Riparian Planting Projects Completed within Asotin Creek Watershed. Final Report

Similar documents
Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

MCCAW REACH RESTORATION

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

September 4, Update on Columbia basin Salmon and Steelhead Recovery Planning

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL

The Blue Heron Slough Conservation Bank

Salmon Recovery Planning in Washington

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

STEELHEAD SURVEYS IN OMAK CREEK

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management

Fisheries Management Plan

U.S. Fish and Wildlife Service Native American Crosscut Funding

Mountain Snake Province

Okanagan Sockeye Reintroduction

April 26, Chairman Rockefeller and members of the Fish and Wildlife Committee. Briefing from Mid-Columbia Regional Fish Enhancement Group (RFEG)

September 27, 2012 MEMORANDUM. Fish and Wildlife Committee. Lynn Palensky. Update on Geographic Review

Strategies for mitigating ecological effects of hatchery programs

June 3, 2014 MEMORANDUM. Council Members. Stacy Horton, Policy Analyst, Washington. SUBJECT: Final 2012 Hatchery Fin Clip Report

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

Fisheries Management Plan Idaho Department of Fish and Game

[FWS R1 ES 2015 N076; FXES FF01E00000] Endangered and Threatened Wildlife and Plants; Revised Draft Recovery Plan for

Update on Columbia Basin Partnership Task Force

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

Backgrounder and Frequently Asked Questions

The Cove Run Brook Trout Restoration Project with the Northern Garrett High School AP Environmental Science Class,

Summary of HSRG Findings for Chum Populations in the Lower Columbia River and Gorge

SECTION 41 Table of Contents

State of Washington Dept. of Fish and Wildlife invites applications for the position of: Permanent Fisheries Biologist 4 *

ESCA. Endangered Species Conservation Act of 1969 Changed in 1973 to ESA Amended several times

Executive Summary. Map 1. The Santa Clara River watershed with topography.


Sub-watershed Summaries

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Throughout the Pacific Northwest, salmon and steelhead have been listed under the Endangered Species Act because their existence is either threatened

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Anadromous Fish Committee Columbia Basin Fish and Wildlife Authority Project Implementation Review Conference

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

Yakima/Klickitat Fisheries Project

Stronghold Investment Partnership Basin Liaisons 2009

South Fork Chehalis Watershed Culvert Assessment

Big Spring Creek Habitat Enhancement and Fishery Management Plans

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Kirt Hughes Washington Department of Fish and Wildlife Region 6 - Fish Program Manager

Attachment 1. Agenda Item Summary BACKGROUND

Chagrin River TMDL Appendices. Appendix F

Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

Western native Trout Status report

Wild Steelhead Coalition Richard Burge Conservation VP September 11, 2006

Conservation and Consumption: Nez Perce Tribe Duty and Obligation

TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL April 12, 2010 Portland, OR

Implementation Toolkit

California Steelhead: Management, Monitoring and Recovery Efforts

COA-F17-F-1343 YEAR END REPORT

Oregon Administrative Rules Oregon Department of Fish and Wildlife

Hatchery Scientific Review Group Review and Recommendations

Follow this and additional works at:

Conserving the Forests, Lakes and Streams of Northeast Michigan

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

October 25, 2012 MEMORANDUM. Fish and Wildlife Committee. Lynn Palensky, Program Development Manager. Update on Geographic Review

ENTIAT WATERSHED ANNUAL REPORT ENTIAT RIVER APPRECIATION A COMMUNITY CLEAN UP EVENT. Vol. II: 2012 INSIDE

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

Oklahoma Ecological Services Field Office U.S. Fish and Wildlife Service Tulsa, Oklahoma. Jonna Polk, Field Supervisor

Snake River Salmon Recovery Board Lead Entity 2017 SRFB Grant Round. Project Tour May 31 st and June 1 st

2016 Volunteer Program Annual Report

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

2012 Bring Back the Natives Awarded Projects

Hatchery Scientific Review Group Review and Recommendations

Endangered and Threatened Wildlife and Plants; Recovery Plan for the. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce the

Implementing Hatchery Reform in the State of Idaho

Kootenai River Burbot Restoration. Presented to KVRI 10/15/2018 by Kootenai Tribe of Idaho Idaho Department of Fish and Game

Ranchers restore fish habitat in Pahsimeroi Valley with help from multiple agencies

Mountain Columbia Province

Southern Oregon Coastal Cutthroat Trout

East Kitsap Peninsula WRIA 15 Salmon Habitat Restoration Strategy Summary

Project Proposal FY 2007 Funding (Funding available through December 31, 2009)

Draft Central Valley Salmon and Steelhead Recovery Plan

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

10/29/ :08 AM. Mountain Whitefish, Mussels (freshwater) and Eulachon (candlefish)(smelt) The current Program makes no mention of these species

THE WESTERN NATIVE TROUT INITIATIVE PLAN FOR STRATEGIC ACTIONS November GOALS, OBJECTIVES, and KEY STRATEGIC ACTIONS

Snake River Salmon Recovery Board Lead Entity 2018 SRFB Grant Round. Project Tour June 5 th 7 th

Kootenai Tribe of Idaho

MEMORANDUM. July 2, Council members. Tony Grover, Fish and Wildlife Division Director SUBJECT:

Eastern Brook Trout Joint Venture Completed Project Report Form

Little Kern Golden Trout Status:

Snake River Salmon Recovery Board Lead Entity 2016 SRFB Grant Round. Project Tour June 1-3, 2016

a GAO GAO COLUMBIA RIVER BASIN SALMON AND STEELHEAD Federal Agencies Recovery Responsibilities, Expenditures and Actions

California Steelhead: Management, Monitoring and Recovery Efforts

Upper Columbia Redband Trout: Conservation for the Future

Hatchery Scientific Review Group Review and Recommendations

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON

Don Pedro Project Relicensing

Eastern Brook Trout. Roadmap to

Wild Virginia and Heartwood first raised this issue at the May 19, 2014 public meeting.

Transcription:

Riparian Planting Projects Completed within Asotin Creek Watershed Final Report 2000-2002 DOE/BP-00006436-1 October 2002

Field37: This Document should be cited as follows: Johnson, Bradley, ''Riparian Planting Projects Completed within Asotin Creek Watershed'', Project No. 2000-05300, 19 electronic pages, (BPA Report DOE/BP- 00006436-1) Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 This report was funded by the Bonneville Power Administration (BPA), U.S. Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The views in this report are the author's and do not necessarily represent the views of BPA.

Riparian Planting Projects Completed within Asotin Creek Watershed 2000-2002 Asotin Creek Riparian Final Report of Accomplishments BPA Project Numbers; 2000-53 Asotin Creek Riparian Plantings Cooperators: Bonneville Power Administration Natural Resource Conservation Service Washington Department of Fish and Wildlife Umatilla National Forest Service, Pomeroy Ranger District Interagency Committee for Outdoor Recreation Washington State Conservation Commission Salmon Recovery Funding Board Nez Perce Salmon Corps.

BPA Riparian Planting Projects Completed within Asotin Creek Watershed 2000-2002 Asotin Creek Riparian Final Report of Accomplishments BPA Project Numbers; 2000-32-0 Asotin Creek Native Tree Nursery 2000-53-0 Asotin Creek Riparian Plantings 1998-47-0 Asotin Watershed Information and Education Prepared for: Bonneville Power Administration Natural Resource Conservation Service Washington Department of Fish and Wildlife Umatilla National Forest Service, Pomeroy Ranger District Interagency Committee for Outdoor Recreation Washington State Conservation Commission Salmon Recovery Funding Board Nez Perce Salmon Corps. by: Bradley J. Johnson Dist. Manager / Model Watershed Coord. / Lead Entity Asotin County Conservation District 720 Sixth St., Ste B Clarkston, WA 99403 brad-johnson@wa.nacdnet.org

Abstract The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in Water Resource Inventory Area (WRIA) 35. According to Washington Department of Fish and Wildlife s (WDFW) Priority WRIA s by At-Risk Stock Significance Map, it is the highest priority WRIA in southeastern Washington. Summer steelhead, bull trout, and Snake River spring chinook salmon which are listed under the Endangered Species Act (ESA), are present in the watershed. WDFW manages it as a Wild Steelhead Reserve; no hatchery fish have been released here since 1997. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe, Washington Department of Ecology (DOE), National Marine Fisheries Service (NMFS), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. Local students, volunteers and Salmon Corps members from the Nez Perce Tribe have been instrumental in the success of the Model Watershed Program on Asotin Creek. ACCD began coordinating habitat projects in 1995 with the help of BPA funding. Approximately two hundred and seventy-six projects have been implemented as of 1999. The Washington State Legislature was successful in securing funding for threatened and endangered salmon and steelhead recovery throughout the State in 1998. While these issues were new to most of the State, the ACCD has been securing and administering funding for threatened salmonids since 1994. The Asotin Creek Riparian Planting 2000-053-00 and Asotin Creek Riparian Fencing 2000-054-00 teamed BPA and the Governor s Salmon Recovery Funding to plant approximately 84,191 trees and shrubs in the Asotin Creek Watershed. In addition BPA and private cost-share dollars were utilized to drill 3 wells, provide 15 off-site alternative water developments (troughs), 5 spring developments, and 9,100 feet of riparian fencing. The trees will provide shade and long-term LWD recruitment to the stream. The wells, alternative water developments, springs and fencing will reduce direct animal impacts on the stream. In one area alone, a well, 3,000 ft of riparian fence with 5 alternative water developments will exclude 300 head of cattle from using the stream as a source of drinking water during the winter months.

Acknowledgements We express our appreciation to the Bonneville Power Administration (BPA), Washington State Salmon Recovery Funding Board (SRFB) and, Interagency Committee for Outdoor Recreation (IAC) for funding considerations. We would especially like to thank Mark Shaw of BPA, Rollie Geppert and Tammy Owings of the IAC for their unending commitment to contracts and answering questions. Jim Schroeder and Courtney B. Smith of the Clarkston NRCS Field Office, Bill Broughton of the Washington State Conservation Commission, Cheryl Sonnen and Megan Browne and the Asotin County Conservation District Board of Supervisors for their support and guidance. We also thank Rick Stauty of the Pomeroy NRCS Field Office, Larry Cooke, Scott Lambert and Tim Dring of the NRCS State Office Stream Team, Steve Martin and Tom Schirm from Washington Department of Fish and Wildlife (WDFW), Bob Bugert of the Governor s Salmon Recovery Office (GSRO), and Del Groat of the Umatilla National Forest Service Pomeroy Ranger District for their recommendations and cooperation in these planting projects. Special thanks to the Asotin County Commissioners and participating landowners for their input and cooperation. Thanks to Dayton Tractor Inc. and Latah Tree Farms for their long hours and minimal impact of our natural resources during riparian planting projects; and to the Nez Perce Salmon Corps for their labor and commitment to protecting and restoring Asotin Creek watershed habitat. Additionally to Johnny Johnston, of WDFW, for his long hours and dedication and commitment to riparian plantings along Asotin Creek and its tributaries. During his days off, Johnny volunteered to help collect willow and cottonwood cuttings for planting projects. The Washington State Conservation Corps (DOE) donated labor for a fencing project at Headgate Park and removal of existing fences inside Conservation Reserve Enhancement Buffers. These projects were a cooperative effort between many different agencies and private landowners. Without the commitment and dedication of all these individuals, our projects would not be as successful. We appreciate everyone s hard work and look forward to continuing working together on habitat projects in Asotin County.

Asotin Creek Watershed History Asotin Creek, a tributary to the Snake River at (Rm) 145 drains approximately 325 square miles of Asotin and Garfield Counties. Headwaters originate in the Blue Mountains (6,200 ft) and flow east into the Snake River (800 ft) at Asotin, WA. Located in WRIA # 35, the highest priority WRIA in southeastern Washington according to WDFW s At-Risk Stock Significance Map, Asotin Creek is part of the Governor s Snake River Salmon Recovery Region. Asotin Creek remains an important Snake River tributary for anadromous salmonid production in Washington and has been given the distinction of a reserve for Wild Steelhead under current WDFW management policy. Charley Creek, an upper tributary, historically has some of the highest densities of juvenile steelhead in southeastern Washington according to WDFW fisheries surveys. ESA listed stocks of summer steelhead, bull trout and spring chinook along with resident rainbow trout utilize the watershed. Indigenous anadromous fish species most actively targeted for management are summer steelhead, bull trout, and spring chinook salmon. The goals for these species are to restore sustainable, naturally producing populations to support tribal and non-tribal harvest and cultural and economical practices while protecting the biological integrity and genetic diversity of these species in the watershed. The broad general strategies used to achieve the habitat objectives include protecting and restoring prioritized habitat through the use of in-stream, riparian and upland best management practices. The Asotin Creek Model Watershed Plan (Plan) was printed in 1995. It was the first BPA funded Model Watershed Plan completed in Washington that deals specifically with watershed restoration and protection focused on fish habitat restoration. Anadromous salmonid production in Asotin Creek is impacted by high summer stream temperatures, sediment deposition, turbidity, loss of riparian vegetation and lack of suitable resting and rearing pool habitat as recognized by the Plan. Decreasing stream water temperatures and protecting fragile streambanks are goals identified in the Plan. The Asotin Creek Riparian Planting and Fencing Projects were identified and proposed for funding by ACCD as a means to achieve these goals. Successful completion of past BPA, SRFB and WCC habitat projects and working relationships with watershed residents and interested parties have resulted in projects being completed to address factors limiting salmonids. Fencing and alternative water developments have been completed to reduce direct animal impacts to the stream and riparian planting projects have been identified as a high priority.

On March 16, 1999 the National Marine Fisheries Service (NMFS) listed seven additional salmon species as Threatened under the federal Endangered Species Act, bringing the total statewide listings to sixteen. Spring chinook were listed in 1992, steelhead in 1997 and bull trout in 1998, all of which occur in Asotin Creek. The new listings in March did not affect ACCD projects as much as other areas of the state. The ACCD has been working with the NMFS and USFWS to obtain permits for its BPA In-Stream Habitat Projects. Biological Assessments were submitted for and approved through this process and the ACCD has developed a good working relationship with the landowners, federal and state agencies, and tribes. NMFS believes that any successful recovery strategy must demonstrate: Substantive protective and conservation elements. A high degree of certainty that it will be implemented. A comprehensive monitoring program. A recognition of the need for partnerships between federal, state, local and tribal governments. The ACCD supports this approach, however local citizens and landowners need to be recognized as partners by all government agencies. Without cooperation and partnerships at the local level this process will not be successful. In April of 2002 the NMFS released their Interim Abundance and Productivity Targets for Pacific Salmon and Steelhead Listed under the Endangered Species Act in the Interior Columbia Basin. Interim Objectives Snake River Steelhead ESU for Asotin Creek Interim Abundance Targets of 400. This provides a preliminary and general sense of ESA recovery objectives currently under development. These interim targets are only a starting point. NMFS will replace these targets with scientifically more rigorous and comprehensive recovery goals using viability criteria developed through the Interior Columbia Technical Recovery Team (TRT) process that commenced in October, 2001 (according to a letter from Bob Lohn of NMFS to Larry Cassidy of the NWPPC). The projects in this report have been completed to help reduce direct impacts to salmonid bearing streams in the Asotin Creek watershed. Riparian planting, fencing, and alternative water developments on private property inform and educate local individuals on the importance of healthy riparian areas and how it impacts anadromous salmonid production.

BPA Riparian Planting Projects Completed by Year Riparian Project FY 1999 FY 2000 FY 2001 FY 2002 TOTALS Riparian Plantings 5,550 6,500 14,506 4,535 31,091 Asotin Creek CREP 102.7 ac 2.6 stream miles 180 ft avg buffer County CREP 295.5 ac 7.4 stream miles 162 ft avg buffer 102.7 ac 2.6 stream miles 180 ft avg buffer 295.5 ac 7.4 stream miles 162 ft avg buffer BPA FUNDS EXPENDED BY YEAR $29,818.19 $20,297.07 $80,299.50 $5,913.01 $136,327.77

Riparian Tree Planting Projects on Asotin Creek Riparian Planting Pictures; Photos on following three pages are early riparian planning projects on Asotin Creek. After floods of 1996 and 97 hand planting and the small track hoe techniques worked well for the first two years.

Riparian Tree Planting Projects on Asotin Creek Digging holes along streambank to plant Red Osier Dogwoods Hand planting Ponderosa Pine and Douglas Fir amongst Cottonwoods on Southfork

Riparian Tree Planting Projects on Asotin Creek Stinger used to plant Willow and Cottonwood whips Pushing the Willow Whip down while the stinger is being pulled up Throwing woody debris into stream for habitat complexity and bank stabilization

Riparian Tree Planting Projects on Asotin Creek Holes were dug using trackhoe in background and waiting for dirt Dirt being carried to holes and Ponderosa Pine Trees planted into dirt Salmon Corps Revegetating 1998 In-Stream Habitat Restoration Projects

Riparian Tree Planting Projects on Asotin Creek Riparian Planting Pictures; This photo collage is depicting our riparian projects from start to finish. An innovative contractor has developed al the equipment necessary for rooting and planting trees and shrubs in adverse riparian conditions. Previous to these techniques, we were not seeing a high planting success rate in the watershed.

FY 2002 Riparian Planting Project on Asotin Creek Mud pump used to fill cartridges with rooting medium (mud slurry). Baskets are placed on the left and conveyor belt advances each basket until all cartridges are filled. Soil mix, water and rooting hormone slurry mixed and injected into cartridges. Ten cartridges are filled at a time and each black basket holds 100 cartridges, plant stock is then hand planted into cartridges

FY 2002 Spring Rooted Planting on Asotin Creek Lowboy with rooted ponderosa pine, cottonwood trees and support equipment Staging area for rooted tree planting projects on Asotin Creek

FY 2002 Spring Cottonwood and Willow Whip Plantings Excavator with Expanding Stinger for planting cottonwood and willow whips Expanding Stinger into rip rap toe along county road and releasing whip, planting into an area denude of vegetation

FY 2002 Spring Rooted Planting on Asotin Creek D-8 Cat with material being loaded for riparian planting project D-8 cat planting into cobbles and fine sediment (trenches run back to stream)

FY 2002 Riparian Planting Project on Asotin Creek D-8 Cat with ripper planting cottonwood poles and rooted material Stinger in background planting willows along stream channel and Ripper planting gravel bar with poles and rooted material

FY 2002 Rooted Plantings on Asotin Creek Inserting rooted ponderosa pine tree into stinger for planting Ponderosa pine tree planted and stinger being pulled out of the ground (notice support: small tractor, four wheeler w/trailer & boxes with trees)

FY 2002 Cottonwood and Willow Whip Plantings on Asotin Creek Expandable Stinger revegetating inaccessible streambanks Capable of reaching into areas & planting at depths up to four feet