Status Date Prepared Reviewed Endorsed Approved

Similar documents
Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved

Reference Number PDS 10 (RIC Standard: EP SP)

Defective Fixed Signals - Rules 1 to 6

Pedestrian Level Crossings Design and Installation

Inspection and Testing of Signalling Inspection and Testing Principles

Rail Profiling - Turnouts

Trackside Warning Signs and Markings

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Sharing practice: OEM prescribed maintenance. Peter Kohler / Andy Webb

Operating Instructions for BAIR22-6 AIR-POWERED CRIMPING TOOL

Lockout/Tagout Training Overview. Safety Fest 2013

URC Voltage Sensor SEN-VOLT for use with MRX units containing sensor ports

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Run-a-Way Speed and Ballast Drag Length Calculator Tools User Guide

Hazardous Energy Control (Lockout-Tagout)

Policy Redesign Project. Plant Safety Policy. Table of Contents

VOLLEYBALL ALBERTA - WEB PRIVACY POLICY


SIL Safety Manual. ULTRAMAT 6 Gas Analyzer for the Determination of IR-Absorbing Gases. Supplement to instruction manual ULTRAMAT 6 and OXYMAT 6

WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (CONFINED SPACES) REGULATIONS 2009

The purpose of this document is to establish the procedures for accident prevention and investigation at (Insert Company Name) jobsites.

Issue 3. Module TS11. Failure of, or work on, signalling equipment signallers regulations. GERT8000-TS11 Rule Book

Original Date of Issue: 04/09

Minimum standard of competence for electro-technical officers (STCW Reg III/6) Electrical, electronic and control engineering at the operational level

MANUAL DIRECT PURGE OPTION. UNION Instruments GmbH CWD2005 PLUS. General information, safety standards and regulations for direct purge option

Indicators and Signs ANSG 604. Applicability NSW SMS. Publication Requirement. External Only. Document Status September 2018.

GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four

LOCKOUT/TAGOUT PROGRAM

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

OVA Privacy Policy. a) Arranges and encourages volleyball matches and competitions within Ontario;

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Model SM/PL Series. Calibration Guide. Precision Loads. Anritsu Company 490 Jarvis Drive Morgan Hill, CA USA

Manual. for ISSF Classification Officer

National Standard for Commercial Vessels

Significant Change to Dairy Heat Treatment Equipment and Systems

6 digital caliper with case

TEXAS DEPARTMENT OF PUBLIC SAFETY Breath Alcohol Laboratory

Megabucks & Megabucks Gold

Lock Out - Tag Out Safety Program

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy

E2K-L. Liquid Level Sensor That Is Unaffected by the Color of the Pipe or Liquid. Liquid Level Sensor. Ordering Information

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Management Plan for Electrical Safety ISD #535

Safe Asset Management - Coastal and Estuarial Defences

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

Safe work method statements

CONFINED SPACE AWARENESS

GALISO SOAP OPTION FOR PCT-ADW-D

Health and Safety Policy

CONFINED SPACE ENTRY PROGRAM

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

The Gambling Act (Class 4) Game Rules 2016

Norrsken Family Booklet

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Electrical Safety Work Practices

Electrical, electronic and control engineering at the operational level

Code for the Provision of Chargeable Mobile Content Services

4 COMPETITIONS 4 COMPETITIONS COMPETITON PROTOCOLS: GENERAL 4.1 VENUES 2016 MANUAL OF MOTORCYCLE SPORT

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

Moor, Tend Mooring And Unmoor Ship - Supervisor Level -

NZQA expiring unit standard version 6 Page 1 of 5. Demonstrate knowledge of electrical safety and safe working practices for electrical workers

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

Our Approach to Managing Level Crossing Safety Our Policy

Recommendations on Checking Anaesthesia Delivery Systems

2. The purpose of this program is to achieve the following objectives:

UNIVERSITY OF EDINBURGH GENERIC RISK ASSESSMENT - RADIATION RP/RA8 - WORK WITH X-RAY FLUORESCENCE ANALYSERS

2017 NORAC RAILROAD OPERATING RULES STUDY GUIDE SYSTEM OPERATING PRACTICES

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

LOCKOUT/TAGOUT PLAN August 2015

INSTRUCTIONS FOR USE

Level Crossing Predictor Design Certification and Test

CRICKET AUSTRALIA. Schedule for the Cricket Australia 9 to Thrive Business Card Draw Promotion

Classification Rules for ITTF Para Table Tennis

INDUSTRIAL HYGIENE GROUP Standard Operating Procedure. TVA-1000 PID/FID Portable Toxic Vapor analyzer. 1 of 9. Contents

Annex 1 to Decision 2009/007/R

SEMEMI SQA Unit Code H2AP 04 Carrying out fault location on electrical equipment and circuits

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

USER MANUAL. JET TST and JET TST S.

Model Visit our website at:

PSSI 1 High Voltage Switching

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:

200 A, 15 and 25 kv class loadbreak bushing insert installation instructions

Lockout / Tagout Safety Program

LOCKOUT-TAGOUT PROGRAM

BSR GPTC Z TR GM References and Reporting Page 1 of 8

230-LOCKOUT/TAGOUT PROGRAM

NZQA Expiring unit standard version 7 Page 1 of 8. Demonstrate knowledge of safe working practices in telecommunications.

New Thinking in Control Reliability

Pressure Systems Safety Regulation

Health & Safety Policy & Plan. Rightway Roofing.

PRO Lifting Operations

Transcription:

Discipline Engineering Standard NSW Category Signalling Title Introduction to Signalling Maintenance Procedures Reference Number SMP 01 (RIC Standard: SC 00 52 00 01 SI) Document Control Status Date Prepared Reviewed Endorsed Approved Issue 1 Revision 2 Mar 05 Standards and Systems Refer to Reference Number Standards Engineer H Olsen GM Infrastructure Strategy & Performance M Owens Safety Committee Refer to minutes of meeting 12/08/04

Disclaimer Australian Rail Track Corporation has used its best endeavors to ensure that the content, layout and text of this document is accurate, complete and suitable for its stated purpose. It makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems of work or operation. Australian Rail Track Corporation will not be liable to pay compensation in respect of the content or subsequent use of this document for any other purpose than its stated purpose or for any purpose other than that for which it was prepared except where it can be shown to have acted in bad faith or there has been willful default. Document Approval The technical content of this document has been approved by the relevant ARTC engineering authority and has also been endorsed by the ARTC Safety Committee. Document Supply and Control The Primary Version of this document is the electronic version that is available and accessible on the Australian Rail Track Corporation Internet and Intranet website. It is the document user s sole responsibility to ensure that copies are checked for curency against the Primary Version prior to its use. Copyright The information in this document is Copyright protected. Apart from the reproduction without alteration of this document for personal use, non-profit purposes or for any fair dealing as permitted under the Copyright Act 1968, no part of this document may be reproduced, altered, stored or transmitted by any person without the prior written consent of ARTC. March 2005 Version 1.2 Australian Rail Track Corporation Page 2 of 9

About This Standard This Standard defines the requirements to be followed when maintaining, interfering with and attending to failed conditions of the operational signalling infrastructure and systems. The Standard forms the descriptive part of a maintenance procedures manual that includes 47 parts detailing the requirements to be followed when dealing with the various situations as mentioned above and as shown below. 01 s 02 Bridging or False Feeding of Signalling Circuits 03 Accidents or Derailments - Action to be Taken 04 Failures 05 Damage to Signalling Equipment Including Cables 06 Release of Track Locking or Indication Locking 07 Apparatus Seldom Used 08 Booking Signalling Equipment Out of Use 09 Disconnection of Signalling Apparatus 10. Testing and Certifying Equipment Worked on or Altered During Maintenance 11. Like for Like Renewals, etc 12. Repair/Replacement of Signalling Wires 13. Field Parallelling of Signalling Contacts 14. Document Control of Signal Plans and Circuit Books Issued to the Field 15. Location of Trackside Equipment 16. Notification of Whereabouts and Liaison With Signallers 17. Maintenance Responsibilities, Frequencies, Recording 18. Depot Overhaul of Vital Signalling Equipment 19. Cleanliness & Lubrication of Mechanical Signalling Equipment 20. Security, Fire Protection, Weather Proofing and Cleanliness of Signalling Equipment, Housings and Locations 21. Minor Signalling Works on Maintenance Areas Involving Installing, Removal or Altering Signalling Equipment 22. Testing Interlockings - Maintenance Responsibilities 23. Insulation Inspection and Testing 24. Vital Signalling Relays 25. Track Circuits 26. Rerailing - Precautions to be Taken 27. Traction Return (1500V DC) 28. Points Detection Test: Separate Electrical Detector 29. Facing Point Lock Testing - Mechanical 30. Facing Point lock and Detection Testing - Combined Point Machine 31. Maintenance of Signal Sighting and Signals 32. Solid State Interlocking (SSI) 33. Electric Train Staff Instruments 34. Custody, Storage and Dispatch of Staffs and Keys 35. Use of Master Keys and Staffs 36. Level Crossings 37. Microtrax Coded Track Circuits 38. Microlok Computer Based Interlocking 39. Westrace Computer Based Interlocking March 2005 Version 1.2 Australian Rail Track Corporation Page 3 of 9

40. Use of Radio Transmitters Near Electronic Signalling Systems 41. Pole routes 42. Not Issued (To be Revised) 43. Guidelines for Irregularity Inspection and Testing to Determine Cause 44. General Signalling Maintenance Management, Administration and Supervision Responsibilities 45. Surveillance Inspections 46. Guidelines for the Safe use of Temporary Recording, Monitoring and Logging Equipment on Signalling Systems 47. Calibration of Tools and Instruments for Signalling Applications March 2005 Version 1.2 Australian Rail Track Corporation Page 4 of 9

Document History Primary Source RIC Standard SC 00 52 00 01 SI Version 2.0 List of Amendments ISSUE DATE CLAUSE DESCRIPTION 1.1 01/09/2004 Reformatting to ARTC Standard 1.2 14/03/2005 Disclaimer Minor editorial change March 2005 Version 1.2 Australian Rail Track Corporation Page 5 of 9

Contents 1 INTRODUCTION... 7 March 2005 Version 1.2 Australian Rail Track Corporation Page 6 of 9

1 INTRODUCTION The purpose of these procedures is to bring to the attention of signalling maintainers engaged in work affecting installed signalling apparatus the essential features, standard practices, and special instructions, so that traffic movements can be made safely yet without delay. The Network Rules and Procedures Manuals direct how work affecting the operation of signalling shall be safely carried out. All signalling maintainers issued with Network Rules and Procedures Manuals shall be held responsible for complying with the relevant safeworking procedures contained in them. The standard practices and procedures contained in this Signal Manual "Signalling Maintenance Procedures" shall be read and carried out in conjunction with the Network Rules and Procedures Manuals which they are intended to supplement, and in no way supersede. Each signalling maintainer who has duties prescribed by these signalling maintenance procedures must have a copy of this manual and shall comply with the prescribed procedures. Wherever terms such as signal engineer, signalling maintainer, mechanical maintainer, linesman, maintenance supervisor and such like are used it shall be taken as read that the respective persons are suitably trained, competent and accredited to perform the specific task required in the context referred to. If they are not suitably competent and accredited then they must arrange for others who are suitably competent and accredited to carry out the task. Signalling employees shall familiarise themselves with, and acknowledge receipt of, new and altered procedures, insert them in the appropriate position in copies of this manual and destroy superseded pages. Where individual responsibility is not explicit in the text of these procedures, signalling employees shall contact their Controlling Officers for clarification. For the purpose of this manual the Maintenance Signal Engineer and signal maintainer, unless otherwise stipulated shall mean a trained, qualified and authorised person who has been accredited by the appropriate Signalling discipline licensing board in Signalling Safeworking. The Maintenance Signal Engineer is the senior signal engineer responsible for the signalling infrastructure on his/her region/district and unless otherwise stipulated may delegate the various tasks specified to them in these procedures to another accredited signal engineer on their region/district, however in doing so, does not dispense with the responsibility and Maintenance Signal Engineers are still ultimately accountable for ensuring the task/s are appropriately handled and completed safely and in accordance with these procedures. Note: Whenever maintenance of the signalling system requires additions or modifications to the signalling system or its safety related components then the requirements of specification SCP 08 to SCP 12 shall be observed. Users of these procedures shall promptly bring to the attention of the Principal Engineer Signals Design for his/her determination any perceived omission, error, ambiguity, inconsistency or lack of clarity with these Procedures as well as suggestions for improvement. March 2005 Version 1.2 Australian Rail Track Corporation Page 7 of 9

SOME BASIC REQUIREMENTS. Some basic requirements relating to maintaining the signalling system are set out below. They are described in detail in the procedures in the following sections of this Manual. 1) The installed signalling system and its components are to be maintained to prevent signalling system failures and associated train delays, and to ensure the safety provided by the system is maintained throughout its operational life. 2) Failed signalling equipment is to be attended to and restored for operational use without undue delay. 3) Details of signalling maintenance and signalling failures and irregularities are to be recorded and analysed to determine any corrective action necessary and to ensure equipment/system safety and reliability levels are maintained. 4) Only signalling maintainers using authorised practices, test equipment, tools, materials and equipment are to maintain the installed signalling system or its components. Test equipment and tools in use are to be in proper working order. 5) Persons who are not suitably accredited shall not have access to enclosures housing vital signalling equipment except under the supervision of a signalling maintainer or as permitted in accordance with stipulated conditions. 6) Only suitably accredited signalling maintainers, or persons directly supervised by the signalling maintainers, are to disconnect or connect to the signalling system equipment and circuits. 7) The movement of trains must be adequately protected when any maintenance action or other interference impairs or could impair the protection provided by the signalling system or could affect the safety of the line. 8) Where the interlocking is disarranged or vital signalling equipment is disconnected from the interlocking, or is dis-assembled, or has safety critical adjustments altered, then its safe operation must be verified before it is certified fit for operational use. 9) Signalling equipment which has failed in an unsafe manner must be taken out of service and the train movements affected must be immediately protected. The irregularity must be fully investigated, the defect rectified, and the equipment must be tested and certified as operating safely before being restored to use for traffic operations. Subject to the former, should signalling apparatus be defective in any manner which potentially might endanger traffic operations it is to be immediately repaired or replaced, if practical. If it cannot be immediately repaired or replaced its operation must be discontinued and traffic operations must be protected. Details must be immediately reported to Controlling Officers. 10) When any function of the signalling system affecting traffic operations is to be taken out of service, the system operator of the affected area is to be advised. 11) Release of track locking or signal indication locking must only be given as prescribed. March 2005 Version 1.2 Australian Rail Track Corporation Page 8 of 9

12) Temporary bridging of contacts of vital signalling control devices must only be carried out as prescribed. 13) Trainstops must only be manually suppressed for train services as prescribed. 14) Where locking facilities are normally provided, the signalling equipment is to be kept locked to prevent unauthorised interference. 15) Alterations or additions to the configuration of the signalling system or its components must not be made unless properly authorised. 16) Prior approval of the ARTC General Manager ISP or nominated Signalling representative is require before any aspect of the operational signalling system, vital or non vital, that could affect the safety and/or reliability of the system is introduced. 17) This requirement includes, the application of experimental, new or modifications to design, signalling systems, signal equipment, train control systems, standards for manufacture, construction, operations, maintenance, disposal and procedures and practices, including practices that were not specifically covered by documented standards but for which a documented standard should apply. 18) Signalling plans, diagrams and circuit books for operating and maintenance use must be available to those who need them to carry out their duties and be maintained up to date. 19) Off-site repair and overhaul of vital signalling equipment shall be authorised and controlled to ensure the equipment is restored to the required specification and standard before being re-used. 20) Temporary repairs of vital signalling equipment shall be to an acceptable and safe standard and procedures shall ensure the temporary repairs are brought up to the permanent standard before they present an unacceptable risk to the safe and reliable operation of the signalling system. 21) Malicious damage or interference to vital signalling equipment or circuits must be reported promptly to the controlling officer. 22) Test equipment for measuring signalling system safety and reliability parameters is to be calibrated where required to verify acceptance/rejection criteria. Signalling maintenance shall be managed and performed to meet the relevant requirements of Australian Standards for Railway Safety Management AS4292 Part 1 General and interstate requirements and Part 4 Signaling and telecommunications equipment and systems. March 2005 Version 1.2 Australian Rail Track Corporation Page 9 of 9