STERN MOTOR FOOT CONTROL KIT For use with the Torqeedo 403 Ultralight

Similar documents
(PLEASE CONTACT YOUR LOCAL DEALER or CUSTOMER SERVICE FOR WARRANTY INFORMATION)

(PLEASE CONTACT YOUR LOCAL DEALER or CUSTOMER SERVICE FOR WARRANTY INFORMATION)

Ref Part Part # Qty Letter A Rudder Catcher B X 1/2 PH Bolts C Rudder Bracket

Rudder Kit Assembly Instructions for Quest 13

INSTALLING THE TRIDENT 11, 13 OR 15 RUDDER

RUDDER KIT INSTRUCTIONS

RUDDER KIT INSTRUCTIONS

INSTALLING THE PROWLER 13 RUDDER

INSTALLING YOUR CLC RUDDER

Complete Rudder installation guide

AdvancedTrak Rudder Kit AE4005. Assembly and Installation Instructions

Hobie Island Spinnaker Instructions

Assembly Instructions. -Cantilever Boat Lifts

Vanguard Sailboats 300 Highpoint Avenue Portsmouth, RI For the dealer nearest you call SAIL

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

Dinghy Racers Parts List

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

ASSEMBLY MANUAL HOBIE CATSY

MODEL / SINGLE and DUPLEX PULLEY SYSTEMS

MODEL CHEST PULLEY SYSTEM

Assembly Instructions Star Kayak Sails kit to a Hobie Mirage drive kayak.

Installation Instructions - Electric Aluminum Drive Systems for Arm Sets to 22 Electric Arm Systems , ,

PARTS - FORWARD. Kayaking + Fishing Parts & Accessories Hook HATCH SEAL "TRIM-LOC" (TOP MOLDED) 5 REQ

Installation Instructions - Electric Steel Drive Systems for Arm Sets to ,

SEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT

Kayaking Bob s Tandem Island SpraySkirt Kit Installation Instructions

PRO1030 Bi-Directional Assembly Replacement

VERSA BIKE RACK INSTRUCTIONS

TANK MATE INCLUDES: TOOLS REQUIRED: CONRADER VALVES 3/4 WRENCH **TUBING CUTTERS TEE PETCOCK TEE ASSEMBLY 8 FOOT NYLON TUBING

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

Table of content Introduction 5 1. Part 1. Assembly Tools needed for Assembly Glossary Hulls Mounting the beams 7

MODEL TRIPEX PULLEY SYSTEM

ULTIMATE 12 RUDDER INSTALLATION INSTRUCTIONS

Assembly instructions nortik scubi 2 Recreational kayak

Inuit Owners Manual. Inuit 13.5

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

CHAPTER 5 REWIND STARTERS

Santa Fe Cycles Assembly Guide Introduction

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

engineered products Foldable Topside Creeper Safety First VIDEO INSTRUCTIONS ARE AVAILABLE ON OUR WEBSITE AT:

To save this document, scroll up and select the download icon

Ladies Shopper Bike Assembly Manual 28C03

SEADUCER BOATS GAS SPORT HYDRO

A-FRAME RESIN IN & OUT FLIP UP LADDER

BackCountry ebikes 2019 MULE Assembly

Kari-Tek. Kari-Tek. Hydro Skeg Retro-Fitting Instructions. Instructions for retro-fitting of Hydro Skeg

Installation Instructions

3. Sail Kit. Table of Contents: Portland Pudgy Safety Dinghy: 3. Sail Kit

2012-June-12 SECOND DRAFT Hobie Getaway Spinnaker Installation Instructions

Rigging Manual. 1 Parts of the Hull. 2 Parts of the Sail. 3 Sunfish Mast Kit. 4 Bailer Installation. 5 Ratchet Block Installation

FDR CHRYSLER 16' CATAMARAN (MUSKETEER) The initial rigging of a sailboat is not difficult, but if the boat is strange

BALL STOP INSTALLTION GUIDE

VERTICAL SURFBOARD CARRIER READ ME! IMPORTANT WARNING!

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

Single and Triple Rain Barrel Setup

3190A NEO-ANGLE DOOR INSTALLATION INSTRUCTIONS. Series MODEL NO

No.5550 INTRUCTION MANUAL WARRANTY WARNING. Notice This is not a toy. Assembly and operating of this boat requires adult supervision.

CO V E R S TA R AU TO MAT I C S A F E T Y CO V E R INSTALLATION GUIDE

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Final Assembly Instructions Bikes with 16 Wheel Size

In each step, the needed parts are shown the number right below. Locate all parts for the step.

Installation Instructions - Steel 4 Spring Arm Kits , , , ,

Bladerider X8 Assembly Help Notes

Installation Instructions - Super Six Electric Arm Kits with Underbody Pivots , , ,

Thank you for purchasing the Hollander II Bike from Made.com

Beach Dolly with cradle & keel pad Assembly Instructions

Final Assembly Instructions Bikes with Threaded Headsets

TM D E A L E R C A T A L O G

EZ-Mount 4 Spring Enclosed System to 22 (Low & High Mount Applications) Installation Instructions

Sanibel Owners Manual

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS

PT 11 trouble-shooting and maintenance.

How To: Install a 1 Body Lift using Hockey Pucks A CFans Members Mod Project by grandmastrblastr

Fairlane & Meteor Instruction Package RC-114K. Rear Coilover Suspension Kit NOTE...

Installation and Training Manual

INSTALLATION INSTRUCTIONS A-Arm Guards, Rear Part Number: Application: Kawasaki Brute Force 750 4x4i

Page 1. Single Scull Car Rack Assembly and User s Manual " "

Bike Rack and Tire Carrier

Final Assembly Instructions Bikes with Quill Stems

How to install AEA s 10 meter meteorological tower

PART NUMBER: E361SXA200 DESCRIPTION: KAYAK CARRIER

1. Assembly Instructions.

SAVE THESE INSTRUCTIONS DEALER/INSTALLER: GIVE TO HOMEOWNER OCEAN BLUE ABOVE GROUND POOL LADDERS

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

GHC Remote Control Instructions manual

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

2. Note that the ropes from the rigging board are secured in the cam cleats of the jib fairleads.

400/488 Rotating Davit Installation Instructions

E-trike Li Assembly Guide

BPB26-1 AND SSPB26-1 PATIO BASE INSTALLATION INSTRUCTIONS

MALONER. Installation & Loading Instructions - Please Read Before Beginning. Step 1: Installing Carriers to Cross Bars

COASTAL IN-BOOM FURLING SYSTEM. Installation Manual


GENUINE CARGO NET INSTALLATION AND USER S INSTRUCTIONS

THUNDER INSTRUCTIONS A LMOST READY TO SAIL MODEL YACHT

Foos 300 Assembly Instructions

SASK-A-POLE OWNERS AND USERS MANUAL

OWNERS MANUAL. Foldable Topside Creeper Model ATD-8116F

Transcription:

STERN MOTOR FOOT CONTROL KIT For use with the Torqeedo 403 Ultralight The Wilderness Systems Foot Control Kit is designed to connect directly to a Torqeedo 403 Ultralight motor mounted on the stern of your kayak. This kit allows you to steer your kayak to the Left or to the Right using a sliding foot brace system, leaving your hands free to cast, operate the throttle or perform a variety of other tasks while out on the water. IMPORTANT: This kit is specifically designed to work with Wilderness Systems Sit-On-Top kayak models that are Rudder- Ready. This means that the poly guide tubing for the rudder cord has already been installed by the factory. If your kayak is NOT rudder-ready or does NOT have poly guide tubing already installed, please contact your local Wilderness Systems dealer or our Customer Service Department to determine which additional parts are needed to complete installation. Tools Required for Installation: #2 Philips head screwdriver (for all models) Scissors or Knife (for cutting Spectra cord) Drill with 5/16 drill bit (for Threshers & ATAK models only) 3/8 Box or open-end wrench (for installing backing hardware if needed)

INSTALLATION INSTRUCTIONS STEP 1: INSTALLING ALUMINUM FOOTBRACE EXTRUSIONS The hardware provided in this kit is intended to accommodate a variety of kayak model configurations. Not all hardware will be needed. Holes in extrusions are tapped/threaded to accept 1/4-20 screws. These holes may need to be drilled out to work on certain models. See specific instructions for Threshers and ATAK models below. Some SOT models have molded-in threaded inserts for attaching the footbraces while others rely on installing internal washers and nuts (depending on accessibility to the interior hull). Hardware for both scenarios is included. Some older models of the Wilderness Systems Ride have 10-32 threaded inserts rather than 1/4-20. Both screw sizes are provided but test thread the insert to identify correct screw size. Mounting holes on extruded aluminum slide rails should line up with mounting holes on kayak once footbraces have been removed. Be sure to confirm this before drilling any new holes. STEPS: 1. Remove existing footbraces from hull. 2. Confirm the appropriate hardware size or sizes needed for your kayak model and install metal extrusions. 3. If installing on ATAK or Thresher models, please follow model specific instructions directly below. Thresher and ATAK: 4. ATAK: Drill out threaded holes in aluminum extrusions with a 5/16 drill bit. Secure foot brace extrusions with a ¼-20 x 5/8 screw in each mounting hole. Tighten hardware securely to secure extrusions to hull.

5. Thresher: Drill out threaded holes in aluminum extrusions with a 5/16 drill bit. At insert locations closest to bow, secure extrusions with ¼-20 x 5/8 screws. At stern locations without inserts, use ¼-20 x 1 screws and secure on the interior of hull with ¼ Combination Washers and ¼-20 Lock Nuts provided. This can be done by using the center storage hatch as an access point. Tighten hardware securely to secure extrusions to hull. STEP 2: INSTALLING FOOTBRACES Some model designs will allow the foot brace runner to slide out of stern end of the extrusion (example: Ride 135). Test your boat by inserting one of the footbraces and then lifting the bow and to see if it slides out of the extrusion. If so, this can be prevented by installing a toothed washer onto a 10-32 x 7/8 Phillips truss head screw (provided). Insert screw & washer into recessed hole in center of each footbrace rail and tighten until snug. This will act as a brake to prevent the runner from sliding out of extrusion (see image at the end of Step 1).

STEPS: 1. Identify the raised stopper molded onto one end of each Keeper footbraces. 2. Slide footbrace rails (with pedals installed) into extrusions so that the stoppers are at front end or bow end of extrusions. STEP 3: INSTALLING SPECTRA CORD & CONNECTING STEERING Help from a friend may be needed on this step for longer kayaks A bowline knot is recommended for attaching the Spectra cord to the footbraces and the motor but there are many other knots that will work. STEPS: 1. Go ahead and tie Spectra Cord ends to footbraces first using a bowline knot. 2. Insert Spectra cord into the tube opening in cockpit area and feed it through. Continue pushing until end of cord emerges from tubing close to the motor assembly at the kayak rear/stern.

3. Attach the two clips through the circular mounting holes on the triangular steering bracket located on the motor. 4. Keeping motor secured in the centered position, tie one of the loose cord ends to its corresponding carabiner using a bowline knot and repeat on opposite side. NOTE: Attaching the carabiners first will allow you to make quick adjustments to ensure proper cord length without having to connect and disconnect the carabiners several times. 5. Once both cord ends are secured to the carabiners on the steering bracket, test the system by sliding one footbrace as far forward as possible. This should pull the steering cord forward as well, turning the motor assembly at the same time (for example: if sliding left footbrace forward, motor should be positioned to the left and vice versa). 6. Extra cord can be trimmed off but it s not a bad idea to leave a few inches of excess to allow adjustments later if needed. SYSTEM INSTALLATION COMPLETE