Preparing a Curb Ramp Project. December 15, 2010

Similar documents
ADA Operations Contact Info

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

ADA Operations Contact Info

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

ADA Training Standard Plans

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

City/ Town: Route: Intersection Name; Street Names:

Designing Accessible Traffic Signals

ADA PRESENTATION (CURB RAMPS)

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

Field guide for Accessible Public Rights-of-Way Edition

City of East Grand Forks. ADA Transition Plan. Inventory Manual. June, 2018 DRAFT

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found

ROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

Americans with Disabilities Act and Curb Ramps

Paul Vraney Bureau of Project Development 02/11/2016

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

SECTION 3 STREET DESIGN

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES

ADA Technical Frequently Asked Questions

Field guide for Accessible Public Rights-of-Way Edition

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

Scoping and Design Considerations for APS and ADA Curb Ramps. Adam Tyra, PE INDOT Greenfield District Traffic

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

Curb Ramp Guidelines. October Version 1.0

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

What Is a Complete Street?

Driveway Design Criteria

Standards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG)

Field Design, Construction and inspection of ADA compliant Curb ramps. Mike Anderson City of Lee s Summit Construction Manager (816)

GENERAL. 1. Description

ADA on Construction. Guidance for Section C Plan Preparers

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

Accommodating Pedestrians in the Work Zone

CITY OF PAPILLION, NEBRASKA

FIRE & LIFE SAFETY STANDARD

Chapter 4: Funding and Implementation

INDEX. Geometric Design Guide for Canadian Roads INDEX

10.0 CURB EXTENSIONS GUIDELINE

12A Accessible Sidewalk Requirements. 12A Protruding Objects

Section 4: Inventory Methodology and Findings

L C E C.P. #2. BASIS OF BEARINGS: Texas Coordinate System of 1983 (NAD83), North Central Zone (4202) as tied to GEOSHACK VRS SYSTEM.

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

Citywide Sidewalk and Crosswalk Programs

A. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances

CURB RAMP INSPECTION REPORT

UDC Street Cross Sections

Geometric Design Tables

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

Design Considerations

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

SECTION 14: LANDSCAPING AND BEAUTIFICATION

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

12A Accessible Sidewalk Requirements

IMPLEMENTATION WORKBOOK

Segment Number Quick Pathways Accessibility Tool. Name of Street: Segment Identification:

ADA TRANSITION PLAN 2013

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

Complete Streets Funding Program Project Prioritization Plan

Off-road Trails. Guidance

Steps to Conducting a Complete Streets Assessment

Route 47 (North Main Street) Reconstruction

Observations and Ideas: Toomer s Corner Streetscape Improvements

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:

ADA & Public Rights of Way

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

PROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices

C. Brian Shamburger, P.E., PTOE Kimley-Horn and Associates, Inc. State of Texas Registered Firm #928

Complete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Design Criteria. Design Criteria

Marshall County. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Defining Purpose and Need

Chapter 10: Pedestrian Facility Design. ACCESS MINNEAPOLIS Design Guidelines for Streets & Sidewalks

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Designing Pedestrian Facilities for Accessibility

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL

CHAPTER 10 ADA / Public Right of Way. Overview

Town of Wakarusa. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Orange Center Elementary School

Hennepin County Transportation Department

Mandan Commission Meeting August 2, 2016 Mandan City Hall

CURBSIDE ACTIVITY DESIGN

Fulton Market Streetscape

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

Restoration Requirements

CITY OF ROSEVILLE DESIGN STANDARDS

Town of Roseland. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

MEMORANDUM. Discussion of the planned crosswalk improvement on Mount Vernon Road near Stratham Drive

CITY OF LANCASTER PROPOSED NEW PROJECTS

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Town of Bourbon. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Transcription:

Preparing a Curb Ramp Project December 15, 2010

3 Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans and identifying ramp types at each quadrant Signalized Curb Ramp Reconstruction with upgrades to APS or APS ready - Custom Design - Identifying Crosswalk Locations - Grades determined in the field New Construction/Reconstruction - Layout proposed curb ramps with X,Y,Z coordinates at curb lines, grade breaks, and push button stations

Non-Signalized Intersections Use curb ramp inventory and perform field walk to determine which ramps are non-compliant and need to be reconstructed with the project Determine whether surveying is needed or if a site visit is adequate to determine necessary pay items and choose appropriate ramp types Talk to local agencies/bike ped/ada unit to determine: - If pedestrian crossings should be added, removed, or kept in place - If any future pedestrian facilities are planned or if the local government has a pedestrian master plan

Non-Signalized Intersections Select appropriate ramp types that are constructible at the chosen quadrant If standard ramp types will not work at a particular quadrant, then a custom ramp must be designed All pay items should be tabulated independently for each quadrant If radial truncated domes are needed the proposed radius and quantity must be provided for each quadrant

Signalized Intersections All signalized intersections in the project will be upgraded to APS or APS ready Surveys should locate: - All utilities including handholes, manholes, hydrants, gate valves, drainage structures, signal poles/cabinets, light poles, loop detectors, telephone/cable boxes, fiber optic vaults, and irrigation/sprinkler heads or services - Buildings and doorways, other permanent features in sidewalk areas such as landscaping, retaining walls, benches, sign posts, etc., - Crosswalk striping, curb and gutter, sidewalk edges 30 in both directions(mainline and side street), Median locations - ROW in areas where the construction limits may fall close to or outside existing ROW

Signalized Intersections All Signalized Intersections should have a separate 20 scale intersection detail sheet that shows: - All signal system components: poles, cabinets, handholes, and pedestrian push button stations - Proposed curb ramp construction including truncated domes, ramps, landings, grade breaks, flares, and curb and gutter - Proposed crosswalk locations, provide X,Y coordinates of the points where the outside edge of the proposed crosswalk intersects the curb line at the curb face - Contractor will use the Crosswalk Control Points to layout push buttons and ramps Two primary designs for APS curb ramps - 1) Two separate perpendicular ramps - 2) Depressed Corner

Locating APS Push Buttons It is important to note that APS Push Buttons and curb ramp designs are integral to each and are difficult to design and construct apart from one another Buttons should be located between 1.5 feet and 10 feet from the back of curb, shoulder, or pavement edge Buttons should be located at the projected outside edge of the crosswalk and no more than a 5 foot offset from the outside crosswalk edge Buttons should have a minimum 10 feet of separation between them Buttons should be placed adjacent to a landing Buttons should be mounted at a height of 42 and no more than 48

Best Practices in Locating APS Maintain a 6 foot MAR (Maintenance Access Route) around ped stations Locate ped stations at least 4 feet back from the back of curb and ideally 6 feet from back of curb Keep button outside truck turning radius Don t obstruct walk/trail Center the push button on the landing Mount push button on signal pole when it is in an appropriate location

New/Reconstruction Provide an Intersection Detail sheet for each intersection Provide curb ramp designs showing ramps, landings, truncated domes, grade breaks, and APS Provide X,Y,Z coordinates of all grade breaks on all pedestrian access routes until they reach the Typical Section Provide X,Y,Z coordinates of APS push button stations Design tolerances 0.25% to 0.50% less than maximum allowable grades

Shared-Use Trails Mn/DOT Bike Manual states that grades in excess of 8.3% (1/12) exceed ADA Accessibility Guidelines - This is true, however when constructing a pedestrian facility at an 8.3% grade, a landing must be provided for every 30 inches of vertical rise (30 feet at 8.3%) - To avoid having to construct landings, design trails with a maximum running slope of 5 percent (4.5% -4.75% for construction tolerance) - Cross slope is still 2.0% maximum Truncated Domes should be full width of the trail - It is unlikely domes will be directional due to 5 foot maximum setback When providing APS, realign trails to come in behind the push button stations and encroach upon clear space requirements if necessary