FUGITIVE DUST CONTROL PLAN

Similar documents
FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

CCR Fugitive Dust Control Plan

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

CCR Fugitive Dust Control Plan

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

Coal Combustion Residuals Closure Plan

D.B. Wilson Station CCR Landfill

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

CCR Closure Plan Ash Impoundment

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

2017 Annual Inspection Report

2018 Annual Inspection Report

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Notice of Intent to Close Inactive CCR Surface Impoundments

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

2016 Annual Inspection Report

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Closure Plan for CCR Surface Impoundments

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

2016 Annual Inspection Report

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Amended Written Closure Plan

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

CSU Channel Islands Lead Operations and Maintenance Program

Hazardous Materials Management Guidelines

Safety Data Sheet (SDS) Revision / Review Date: 11/14/14

SAFETY DATA SHEET A-14 E

SAFETY DATA SHEET A-15 E

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

ENFIELD BOARD OF EDUCATION ENFIELD, CONNECTICUT

Explosive gas migration monitoring for a sanitary landfill facility.

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

Amec Foster Wheeler 2016.

MATERIAL SAFETY DATA SHEET

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

3M MATERIAL SAFETY DATA SHEET 3M Fire Barrier - Duct Wrap 15A, 20A; Plenum Wrap 5A; and Collar 20A 06/20/2006

2018 INSPECTION REPORT

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

MATERIAL SAFETY DATA SHEET High Pressure Laminate

Mine Dust Management Plan

MATERIAL SAFETY DATA SHEET 3M Fire Barrier - Duct Wrap 15A, 20A; Plenum Wrap 5A; and Collar 20A 01/31/2008

Appendix B. Emissions Inventory

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

Safety Data Sheet EnviroShield ES-100

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Safety Data Sheet (SDS) Revision / Review Date: 10/27/14

Renown Gym/Facility Wipes Safety Data Sheet

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different

Special education/504 students shall be adjudged on an individual basis, in accordance with their Individual Education Plans (IEPs)/504 Plans.

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

MATERIAL SAFETY DATA SHEET

EMERGENCY PHONE: or (651) (24 hours)

MATERIAL SAFETY DATA SHEET 3M(TM) ESPE(TM) 1954 AND 1956 SERIES SOF-LEX(TM) FINISHING AND POLISHING STRIPS 12/31/2008

MATERIAL SAFETY DATA SHEET

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MATERIAL SAFETY DATA SHEET Validation Beads for ique Screener PLUS

Material Safety Data Sheet SECTION 1: PRODUCT AND COMPANY IDENTIFICATION SECTION 2: INGREDIENTS SECTION 3: HAZARDS IDENTIFICATION

SILICA EXPOSURE CONTROL PLAN

Coconut Base Activated Carbon Safety Data Sheet

ALUMINUM SULFATE SAFETY DATA SHEET

CHEMICAL & FERTILIZER, LLC Safety Data Sheet Section 1 Chemical Product and Company Identification

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Safety Data Sheet according to WHS Regulations

EMERGENCY PHONE: or (651) (24 hours)

BODY OF KNOWLEDGE TANK ENTRY SUPERVISOR CERTIFICATION PROGRAM Revision 2, October 2013

CONFINED SPACE ENTRY

Transcription:

FUGITIVE DUST CONTROL PLAN PLEASANTS LANDFILL Willow Island, WV Allegheny Energy Supply Company, LLC A FirstEnergy Company October 19, 2015

CONTENTS Introduction 1 CCR Unit Description 1 CCR Fugitive Dust Control Measures 2 Applicability and Appropriateness of Dust Control Measures 3 Procedures for Emplacement of Conditioned CCR 4 Procedure to Log Citizen Complaints 4 Procedure to Assess Control Plan Effectiveness 4 Date of Initial Plan 4 Plan Amendments Procedure 5 Qualified Professional Engineer Certification 5 Annual CCR Fugitive Dust Control Report 5 Recordkeeping Requirements 5 i

ATTACHMENTS Attachment A: Citizen Complaint Log Attachment B: Plan Amendments Summary Table Attachment C: Qualified Professional Engineer Certification ii

INTRODUCTION Pursuant to the Federal Coal Combustion Residuals (CCR) Rule at 40 CFR 257.80 each CCR unit is required to have a Fugitive Dust Control Plan that will effectively minimize CCR from becoming airborne from the CCR unit, roads leading to and from the CCR unit, and any other CCR management and material handling activities. This plan must: 1) Identify and describe the CCR fugitive dust control measures that will be used to minimize CCR from becoming airborne at the facility, and explain how these measures are applicable and appropriate for the CCR unit; 2) Include procedures to emplace the CCR as conditioned CCR by means of wetting with water to a moisture content that will prevent wind dispersal but will not result in free liquids, or by means of a chemical dust suppression agent; 3) Include procedures to log citizen complaints received by the owner/operator involving fugitive dust events at the CCR unit; 4) Include a description of the procedures the owner/operator will follow to periodically assess the effectiveness of the control plan; 5) Be prepared as an initial plan for applicable CCR units by October 19, 2015, or by initial receipt of CCR for any unit subject to the regulation after October 19, 2015; 6) Include amendments to the plan whenever there is a change in conditions that would substantially affect the written plan in effect; and 7) Be certified by a qualified professional engineer, licensed in the state in which the CCR unit resides, that the initial CCR fugitive dust control plan, or any subsequent amendment thereto, meets the seven requirements as listed here per 40 CFR 257.80. CCR UNIT DESCRIRTION The is an engineered CCR landfill located near the town of Willow Island, West Virginia, and is owned by Allegheny Energy Supply Company, LLC, a wholly owned subsidiary of FirstEnergy Corp. It is regulated by the West Virginia Department of Environmental Protection (WVDEP) under the West Virginia solid waste management regulations. The CCRs it receives from the Pleasants Power Station 1 are stabilized flue gas desulfurization (FGD) material, fly ash, and bottom ash not managed as a product. Bottom ash from the station is also managed as a product and is used as a landfill liner construction component (i.e. a permeable protective liner cover). The bottom ash managed as a product is not regulated by the CCR rule. The CCRs 1 In addition, the WVDEP issued solid waste permit allows for disposal of fly ash and bottom ash (not managed as a product) from Fort Martin and Harrison Power Stations on an as needed basis. These CCRs are transported by trucks equipped with tarps. 1

destined for disposal in the landfill are transported by truck from the station via a private (nonpublic) haul road. At the landfill, the trucks unload the CCRs where it is placed in lifts and compacted by heavy equipment. These lifts comprise a series of benches that constitute the landfill. As a bench is finished it is contoured for positive drainage and the bench is covered with soil, seeded and mulched. All precipitation contacting the landfill material is collected and routed to a wastewater treatment pond that has a permitted outfall under the WVDEP National Pollution Discharge Elimination System (NPDES) regulations. CCR FUGITIVE DUST CONTROL MEASURES There are a series of dust control measures to control and minimize the dispersal of fugitive dust in the operation of the. 1. Landfill Location and Natural Barriers The is located in a remote area of West Virginia with limited neighbors. It is constructed in a valley between two ridges and as such has a natural barrier of ridges and trees along the shoulders of the valley. These natural barriers reduce the exposure of wind to the landfill, thus minimizing the potential for fugitive dust from the site. 2. Truck Loading The stabilized FGD material generated at the station has a latent moisture content of approximately 20 to 30 percent, thus the material has sufficient water to keep it from dispersing in the wind when being transferred from the truck loading silo to the haul trucks. In addition, the fly ash and bottom ash that are transferred to the landfill via truck are conditioned with water at the time of truck loading so as to minimize the production of airborne fugitive dust. 3. Haul Road The filled trucks then drive on a dedicated (non-public) paved haul road up to the point of the landfill s working area where the trucks then traverse a specified lane on the placed and compacted material to the point of the active face unloading area. The haul road and (when weather conditions dictate) the placed and compacted material that is traversed by the haul trucks, is wetted by a water truck. The water truck keeps the paved haul road wetted during the daily hauling shift when there is no natural precipitation. On particularly dry days or if excess solids accumulate on the paved road surface (for example after a heavy downpour that causes gravel and solids to wash over the top of drainage ditches across the road surface) the road is also cleaned by a sweeper vacuum truck to remove the solids that 2

could get crushed under the weight of the haul trucks and form airborne dust. Watering of the road is kept to a minimum during winter months to prevent the formation of ice. In addition, due to the weight of the trucks and the grade of the road, truck speed is maintained around 25 miles per hour or less (particularly with full payload) so as to minimize the dispersal of road dust by the movement of the vehicles over the road surface. 4. Landfilling Process As stated in item 2 above, the CCR material has sufficient moisture, as an inherent property of production or by intentional conditioning, to minimize its dispersion as fugitive dust. The material is mechanically compacted essentially forming a large monolithic bench of material that has limited surface area (outer lift slope and bench surface) from which fugitive dust can be generated. When a bench is completed, it is covered with soil, seeded and mulched. Once vegetated the production of fugitive dust is minimized to its maximum extent. 5. Suspension of Operations During Severe Weather Conditions Due to the composition of the CCR material, weather conditions producing excessive precipitation may halt disposal operations because the operating face of the landfill will become too slick for safe operation of trucks and equipment. Despite any accompanying high winds during these weather conditions the material is far too wet to disperse in the wind. Likewise, operations may also halt during extremely cold temperatures because the material can freeze. High wind conditions (without precipitation) also may temporarily halt landfill operations. If these weather conditions persist for extended periods (days) the CCRs can be stored in the various collection and process silos and/or a dome enclosure at the station proper. APPLICABILITY AND APPROPRIATENESS OF DUST CONTROL MEASURES The dust control measures described in this plan are applicable and appropriate as accepted industry best management practices and reasonable engineering controls for industrial landfill operations. Moreover, these measures, practices, and controls are recognized by the United States Environmental Protection Agency (US EPA) as discussed in the Compilation of Air Pollutant Emission Factors document (AP-42) detailing fugitive dust emission calculations under uncontrolled and controlled scenarios. 2 2 AP-42 was first published in 1968 by the U.S. Public Health Service, and was then revised and reissued by the U.S. EPA in 1972. It is currently available as the 1995 Fifth Edition. Fugitive dust is specifically addressed in Chapter 13, Miscellaneous Sources. 3

PROCEDURE FOR EMPLACEMENT OF CONDITIONED CCR As described above, the CCR material placed in the has sufficient moisture, as an inherent property of production or by intentional conditioning, to prevent dispersal of fugitive dust in accord with the requirement in the federal CCR rule [40 CFR 257.80(b)(2)]. PROCEDURE TO LOG CITIZEN COMPLAINTS The station maintains a fugitive dust complaint log. Any complaint that is phoned into the station is recorded on the appropriate log including date, time, name of party lodging complaint, a description of the complaint, and ambient weather conditions at the time the complaint is made. The appropriate station personnel are then notified to verify the continued occurrence of the complaint and the manner in which the issue is to be resolved. These actions are also recorded in the citizen complaint log. If the complaint involves a claim of damage, a company representative contacts the party lodging the complaint to resolve the citizen s claim. A copy of the log is provided as Attachment A to this plan. PROCEDURE TO ASSESS CONTROL PLAN EFFECTIVENESS The is a permitted facility under the applicable regulations of West Virginia. As such there are existing permit conditions that require the logging of certain activities undertaken to minimize the creation of fugitive dust. In the case of the, for example, these permit conditions control the amount of fugitive dust potentially created by the operation by limiting both the amount of CCRs that can be hauled to the landfill as well as the hours of operation of the CCR placement equipment (dozers). In addition, the station s Title V permit requires the submission to the WVDEP of an annual emissions inventory, including fugitive dust emissions from the landfill operation. These conditions, limitations, reports, and citizen complaint log will be reviewed to evaluate the effectiveness of the measures taken and practices put in place to minimize the dispersal of fugitive dust. DATE OF INITIAL PLAN Since the is an existing CCR landfill (per 40 CFR 257.53) that is receiving CCRs both before and after October 19, 2015, the initial CCR fugitive dust control plan must be prepared and placed in the operating record by October 19, 2015. The CCR fugitive dust control plan will be placed on the facility s CCR website within 30 days of placing the information in the operating record. The facility will also notify the State Director within 30 days of when the plan is placed in the operating record. 4

PLAN AMENDMENTS PROCEDURE The plan will be amended in response to limitations identified during the annual plan review, or if operational or facility changes warrant an update. When changes are made, the title page of the amended plan shall include a notation identifying the date of the initial plan as well as the date of all subsequent revisions. The amendments made to the plan will be identified in an amendment table, attached hereto as Attachment B, identifying the date of the amendment, the reason for the amendment and the sections of the plan amended. QUALIFIED PROFESSIONAL ENGINEER CERTIFICATION Pursuant to 40 CFR 257.80(b)(7) the initial fugitive dust control plan and any subsequent amendment of it will be certified by a qualified professional engineer (PE). A copy of the certification is attached hereto as Attachment C. ANNUAL CCR FUGITIVE DUST CONTROL REPORT The annual fugitive dust control report will include a description of the actions taken by the facility to control CCR fugitive dust and a record of all citizen complaints logged in the previous twelve months along with corrective measures taken, if any. The initial CCR fugitive dust control report will be completed no later than 14 months after the initial CCR fugitive dust control plan has been placed in the operating record. Subsequent reports will be completed and placed in the operating record within one year of completing the previous year s report. RECORDKEEPING REQUIREMENTS As required by the CCR Rule, the CCR fugitive dust control plan and annual CCR fugitive dust control report will be placed in the facility s operating record. As the CCR fugitive dust control report is amended, the most recent version of the plan will be maintained in the facility s operating record. Both the most recent version of the CCR fugitive dust control plan and the annual CCR fugitive dust control report will be placed on the facility s CCR website within 30 days of placing the information into the operating record. 5

ATTACHMENT A CITIZEN COMPLAINT LOG

Fugitive Dust Control Plan Citizen Complaint Log Page 1 Call No. Date (mm/dd/yyyy) Caller's Name Description of Complaint Time Weather Conditions Action Taken

ATTACHMENT B PLAN AMENDMENTS SUMMARY TABLE

Fugitive Dust Control Plan Plan Amendments Summary Table NOTE: All amendments to plan must be indicated on the title page with a Revision number and corresponding date Page 1 Rev No. Date (mm/dd/yyyy) Section Title Amended Reason for Amendment Amendment Description Initials

ATTACHMENT C QUALIFIED PROFESSIONAL ENGINEER CERTIFICATION