PRESS RELEASE San Joaquin Council of Governments

Similar documents
CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Chapter 4: Funding and Implementation

San Jose Transportation Policy

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Item No. 14 Town of Atherton

Draft North Industrial Area-Wide Traffic Plan

NJDOT Complete Streets Checklist

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Active Transportation Facility Glossary

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Non-Motorized Transportation 7-1

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Broad Street Bicycle Boulevard Design Guidelines

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Engineering - Bicycle and Pedestrian

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

ACTIVE TRANSPORTATION

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

Lynchburg District Update

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Perryville TOD and Greenway Plan

4. Mobility and Transportation Element. Page Bikes and Pedestrians

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Citywide Sidewalk and Crosswalk Programs

City of Birmingham Draft Multi-modal Transportation Plan

Active Transportation Access to Transit

Appendix 3 Roadway and Bike/Ped Design Standards

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Solana Beach Comprehensive Active Transportation Strategy (CATS)

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Chapter 13 ORANGE COVE

City of Jacksonville Mobility Fee Update

Omaha s Complete Streets Policy

St. Francis Drive through the City of Santa Fe Corridor Study

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

The DC Pedestrian Master Plan

5 CIRCULATION AND STREET DESIGN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Multi-Modal Traffic Analysis. Parisi and Associates

Safe Routes to School Action Plan Aberdeen, Idaho

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

CITY MANUALS AND STANDARDS REVIEW

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

DRAFT. Table of Contents. Background

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

9/22/2014 VIA . RE: Butano Apartments Pre App (PAMP )

What Is a Complete Street?

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Madison: 2017 Capital Budget Capital Improvement Plan

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

11/28/2016 VIA

Chapter 5 Future Transportation

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Castro Valley Municipal Advisory Council March 19, 2018

MASTER BICYCLE AND PEDESTRIAN PLAN

5. RUNNINGWAY GUIDELINES

Table #6 VISION CHARACTERISTICS

City of Davis East Covell Corridor Plan

10/30/2012 VIA

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Duwamish Way-finding and CTR Report

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

Pedestrian Project List and Prioritization

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

RE: Park Plaza Walgreens (P12-016)

Cross Street Corridor Non-Motorized Enhancement Project Project Description

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

Chapter 3: Multi-Modal Circulation and Streetscapes

Polk Streetscape Project

Existing Pedestrian Conditions. PSAC February 8, 2011

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CITY OF LANCASTER PROPOSED NEW PROJECTS

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

9/21/2016 VIA . RE: The Knot (DR16-270)

Bicycle Boulevards and Neighborhood Greenways

Transcription:

PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian, & Safe Routes to School Program and Smart Growth Incentive Program Funds STOCKTON At their February 22nd meeting, the SJCOG Board awarded a total of $19.63 million of competitive funding from the Measure K Bicycle, Pedestrian, and Safe Routes to School Program and the Measure K Smart Growth Incentive Program to 21 projects and plans. The Measure K Bicycle, Pedestrian, and Safe Routes to School Program provides funding to help expand and enhance pedestrian and bicycle safety and facilities within San Joaquin County. The Measure K Smart Growth Incentive program provides funding for infrastructure enhancements that will assist local agencies to better integrate transportation and land use. These funds are used to support infill development, neighborhood revitalization, and downtown improvements. SJCOG received far more applications than it was able to fund. A total of 40 applications were received requesting more than $39 million in funding. Measure K helps provide vital transportation funding for our region, said San Joaquin County Supervisor and SJCOG Chair Kathy Miller. These important projects will help meet the mobility needs for people of all ages and abilities throughout San Joaquin County by improving and enhancing the existing bicycle and pedestrian network and providing safe routes to schools. These projects will help improve safety and support infill development and neighborhood revitalization throughout our region. San Joaquin Council of Governments is a joint powers authority comprised of the County of San Joaquin and the cities of Stockton, Lodi, Manteca, Tracy, Ripon, Escalon, and Lathrop. The agency serves as the federally-designated metropolitan planning organization, the state-designated regional transportation planning agency, the implementing agency for the habitat conservation program, and the local transportation authority (overseeing Measure K, the local half-cent transportation sales tax) for the San Joaquin region. For more information, visit sjcog.org, follow SJCOG on Facebook and Twitter, or call 209-235-0600. ###

2017-2021 Measure K Bicycle, Pedestrian, and Safe Routes to School and Measure K Smart Growth Incentive Program Adopted Projects Applicant Project Name Total Project Total Measure K Cost Awarded Escalon First Street Improvements $730,000 $500,000 Escalon Rectangular Rapid Flashing Beacons: 3 Locations $130,000 $130,000 Lathrop Warren Avenue Safe Routes to School $499,000 $449,100 Lodi Church Street Road Diet Project $1,622,150 $1,459,935 Manteca Yosemite Avenue Pavement Improvement Project - Bike Lanes $240,000 $144,000 Manteca Union Interchange - Multi-use Path $2,400,000 $1,440,000 Manteca Main Street Pavement Improvement Project - Bike Lanes $350,000 $210,000 Manteca Non-motorized Transportation Plan $300,000 $240,000 Ripon Doak Boulevard Shared-Use Path $385,165 $385,165 Ripon Lower Stanislaus River Multi-Use Trail $498,528 $444,979 RTD Stockton Transit Bike Share Study $150,000 $120,000 SJRRC East Channel Street Streetscape and Connectivity Project $5,023,410 $2,000,000 Stockton Miner Avenue Complete Streets Median Improvements $13,405,000 $2,000,000 Stockton Safe Routes to School Priority Safety Projects $1,547,000 $1,242,000 Stockton California Street Road Diet Phase 1 $2,200,000 $2,000,000 Stockton South Airport Way Separated Bikeway $2,245,000 $2,020,000 Stockton Main Street Complete Streets $770,000 $700,000 Stockton Central Stockton Road Diet and Striping Connections Construction $1,240,563 $1,116,507 Stockton Safe Routes to School Sidewalk Network Completion Project $2,445,000 $2,200,000 Stockton Pacific Avenue Complete Streets Corridor Study $250,000 $169,733 Tracy Tracy Boulevard Sidewalk $731,756 $658,581 TOTAL $37,162,572 $19,630,000 San Joaquin Council of Governments Page 1 of 6 2/23/2018

2.76 Miles of 117 Crosswalks and Class I Bike Paths 12 Flashing Beacons 9.47 Miles of Class II Bike Lanes 218 Street Trees 1.31 Miles of 4.32 Miles of Class III Bike Routes Sidewalks 5.75 Miles of Class IV Separated Bikeways San Joaquin Council of Governments Page 2 of 6 4 Plans and Studies 2/23/2018

City of Escalon First Street Improvements Measure K Project Descriptions This project will repair damaged sidewalks, close sidewalk gaps, install high visibility crosswalks, plant landscaping to provide a buffer strip between pedestrians and traffic, and improve ADA access across the BNSF railroad tracks on First St between McHenry Ave and Main St in Escalon. City of Escalon Rectangular Rapid Flashing Beacons: 3 Locations This project will install three Rapid Rectangular Flashing Beacons (RRFB) in conjunction with high visibility crosswalk striping to increase safety and connectivity for pedestrians at crosswalks in Escalon on Escalon Road between Arthur Road and Miller Ave, California St (State Route 120) at Sacramento St, and Jackson Ave (State Route 120) at Elizabeth Ave in Escalon. City of Lathrop Warren Avenue Safe Routes to School This project will implement Safe Routes to School improvements including new curb and gutter and ADA improvements on sidewalks, driveways and curb ramps along Warren Avenue in Lathrop in order to provide pedestrian connectivity through to Joseph Widmer Jr. Elementary School. The project includes a parking, curb and gutter, and sidewalks on both sides of the road. The project will close the sidewalk gap between Reverend Maurice Cotton Drive and Jasper Street. City of Lodi Church Street Road Diet Project The Church Street Road Diet will install Class II bike lanes, enhance pedestrian facilities and intersection crossings by reducing the existing traveled four-lanes to two-lanes on Church Street between Lodi Avenue and Lockeford Street in Lodi. Improvements will include replacement of damaged sidewalks, installation of accessible curb ramps with updated pedestrian push buttons, traffic signal improvements including separated left turn phases and pedestrians countdown heads, enhanced crosswalks and traffic signal video detection for bicyclists. City of Manteca Yosemite Avenue Pavement Improvement Project - Bike Lanes This project is located in the City of Manteca, on Yosemite Avenue between Main Street and Cottage Avenue. This area is an urban area with a high traffic volume and limited bicycle and pedestrian improvements. The project will provide bicyclists with a Class II bike lane that includes distinctive green lane coloring and pedestrian crossing improvements at various intersections. City of Manteca Union Interchange Multi-use Path The project is located in the City of Manteca, on Union Road at the State Route 120 Interchange. As part of the modification and upgrade the existing interchange into the first Divergent Diamond Interchange in California, this project will construct bicycle and pedestrian improvements consisting of access improvements, Class II Bike Lanes, and a grade separated Class I multiuse path with under crossings at the East bound on ramp and the West bound off ramp. San Joaquin Council of Governments Page 3 of 6 2/23/2018

City of Manteca Yosemite Avenue Pavement Improvement Project - Bike Lanes This project is located in the City of Manteca, on Main Street between Yosemite Avenue and Atherton Drive. Main Street lacks adequate bicycle and pedestrian crossing facilities. Main Street also lacks bicycle and pedestrian crossing improvements at the State Route 120 overpass creating a barrier between residents and amenities located on either side of State Route 120. The construction of this project will provide bicyclists with a clearly marked Class II bike lane that includes distinctive green lane coloring. City of Manteca Non-Motorized Transportation Plan The City will update the adopted 2003 Manteca Bike Master Plan to include all forms of non-motorized transportation by reviewing the existing transportation infrastructure, identifying deficiencies, developing and prioritizing potential projects, holding public meetings to identify community needs, and compiling all findings into a single plan that can be used to guide development and procure project funding through a variety of State and Federal funding sources. City of Ripon Doak Boulevard Shared-Use Path The proposed project will close gaps and provide connectivity to address deficiency in the existing path which directly serves the disadvantaged community. The project will fill two gaps along the Doak Boulevard corridor that runs the width of the City providing 1.6 miles of shared-use path. The infill improvements will provide an accessible path, remove barriers along Doak Boulevard and provide connectivity to existing paths within the City. City of Ripon Lower Stanislaus River Multi-Use Trail This project will construct 1.8 miles of Class I trail to replace the existing dirt path on the west and east ends of the Lower Stanislaus River trail, closing trail gaps, and removing active transportation barriers which will result in an interconnected trail system within the City and regional trails. The project area extends the Lower Stanislaus River Trail, on the west end by connecting South Jack Tone Road to the Stanislaus River and the east end from Stockton Avenue to Parallel Road. This project expands the existing active transportation network, fills in gaps and links the disadvantaged neighborhoods in the southern portion of the City to parks, schools, recreational areas and connects existing trails on the east and west side of State Route 99 and the Union Pacific Railroad. San Joaquin Regional Transit District (RTD) Stockton Transit Bike Share Study This plan will determine the feasibility, potential design, and requirements to implement a bike share program. The plan will evaluate implementation of bike share programs by other agencies, assess the applicability of a bike share program within Stockton, and estimate the total cost to implement and maintain a bike share program. The project benefits include increased connectivity, a more seamless system of public transportation, promotion of active transportation options, and the enhancement of the existing bicycle network. The project will be located within the San Joaquin County throughout RTD's system of public transportation. This bike share program would be implemented within RTD's service area and surrounding areas within biking distance. San Joaquin Council of Governments Page 4 of 6 2/23/2018

San Joaquin Regional Rail Commission East Channel Street Streetscape and Connectivity Project The East Channel Street Streetscape and Connectivity Project addresses extremely substandard street conditions along East Channel Street, which reduces walkability and connectivity. The project will strengthen pedestrian connections and amenities along the street, with the primary goal of better connecting Cabral Station, the Downtown Transit Center, and the Waterfront/Entertainments Districts in Stockton. With an emphasis on strengthening active transportation connections through widened sidewalks/bulb-outs, ADA infrastructure, high visibility crosswalks, Class III Bike Routes, pedestrian-scale lighting, and street trees, this project will encourage multi-modal trips while furthering revitalization efforts in Downtown Stockton. City of Stockton Miner Avenue Complete Streets Median Improvements The Miner Avenue Complete Streets Project is a 10-block conversion of Miner Avenue, from Center Street to Aurora Street, from four lanes to two lanes (one lane in each direction), adding Class II bicycle lanes, landscaped medians, parklets, and improving deficient sidewalks to improve safety of pedestrians and bicyclists. Measure K funding will be used specifically for the landscaped median work, associated utility relocations, as well as construction of two parklets as part of the overall project. City of Stockton Safe Routes to School Priority Safety Projects This project will construct crossing improvements, including new raised medians, curb and gutter, curb ramps and high visibility crosswalk signing and striping to improve safety and accessibility for pedestrians at locations throughout the City of Stockton. The project will also restripe roadways to provide new bicycle facilities along routes to schools as identified in the City of Stockton Safe Routes to School (SRTS) Plan. City of Stockton California Street Road Diet Phase 1. The California Street Road Diet extends from Alpine Avenue to El Dorado Street in Stockton. This corridor is intended to function as Stockton s bicycle spine that would connect North and Central Stockton through the downtown with South Stockton. This north/south facility would connect seven east/west backbone facilities throughout Stockton. This project would include final design for the entire project (4.3 miles), as well as construction funding for Phase 1 from Alpine Avenue to Miner Avenue (1.8 miles). Class IV separated bikeways would be implemented between Alpine Avenue and Hazelton Avenue, Class II buffered bicycle lanes would be implemented between Hazelton Avenue and Dr. Martin Luther King Jr. Boulevard, and Class II bicycle lanes would be striped between Dr. Martin Luther King Jr. Blvd and El Dorado St. City of Stockton South Airport Way Separated Bikeway South Airport Way in south Stockton has four lanes of traffic and carries substantial truck traffic The project would install separated bike lanes with vertical delineator posts along South Airport Way between Martin Luther King Jr. Blvd and Performance Drive to provide low-stress bicycle access between southeast Stockton and downtown. The proposed improvements will also close gaps between existing sidewalks along South Airport Way and improve access to multiple schools, the San Joaquin County Fairgrounds, Williams Brotherhood Park, and provide connectivity between residences and transit, employment and commercial activity centers. San Joaquin Council of Governments Page 5 of 6 2/23/2018

City of Stockton - Main Street Complete Streets Main Street in eastern Stockton consists of four vehicle lanes without bicycle lanes, poor lighting for pedestrians, and failed sidewalks with inaccessible ramps. The project will reduce sections of four-lane road will be reduced to two vehicle lanes with buffered bicycle lanes between Aurora Street and the State Route 99 overcrossing. Areas of one-way road will be reduced by one vehicle lane in order to provide a bicycle lane. The project will also install street lighting, repair failed sidewalks, upgrade curb ramps for ADA compliance and remove conflict points of driveways. Measure K funding will be used to complete the preliminary engineering and environmental phase of this project. City of Stockton Central Stockton Road Diet and Striping Connections Construction The project is located in Central Stockton, and runs along Fremont Street, Madison Street, Acacia Street, and Monte Diablo Avenue to create an east/west bicycle connection for five north/south backbone bicycles facilities in central Stockton. The project will construct east/west bicycle facilities on Monte Diablo Ave and Acacia Street from Louis Park to California Street, and on Fremont Street from Baker Street to El Dorado Street. The Madison Street Bicycle Lanes would serve as a north/south connector between the project s east/west bicycle facilities, and would extend from Harding Way to Fremont Street. City of Stockton Safe Routes to School Sidewalk Network Completion Project This project construct concrete sidewalks, including new curb and gutter, curb ramps and high visibility crosswalks at existing crossings to close gaps in the existing sidewalk network and improve safety and connectivity for pedestrians along priority routes to schools as identified in the City of Stockton Safe Routes to School (SRTS) Plan. Improvements will be constructed at seven locations at Van Buren Elementary School, John Adams Elementary School, and Great Valley Elementary School. City of Stockton Pacific Avenue Complete Streets Corridor Study The Pacific Avenue Complete Streets Corridor Study will study the feasibility of separated or enhanced bikeways from Lower Sacramento Road to Harding Way. The Pacific Avenue corridor is one of four north/south facilities in the backbone ( low-stress ) network from the Bicycle Master Plan and. Pacific Avenue currently has high levels of bicycle ridership, but also experiences a high number of bicycle-related collisions. The cross-section varies throughout the corridor, ranging from a six-lane arterial with no parking to a three-lane facility with parking. The Study covers the full length of Pacific Avenue from Harding Way north to Lower Sacramento Road. The corridor is a key north/south route linking central and north Stockton. Pacific Avenue provides direct connection to University of the Pacific, San Joaquin Delta College, Calaveras River Path, the Miracle Mile District, and numerous other destinations. City of Tracy Tracy Boulevard Sidewalk Tracy Boulevard is a four-lane arterial with frontage improvements and a landscaped median island. A segment of the road north and south of Gandy Dancer Drive does not have sidewalk on the east side. The project will construct concrete sidewalk on the east side of the street to close the gap of missing sidewalk between south of Valpico Road and Whispering Wind Drive to help improve pedestrian access to the Tracy ACE Station San Joaquin Council of Governments Page 6 of 6 2/23/2018