STREETS ENTRY ROADS E1 E2 RING ROAD R1 R2 R3 R4 R5 R6 R7 CIVIC STREETS C2 C3 B-DOUBLE ROADS B1 LOCAL STREETS LANEWAY LA1 ISSUE

Similar documents
CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

5 CIRCULATION AND STREET DESIGN

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:

Transit boulevard: A new road type for Sydney s Growth Centres

PUBLIC REALM MASTER PLAN

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) Building Frontages: A: Stair Applications. Geometry (Accessed from the Sidewalk) Refer to A:

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Frome Street Bicycle Route

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Part B Design Guidance / Principles _

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

10 SHERFORD Town Code

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

STREETSCAPE CONCEPTS

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Liveable Neighbourhoods Design Code and Policy

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

TRANSPORT AND MOVEMENT

McLean Main Street Public Forum Follow-up

Classification Criteria

NEW TOWN RETAIL PRECINCT UPGRADE

Anniedale- Tynehead NCP Best Practices in Transportation Planning Summary

Tonight is for you. Learn everything you can. Share all your ideas.

Strategy for Walking & Cycling Action Plan

S T A T I O N A R E A P L A N

Broad Street Bicycle Boulevard Design Guidelines

DMURS - Practical Implications

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Minta Farm Berwick S96A Transport Impact Assessment

PLAN 20 PUBLIC TRANSPORT NETWORK

Complete Streets. Designing Streets for Everyone. Sarnia

Christchurch 3 years on: - growing resilience

1.3 Pedestrian Environments

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Rethinking Transportation

Dowling/Beaty Cycling Route

Section 7 Complete Green Street Guidelines DRAFT

Miami Health District

(HIGHWAY GEOMETRIC DESIGN -1)

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

Road Description Max. No. of Design Speed C'way and Description and Comments Type Dwellings served footway details

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

guide to a phased approach TRIPP

Complete Streets for Niagara A working method to visualize the creation of a complete street June 20th, 2013

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

NJDOT Complete Streets Checklist

Green Streets and Urban Greenways

Active Transportation Facility Glossary

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

PROJECT KEY TYPICAL SECTION 1 =60

NEIGHBOURHOOD DEVELOPMENT PLAN: Project update. Case: HSR Layout, Bangalore. August,2013

MARTIN LUTHER KING JR. WAY

DEFINING THE STREETSCAPE DRAFT

Sponsored by Mrs. Gina Gregory and Mr. Reggie Copeland.

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

Figure 5-1 Complete Street Zones. Roadside. May include frontage, pedestrian throughway, furnishings and curbside areas.

Daleston Masterplan Traffic & Transport Assessment

WELCOME. City of Eden Prairie West 70 th Street

MILTON ROAD LLF PROJECT UPDATE

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Completing the Street: Denning Drive

Omaha s Complete Streets Policy

CONTENTS SECTION 4 TRANSPORT

Living Streets Policy

1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street

Niagara Region Transportation Master Plan. Niagara Region Complete Streets Design Guidelines

Lawrence Avenue Streetscape Concepts August 30, 2011

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

Welcome. If you have any questions or comments on the project, please contact:

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Streetscape: Core Shopping District

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

City of Davis East Covell Corridor Plan

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Street Design Guidelines for Greater Mumbai

A Guide to Great Streets: The Basics. September 25, 2009

PROPOSED RESIDENTIAL SUBDIVISION

TRANSPORTATION COMMISSION Agenda Staff Report

Community Task Force November 15, 2017

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

Governance and Priorities Committee Report For the July 2, 2015 Meeting

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Report. Typical Sections. City of Middleton, WI

Toronto Complete Streets Guidelines

See Figure 38, Existing Nonmotorized Connections.

Toronto Complete Streets Guidelines

Why invest in the 1 Street S.W. Corridor?

Major Bike Routes 102 Avenue Workshop April 21, 2015

Transcription:

STREETS ETRY ROADS E1 E2 RIG ROAD R1 R2 R3 L3 L1 R4 R5 R6 R7 CIVIC STREETS R7 C1 R6 C4 L2 C2 C3 E1 LA1 LA1 R1 E2 C4 B-DOUBLE ROADS B1 L2 LA1 R5 C3 C1 C2 R2 B1 LOCAL STREETS L1 L2 L3 LAEWAY LA1 R3 R4 31 PUBLIC DOMAI MAUAL STREETS

ETRY ROAD- ALAWOOA AVEUE E1 Provide a strong entry corridor into the site that caters equally for vehicles, pedestrians and cyclists. Encourage an active streetscape that engages with the built form and vice versa. Wide footpaths on the northern side linking the train station to the Main Assembly Building and the Town Square. Car parking on the southern side to service retail premises. Wide verges with amenities to encourage social interaction. Dedicated off-road cycle lanes connecting the Main Assembly Building and Town Square with Alawoona Avenue beyond the site boundary and broader community cycle networks. Integrate wayfinding + public art. Underground existing high voltage powerlines PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 SEATIG SEA01 EDGIG EDG02 / EDG03 KERBS KER01 SERVICE SER01 WALLS WAL01/WAL02 CYCLE RACKS CYR01 TREE GRATES TRG01 DRIKIG FOUTAI DRF01 BOLLARDS BOL02 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 PLATIG PLT01 PUBLIC LIGHTIG LIG01 / LIG03 WATER/IRRIGATIO WAT01 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 LIEAR OPE SPACE LOP05 LAD USE RET 4.5 m 2.3 m 1.84 m 2.4 m 1.5 m 1.7 m 2.8 m 3.0 m 23.64 m ote: kerb width=0.14m 32 PUBLIC DOMAI MAUAL STREETS

ETRY ROAD- SOUTH ROAD LIK E2 Existing alignment is maintained. Dedicated dual off-road cycle lanes on the northern verge. Wide footpaths connecting to South Road and associated public transport. 5 lanes of traffic required at the South Road intersection. This will transition to two lanes (one in each direction) at the intersection with the Ring Road. Wide verges with clusters of large trees. Clean central median with feature lighting columns Integrate wayfinding + public art. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 / SUR05 SEATIG SEA01 EDGIG EDG01 / EDG02 KERBS KER01 SERVICE SER01 WALLS WAL01 / WAL02 CYCLE RACKS CYR01 TREE GRATES TRG01 TACTILE IDICATORS TAC01 TREES TRE02 / TRE03 PLATIG PLT01 PUBLIC LIGHTIG LIG02 / LIG03 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 GATEWAY GAT01 LAD USE BUS / HVI 2.0 m 2.14 m 3.5 m 2.0 m 3.5 m 3.5 m 2.0 m 3.5 m.84 1.8 m 31.38 m / Rumble Strip ote: kerb width=0.14m 33 PUBLIC DOMAI MAUAL STREETS

RIG ROAD- EAST (ORTH OF ETRY ROAD E2) R1 Dedicated off-road cycle lanes encouraging use of the northern Ring Road as the major east-west cycle route. Shared-use path to the western verge as part of a continuous loop encouraging use of the Ring Road as the major circulation system. Practical verge widths to enable access to sites by vehicles including trucks and minimise conflict with pedestrians and cyclists. Cater for large vehicles including semi-trailers. Tree planting reinforces the ring road hierarchy and provides shade for pedestrian and the onstreet car parking. Incorporates rain gardens to treat stormwater runoff. Car parking on the eastern side to service commercial office frontage premises. Integrate wayfinding. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 SEATIG SEA01 KERBS KER01 SERVICE SER01 CYCLE RACKS CYR01 TREE GRATES TRG01 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 PLATIG PLT01 PUBLIC LIGHTIG LIG01 WATER/IRRIGATIO WAT01 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 PLAZA PLZ01 LAD USE BUS / HVI 2.8 m 1.5 m 1.84 m 2.4 m 1.5 m 1.7 m 1.6 m 19.94 m ote: kerb width=0.14m 34 PUBLIC DOMAI MAUAL STREETS

RIG ROAD- EAST (SOUTH OF ETRY ROAD E2) R2 Shared-use path to the western verge as part of a continuous loop encouraging use of the Ring Road as the major circulation system. Practical verge widths to enable access to sites by vehicles including trucks and minimise conflict with pedestrians and cyclists. Tree planting reinforces the ring road hierarchy and provides shade for pedestrians and cyclists. Cater for large vehicles, including B-Double trucks.. Incorporates rain gardens to treat stormwater runoff. Car parking on the eastern side to service commercial office frontage premises. Integrate wayfinding. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 SEATIG SEA01 KERBS KER01 SERVICE SER01 CYCLE RACKS CYR01 TREE GRATES TRG01 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 PLATIG PLT01 PUBLIC LIGHTIG LIG01 WATER/IRRIGATIO WAT01 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 PLAZA PLZ01 LAD USE HVI 3.0 m 1.5 m 3.5 m 3.5 m 2.4 m 1.5 m 1.8 m 17.2 m ote: kerb width=0.14m 35 PUBLIC DOMAI MAUAL STREETS

RIG ROAD- EAST (ADJACET SIEC) R3 Shared-use path to the western verge as part of a continuous loop encouraging use of the Ring Road as the major circulation system. Tree planting reinforces the ring road hierarchy and provides shade for pedestrians and cyclists. Cater for large vehicles, including semitrailers. Incorporates rain gardens to treat stormwater runoff. Feature retaining wall to the eastern edge. Integrate wayfinding. PAVIG + SURFACES SUR01 / SUR02 / SUR03 EDGIG EDG02 KERBS KER01 SERVICE SER01 WALLS WAL02 TREE GRATES TRG01 TREES TRE01 / TRE02 PLATIG PLT01 PUBLIC LIGHTIG LIG01 / LIG03 WATER/IRRIGATIO WAT01 PERIMETER PER01 LAD USE EDU 2.5 m 1.5 m 1.5 m 1.5 m 13.6 m ote: kerb width=0.14m 36 PUBLIC DOMAI MAUAL STREETS

RIG ROAD- SOUTH R4 Shared-use path to the northern verge as part of a continuous loop encouraging use of the Ring Road as the major circulation system. Wide footpath to the southern verge to cater for pedestrians coming to and from the adjacent car park. Provide a dedicated pedestrian crossing linking the car park to the southern plaza. Tree planting reinforces the ring road hierarchy and provides shade for pedestrians and cyclists. Cater for large vehicles, including semi-trailers. Incorporates rain gardens to treat stormwater runoff. Integrate wayfinding. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 SEATIG SEA01 KERBS KER01 SERVICE SER01 CYCLE RACKS CYR01 TREE GRATES TRG01 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 PLATIG PLT01 PUBLIC LIGHTIG LIG01 WATER/IRRIGATIO WAT01 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 PLAZA PLZ03 CAR PARK CPK1 PERIMETER PER1 LAD USE EDU 3.0 m 1.5 m 1.5 m 2.5 m 15.1 m ote: kerb width=0.14m 37 PUBLIC DOMAI MAUAL STREETS

RIG ROAD- WEST (SOUTH OF ALAWOOA AVE) R5 Shared-use path to the eastern verge as part of a continuous loop encouraging use of the Ring Road as the major circulation system. Wide footpath on the western side to encourage social interaction and provide a strong connection between the Alawoona Avenue precinct and the residential component of the development further north. Car parking on the west to service tenancies and retail near the Alawoona Avenue intersection. Tree planting reinforces the ring road hierarchy and provides shade for pedestrians and cyclists. Cater for large vehicles, including semi-trailers. Integrate wayfinding. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 SEATIG SEA01 KERBS KER01 SERVICE SER01 CYCLE RACKS CYR01 TREE GRATES TRG01 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 PLATIG PLT01 PUBLIC LIGHTIG LIG01 WATER/IRRIGATIO WAT01 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 LAD USE HVI 3.0 m 1.5 m 2.4 m 1.5 m 3.0 m 18.0 m ote: kerb width=0.14m 38 PUBLIC DOMAI MAUAL STREETS

RIG ROAD- WEST (ORTH OF ALAWOOA) R6 Dedicated off-road cycle lanes encouraging use of the northern Ring Road as the major east-west cycle route. Shared-use path to the eastern verge as part of a continuous loop encouraging use of the Ring Road as the major circulation system. Wide western verge to encourage social interaction and provide a strong connection between the Alawoona Avenue precinct and the residential precinct. Double row of trees on the western verge for increased amenity and increased separation from the residential precinct. Car parking on the west to service tenancies and retail near the Alawoona Avenue intersection. Cater for large vehicles including semi-trailers. Large tree planting. Integrate wayfinding and public art. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 / SUR05 SEATIG SEA01 EDGIG EDG01 / EDG02 KERBS KER01 SERVICE SER01 WALLS WAL01 / WAL02 CYCLE RACKS CYR01 TREE GRATES TRG01 BOLLARDS BOL02 FECIG + BARRIERS FE02 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 PLATIG PLT01 PUBLIC LIGHTIG LIG01 / LIG02 / LIG03 WATER/IRRIGATIO WAT01 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 PLAZA PLZ2 LIEAR OPE SPACE LOP6 LAD USE EDU / RES / RET / MU / BUS 1.6 m 1.2 m 1.7 m 1.5 m 2.4 m 1.84 m 1.5 m 2.8 m 21.14 m ote: kerb width=0.14m 39 PUBLIC DOMAI MAUAL STREETS

RIG ROAD- ORTH R7 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 Dedicated off-road cycle lanes encouraging use of the northern Ring Road as the major east-west cycle route. Shared-use path to the southern verge as part of a continuous loop encouraging use of the Ring Road as the major circulation system. Wide southern verge including seating and furniture to support an active streetscape, in particular, for students of Flinders University. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 SEATIG SEA01 EDGIG EDG02 / EDG03 KERBS KER01 SERVICE SER01 WALLS WAL01 / WAL02 CYCLE RACKS CYR01 TREE GRATES TRG01 DRIKIG FOUTAI DRF01 BOLLARDS BOL01 / BOL02 Provide a strong connection between the MAB north precinct and the residential and mixed use area. Tree planting reinforces the ring road hierarchy and provides shade for pedestrians and cyclists. Rain gardens to treat stormwater runoff. Cater for large vehicles including semi-trailers. Car parking on the northern side to service HVI premises. Integrate wayfinding and public art. TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 / TRE03 PLATIG PLT01 PUBLIC LIGHTIG LIG01 / LIG03 WATER/IRRIGATIO WAT01 LIEAR OPE SPACE LOP3 LAD USE EDU / RES / HVI 2.5 m 1.84 m 2.4 m 1.5 m 1.7 m 1.6 m 21.44 m ote: kerb width=0.14m 40 PUBLIC DOMAI MAUAL STREETS

CIVIC STREET- MAB EAST STREET C1 Provide an ample movement corridor for pedestrians and cyclists whilst accomodating vehicular access. Provide an active interface with the MAB that is appropriate to its scale. Provide a forecourt and entry legibility to the MAB. Shared-use path to the western verge to provide generous access to the MAB and connect to the Ring Road loop. Rain gardens to treat stormwater runoff. Loading bays, drop-off and potential Go-Get cars to service the MAB. Car parking to the east to service tenancies. Amenities including seating, cycle racks and large street trees. Focus street for public art and wayfinding. Provide dedicated pedestrian crossing between PLZ1 and the MAB. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 SEATIG SEA01 EDGIG EDG02 / EDG03 KERBS KER01 SERVICE SER01 WALLS WAL01 / WAL02 CYCLE RACKS CYR01 TREE GRATES TRG01 DRIKIG FOUTAI DRF01 BOLLARDS BOL01 / BOL02 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 / TRE03 PLATIG PLT01 PUBLIC LIGHTIG LIG01 / LIG03 WATER/IRRIGATIO WAT01 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 LIEAR OPE SPACE LOP2 TOW SQUARE TW1 PLAZA PLZ1 LAD USE EDU / HVI / RET / MU / BUS 3.0 m 3.5 m 3.5 m 3.0 m 22.3 m 3.0 m 2.4 m 1.5 m 2.4 m ote: kerb width=0.14m 41 PUBLIC DOMAI MAUAL STREETS

CIVIC STREET C2 Allow views to the MAB and connect to the entry opposite the western end of the street. Tree planting to provide structure and shade for pedestrians and parked cars. s to both sides to connect the Ring Road to the MAB. Car parking on both sides to service tenancies. Rain gardens to treat stormwater runoff. Integrate wayfinding and public art. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 SEATIG SEA01 EDGIG EDG02 KERBS KER01 SERVICE SER01 CYCLE RACKS CYR01 TREE GRATES TRG01 BOLLARDS BOL02 TACTILE IDICATORS TAC01 TREES TRE02 PUBLIC LIGHTIG LIG01 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 LAD USE HVI 1.8 m 1.5 m 2.1 m 3.0 m 3.0 m 2.1 m 1.5 m 1.8 m 16.8 m ote: kerb width=0.14m 42 PUBLIC DOMAI MAUAL STREETS

CIVIC STREET- SIEC LIK C3 Provide a pedestrian and cycle link from the Greenway and train station. Amenities including seating and street trees. Encourage active frontages to enliven the streetscape. Provide a safe pedestrain crossing at the intersection with the Ring Road. Incorporate wayfinding and public art. PAVIG + SURFACES SUR01 / SUR02 / SUR04 SEATIG SEA01 EDGIG EDG01 / EDG02 SERVICE SER01 CYCLE RACKS CYR01 TREE GRATES TRG01 BOLLARDS BOL02 TACTILE IDICATORS TAC01 TREES TRE02 / TRE03 PLATIG PLT01 PUBLIC LIGHTIG LIG02 / LIG03 WATER/IRRIGATIO WAT01 / WAT02 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 LIEAR OPE SPACE LOP4 LAD USE HVI min 2.5 m (East of Ring Road) 1.5 m min 2.0 m ote: kerb width=0.14m 12.6 m 43 PUBLIC DOMAI MAUAL STREETS

CIVIC STREET- MAB SERVICE ACCESS WAY C4 Provide access to the loading docks on the western edge of the MAB and allow for service access to the electrical sub-station. Provide vehicle access to the retail car park in the MAB. Provide footpaths to both sides. Tree planting to provide shade. PAVIG + SURFACES SUR01 / SUR03 EDGIG EDG01 KERBS KER01 SERVICE SER01 WALLS WAL01 / WAL02 CYCLE RACKS CYR01 TREE GRATES TRG01 BOLLARDS BOL02 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 PUBLIC LIGHTIG LIG01 / LIG02 LAD USE EDU / HVI / RET min 1.5 m 11.1 m 1.5 m min 1.5 m ote: kerb width=0.14m 44 PUBLIC DOMAI MAUAL STREETS

B-DOUBLE ROAD B1 Accommodate B-Double trucks. Practical verge widths to enable access to sites by vehicles including trucks and minimise conflict with pedestrians. Tree planting provides shade for pedestrians. Incorporates rain gardens to treat stormwater runoff. Car parking on the eastern side to service commercial office and High Value Industry frontage premises. Integrate wayfinding. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 SEATIG SEA01 KERBS KER01 SERVICE SER01 CYCLE RACKS CYR01 TREE GRATES TRG01 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 PLATIG PLT01 PUBLIC LIGHTIG LIG01 WATER/IRRIGATIO WAT01 LIEAR OPE SPACE LOP1 LAD USE HVI / BUS 1.5 m 1.8 m 1.5 m 3.5 m 17.5 m 3.5 m 2.4 m 1.5 m 1.8 m ote: kerb width=0.14m 45 PUBLIC DOMAI MAUAL STREETS

LOCAL STREET- RESIDETIAL LIK ROAD L1 Provide a strong entry corridor into the site that accommodates a potential future link to the existing neighbourhood to the north. provide a clear route to the MAB. Encourage an active streetscape that engages with the built form and vice versa. Integrate with the open space link to the west (LOP7). Car parking on the western side adjacent open space. Large tree planting to provide structure and shade for pedestrians and parked cars. Integrate wayfinding and public art. PAVIG + SURFACES SUR01 / SUR02 / SUR03 / SUR04 / SUR05 SEATIG SEA01 EDGIG EDG02 KERBS KER01 SERVICE SER01 WALLS WAL02 TREE GRATES TRG01 BOLLARDS BOL02 FECIG + BARRIERS FE02 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 / TRE03 PLATIG PLT01 / PLT02 PUBLIC LIGHTIG LIG01 / LIG02 / LIG03 WATER/IRRIGATIO WAT01 / WAT02 SIGAGE + WAYFIDIG SWF01 PUBLIC ART ART01 LIEAR OPE SPACE LOP7 LAD USE HVI / RES 1.8 m 1.5 m 2.4 m 1.5 m 1.8 m 15.6 m ote: kerb width=0.14m 46 PUBLIC DOMAI MAUAL STREETS

LOCAL STREET L2 Provide minimum lane widths to encourage traffic calming and a corridor appropriate in scale to the mixed use density in residential areas. Large tree planting to provide structure and shade for pedestrians and parked cars. s to both sides. Car parking on both sides to service allotments. Integrate with the Greenway to the west (GR1) and the open space to the north (LOP8). Integrate wayfinding. PAVIG + SURFACES SUR01 / SUR03 / SUR04 / SUR05 EDGIG EDG01 KERBS KER01 SERVICE SER01 BOLLARDS BOL02 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 PLATIG PLT01 PUBLIC LIGHTIG LIG01 SIGAGE + WAYFIDIG SWF01 LIEAR OPE SPACE LOP8 GREEWAY GR1 LAD USE HVI / RES / BUS 1.8 m 1.5 m 2.1 m 2.1 m 1.5 m 1.8 m 17.4 m ote: kerb width=0.14m 47 PUBLIC DOMAI MAUAL STREETS

LOCAL STREET- RESIDETIAL L3 Provide minimum lane widths to encourage traffic calming and a corridor appropriate in scale to the residential density. Large tree planting to provide structure and shade for pedestrians and parked cars. s to both sides. Car parking on both sides to service allotments. Integrate with the Greenway to the west (GR1) and the open space to the north (LOP8). Integrate wayfinding. *ote: Layout of residential streets is indicative only. PAVIG + SURFACES SUR01 / SUR03 / SUR04 / SUR05 EDGIG EDG01 KERBS KER01 SERVICE SER01 BOLLARDS BOL02 TACTILE IDICATORS TAC01 TREES TRE01 / TRE02 PLATIG PLT01 PUBLIC LIGHTIG LIG01 SIGAGE + WAYFIDIG SWF01 LIEAR OPE SPACE LOP8 GREEWAY GR1 LAD USE HVI / RES / BUS 1.8 m 1.5 m 2.1 m 3.0 m 3.0 m 2.1 m 1.5 m 1.8 m 16.8 m ote: kerb width=0.14m 48 PUBLIC DOMAI MAUAL STREETS

LAEWAY LA1 Provide a 6m clear accessway (shared) for vehicles servicing adjacent allotments. Varied pavement surfaces to define zones and calm traffic. Utilise bollards and tree planting as necessary to direct vehicles and protect lighting. Manage parking through short term drop off / loading zones. Potential for vehicle controls at one end to manage traffic flows. PAVIG + SURFACES SUR01 / SUR03 SERVICE SER01 CYCLE RACKS CYR01 BOLLARDS BOL01 / BOL02 TACTILE IDICATORS TAC01 PUBLIC LIGHTIG LIG TREES TRE03 LAD USE BUS / HVI / RET Shared Zone VARIES (max 2m) 6.0 m VARIES (max 2m) TOTAL 8.0 m 49 PUBLIC DOMAI MAUAL STREETS