Route 15 Congestion Report Findings

Similar documents
Boston Post Road Design Feasibility Study

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Cincinnati Dayton Rd Widening

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Viewing SMART SCALE Application

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Route 28 Corridor Safety and Operations Study

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

TRASBURG RANSPORTATION

Route 28 Corridor Safety and Operations Study

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Legislative Update Williamsburg Residency

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Donahue Drive Corridor Traffic Operational Evaluation

Southcote Road Improvements Class Environmental Assessment Study

Giles Run Connector Road

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Route 7 Corridor Study

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Intersection Traffic Control Feasibility Study

Chapter 5 Future Transportation

County of Fairfax, Virginia. Department of Transportation

VT15 / Allen Martin Drive Intersection Scoping Study

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Board of Supervisors February 27, 2017

EXTRA. Special Edition The US Route 15 Improvement Process. Part of the mission of both the Lucketts Ruritan Club and the.

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

Application of a Complete Street

Fleur Drive Reconstruction

CTH M HIGHWAY PROJECT CTH Q to STH 113

Highway 56 Traffic Study Rymal Road to Cemetery Road

CSAH 101 Preliminary Design

Route 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

Roundabouts: The Virginia Experience AASHTO SCOTE June 20, 2012

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

North Avenue Corridor Study

City of Wausau Wausau Center Urban Design and Transportation Master Plan. Design Workshop // October 18, 2018

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Committed to Service

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

ARRENTON RANSPORTATION

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Small Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia

Welcome to the Open House

Route 29 Solutions Projects

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

APPENDIX L: COST ESTIMATING TOOLS

CHAPTER 5 TRANSPORTATION GOAL

Owl Canyon Corridor Project Overview and Summary

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Shockoe Bottom Preliminary Traffic and Parking Analysis

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Bluffdale/ UDOT South High-T Intersection Project Type Operations

TRANSPORTATION NEEDS ASSESSMENT

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Design Criteria. Design Criteria

State Street and Pierce Park Lane Intersection Concept Report

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Highway 1 Kamloops to Alberta Four-Laning Program

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Highway 93 South Corridor. Planning

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

June Dear Colleagues:

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

Appendix D: Concept Screening

Thank you for attending

Transcription:

Route 15 Congestion Report Findings Briefing To Loudoun County Board of Supervisors May 18, 2016 1

Overview: Previous Studies: Route 15 Corridor, Leesburg to Maryland Route 15 Congestion Report: Between Battlefield Parkway and Whites Ferry Road/Raspberry Drive 2

Previous Studies: Route 15 Corridor Leesburg to Maryland 3

Background

Route 15 Safety Study North Segment (1998) Recommendations from Previous Studies Study Recommendations Provide a paved shoulder Remove of fixed objects within the clear-zone Install left-turn lanes Spot impovements (improve signage, add right-turn lane, etc) Truck pull out location Splitter Islands Safety Improvements School Turn Lane Improvements Intersection Improvements intersection Improvements with 662 Extension Implemented Yes Mostly Yes Yes Yes No No No No U.S. Route 15 Roadway Safety Improvements Village of Lucketts Study (2006) Route 15 Safety Assessment (2007) 0.02 mi. N Rt 655 Whites Ferry Rd to 0.27 mi. S Rt 662 Lucketts Rd Standard width travel lanes, standard width shoulders with edge rumble strips, turn lanes at Rt 661 and Rt 663, truck inspection area on NB Rt 15 and SB Rt 15, guard rail where warranted, improved lines of sight Yes (note: no rightturn lane at Limestone School Road) Lucketts: 0.28 mi. S to 0.19 mi. N Lucketts Rd (Recommendations from 2006 County project) Curb & gutter, sidewalk with wide buffer strips on both sides, separation islands on either end of the village, left turn lanes at Rt 662, shared turn lane at Lucketts Elementary School, sidewalk & landscaping No Lucketts to MD State Line Standard width travel lanes, standard width shoulders with edge rumble strips, turn lanes at Lovettsville Rd, traffic signal at Lovettsville Rd, guard rail where warranted, improved lines of sight No (Guardrail only) 5

Recommendations from Previous Studies (Cont.) Study Recommendations Implemented U.S. Route 15 at Whites Ferry Road Roundabout Evaluation (2014) Study concluded neither a single or two lane roundabout will provide congestion relief No Congestion Study (2016) U.S. Route 15 and Battlefield Parkway Congestion Study (2016) Study recommended two alternatives: - Alternative 4A (Dual Lane Roundabout) - Alternative 6 (Widen Route 15 from Battlefield Parkway past Whites Ferry Road) Study concluded that the intersection congestion can not be mitigated unless Route 15 capacity is increased through the Whites Ferry Road intersection. No No 6

Corridor Designations Route 15 is designated as a National Scenic Byway and is part of the Journey Through Hallowed Ground National Heritage Area Ball's Bluff Battlefield National Historic Landmark expanded to include part of Route 15 (January 2017) 7

Route 15 Congestion Report Between Battlefield Parkway and Whites Ferry Road/Raspberry Drive 8

Current Project Study Area Battlefield Parkway to Whites Ferry Road/Raspberry Drive Existing Conditions, 2020, and 2040 Conditions Weekday AM and PM peak periods

Existing Congestion Issues Route 15 experiences recurring congestion Morning: mostly around schools on King Street and at Battlefield Parkway Afternoon: primary congestion issue, northbound from south of Battlefield Parkway until Whites Ferry Road/Raspberry Drive 10

Countywide Transportation Plan Rural, 2-lane, north of Tutt Lane Urban, 4- lane, south of Tutt Lane

Preliminary Meetings To Date Supervisors Higgins and Umstattd Town of Leesburg VDOT Journey Through Hallowed Ground Catoctin Coalition Information Provided by: LCPS Bike Loudoun 12

Development of Recommendations 10 initial concepts analyzed Combined elements of concepts refined alternatives Analyzed traffic for the refined alternatives Recommendations based upon traffic performance 13

Recommended Alternatives Alternative 1B Alternative 3 14

Report Recommendations Widen Route 15 to 4 Lanes from Battlefield Parkway to ~2,000ft north of Whites Ferry Road/Raspberry Drive Options Whites Ferry Road/Raspberry Drive Intersection Traffic signal, or Two-lane roundabout King Street Intersection Traffic signal (standard or Green T - similar to Leesburg Outlet Mall entrance), or Flyover 15

Proposed Interim Improvements that Build Towards Report Recommendations Recommended Implementation Order: Phase 1: Northbound auxiliary lane between King Street and Tutt Lane Phase 2: Capacity improvements from Battlefield Parkway to south of the King Street merge Phase 3: US Route 15/King Street intersection signalization and roadway realignment Phase 4A: Capacity improvements from King Street to north of Whites Ferry Road/Raspberry Drive with traffic signal or Phase 4B: Capacity improvements from King Street to north of Whites Ferry Road/Raspberry Drive with two-lane roundabout 16

Phase 1: Northbound auxiliary lane between King Street and Tutt Lane 17

Phase 1: Northbound auxiliary lane between King Street and Tutt Lane 18

Phase 2: Capacity improvements from Battlefield Parkway to south of the King Street merge 19

Phase 2: Capacity improvements from Battlefield Parkway to south of the King Street merge 20

Phase 3: US Route 15/King Street intersection signalization and roadway realignment 21

Phase 3: US Route 15/King Street intersection signalization and roadway realignment 22

Phase 4: Capacity improvements from King Street to north of Whites Ferry Road 23

Phase 4: Capacity improvements from King Street to north of Whites Ferry Road 24

Cost Estimate Recommended Alternatives Low Estimate Range High Estimate Range Alternative 1B - Capacity Option with traffic signals at King Street and Whites Ferry Road/Raspberry Drive Alternative 3 Capacity Option with a traffic signal at King Street and a two-lane roundabout at the Whites Ferry Road/Raspberry Drive intersection $31,000,0000 $36,000,000 $37,000,000 $43,000,000 Interim Improvements Low Estimate Range High Estimate Range Phase 1: Northbound auxiliary lane $1,700,000 $2,000,000 Phase 2: Capacity improvements from Battlefield Parkway to South of the King Street Merge Phase 3: US Route 15 and King Street intersection - traffic signal and roadway realignment Phase 4A: Capacity improvements from King Street to north of Whites Ferry Road/Raspberry Drive with traffic signal at Whites Ferry Road Phase 4B: Capacity improvements from King Street to north of Whites Ferry Road/Raspberry Drive with two-lane roundabout at Whites Ferry Road $8,000,000 $9,000,000 $7,000,000 $8,000,000 $24,000,000 $28,000,000 $28,000,000 $33,000,000 25

Route 15 Congestion Report Conclusions Additional capacity (4-lanes) along Route 15 is necessary from Battlefield Parkway to north of Whites Ferry Road Improve intersections at Whites Ferry Road and at King Street Consider a phased implementation to provide some congestion relief as soon as possible 26

Staff Recommendations Expand Study from Whites Ferry Road to Maryland State Line Focus on: Safety Mobility Design consistent with historic character/national bypass designation Public input meetings 27

Preliminary Concepts Considered A. No-Build Condition B. Single-lane roundabout at Whites Ferry Road/Raspberry Drive C. Single-lane roundabout with slip lanes at Whites Ferry Road/Raspberry Drive D. Double-lane roundabout Whites Ferry Road/Raspberry Drive E. Two single-lane roundabouts - one north of and one south of Whites Ferry Road/Raspberry Drive F. Capacity option (Widening Route 15) with roundabouts: two doublelane roundabouts, one north of and one south of Whites Ferry Road G. Capacity option (Widening Route 15) with traffic signal at Whites Ferry Road/Raspberry Drive 29