RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

Similar documents
JAP Additional Information Sheet

CHAPTER X: PORTAGES AROUND DAMS

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Water Resources Report RKLD Annual Meeting July 30, 2016

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

Canoe/Kayak Launch Sites and Accessibility

Information for File # SEW

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Community Open House December 13, A project of the Green Infrastructure Center, supported by Skeo Solutions

Launch Site Accessibility Evaluation & Design Recommendations

AN EARTHWORK HILL, RINGED WITH SEATING AND SHAPED TO SLOPE DOWN TO THE RIVER, FORMS THE CENTERPIECE TO A NEW SOCIAL PIER. A WOOD SEATING TERRACE

Emerson Circle Entrance

18 HOLE RISK ASSESSMENT COMPLETED BY: MARK HAINES POSITION HELD: COURSE MANAGER DATE:

Cross-Vane Plan View FIN-UP Habitat Consultants, Inc. 220 Illinois Avenue Manitou Springs, CO (719) P.

PREPARE TO LAUNCH! DESIRED LAUNCH CHARACTERISTICS Updated April User Accessibility. Site Location Appropriateness

Lewis River Hydroelectric Projects Settlement Agreement Lewis River Recreation Coordination Committee (LRC) Meeting Agenda

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

Stevens Creek Corridor

Of the following, which best describes you?

Estuarine Shoreline Stabilization

SUMMARY COSTS: (Please attach a detailed budget including all sources of recipient funding)

San Francisco Bay Area Water Trail Site Description for. Cuttings Wharf

Midtown Rail Station Accessibility Assessment N4

Summary of Water Access for Marinas and Public Boat Ramps

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

section 4 Existing Conditions, Issues, and Options

At Home on the Elbow River. -Ours to share-

HARBOR INFRASTRUCTURE INVENTORIES Fairport Harbor, OH

Hope Mills Lake Recreational Improvement Plan. Lake Advisory Committee

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

Shoreline Studies Program, Department of Physical Sciences, VIMS

Simulating Streams Through Culverts in Mat-Su, Alaska

FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM

MISSISSIPPI EAST BANK TRAIL

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

Stephens Creek Culvert Replacement. CAC April 28, 2010

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB

City of Anoka Archery Deer Hunting Program

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

1. In Reach 3, Perry, Knox, Lowell, and Hooker have crossings identified. What are these?

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

APPENDIX J HYDROLOGY AND WATER QUALITY

CFH Boise City Parks and Recreation

Emergent Sandbar Habitat Program Middle Missouri River

HARRY AND LAURA NOHR CHAPTER OF TROUT UNLIMITED

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

Waikanae River Environmental Strategy. 12. Arapawaiti/Otaihanga Reach

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

Portage Bay Park Design Commission Review 4: 90% Design Development January 5, 2017

XI TERMINAL A TER T A W

CITY OF MADISON PROPOSED PROJECT. Wingra Park Shoreline Repair

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

COPE PARK MASTER PLAN

SOLITUDE MOUNTAIN RESORT MASTER DEVELOPMENT PLAN AMENDMENT PROPOSAL

Tonight is for you. Learn everything you can. Share all your ideas.

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Austin Avenue Bridges Project. Public Meeting Summary

HARBOR INFRASTRUCTURE INVENTORIES Port Sanilac Harbor, Michigan

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 3: PEDESTRIAN AND BICYCLE CIRCULATION

RENOVATION MASTER PLAN

10/20/2010 Version 3. Guidelines for Developing Non-motorized Boat Launches in Florida

Lake Michigan Coastal Communities Trail Towns Master Plan. St. Joseph

South Fork River Retreat SWAN VALLEY, IDAHO

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

RI Regulatory Setbacks & Buffers: Coastal Management Issues

BASS LAKE PLANNING UNIT Willow Creek Watershed

What Is a Complete Street?

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

Annex E Bridge Pier Protection Plan

Somerville Community Path Feasibility Study

BOLAND DRIVE PATH PROJECT. Martin Le Jack Reilly Paul Rodriguez Allison Rotella Maria Wilson

HARBOR INFRASTRUCTURE INVENTORIES Caseville Harbor, Michigan

COASTAL HAZARDS. What are Coastal Hazards?

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Safe Routes to School Action Plan Aberdeen, Idaho

Off-road Trails. Guidance

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

2012 North Ottawa Dunes Deer Management Hunt. Rules and Regulations

Technical Report Culvert A Hydraulic Analysis

Safe Streets. City of Lake Forest Park. March 21, 2017

For more information or permission to reprint slides, please contact Donna Milligan at 1

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Accommodating Pedestrians in the Work Zone

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION

REC 6 FISHERIES HABITAT EVALUATION

TOP:001.3 U.S. Fish and Wildlife Service TECHNICAL OPERATING PROCEDURE

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

City of Los Angeles Department of Building & Safety Disabled Access Section Supplemental Plan Review Checklist No. 8 RECREATION FACILITIES

RESILIENCE THROUGH RESTORATION

Transcription:

AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN DESIGN DETAILS 135

AREA CHARACTER East Grand Forks a city of 7,501 people is located across the Red River of the North from the Grand Forks / North Dakota border. It suffered considerable damage from a major flood in 1997. Most of its homes and many of its businesses were destroyed. The city has been rebuilt on higher ground. Dikes have been erected and The Greenway has been created in the floodway along the main stem of the Red River of the North. East Grand Fork s Eagle Point is located on the southern shore of the Red Lake River just upstream from the confluence of the Red Lake River and the Red River. DESCRIPTION OF PHOTOGRAPHS EXISTING FISHING LOCATION: Taking advantage of great fishing, most fisher people choose to fish from the south bank of the Red Lake River in the areas with moderate forest cover. This location is close to the future boat launch. EXISTING FISHING LOCATION: The edge condition along the banks of the Red Lake River protect the bank from erosion and are ideal locations for potential river access locations. FUTURE BOAT LAUNCH (A): This view describes the location of a future boat launch just north of the Second Avenue Southeast Bridge. VIEW OF EAGLE POINT TRAIL & TRAILHEAD (B): The Eagle Point Trailhead and its building are located west of Second Avenue Southeast. VIEW OF SECOND AVENUE SOUTHEAST BRIDGE (C): Second Avenue Southeast Bridge bisects Eagle Point. Because the road is elevated to protect it from flooding, a path beneath the road connects the two areas. 136

EXISTING FISHING LOCATION B A C EXISTING FISHING LOCATION AERIAL VIEW OF EAGLE POINT AREA AERIAL VIEW OF GRAND FORKS AREA N FUTURE BOAT LAUNCH (A) VIEW OF EAGLE POINT TRAIL & TRAILHEAD (B) VIEW OF SECOND AVENUE SOUTHEAST BRIDGE (C) 137 137

RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE The new red Lake River Boat Launch will provide a great asset to the Red Lake River and to the City of East Grand Forks. Siting the new boat launch adjacent to the Eagle Point Trailhead provides new opportunities for recreation while creating a unique place at the confluence of the Red Lake River and the Red River of the North. This location will serve as the terminus of the Red Lake River Corridor and celebrate river user s arrival at East Grand Forks. The integration of trails, new fishing benches, piers, platforms, re-forestation, signage, and sculpture provide a unique experience and a destination within the community. 138

RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE Cottonwood Plantings DNR Boat Launch Fishing Bench Typ. Rock Riffle To Fishing Platform Fishing Pier / Carry-in Trail Reforestation Plantings (Shown in Hatch Pattern) RLRC Water Level Sculptures Fishing Pier Eagle Point Trailhead 139 139

EAGLE POINT DESIGN The Red Lake River Corridor plan terminates at Eagle Point just above the confluence of the Red Lake River and the Red River. It is bisected by Second Avenue Southeast. Located in the flood plain, Eagle Point is bounded on the north side by the Red Lake River. Access to both rivers and access to the Eagle Point Trail System are features of the design. The design uses the landscape, river, and flood levels to create a planting scheme that accentuates the sites environmental conditions while integrating both sides of the Second Avenue Southeast bridge into a connected whole. By uniting the boat launches, fishing piers, trail system, carry-in locations, and trailhead design the plan creates a place that marks the arrival to East Grand Forks, the confluence of the rivers, and Eagle Point as a community space. HC ACCESSIBLE FISHING PIER / OVERLOOK: The fishing pier/overlook provides handicap access to the Red Lake River. It also provides views up and down the river. BOAT LAUNCH & PARKING LOT: The boat launch is sited just east of the Second Avenue Southeast Bridge on the Red Lake River. The parking lot is sited on higher ground. Pathways lead from the parking lot to the fishing pier, the boat launch, and the trailhead building. (The boat launch specifications and plan were provided by the Minnesota Department of Natural Resources.) VEGETATED SWALE: The drainage swale winds its way through the park and empties into the Red Lake River just west of the boat launch. It is designed to receive storm water run off and cleanse it before emptying it into the Red Lake River. The swale s shallow cross section and heavily vegetated edges of native plants will clean the storm water runoff, promote its infiltration, and provide wildlife habitat. TRAIL SYSTEM: A trail system on the point connects the fishing pier, the boat launch, the parking lot, to the Eagle Point Trailhead building and the Greenway Trail. COTTONWOOD PLANTINGS: Rows of cottonwood trees are aligned with the piers that elevate Second Avenue Southeast. In addition to marking the piers and marking the changing water levels in the floodplain, they strengthen the connection between the two park areas that are separated by Second Avenue Southeast. This water-tolerant specie with stands periodic inundation of water and helps to prevent shoreline erosion, characteristics that are desirable and necessary in this flood-plain location. The trees act as living sculptures accentuating the flooding waters on the landscape. RLRC WATER SCULPTURES: Two sculptures are placed on the trail that connect the trailhead facilities building and boat launch. Their placement creates a connection between the areas on either side of the bridge They are designed to mark water level changes during high water. RLRC INFORMATIONAL SIGN: The signs at the boat launch and fishing pier/overlook provide information about East Grand Forks, the Greenway, and the Red Lake River Corridor and its trail resources such as picnic areas, camping areas, and restrooms. 140

EAGLE POINT DESIGN New Fishing Pier (detail pg. 143) RED LAKE RIVER INFORMATIONAL SIGN Red Lake River New Access / Boat Launch (Boat Launch & Parking Lot Used With Permission From The Minnesota Department of Natural Resources) VEGETATED SWALE Boat Trailer Parking COTTONWOOD PLANTINGS H.C. ACCESSIBLE FISHING PIER / OVERLOOK RED LAKE RIVER INFORMATIONAL SIGN Bridge Abutments Park Bridge Prairie Species Car Parking RLRC WATER SCULPTURES RED LAKE RIVER INFORMATIONAL SIGN Trail Connection to RiverConfluence Crosswalks Information Kiosk Contours @ 5 Interval RLRC Logo Welded Tabs Conc. Footing 2 Collars 4 Galvanized Steel Pipe River Resource Signage 1 Rebar Eagle Point Trailhead Facilities & Parking N 141 141

FISHING PIER / OVERLOOK DETAILS PROTOTYPICAL FISHING PIER / OVERLOOK: The fishing pier / overlook provides handicap access to the Red River. Located at the point where the riverbank drops to the water at a steep angle, this fishing structure provides access to the river for those wishing to fish as well as those who came to look at the river. The pier has a staircase to its side providing access to the river even during low flows. This structure is designed with the RLRC design vocabulary of galvanized steel and metal grates creating a familiarity between installations along the Red Lake River Corridor. Positioned within existing or planted trees the pier is designed to withstand moderate flood events and river debris contact. HC ACCESSIBLE FISHING PIER / OVERLOOK: The handicap accessible fishing pier/overlook uses the signature design vocabulary developed for access points, sign locations, and camping facilities all along the Red Lake River Corridor. Existing trees protect it from debris during high water. The pier is stepped to accommodate use at several water levels. The steel decking minimizes maintenance over time by allowing sediments to deposit through the deck back into the river. It can be removed to prevent damage from flooding. The pier is set into the bank to remain usable during high water and to minimize the distance it extends into the river channel. Rip-rap protects the shoreline. 142

FISHING PIER / OVERLOOK DETAILS PROTOTYPICAL FISHING PIER / OVERLOOK HC ACCESSIBLE FISHING PIER / OVERLOOK HC Accessible Ramp Maintains 5% Slope and Provides Landings at Equal Intervals Tree Lined Trail Produces a Strong Connection Back to The Greenway Multiple Levels of Accessiblity Accomodates Multiple Flood Stages 1-3 Pier is Placed within Existing Trees which Serve to Deflect Water Born Debris During Flood Events Pier is Placed within Existing Trees which Serve to Deflect Water Born Debris During Flood Events RLRC Informational Sign 2 Trail to Parking Fishing Pier & Overlook 1 Custom Steel Pilings with Removable Steel Deck 3 Steel Grating Allows Sediments to Deposit Through the Deck Back into the River Fishing Pier Railing Placed at Alternate Heights (42-32 ) to Accommodate Handicap Accessibility Issues Platform Is Handicap Accessible With ADA Approved Steel Grate Decking Stairway to Water Edge Trail to Parking Pier is Placed within Existing Trees which Serve to Deflect Water Born Debris During Flood Events Rip Rap Type Boulder Shoreline Refinforcement 143 143

MAKING RIVER PROCESSES VISIBLE RLRC WATER SCULPTURE: The steel bar Water Sculpture marks the changes in water levels during flood events. Sited on the trail between the new trailhead facilities building and boat launch, this vertical landscape element strengthens the connection between the two. The spiraling form accentuates the vertical nature of rising and falling water levels. Large horizontal steel plates make visible the changes in water level and make the water elevation in feet. The design and character elements connect the Red Lake River Corridor to the Greenway while creating a public space for the East Grand Forks Community. 144

RLRC WATER LEVEL SCULPTURE 145