SAFETY MANAGEMENT SYSTEM

Similar documents
SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM

Print this activity then complete it and keep it as evidence in your folder, or portfolio.

Plant hazard checklist

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147

Safety Audit/Risk Assessment

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

Product Risk Assessment

Material Lift Risk and Hazard Management

Manually Propelled Risk and Hazard Management

Risk and Hazard Management

Risk and Hazard Management

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

Risk and Hazard Management

Risk and Hazard Management

Runabout Risk and Hazard Management

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

ONSITE PLANT ASSESSMENT: PH: MOBILE PLANT RISK ASSESSMENT 2010.

Plant Hazard Identification and Risk Assessment

Plant Hazard Identification and Risk Assessment

PLANT RISK ASSESSMENT

University College Dublin Machinery/Equipment Risk Assessment Template

Static, Hazard & Risk Assessment of Mobile Plant

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA)

PLANT/EQUIPMENT/ASSET HAZARD REPORT

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details.

PLANT RISK ASSESSMENT WORKSHEET (PRA)

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

Job Safety & Environment Analysis

Safe Work Method Statement

RISK ASSESSMENT. Bobcat Skid Steer Loader. Series F & G (incl. S Models) For. SSL Version 2

Hazard Identification and Risk Management

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT

RISK & HAZARD MANAGEMENT

RISK & HAZARD MANAGEMENT

SAFE WORK METHOD STATEMENT

JACKHAMMER SAFETY TRAINING

SAFE WORK METHOD STATEMENT SWMS No Version

PLANT RISK ASSESSMENT REPORT

MEWP - Boom Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015

Accident Investigation and Hazard Analysis

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0

SAFE WORK METHOD STATEMENT Part 1

SAFE WORK METHOD STATEMENT

PLANT RISK ASSESSMENT REPORT

Safe Work Method Statement Transmission Field Protection Services

Safe Work Method Statement

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

UNDERSTANDING JOB HAZARDS

HS329 Risk Management Procedure

PLANT RISK ASSESSMENT REPORT

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

Preventive Maintenance

Surface exploration drilling

WORK METHOD STATEMENT STRUCTURAL STEEL

FLEXIHIRE PLANT RISK ASSESSMENT

TASK DAY RISK ASSESSMENT FORM

Revision 1. Review Date 1/9/2013

Work Activity (e.g. Road Work): Work Location:.

How severely could the risk hurt someone? Low/Insignificant First aid

Plant Risk Assessment Self Propelled Scissorlift type Elevating Work Platform Model: S2755RT

Recognition, Evaluation, and Control of Hazards

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

Powerplay Paintball Brighouse Risk Assessment

in Australian Workplaces

Hazard Management Making your workplace safer

TLILIC2001 Licence to Operate a Forklift Truck

Safe Work Method Statement

Revision 4. Review Date 1 Septrmber 2014

How severely could the risk hurt someone?

PPE and Tools PPE and Tools

Working safely in an engineering environment

Temporary load-bearing support for structural alterations or repairs

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

LEARNER GUIDE. Asphalt Paver (AP) PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

Accident/Incident Reporting and Investigation Procedures

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Product Safety Information

How severely could the risk hurt someone? Low/Insignificant First aid

Risk Assessment Form (Qualitative)

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/

WORK METHOD STATEMENT CARPET LAYING

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

Risk Assessment June Skirmish Paintball Games Exeter

A Health and Safety Tip Sheet for School Maintenance Staff. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions

Risk Management Resources

Transcription:

Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving parts of the plant, or materials in motion? Equipment: Manufacturer Details Action Required / Knuckle Boom Approved By: Steven Jose Signature: Various Risk Level (Refer to risk matrix) Hierarchy of Control Hazard and Risk Treatment (Complete Hazard Report Form) Ensure to wear the appropriate Risk Level after Risk Treatment (Refer to risk matrix) Crushing Can anyone be crushed due to: Material falling off the plant? Uncontrolled or unexpected movement of the plant or its load? Lack of capacity for the plant to be slowed, stopped or immobilized? The plant tipping or rolling over? Parts of the plant collapsing? Coming in contact with moving parts of the plant during testing, inspection, use, maintenance, cleaning or repair? Being thrown off or under the plant? Being trapped between the plant and materials or fixed structures? Other factors? HIGH Ensure travel of moving vehicle (forward or reversing) is free of all personnel Use spotter in restricted areas Ensure machine and attachments are tied down securely when being transported Ensure to wear the appropriate The boom is clearly labelled with warning decals due to the potential crushing hazard associated with boom type plants Ensure to wear the appropriate Authorised by: General Manager - Safety & Personnel Date: 2/06/2014 Review Date: MAY 2016 Issue : 1 Page 1 of 8

Cutting, Stabbing and Puncturing Can anyone be cut, stabbed or punctured due to? Coming in contact with sharp or flying objects? Coming in contact with moving parts of the plant during testing, inspection, operation, maintenance, cleaning or repair of the plant? Plant, parts of the plant or work pieces disintegrating? Work pieces being ejected? The mobility of the plant? Uncontrolled or unexpected movement of the plant? Other factors? Ensure all guards and fixtures are in place Ensure machine is switched off before adjusting depth of tiller Ensure guards cover the entire width of the rotating parts Ensure appropriate s are used (e.g. protection for eyes, hearing and footwear) Shearing Can anyone s body parts be: Sheared between two or more parts of the plant, or between a part of the plant and a work piece or structure? Ensure to wear appropriate whilst operating this machine Friction Can anyone be burnt, gain abrasions etc. due to: Contact with moving parts or surfaces of the plant, or material handled by the plant? Allow motor and other components to cool before servicing Hot parts that require access should be guarded and wear appropriate Authorised by: General Manager - Safety & Personnel Date: 2/06/2014 Review Date: MAY 2016 Issue : 1 Page 2 of 8

Striking Can anyone be struck by moving objects due to: Uncontrolled or unexpected movement of the plant or material handled by the plant? Plant, parts of the plant or work pieces disintegrating? Work pieces being ejected? Mobility of the plant? Other factors? Ensure travel path of moving vehicle (forward or reversing) is free of all personnel and obstacles Ensure all loads are placed and secured within tray or basket/platform Ensure exclusion zone in and around vehicle while loading/unloading Ensure all overhead and underground conditions are capable of supporting safe operation of equipment Ensure to wear the appropriate High Pressure Fluid Can anyone come into contact with? Fluids under high pressure in normal use, in the instance of plant failure? Ensure that during maintenance hydraulic hoses are secure before operating Be aware that High temperature components (motor and pump) are positioned within turntable Ensure to wear the appropriate Electrical Can anyone be injured by electrical shock or burnt due to: The plant contacting live electrical conductors? Plant working close to electrical conductors? Overload of electrical circuits? Damaged or poorly maintenance electrical leads or cables? Damaged electrical switches? Water near electrical equipment? Lack of isolation procedures? Other factors Do not operate in areas with overhead/underground wiring or other obstructions machine is NOT insulated Have power disconnected before loading or unloading Ensure to wear the appropriate Authorised by: General Manager - Safety & Personnel Date: 2/06/2014 Review Date: MAY 2016 Issue : 1 Page 3 of 8

Explosion Can anyone be injured by fuels such as gases, vapors, liquids, dusts or other substances being ignited triggered by the operation of the plant or by materials handled by the plant? Slipping, tripping and Falling Can anyone using the plant, or in the vicinity of the plant, slip, trip or fall due to: Uneven or slippery work surfaces? Poor housekeeping, such as shavings in the vicinity of the plant, spillage not cleaned up? Obstacles being placed in the vicinity of the plant? Other factors? High Temperature Can anyone: Come into contact with objects at high temperature? Come into contact with hot fluids? Be injured by fire? Fuel filling must be carried out in well ventilated space, away from ignition source/s Engine must be switched off and cooled before fuel filling Avoid contact with hot surfaces such as exhaust system Ensure to wear the appropriate Wear appropriate footwear Use steps provided when getting in/on equipment Never climb on or enter basket/platform area while it is elevated Always observe three points of contact if need to get on/in basket/platform Maintain cleanliness of equipment (inside and out) Ensure to wear the appropriate Allow motor and other components to cool before servicing Be aware of Turntable covers as they are hot and cause personal injury Ensure to wear the appropriate Authorised by: General Manager - Safety & Personnel Date: 2/06/2014 Review Date: MAY 2016 Issue : 1 Page 4 of 8

Temperature and Thermal Comfort Can anyone suffer ill-health due to: Exposure to high or low temperatures? Failure of air conditioning equipment? Suffocation Can anyone be suffocated due to: Lack of oxygen, or atmospheric contamination? Ergonomics Can anyone be injured due to: Poorly designed seating? Repetitive body movements? Constrained body posture or the need for excessive effort? Design deficiency causing physical or personal stress? Inadequate or poorly placed lighting? Lack of consideration given to human error or human behavior? Mismatch of the plant with human traits and natural limitations? Other factors? Transportation Can anyone be injured by this equipment falling or driven off vehicle or trailer while loading, unloading or transportation? Take regular breaks/rests Exercise/stretch regularly Do not operate beyond your personal capabilities Do not use in confined space Only use in well ventilated areas Ensure to wear the appropriate Take regular breaks/rests Exercise/stretch regularly Do not operate beyond your personal capabilities Use suitably designed and secured loading/unloading procedures including crane, hoist, ramps etc. Observe and use proper manual handling techniques Ensure to wear the appropriate Load/unload on firm, flat, level ground Ensure vehicle capacities are not exceeded by the equipment Ensure equipment, attachments and sundry items are securely tied down Authorised by: General Manager - Safety & Personnel Date: 2/06/2014 Review Date: MAY 2016 Issue : 1 Page 5 of 8

Operational Can anyone be injured by this equipment Apply/use chocks if necessary Ensure liquids are prevented from spillage Maintain vehicle and/or equipment in good working order - report any malfunction or damage to Master Hire immediately and stop using equipment where it is reasonable to foresee further risk to persons or damage to equipment Ensure to wear the appropriate Complete Daily Checklist each day or shift Ensure shutdown is completed at the end of use and equipment is secured from unauthorised use Ensure equipment is on stable ground and clear of obstructions when in use and being stowed Ensure adequate ventilation Ensure safety gears, levers, switches etc. are engaged/disengaged appropriately before starting/operating Ensure all guards and fixtures are in place Ensure machine is switched off before making any adjusts Do not operate on steep slope Ensure handles and other adjustable parts are set right for the operator Ensure guards cover the entire width of the rotating parts Ensure appropriate s are used (e.g. protection for eyes, hearing and footwear) Authorised by: General Manager - Safety & Personnel Date: 2/06/2014 Review Date: MAY 2016 Issue : 1 Page 6 of 8

Other Hazards Can anyone be injured or suffer ill-health from exposure to: Chemicals? Toxic gases or vapors? Fumes? Dust? ise? Vibration? Radiation? Other Factors? Operate in well-ventilated areas only Check for overhead/underground utilities (gas, water, electrical) before operation Ensure equipment is appropriately labeled and meet the relevant State Legislative requirements Maintain vehicle and/or equipment in good working order - report any malfunction or damage to Master Hire immediately and stop using equipment where it is reasonable to foresee further risk to persons or damage to equipment Ensure appropriate s are used (e.g. protection for eyes, hearing and footwear) Further Comments: A Specific Risk Assessment on site must been undertaken prior to plant operation? This equipment must only be driven/operated by competent persons and holders of the appropriate license Checklist: Manufacturers manuals referenced Copy kept in Master Hires Risk Management File Authorised by: General Manager - Safety & Personnel Date: 2/06/2014 Review Date: MAY 2016 Issue : 1 Page 7 of 8

Step 1 Determine Likelihood What is the possibility of the event happening? Criteria SAFETY MANAGEMENT SYSTEM Hazard / Risk Matrix Reference: Workplace Health and Safety Queensland - Risk Assessment - Supplement 2 Risk Management Code of Practice 2007 Description Almost certain Expected in most circumstances. Event is a common problem Likely Will probably occur in most circumstances. Event is known to have occurred at this site or it has happened Possible Might occur at some time Event could occur at the site or I ve heard of it happening Unlikely Could occur at some time Event is not likely to occur at the site or I have not heard of it happening Rare May occur only in exceptional circumstances Event is practically impossible. Step 2 Determine Consequence - What will be the result if it happens? Step 3 Determine the risk score Classification Insignificant Minor Moderate Major Catastrophic Example detail description injuries First aid treatment only; spillage contained at site. Medical treatment; spillage contained but with outside help. Extensive injuries; loss of production Death; toxic release of chemicals CONSEQUENCE LIKELIHOOD Insignificant Minor Moderate Major Catastrophic Almost certain 3 High 3 High 4 Acute 4 Acute 4 Acute Likely 2 Medium 3 High 3 High 4 Acute 4 Acute Possible 1 Low 2 Medium 3 High 4 Acute 4 Acute Unlikely 1 Low 1 Low 2 Medium 3 High 4 Acute Step 4 Record risk score against the job sequence steps (te Risk scores have no absolute value and should only be used for comparison and to engender discussion.) Score Action 4 A: Acute ACT NOW Urgent do something about the risks immediately. Requires immediate attention. 3 H: High Highest management decision is required urgently. 2 M: Medium Follow management instructions. 1 L: Low OK for now. Record and review if any equipment/ people/ materials/ work processes or procedures change. Rare 1 Low 1 Low 2 Medium 3 High 3 High Authorised by: General Manager - Safety & Personnel Date: 2/06/2014 Review Date: MAY 2016 Issue : 1 Page 8 of 8