' CLEAR 1 Feet END PEDESTRIAN OVERPASS BRIDGE BEGIN S +31.3 11+7. SR-5/S. DIXIE HIGHWAY 3 3 3 3 3 (+) 3.% PI +3.9 EL. 9.9 (-) 3.% PI +1. EL. 1.5 PEDESTRIAN OVERPASS BRIDGE END PEDESTRIAN OVERPASS BRIDGE BEGIN PI +31.3, EL 1.13 3 3 3 3 3 PEDESTRIAN/BICYCLE RAILING (-) 3.% (-) 3.% (-) 3.% 1 1 1 (-) 3.% 1 1 1 1 1 5.3 5.13 5.19 5. 5.1 5.7.93.75.51 7' V.C.. 3.9 3.5 3.7.5.5 MINIMUM 17.5' VERTICAL CLEARANCE 1 1 GROUND LINE 11+ 113+ 11+ 115+ 11+ REVISIONS MARLIN ENGINEERING, INC. 17 NW Ave., Ste. 1 Plantation, FL 33313 (35) 77-7575 C.A. No. 1 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SR-5 MIAMI-DADE 153-3-1-3 ROADWAY PLAN & PROFILE BIRD ROAD OVERPASS SHEET NO. 3 rlagos //17 3:53:7 PM K:\155.1 NonMotorizedPedBikeUS1\153313\roadway\PLAN\PLANRD3.dgn

True North N 1 Feet 11+7. 1,.1 1.' CLEAR METRORAIL TRACK METRORAIL TRACK END S BEGIN S +.3 S N Direction of Travel 117 11 119 1 11 1 MetroRail UNDERLINE 1+3. PEDESTRIAN OVERPASS END PEDESTRIAN OVERPASS END 11+3.97 SR-5/S. DIXIE HIGHWAY 1 1 1 1 1 - - - - -1-1 PEDESTRIAN/BICYCLE RAILING END BEGIN PI +.3, EL. 5. END PEDESTRIAN OVERPASS END PI +3.97, EL.. (-) 3.% (-) 3.% GROUND LINE 117+ 11+ 119+ 1+ 11+ 1+ 1 1 1 1 1 - - - - -1-1 REVISIONS MARLIN ENGINEERING, INC. 17 NW Ave., Ste. 1 Plantation, FL 33313 (35) 77-7575 C.A. No. 1 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SR-5 MIAMI-DADE 153-3-1-3 ROADWAY PLAN & PROFILE BIRD ROAD OVERPASS SHEET NO. rlagos //17 3:53:9 PM K:\155.1 NonMotorizedPedBikeUS1\153313\roadway\PLAN\PLANRD.dgn

SW th. STREET (BIRD RD.) 3'-1 1/" 1 3/" CONCRETE DECK BOTTOM CHORD BRACE DIAGONAL WESTBOUND TRAIN EASTBOUND TRAIN 5'-" TYPE 3 SUNSHINE INFILL PANEL STL. PED/BICYCLE FLOOR BEAM SIDE DAM RAILING - TYPE 3 SUNSHINE INFILL PANEL PER INDEX 5 DECK BRACING PEDESTRIAN OVERPASS PLAN FRAMING DETAIL 1 VARIES SYSTEM SECTION 1 TOP CORD CONCRETE ABUTMENT VERTICAL DIAGONAL PEDESTRIAN OVERPASS ELEVATION BOTTOM CHORD WESTBOUND TRAIN EASTBOUND TRAIN 5'-" 1.' CLEAR 1.' CLEAR 5'-" VARIES 1.' 17'-" MIN. SW th. STREET (BIRD RD.) SECTION EOP ALONG WESTBOUND TRAIN EASTBOUND TRAIN SR5 / US 1 / S. DIXIE HWY 17'-" MIN. GUARDRAIL US-1 (S. DIXIE HIGHWAY) SECTION 3 REVISIONS MARLIN ENGINEERING, INC. 17 NW Ave., Ste. 1 Plantation, FL 33313 (35) 77-7575 C.A. No. 1 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SR-5 MIAMI-DADE 153-3-1-3 TYPICAL SECTION DETAILS SHEET NO. 5 rdominguez 3//17 ::55 PM K:\155.1 NonMotorizedPedBikeUS1\153313\roadway\PLAN\TYPSRD1.DGN