I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

Similar documents
I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

I-395 Express Lanes Northern Extension Project Public Hearings

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Washington DC Section of ITE Project Briefing

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

I-66 Corridor Improvements Route 15 to I-495. November 2014

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

City of Fairfax, Virginia City Council Work Session

The following item was handed out at the December 6, 2018 NVTC Meeting.

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

VIRGINIA RAILWAY EXPRESS

Commuter Connections Regional TDM Marketing Group Meeting

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Public Information Meeting

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

County of Fairfax, Virginia. Department of Transportation

Capital Beltway HOT Lanes Project

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Fairfax County Parkway Widening Fairfax County

395 Express Lanes Extension

Transportation Management Program Office Newsletter J U L Y

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018

Public Information and Participation Comments

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

2045 Long Range Transportation Plan. Summary of Draft

101 Corridor Managed Lanes

What if YOU could help plan Northern Virginia s transportation future?

Crystal City-Potomac Yard Transitway Extension

Project Description Form 8EE

Ridership in Virginia by System FY2017

I-105 ExpressLanes Project

Transportation Management Program Office Newsletter N O V E M B E R

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

PenPlace SPRC #6. September 27, DRAFT

Interstate 66 TRANSPORTATION TECHNICAL REPORT. From US Route 15 in Prince William County To Interstate 495 in Fairfax County FEBRUARY 2013

Route 29 Solutions Projects

Interstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012

HOW OUR REGIONAL TAX DOLLARS ARE BEING SPENT THE HONORABLE MARTY NOHE CHAIRMAN, NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

Crystal City Citizen Review Council Meeting. July 10, 2013

Transit and Rail Funding in the Commonwealth

US 1 Express Lanes Public Kick-Off Meeting

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Development of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

I-95/Temple Avenue Improvements Project Colonial Heights, VA

FM #: ETDM #: 11241

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Capital Beltway HOT Lanes - Frequently Asked Questions

ITEM 15 Notice March 29, 2017

DRAFT. Memo. Range of the Alternatives Considered in the EIS

Overview of 64 Express Lanes. Secretary of Transportation Aubrey Layne April 12, 2017

NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017)

I-95 Transit/ TDM Study. LRTP Advisory Committee Meeting April 20, 2017

Introductions John Carten noted that Linda Massaro has resigned from the TAC.

Preliminary Transportation Analysis

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Working Group Meeting

Metropolitan Park 4/5

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Public Opinion about Transportation Issues in Northern Virginia

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

Table of Contents. 2.0 Land Use and Transportation Inputs Land Use Factors Transportation Factors

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Alternatives Development Technical Report

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Highway 217 Corridor Study. Phase I Overview Report

MnPASS System Today and the Future

ARLINGTON COUNTY, VIRGINIA

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park

Executive Summary June 2015

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Project Description Form 6V

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Figure 1: East West Connector Alignment Alternatives Concept Drawing

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Integrating Community Development and Transportation Strategies. November 13, 2014

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary

A wide variety of transportation

TECHNICAL MEMORANDUM. Introduction. Neighborhood Traffic Analysis. Vehicular Travel Times. Mitch Bonanno. Vornado/Charles E. Smith.

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Roundabout Feasibility Memorandum

PUBLIC COMMENT SUMMARY REPORT Public Information Meetings

Giles Run Connector Road

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

North Coast Corridor:

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Transcription:

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016 Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of Transportation 1

Meeting Agenda Project Update Eads Street improvements design concept Key findings of draft Environmental Assessment Key traffic findings Update on the 95/395 Transit and Traffic Demand Management Study Project schedule 2

Existing Conditions Lack of capacity and congestion on I-395 between the current Express Lanes terminus near Edsall Road and Washington DC Access challenges to and from the Pentagon at the Eads Street Interchange Lack of capacity on Eads Street ramp 3

Purpose and Need Develop a transportation solution that improves roadway conditions throughout the corridor by: Reducing congestion Providing additional travel choices Improving travel predictability Improving roadway safety 4

Project Background Comprehensive Agreement executed in 2012 with 95 Express Lanes, LLC (95 Express) for 95 Express Lanes contemplated potential future development of the Northern Express Lanes in the I-395 corridor In November 2015, VDOT and 95 Express signed a Development Framework Agreement outlining roles and responsibilities VDOT is working to finalize the scope The toll project will provide long-term transit investment through an annual transit payment Improvements to be built largely within VDOT s right of way 5

Atlantic Gateway: Partnering to Unlock the I-95 Corridor (FASTLANE/TIGER Grants) Virginia selected to receive $165 million dollar federal grant to improve more than 50 miles of the I-95/I-395 Corridor from Fredericksburg to the Pentagon. Extending I-95/I-395 Express Lanes North to the Pentagon (~ 7 miles) South to Fredericksburg (~ 10 miles) Improving commuter rail service on VRE and Amtrak Third track construction in Fairfax County (~ 8 miles) Improvements to Long Bridge (Potomac Crossing) (~ 6 miles) Increases Capacity on Interstate General Purpose Lanes Eliminates bottleneck on I-395 at Duke Street Adds new lanes across Rappahannock Expanding bus service and commuter parking spaces in the corridor 6

Expand and convert the two existing reversible High Occupancy Vehicle (HOV) lanes on I-395 to three managed High Occupancy Toll (HOT) or Express Lanes for eight miles along I-395 from north of Edsall Road to the vicinity of Eads Street near the Pentagon Provide improved connections between the proposed I-395 Express Lanes and Eads Street Install signage, toll systems, and an Active Traffic Management System Provide sound walls Project Scope Conduct a Transit/TDM Study to identify candidate projects 7

Typical Section 8

Express Lanes Access All existing access points to remain the same except for Eads Street Interchange Capacity and operational improvements at Eads Street Interchange under evaluation Seminary Road South facing ramp remains limited to HOV-only at all times 9

Eads Street Interchange Concept AM Operation 10

Pentagon South Parking and Eads Street Interchange Concept 11

VDOT and DRPT Environmental Assessment Partner Roles and Responsibilities 95 Express Preliminary Engineering and Design Interchange Modification Report (IMR) Federal, State and Local Agency Coordination Transit/TDM Study Public Outreach to Support Environmental Assessment Cost Estimating Finance Plan Design-Build Procurement Community and Public Outreach for I-395 Express Lanes 12

Environmental Assessment Findings Environmental Resource Property Impacts Environmental Justice Land Use, Community Facilities, and Recreational Resources Cultural Resources Air Quality Noise Wetlands and Streams Floodplains Wildlife and Habitat Resource Summary No relocations or displacements. 5.3 acres of right of way acquisition and/or easements. No disproportionate impacts. No substantial impacts. No adverse effect. 5.91 acres of property may be impacted by noise barriers. No adverse impacts to ambient air quality and no violation of NAAQS. Impact to 2,857 noise-sensitive receptors. 8.1 miles of barriers have preliminarily been identified as being feasible and reasonable. Impacts to 0.004 acres of wetlands. Impacts to 0.09 acres of 100-year floodplains and 0.01 acres of 500-year floodplains. Minimal Impact. Threatened, Endangered, and Special Status Species No adverse effects to the Northern Long Eared Bat and the Dwarf Wedgemussel. Anadromous Fish Use areas mapped downstream of the study area may require time-of-year restrictions. 8 sites of elevated environmental concern. Sites will be managed and handled in accordance with Hazardous Materials federal, state, and local procedures. Minimal impacts since the proposed improvements are to an existing facility within existing right of way Indirect and Cumulative Effects in an environment that is highly developed. If right of way impacts occur to historic properties, the Section 4(f) use would likely be considered a de Section 4(f) minimis impact. 13

Noise Barriers within Alexandria Four barriers and a portion of one barrier (3.4 miles) have been preliminarily identified as feasible and reasonable (green barriers). Two barriers will be constructed as part of a previous project (red barriers). 14

Noise Barriers within Arlington Nine barriers and a portion of one barrier (4.7 miles) have been preliminarily identified as feasible and reasonable (green barriers). 15

Noise Barrier Construction and Examples 16

PERSONS PERSONS Northbound AM Peak Period (6 AM 9 AM) Person Throughput Comparison 2040 Build Conditions (All Lanes): 4,600 4,900 (8-11%) Increase 40,000 30,000 20,000 10,000 HOV HOV HOT HOV HOV HOT 0 2015 2040 2040 2015 2040 2040 No Build Build Build Build North of Turkeycock Run North of Glebe Rd 40,000 30,000 20,000 10,000 GP GP GP GP GP GP 0 2015 2040 2040 2015 2040 2040 No Build Build No Build Build North of Turkeycock Run North of Glebe Rd 17

PERSONS PERSONS Southbound PM Peak Period (3 PM 6 PM) Person Throughput Comparison 2040 Build Conditions (All Lanes): 6,050 10,450 (15-26%) Increase 40,000 30,000 20,000 10,000 HOV HOV HOT HOV HOV HOT 0 2015 2040 2040 2015 2040 2040 No Build Build No Build Build North of Turkeycock Run North of Glebe Rd 40,000 30,000 20,000 10,000 GP GP GP GP GP GP 0 2015 2040 2040 2015 2040 2040 No Build Build No Build Build North of Turkeycock Run North of Glebe Rd 18

Minutes Northbound I-395 Travel Times AM Peak South of Edsall Rd to North of HOV Lane Terminus in DC 2040 Build Condition vs. 2040 No Build Condition: Travel times decrease 11 min from 8 AM to 10 AM Average travel time decrease of 5.7 minutes (15% reduction) 50 45 40 35 30 25 20 15 10 5 0 Existing GP 2040 No Build GP 2040 Build GP 6-7 AM 7-8 AM 8-9 AM 9-10 AM 19

Minutes Southbound I-395 Travel Times PM Peak South of Edsall Rd to North of HOV Lane Terminus in DC 2040 Build Condition vs. 2040 No Build Condition: Travel times decrease 10-16 min from 4 PM to 6 PM Average travel time decrease of 7.4 minutes (15% reduction) 60 50 40 30 20 10 0 Existing GP 2040 No Build GP 2040 Build GP 3-4 PM 4-5 PM 5-6 PM 6-7 PM 20

AM Peak Hour Level of Service Study Intersections 55 intersections evaluated Overall improvement in LOS in 2040 Build Condition Reduced number of intersections operating at LOS E/F Eads Street Interchange Improvements eliminate several deficient intersections 2015 Existing LOS 15% 2.5% 2.5% 2040 No Build LOS 9% 4% 2% 2040 Build LOS 7% 2% 80% 85% 91% A-C D E F A-C D E F A-C D E F 21

Northbound I-395 North of Glebe Road Origins AM Peak 22

Move More People Project Benefits 35-50% increase in traffic volumes in HOT lanes; relieves General Purpose lanes Move more than 13,000 more people in PM peak (north of Glebe Rd) Reduce Congestion Average 6 to 8 minute travel time reduction in General Purpose Lanes 15% reduction in travel times in General Purpose lanes Increasing capacity on I-395 reduces diversion of traffic to arterial roadways Expand Travel Choices Promote HOV throughout the day (currently no incentive to HOV during off-peak) Allow all motorists to continue north on the HOT lanes at Turkeycock Run or enter the southbound HOT lanes exiting DC Increase Reliability Reduce congestion in HOT lanes before and after current HOV restricted periods Improve Safety Increased capacity will reduce the potential for congestion-related crashes Increase safety at Eads Street interchange (eliminate southbound weave) 23

I-95/I-395 Transit and TDM Study DRPT is leading the development of a new I-95/I-395 Transit/Transportation Demand Management (TDM) Study in coordination with key stakeholders including: Cities of Alexandria and Fredericksburg Arlington, Fairfax, Prince William, Spotsylvania and Stafford Counties Northern Virginia Transportation Commission (NVTC) Potomac and Rappahannock Transportation Commission (PRTC) VRE and WMATA 24

I-95/I-395 Transit/TDM Eligible Projects and Funding Eligible projects will increase mobility and move more people along I-95 and I-395 and benefit toll payers in the I-395 corridor. Example projects: Enhanced service on existing routes New local and commuter bus service Transit capital (bus and rail) projects Park and ride lots TDM program enhancements Technology supporting transit/tdm The Commonwealth will commit that at least $15 million will be provided annually through toll revenues for I-95/I-395 Transit and TDM initiatives. 25

Project study area extends from the southern terminus of the I-95 Express Lanes (at Garrisonville Road) north to the Potomac River and includes: Parallel commuting corridors Alternative modes of travel Transit/TDM services, programs, or facilities that are being studied include those that: Use I-95 and/or I-395 and serve work destinations within the study area inside the Beltway (including downtown DC) Increase person throughput but do not use I-95 or I-395 Provide direct access to services in the corridor that increase person throughput or travel choices in the study area I-95/I-395 Transit/TDM Study Area and Markets 26

Existing Peak Period Travel In the A.M. peak period, there are 65,000 persons carried in 40,000 vehicles northbound 54% of the person trips are on the HOV lanes Transit vehicles are less than 1% of the vehicles but carry 12% of trips 27

Existing Transit Service WMATA Metrorail & Metrobus Alexandria DASH Arlington ART Fairfax Connector PRTC OmniRide & Metro Direct Fredericksburg/Stafford FRED Martz Commuter Bus VRE / Amtrak 28

Proposed Transit Improvements in Arlington ART Improvements: Improve frequency and span of existing ART routes Extend existing ART Route 77 to Rosslyn New ART routes connecting activity centers, including Shirlington, Crystal City, the Pentagon and Reagan National Airport Convert some existing ART service into neighborhood circulators New/Expanded Transit Centers, including the Army-Navy Transit Center, Landmark Transit Center and Mark Center WMATA Metrobus Improvements: Improve frequency on existing WMATA routes Enhance WMATA Route 10 to Rosslyn and Huntington to accommodate discontinuation of Route 9A New WMATA routes connecting Columbia Pike corridor to activity centers Improve Curbside Bus Capacity for Staging and Layover WMATA Metrorail Improvements: Station improvements at Pentagon City and Crystal City Railcar fleet expansion to increase 8-car trains VRE Service Enhancements and Extension of Crystal City Platform New Commuter Bus Routes to be operated by Fairfax Connector and PRTC serving the Pentagon and Crystal City 29

Public Outreach Update Meetings with key stakeholder groups and elected officials Alexandria Transportation Commission briefing on September 21 Arlington County Transportation Commission on September 29 Arlington County Board on October 18 Pentagon District Department of Transportation Northern Virginia Transportation Commission (NVTC) Potomac and Rappahannock Transportation Commission (PRTC) Community Briefings with 95 Express partner Coordination with planned projects along the corridor Virginiadot.org/395express project website and opportunity to sign-up for updates 30

Key Milestones Key Milestones Begin Dates Public Outreach and Technical Coordination Ongoing Begin NEPA Environmental Assessment January 2016 Begin Transit/TDM Study April 2016 Public Information Meetings April 11 and 13, 2016 Public Meetings and Hearings October 24 and 26, 2016 October 27 (395 Widen) November 30 Regional Long-Range Plan Decision November 2016 Final NEPA Decision December 2016 Final Transit/TDM Study December 2016 Final NEPA Decision December 2016/Jan 2017 Final Financial Agreement January 2017 Begin Construction 2017 Project Completion 2019 31

I-395 South Widening Duke Street to Edsall Road I-395 Widen Southbound I-395 from 3 lanes to 4 lanes between Duke Street and Edsall Road Edsall Road Interchange Replace existing Edsall Westbound to I-395 Southbound Loop Ramp with new signalized intersection Duke Street Interchange Replace existing I-395 Southbound to Duke Eastbound Loop Ramp with new signalized intersection 32

Upcoming Public Hearings I-395 Corridor I-395 Express Lanes Northern Extension Public Meeting on draft Environmental Assessment and Design Monday, October 24, 2016 (6:30 8:30 p.m. Presentation at 7 p.m.) Wakefield High School Cafeteria 1325 S. Dinwiddie Street Arlington, VA 22206 Wednesday, October 26, 2016 (6:30 8:30 p.m. Presentation at 7 p.m.) Francis C. Hammond Middle School 4646 Seminary Road Alexandria, VA 22206 I-395 South Widening Duke Street to Edsall Road Public Hearing Thursday, October 27, 2016 (6:30 8:30 p.m.) Francis C. Hammond Middle School 4646 Seminary Road Alexandria, VA 22206 I-395 Express Lanes Northern Extension Public Hearing on draft Environmental Assessment and Design Wednesday, November 30, 2016 (6:30-8:30 p.m. Presentation at 7 p.m.) Bren Mar Park Elementary School 6344 Beryl Road Alexandria, VA 22312 33

Thank you Virginiadot.org/395express For more information and to sign up for updates 34