NOTICE and AGENDA. 1. Meeting Called to Order 2. Roll Call

Similar documents
Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida

EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA. Mohamed A. Dabees 1 and Brett D.

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA

Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program

UPPER BEACH REPLENISHMENT PROJECT RELATED

ST. LUCIE COUNTY, FLORIDA

CLAM PASS ANNUAL RESTORATION & MANAGEMENT PLAN TIDAL ANALYSIS ELEMENT REPORT NO. 13

Performance of Upham Beach T-Groin Project and Its Impact to the Downdrift Beach

Assateague Island National Seashore North End Restoration Project Timeline

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring

CHAPTER 281 INFLUENCE OF NEARSHORE HARDBOTTOM ON REGIONAL SEDIMENT TRANSPORT

Passage Key Inlet, Florida; CMS Modeling and Borrow Site Impact Analysis

Chapter 4 EM THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents. Page. I-4-1. Background...

North Shore of Long Island, Feasibility Study

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

Long Beach Island Holgate Spit Little Egg Inlet Historical Evolution Introduction Longshore Transport Map, Survey and Photo Historic Sequence

Regular Workshop October 20, 2014 Agenda Item: Dr. Albert E. Browder, PE; Olsen Associates, Inc.

Impact of Hurricane Matthew on the Atlantic Coast of Florida

New Jersey Coastal Zone Overview. The New Jersey Beach Profile Network (NJBPN) 3 Dimensional Assessments. Quantifying Shoreline Migration

DUNE STABILIZATION AND BEACH EROSION

ATLANTIC COUNTY 2006 to 2008

CLAM PASS RESTORATION AND MANAGEMENT PLAN BATHYMETRIC MONITORING REPORT NO. 7 Including Interior Bay Dredge Cuts and Tidal Data

Appendix E Cat Island Borrow Area Analysis

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS

NORTHERN CELL OPTIONS SHORTLIST RECOMMENDATIONS

COASTAL CASE LAW UPDATE: RECENT ADMINISTRATIVE AND JUDICIAL DECISIONS RELATING TO FLORIDA BEACHES FSBPA Annual Conference, September 21, 2018

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida

Tanya M. Beck. Kelly Legault. Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS

Figure 262. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 279

Protecting our Beaches

GENERAL METHODOLOGY FOR INLET RESERVOIR MODEL ANALYSIS OF SAND MANAGEMENT NEAR TIDAL INLETS. Mohamed A. Dabees 1, Nicholas C.

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

OECS Regional Engineering Workshop September 29 October 3, 2014

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

New Jersey Beach Profile Network Atlantic County Profile Site Locations

Q1. What are the primary causes/contributors to coastal erosion at Westshore and the concept of longshore / littoral drift.

23- Year Sand Volume Changes at Site 132, 15th Street, Brigantine

CHAPTER 179. Performance of a Submerged Breakwater for Shore Protection

SELECTION OF THE PREFERRED MANAGEMENT OPTION FOR STOCKTON BEACH APPLICATION OF 2D COASTAL PROCESSES MODELLING

LAB: WHERE S THE BEACH

CHAPTER 8 ASSESSMENT OF COASTAL VULNERABILITY INDEX

Fact Sheet Ordinance Regulating Erosion Threatened Structures

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

Absecon Island Shore Protection The planning behind the project

Broad Beach Sand & Dune Habitat Restoration Project. Revetment Owners Meeting July 12, 2017

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

Table 4. Volumetric Change Rates Pre-Project and Post-Project for the Town of Duck

DELAWARE S VULNERABLE COASTAL AREAS. DELAWARE INLAND BAYS and DELAWARE BAY RECONNAISSANCE STUDY

A REVIEW OF THE CONDITION OF THE MUNICIPAL BEACHES AS A RESULT OF HURRICANE SANDY IN THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

PINELLAS COUNTY COASTAL MANAGEMENT PROGRAM SUMMARY PLANNING DOCUMENT. Prepared For:

SEDIMENT BUDGET OF LIDO OF PELLESTRINA (VENICE) Written by Marcello Di Risio Under the supervision of Giorgio Bellotti and Leopoldo Franco

KEYNOTE PRESENTATION FSBPA olsen

FINDING OF NO SIGNIFICANT IMPACT

Mayor Holden asked for a moment of silence and then called the meeting to order.

2018 Beach Preservation Project Information

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc.

Nearshore Placed Mound Physical Model Experiment

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION

CHAPTER 134 INTRODUCTION

Sediment Transport Analysis Village of Asharoken, New York

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION AND FUNCTIONAL DESIGN OF COASTAL STRUCTURES

Ninilchik Harbor Page 2 of 11

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

IMPACTS OF COASTAL PROTECTION STRATEGIES ON THE COASTS OF CRETE: NUMERICAL EXPERIMENTS

USE OF SEGMENTED OFFSHORE BREAKWATERS FOR BEACH EROSION CONTROL

United States Department of the Interior

Dauphin Island East End Beach and Barrier Island Restoration Project. Beau Buhring South Coast Engineers

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

Beach Renourishment in Jacksonville

Beach Restoration in Okaloosa and Walton Counties. FSBPA Technology Conference Clearwater, FL

Nome Harbor Page 2 of 12

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

INFLUENCE OF DAMAGED GROINS ON NOURISHED SEASHORE

US Beach Nourishment Experience:

Lecture Outlines PowerPoint. Chapter 15 Earth Science, 12e Tarbuck/Lutgens

Salt Ponds Shore Zone Modeling for Breakwater Placement: Summary Report

Traffic Calming Policy

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments

Impacts of breakwaters and training walls

Severe Beach Erosion Caused by Permanent Beach Sand Loss Through Rollover Fish Pass Bolivar Peninsula, Texas

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Physical Modeling of Nearshore Placed Dredged Material Rusty Permenter, Ernie Smith, Michael C. Mohr, Shanon Chader

Figure 4, Photo mosaic taken on February 14 about an hour before sunset near low tide.

Overview. Beach Features. Coastal Regions. Other Beach Profile Features. CHAPTER 10 The Coast: Beaches and Shoreline Processes.

First Year Morphological Evolution of an Artificial Berm at Fort Myers Beach, Florida

Julebæk Strand. Effect full beach nourishment

Figure 46. Locations of the 28 NJBPN profile stations in Ocean County, NJ. A new site was added in the Borough of Seaside Heights (#248).

Reading Material. Inshore oceanography, Anikouchine and Sternberg The World Ocean, Prentice-Hall

2013 FEDERAL STORM RESPONSE

Shoreline Change in Response to Sea Level Rise on Florida s Panhandle Coast. Jim Houston `

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

Port and Coastal Engineering

FINAL REPORT FOR 2013 ON THE CONDITION OF THE MUNICIPAL OCEANFRONT BEACHES THE BOROUGH OF AVALON, CAPE MAY COUNTY, NEW JERSEY

Street Paving and Sidewalk Policy

STORM RESPONSE SIMULATION

Chapter 10 Lecture Outline. The Restless Oceans

Transcription:

NOTICE and AGENDA CITY OF TREASURE ISLAND, FLORIDA BEACH STEWARSHIP COMMITTEE CITY HALL AUDITORIUM, 120 108th AVENUE, TREASURE ISLAND, FLORIDA 33706 WEDNESDAY, April 12, 2017 AT 1:30 PM Welcome to the City of Treasure Island Beach Stewardship Committee Meeting. If you wish to speak on a topic which is on today s agenda, a speaker s form [available in the rear of the room] must be completed and given to the Chairperson. Please do not address the Board from your seat, but rather from the podium where your comments can be heard by all and recorded as required by Florida law. Unscheduled topics may be presented under the Public Comments section of the agenda. 1. Meeting Called to Order 2. Roll Call Heidi Horak (Chair) District 4 Deborah Boyer District 3 George Greenfield District 2 Don Nolan District 1 Greg Taylor (Vice-Chair) Vice-Mayor Larry Lunn Appointed by Mayor Commission Representative 3. Acceptance of Minutes from October 12, 2016 Meeting Minutes 4. Changes to the Agenda 5. DRAFT Administrative Policy-Beach Vegetation Management 6. Beach Trash and Recycling Containers-Color Options 7. Comments about the Beach Trail 8. Proposed Sea Oat Planting Area 9. DRAFT Blind Pass Management Plan (28 pages) 10. Adjournment and Next Meeting Date is July 12, 2017 For any person desiring to appeal any decision made by the board, agency, or commission with respect to any matter considered at such meeting or hearing, he or she will need a record of the proceedings, and that, for such purpose, he or she may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. The requirements of this section do not apply to the notice provided in s. 200.065(3). (F.S. Chapter 286.0105) NOTE: Any transcript shall be requested and made by the individual requesting same at his or her own expense. Therefore a court reporter may be desired or required accordingly. Any person with a disability who needs any accommodation in order to participate in this proceeding is entitled to assistance at no cost. Please contact the office of the City Clerk in writing at 120 108 Avenue, Treasure Island FL 33706 or by phone at 727 547 4575 at least two working days prior to the meeting to advise what assistance is needed. POSTED: April 7, 2017-April 12, 2017

MINUTES CITY OF TREASURE ISLAND, FLORIDA BEACH STEWARSHIP COMMITTEE CITY HALL AUDITORIUM, 120 108th AVENUE, TREASURE ISLAND, FLORIDA 33706 WEDNESDAY, JANUARY 11, 2017 AT 1:30 PM 1. Meeting Called to Order The meeting was called to order at 1:30 p.m. by Vice Chair George Greenfield. 2. Roll Call Heidi Horak District 4 Present Deborah Boyer District 3 Present George Greenfield (Vice-Chair) District 2 Present Don Nolan District 1 Present Greg Taylor Appointed by Mayor Present Mayor Robert Minning Commission Representative Present 3. Discuss Letter from Mansions Board of Directors Carl Anderson introduced himself and Mr. Steve Freedman and thanked the board for the service they provide. They walk the beach every morning. They noticed the erosion problems, particularly in front of Mansions. He sent a letter to John Bishop. He explained the gist of his letter. In prior beach renourishments the sand on the south side would drift to their beach. It hasn t happened. Instead it has gone to the inter-coastal. The water seems to be encroaching on the dunes. They are asking that they consider renourishing the southern part of Sunset Beach 77 th to Land s End. Mr. Anderson asked when the renourishment would take place. Ms. Boyles said they hoped the schedule would have been moved up, but they are looking at the summer of 2018. That is if funding is approved. Mr. Anderson asked why the stretch from the rock jetty down to Land s End has never been renourished. Mayor Minning said it all became a federal project in 1969. It was never included in the federal project and perhaps during that time the area didn t need to be renourished. Mr. Anderson said that is the most narrow part of the beach. In front of Land s End it is actually quite good. Mr. Anderson said there are two banks and asked if there there is some way to slope it down so it is more aesthetically pleasing. Ms. Boyles clarified south of the south jetty. She stated there was a period of time that the beach tractor couldn t get down there to fix the escarpments. Ms. Boyles needs to see if they can get down that far. The beach staff knows what the maximum allowable drop-offs are. Ms. Boyles said she would be willing to look into it. Ms. Anderson said they would be very appreciative. Mayor Minning said they would offer a drawing as to exactly where the federal project ends. Mr. Steve Freedman asked if they look at the federal project to change the area. One of his concerns is that the people who have homes have big drops after their property line. He thinks from a tourist aspect it would be nice to have a sloping so it doesn t appear to be erosions. Ms. Boyles stated there 1 Beach Stewardship Committee Minutes 1/18/17

may be strict guidelines. Mr. Freedman said it would help property values. Mayor Minning said back in 2006 they did bring the sand up to the property lines. In 2010 they followed the strict template of the federal project. Ever since Hurricane Sandy the Army Corp has been very strict in making sure that the portion they use is accessible to the public. Mr. Freedman asked if they need to follow the Army Corp guidelines or is there flexibility. Mayor Minning said it is a county, state and federal. With regard to redrawing the template, Mayor Minning said the 2019 is when the current federal project needs to be redone. They have gotten extensions to 2022. They are working hard with the Corp to so they don t have to start at ground zero. If they start out at ground zero the template may be expanded, but that is a long drawn out process. Mayor Minning stated that the City has been doing renourishment for 50 years. Why start at ground zero with an environmental impact statement? For the 50 years that it has been in place the City has passed the cost benefit ratio, which is the key indicator as to whether or not the project is worth doing. If they don t have to do the environmental impact study, he believes the template will stay the same. Mr. Anderson asked if they would be getting a response from Dr. Bishop. Mayor Minning suggested the best way to document is via the meeting minutes. Mr. Anderson mentioned a few things about garbage pick-up in front of the Mansions. He thanked the Committee for their time. He said the concern is that in a dense area they pay a lot of property taxes. They would like to have that area looked at. Ms. Horak said in April they will have the updated erosion analysis. Ms. Boyles said that the Beach Management Plan would be provided on the City s website. Ms. Horak suggested that someone from their board stay involved with the erosion. She also mentioned the sea oat planting in that area. The sea oats are very helpful. Ms. Horak suggested they stay involved. Ms. Anderson said he would like to participate. Ms. Horak said the next meeting is April 12, 2017. 4. Nomination of Chair Person Mr. Greenfield said he would not be able to be a head chair person. Mr. Greenfield nominated Ms. Heidi Horak. Ms. Boyer seconded the nomination. Ms. Horak nominated Mr. Greg Taylor. Mr. Taylor said he doesn t have enough time. Mr. Taylor suggested Ms. Horak take the chair position. Ms. Horak invited Mr. Taylor to be the vice-chair. He agreed. Mr. Nolan seconded for Mr. Taylor for vice-chair. The vote was unanimous to have Ms. Horak as chair and Mr. Taylor as vice-chair. 5. Acceptance of Minutes from October 12, 2016 Meeting Minutes It was moved by Ms. Horak to accept the October 12, 2016 meeting minutes and seconded by Mayor Minning. The voice vote was unanimous. 6. Updated Information from the County Ms. Boyles said the County will be providing sea oats for planting. They will not approve plantings on beaches that are too narrow. It will be up to the City to decide the placement. Public Works will come back with an idea. Ms. Boyles invited the Beach Stewardship Committee to provide ideas and give some feedback. Ms. Boyer said when they did the planting at Sunset Beach they didn t go south of 77 th Avenue. Ms. Boyles said that area may be too narrow to have the planting approved. Ms. 2 Beach Stewardship Committee Minutes 1/18/17

Boyer noted that the areas are a bit unsafe. She pointed out that the stairs that lead to the beaches are hardly touching the beach. Ms. Boyles said that Public Works will look into that. Mr. Taylor briefly discussed the older dredging projects in Blind Pass. Ms. Horak said that when they did it they found oil from the 1993 spill and started putting the sand elsewhere. Mr. Taylor said he knows the erosion at that end is pretty bad down there. Ms. Horak asked if it is a county maintenance dredging. Mayor Minning believes that it is part of the rock jetty project. The funding got approved. Mayor Minning said it is Army Corps, State and local funding. 7. Comments about the Beach Trail Mayor Minning said not much has changed since the last meeting. They had the mediation. They agreed to take it back before the Commission. There was a proposal to cut within two feet of the wall. There is some significant cracking there and at the nodes. A new proposal was to go within one foot of the sand wall where there is significant cracking. They are looking for a consensus. Ms. Horak asked what the money difference would be for a new wall. Mayor Minning said it would be expensive and would it include the sand wall. Ms. Horak said the sand wall curves which adds a lot of cost to it. Mayor Minning said the consultants have told us that it is cracking is because of the extended footers. When the concrete went to shrink and expand, the cracks developed to relieve the stress. Up at 119 th Avenue, they didn t use extended footers and there are no cracks. The replacement would maintain the extended footer under the sand wall, but there would be no extended footer on the landward side so the concrete can expand and contract with the climate. Mayor Minning is hopeful that they will get feedback from the defendants within a month. Then bring it to the Commission. There is still a trial date set for July. 8. Remarks by Members and Staff Mr. Taylor said they have possibly gained sand in the north area of the beach since the last storm. Ms. Horak said that they lost it in Sunset Beach. Mayor Minning said that on the re-upping on the federal project, they worked with Representative Jolly in the past, haven t heard anything since Crist took office. Ms. Horak wanted to know if it Beach Management Plan was on the website. Ms. Boyles commented that the City was getting a new website and it would be put on there when completed. Mr. Greenfield wished the new chairs good luck. 9. Adjournment and Next Meeting Date is April 12, 2017 The meeting adjourned at 2:01 pm. 3 Beach Stewardship Committee Minutes 1/18/17

Final Order Adopting Blind Pass - Inlet Management Plan WHEREAS in 2008, the Florida Legislature amended Section 161.142, Florida Statutes, finding, The Legislature recognizes the need for maintaining navigation inlets to promote commercial and recreational uses of our coastal waters and their resources. The Legislature further recognizes that inlets interrupt or alter the natural drift of beach-quality sand resources, which often results in these sand resources being deposited in nearshore areas or in the inlet channel, or in the inland waterway adjacent to the inlet, instead of providing natural nourishment to the adjacent eroding beaches. Accordingly, the Legislature finds it is in the public interest to replicate the natural drift of sand which is interrupted or altered by inlets to be replaced and for each level of government to undertake all reasonable efforts to maximize inlet sand bypassing to ensure that beach-quality sand is placed on adjacent eroding beaches. Such activities cannot make up for the historical sand deficits caused by inlets but shall be designed to balance the sediment budget of the inlet and adjacent beaches and extend the life of proximate beachrestoration projects so that periodic nourishment is needed less frequently. And WHEREAS in 2015, the Department of Environmental Protection (Department) and Pinellas County sponsored an inlet management study of Blind Pass performed by the University of South Florida Coastal Research Laboratory (USF-CRL) to compile new and historical data and information regarding its coastal processes and inlet and shoreline dynamics and update its sediment budget, and WHEREAS in 2016, the USF-CRL completed the inlet management study for Blind Pass, which included recommendations for inlet management alternatives, and WHEREAS, on March 2 nd, 2017, the Department developed an inlet management plan that contains corrective measures to mitigate the identified inlet erosion impacts to adjacent beaches, and WHEREAS, Pinellas County and the U.S. Army Corps of Engineers are the entities responsible for dredging at Blind Pass, and therefore, responsible for implementation of the inlet management plan, and March 2017, Page i

WHEREAS, this inlet management plan is consistent with the Department s program objectives under Chapter 161, Florida Statutes, THEREFORE: The Department does hereby adopt the following implementation strategies as set forth in the attached Blind Pass Inlet Management Plan 2016. Future inlet management activities shall be consistent with the following four strategies: 1) A comprehensive beach and inlet hydrographic monitoring program shall be conducted to evaluate the performance and impact of existing sand bypassing and nourishment projects and to periodically update the inlet sediment budget. 2) Sand bypassing shall be performed from the Blind Pass entrance channel borrow area to the adjacent gulf-fronting beaches both to the north and to the south of the inlet within designated critically eroded areas between FDEP Reference Monuments R136 and R148. The quantity of fill to be placed in each area shall be based on observed beach erosion patterns and quantities documented through the monitoring protocol of Strategy #1 above. 3) The initial target inlet sand bypassing quantities shall be 31,000 cubic yards per year to the south of the inlet and 12,000 cubic yards per year to the north. These target quantities may be modified based on a minimum of four years of monitoring indicating a change in the sediment budget. In the interim, should the volume of sand accumulating in the Blind Pass entrance channel borrow area exceed these quantities, the additional sand may be dredged and placed on the adjacent beaches to extend the life of the adjacent beach restoration projects. 4) The source of sediment for meeting the target sand bypassing quantities in Strategy #3 above shall be the Blind Pass entrance channel borrow area. Acceptable beach quality sand may also be obtained from inland sand mines or offshore sources to supplement the target sand bypassing quantities or to facilitate development and growth of the Blind Pass ebb shoal. March 2017, Page ii

Inlet management actions that implement the strategies contained in this plan are subject to further evaluation, and subsequent authorization or denial, as part of the Department s permitting process. Activities that implement these adopted strategies shall be eligible for state financial participation pursuant to Section 161.143, Florida Statutes, subject to Department approval and an appropriation from the Florida Legislature. The level of State funding shall be determined based on the activity being conducted and the Department s rules. The Department may choose not to participate financially if the proposed method of implementation is not cost effective or fails to meet the intent of Section 161.142, Florida Statutes, and this final order. Nothing in this plan precludes the evaluation and potential adoption of other strategies for the effective management of Blind Pass and the adjacent beaches. Execution of this Final Order constitutes agency action. Any Florida corporation not for profit which meets the requirements of Subsection 403.412(6), Florida Statutes, and any person whose substantial interests will be determined or affected by the Final Order may petition the Department for a formal or informal administrative hearing pursuant to Section 120.569 or 120.57, Florida Statutes, as set forth in the attached Notice of Rights, to challenge the provisions of this Final Order. If the Department proposes to issue a permit that implements the strategies in this Final Order, any Florida corporation not for profit which meets the requirements of Subsection 403.412(6), Florida Statutes, and any person whose substantial interests will be determined or affected by the proposed permit may petition the Department for a formal or informal administrative hearing pursuant to Section 120.569 or 120.57, Florida Statutes, as set forth in the Notice of Rights attached to the permit. The scope of a challenge to a permit approval or denial is limited to whether the agency action complies with the permitting criteria. Agency action previously subject to challenge or administrative review will not be subject to challenge at the time of permit approval or denial. March 2017, Page iii

Approval of Adoption Justin B. Green Director of Division of Water Resource Management Florida Department of Environmental Protection Filing and Acknowledgement FILED, on this date with the designated Department Clerk, pursuant to Section 120.52, F.S., receipt of which is hereby acknowledged. Deputy Clerk 03/02/2017 Date March 2017, Page iv

Notice of Rights The Department s proposed agency action shall become final unless a timely petition for an administrative hearing is filed under Sections 120.569 and 120.57, Florida Statutes, before the deadline for filing a petition. The procedures for petitioning for a hearing are set forth below. A person whose substantial interests are affected by the Department s proposed action decision may petition for an administrative proceeding (hearing) under Sections 120.569 and 120.57, Florida Statutes. The petition must contain the information set forth below and must be filed (received by the clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000. Petitions must be filed within twenty-one days of receipt of this written notice. Under Rule 62-110.106(4), Florida Administrative Code, a person whose substantial interests are affected by the Department s action may request an extension of time to file a petition for an administrative hearing. Requests for extension of time must be filed (received by the clerk) with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, before the end of the time period for filing a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon. Petitions filed by any persons other than those entitled to written notice under Section 120.60(3), Florida Statutes, must be filed within twenty-one days of publication of the notice or within twenty-one days of receipt of the written notice, whichever occurs first. Under Section 120.60(3), Florida Statutes, however, any person who asked the Department for notice of agency action may file a petition within twenty-one days of receipt of such notice, regardless of the date of publication. The failure of any person to file a petition or request for extension of time within the appropriate time period shall constitute a waiver of that person s right to request an administrative determination (hearing) under Sections 120.569 and 120.57, Florida Statutes, or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding March 2017, Page v

initiated by another party) will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28-106.205, Florida Administrative Code. A petition that disputes the material facts on which the Department s action is based must contain the following information: (a) (b) (c) (d) (e) (f) (g) The name and address of each agency affected and each agency s file or identification number, if known; The name, address, and telephone number of the petitioner; the name, address, and telephone number of the petitioner s representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner s substantial interests are or will be affected by the agency determination; A statement of when and how the petitioner received notice of the agency decision; A statement of all disputed issues of material fact. If there are none, the petition must so indicate; A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency s proposed action; A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency s proposed action; and A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency s proposed action. A petition that does not dispute the material facts on which the Department s action is based shall state that no such facts are in dispute and otherwise shall contain the same information as set forth above, as required by Rule 28-106.301, Florida Administrative Code. March 2017, Page vi

Because the administrative hearing process is designed to formulate final agency action, the filing of a petition means that the Department s final action may be different from the position taken by it in this notice. Persons whose substantial interests will be affected by any such final decision of the Department have the right to petition to become a party to the proceeding, in accordance with the requirements set forth above. Mediation under Section 120.573, Florida Statutes, is not available. Once this decision becomes final, any party to the final agency action has the right to seek judicial review of it under Section 120.68, Florida Statutes, by filing a notice of appeal under Rule 9.110 of the Florida Rules of Appellate Procedure with the clerk of the Department in the Office of General Counsel, Mail Station 35, 3900 Commonwealth Boulevard, Tallahassee, Florida 32399-3000, and by filing a copy of the notice of appeal accompanied by the applicable filing fees with the appropriate district court of appeal. The notice of appeal must be filed within thirty days after this decision is filed with the clerk of the Department. March 2017, Page vii

Table of Contents Introduction... 1 Program Objectives and Statutory Responsibilities for Inlet Management... 1 History of Blind Pass (Mehta et al, 1976; USCOE, 1966; Wang et al, 2016)... 2 Inlet Management Study... 8 Updated Sediment Budget through 2015 (Wang et al, 2016)... 14 Recommended Inlet Management Plan Strategies... 18 References... 20 March 2017, Page viii

BLIND PASS INLET MANAGEMENT PLAN Introduction Pursuant to Subsection 161.101(2), Florida Statutes, the Florida Department of Environmental Protection (Department) is the beach and shore preservation authority for the State of Florida. As part of the Department s statewide beach management plan adopted pursuant to Section 161.161, Florida Statutes, the Department is adopting this inlet management plan for Blind Pass in Pinellas County, Florida. Blind Pass - Inlet Management Plan updates strategies for Blind Pass adopted in the Strategic Beach Management Plan (FDEP, 2015) to be consistent with current statutes and observed erosion 1 conditions. As a first step towards adoption of this inlet management plan, in 2015-16, the Department and Pinellas County sponsored a study of Blind Pass performed by the University of South Florida Coastal Research Laboratory (USF-CRL) to compile new and historical data and information regarding beach and inlet changes and the dynamic coastal littoral processes in this area, and develop an updated sediment budget. Program Objectives and Statutory Responsibilities for Inlet Management In 2008, the Florida Legislature amended Section 161.142, Florida Statutes, finding, The Legislature recognizes the need for maintaining navigation inlets to promote commercial and recreational uses of our coastal waters and their resources. The Legislature further recognizes that inlets interrupt or alter the natural drift of beach-quality sand resources, which often results in these sand resources being deposited in nearshore areas or in the inlet channel, or in the inland waterway adjacent to the inlet, instead of providing natural nourishment to the adjacent eroding beaches. Accordingly, the Legislature finds it is in the 1 As used in this document, the term erosion means wearing away of land or the removal of consolidated or unconsolidated material from the coastal system by wind or wave action, storm surge, tidal or littoral currents or surface water runoff. As used in this document, the term accretion means the buildup of land or accumulation of unconsolidated material within the coastal system caused by wind and wave action, storm surge, or tidal or littoral currents. The descriptions of coastal processes in this document are not intended to affect title to real property or real property boundaries. March 2017, Page 1 of 20

public interest to replicate the natural drift of sand which is interrupted or altered by inlets to be replaced and for each level of government to undertake all reasonable efforts to maximize inlet sand bypassing to ensure that beach-quality sand is placed on adjacent eroding beaches. Such activities cannot make up for the historical sand deficits caused by inlets but shall be designed to balance the sediment budget of the inlet and adjacent beaches and extend the life of proximate beach restoration projects so that periodic nourishment is needed less frequently. Pursuant to Section 161.143, Florida Statutes, Studies, projects and activities for the purpose of mitigating the erosive effects of inlets and balancing the sediment budget on the inlet and adjacent beaches must be supported by separately approved inlet management plans or inlet components of the statewide comprehensive beach management plan. The U.S. Army Corps of Engineers (USACE) and Pinellas County have been the entities responsible for maintenance dredging the Blind Pass entrance channel borrow area and consequently, mitigating the extent of beach erosion caused by the inlet, as specified in Subsection 161.142 (6), Florida Statutes. History of Blind Pass (Mehta et al, 1976; USCOE, 1966; Wang et al, 2016) Blind Pass is in Pinellas County on the southwest Gulf of Mexico coast of Florida separating the barrier islands of Treasure Island to the north and Long Key to the south (Figure 1). The inlet connects the Gulf of Mexico to Boca Ciega Bay. It is important to understand the history of Blind Pass, its geomorphological evolution and prior inlet management activities, and beach erosion control activities along the adjacent beaches, to gain a perspective on the inlet s dynamics and the need to change inlet management strategies over time. Over the past century and a half, Blind Pass has experienced three epochs of different inlet management approaches. From the 19 th century to 1937, there was a general lack of management as nature was allowed to take its course. Between 1937 and 1968, the construction of rigid structures (seawalls, bulkheads, groins, and jetties) comprised the inlet s management activities. From 1969 to date, excavation of sediment from the inlet s entrance channel and placement of the dredged material along the adjacent beaches has been the principle management activity, along with extending the jetties. March 2017, Page 2 of 20

Figure 1. Blind Pass in Pinellas County, Fl. (2014 aerial photo) March 2017, Page 3 of 20

Blind Pass has a history of dynamic morphological changes dominated by a southward migration (Figure 2). Between 1873 and 1926, Blind Pass migrated southward approximately 3,900 feet. Between 1926 and 1939, the inlet migrated another 2,200 feet for a total of 6,100 feet. As Blind Pass migrated southward, the south end of Treasure Island grew through the accumulation of sediment. Starting in 1937, the location of Blind Pass became stabilized with various structures. A small 90-foot long jetty was constructed on the south side of the inlet to prevent further southward inlet migration in 1937. This structure was extended further landward in the 1950s. Figure 2. Southward migration of Blind Pass following the opening of John s Pass in 1848. (Note that Blind Pass was stabilized in 1937 and the location of 1957 is the same as that in 1937.) [reference Mehta et al., 1976] March 2017, Page 4 of 20

Natural fluctuations in shoreline position along southern Treasure Island and northern Long Key has occurred over time as observed on aerial photography and shoreline surveys (Figure 3). Beach erosion control activities on Treasure Island and Long Key have been conducted since 1960, and include shore-protection structures, beach restoration and nourishment, and inlet sand bypassing. In 1960, 56 groins were constructed on Treasure Island. These groins were constructed of timber and were only partially successful at mitigating shoreline erosion. In 1962, a 425-foot jetty was constructed on the north side of Blind Pass by the USACE. The inlet channel was dredged in 1964 and 10,000 cubic yards of sand was placed on the south end of Treasure Island, in a location named Sunset Beach. In 1968, another 30,000 cubic yards of sand was dredged from Blind Pass and placed at an undocumented site. Figure 3. Historical aerial photos of Blind Pass showing both erosion and accretion to the adjacent shorelines (various sources: U.S. Dept. of Commerce; FL Dept. of Transportation; USF-CRL). In 1968, the Board of Trustees for the Internal Improvement Trust Fund of the State of Florida granted the USACE an easement to conduct a beach restoration project on Treasure Island. The beach restoration project was constructed by the USACE in 1969 and included the placement of 790,000 cubic yards of beach fill along the gulf shoreline between FDEP reference monuments R132 and R140, or from 104 th Avenue to 77 th Avenue. Approximately 108,000 cubic yards of sand was dredged from Blind Pass and spread along southern Treasure Island; the remainder was obtained from borrow pits located immediately offshore. In 1972, 155,000 cubic yards of sand was excavated from borrow areas off the south end of Treasure Island and placed on Sunset Beach between reference monuments R141 and R142. In March 2017, Page 5 of 20

1974, a breakwater was constructed on the south side of the inlet. In 1975, two king-pile groins were constructed on Upham Beach, which is just south of Blind Pass on Long Key and 75,000 cubic yards of sand was dredged from the Blind Pass and placed on Upham Beach. In 1976, 405,000 cubic yards of sand was dredged from Blind Pass and offshore, and placed north of Blind Pass along the southern one-third of Treasure Island between monuments R135 and R142. Also in 1976, the USACE constructed an extension to the Blind Pass north jetty and officially called it a terminal groin to anchor the Treasure Island beach restoration project at Sunset Beach. In addition, a boulder mound groin with a length of 285 feet was constructed 2,300 feet north of the inlet near monument R141. Despite the north jetty/terminal groin extension, southward transport of nourishment material from Treasure Island shoaled in Blind Pass closing it to tidal flow in 1978. That prompted the USACE to conduct emergency dredging within Blind Pass, removing 50,000 cubic yards of sand and placing it on Sunset Beach. From 1980 to date, Blind Pass has been dredged on numerous occasions and the sand has been placed on both Sunset Beach to the north and on Upham Beach to the south of Blind Pass. Table 1 provides a list of the recent dredging projects at Blind Pass, as well as other dredging projects with borrow areas located at the ebb shoals of Johns Pass, Pass-a-Grille, and Egmont Channel, that had fill placements on either Sunset Beach or Upham Beach. The terminal groin at Blind Pass was extended again in 1983. In 1985, Labor Day s Hurricane Elena and Halloween s Tropical Storm Juan each lingered in the gulf for a couple days causing storm erosion of area beaches. In 1986, the U.S. Congress responded with post-storm emergency funding resulting in the USACE excavating sand from the Pass-a-Grille ebb shoal and placing the material along Treasure Island between reference monuments R129 and R141 and on Upham Beach between reference monuments R144 and R146. In addition, the south jetty was extended southward but was not connected to the breakwater. To mitigate the chronic erosion occurring at Upham Beach, the gap was closed between the south jetty and the breakwater and five sand-filled geotextile T-groins were installed along Upham Beach in 2006. March 2017, Page 6 of 20

Table 1. Sand Placement at Sunset Beach and Upham Beach (Wang et al., 2016; data from USACE) Year Volume (cubic yards) 1969 790,000 Sand Source Blind Pass and Offshore 1971 75,000 Offshore 1972 155,000 Blind Pass 1976 380,000 Offshore 1978 32,000 Blind Pass 1980 253,760 Blind Pass Placement Location by Range (R) Monument & Beach R132-R141 Sunset Beach R131-R132 Mid Beach, Treasure Island R141-R142 Sunset Beach R135-R142 Sunset Beach R135-R142 Sunset Beach R144 - R146 Upham Beach 1983 220,000 Blind Pass 1986 550,000 * 1986 96,712 1991 229,950 1996 252,950 1996 51,300 2000 348,722 2000 358,900 2004 225,000 Pass-A-Grille s ebb shoal Pass-A-Grille s ebb shoal Pass-A-Grille s ebb shoal West Egmont Shoal West Egmont Shoal Blind Pass and John s Pass Blind Pass and John s Pass Pass-a-Grille s Ebb Shoal R138 - R142 Sunset Beach R129 - R141 Treasure Island and Sunset Beach R144 - R146 Upham Beach R144 - R146 Upham Beach R144 - R146 Upham Beach R138 - R144 Sunset Beach R136-R144 Sunset Beach R144-R146 Upham Beach R136 - R141 Sunset Beach March 2017, Page 7 of 20

Year Volume (cubic yards) Sand Source Placement Location by Range (R) Monument & Beach 2004 366,092 2004 41,670 * 2006 104,636 2006 106,302 Pass-a-Grille s Ebb Shoal Pass-A-Grille s ebb shoal West Egmont Shoal West Egmont Shoal R144 - R146 Upham Beach R144-R146 Upham Beach R144 - R146 Upham Beach R136 - R141 Sunset Beach 2010 159,572 Blind Pass 2010 125,423 2014 232,407 John s Pass, attachment lobe and Blind Pass East Egmont Shoal R144 - R146 Upham Beach R140 - R143 Sunset Beach R136 - R141 Sunset Beach 2014 156,748 East Egmont Shoal R144 - R146 Upham Beach *Emergency sand placement events in 1986 and 2004 are due to Hurricane Elena (1985) and Hurricane Frances (2004). Sunset Beach continues to erode, with the exception of the southern approximately 1,000 feet of beach immediately adjacent to the terminal groin. Immediately south of Blind Pass, Upham Beach likewise continues to erode. The five geotextile T-groins that were constructed in 2006, were monitored and determined to be successful at increasing the nourishment interval between sand bypassing projects. The Department subsequently authorized the reconstruction of these geotextile T-groins as boulder mound groins of similar design dimensions. As of the adoption of this inlet management plan, these groins have not yet been constructed. Inlet Management Study In 2014, the Department contracted with the University of South Florida, Coastal Research Laboratory (USF-CRL), to conduct an inlet management study of Blind Pass and John s Pass. Both inlets were jointly investigated because the tidal prism of each inlet overlaps within Boca Ciega Bay to create a multi-inlet hydrodynamic system between the gulf and the bay. The goals March 2017, Page 8 of 20

of this study were to provide an updated sediment budget for Blind Pass and John s Pass, and to identify and quantify the sediment pathways to update the respective inlet management plans pursuant to Section 161.142, Florida Statutes. The study, which was completed in 2016, also provided an evaluation of alternative inlet management implementation strategies. A Technical Advisory Committee (TAC) was created to provide technical guidance to USF-CRL during the course of the study. The TAC was made up of representatives of the Department, the USACE, and Pinellas County. In this study, the USF-CRL set up, calibrated and verified a Coastal Modeling System (CMS) model of Blind Pass and John s Pass and the surrounding aquatic systems. The CMS model, developed by the USACE, is a widely used numerical model for evaluating inlets. As recommended by the TAC for the study, seven alternative inlet management strategies were evaluated using the CMS model, as reported by Wang et al. (2016). Alternatives 2, 3 and 7 involve dredging at John s Pass, and therefore, are not specifically relevant to the management of Blind Pass. Only Alternatives 1, 4, 5 and 6 evaluated in this study apply to Blind Pass and are discussed below. March 2017, Page 9 of 20

Alternative 1: Maintain present bathymetry. Alternative 1 provides baseline conditions for comparison purposes with the additional management alternatives, as shown in Figure 4. Figure 4. Intial bathymetry illustrating the present conditions at Blind Pass (Wang et al., 2016). March 2017, Page 10 of 20

Alternative 4: Re-dredge 198,000 cubic yards of sand from the John s Pass 2010 channel dredge footprint down to -16 ft. mean sea level, and re-dredge 179,000 cubic yards of sand from the Blind Pass 2010 entrance channel borrow area to -16 ft. mean sea level. Continue periodic dredging of 179,000 cubic yards of sand every four to six years from 2010 Blind Pass dredging template in conjunction with continuation of periodic dredging of 198,000 cubic yards of sand every five to ten years from the 2010 John s Pass dredging template. This is the inlet management activity that was applied in 2010 for Blind Pass, as shown in Figure 5. Figure 5. Blind Pass and adjoining beaches showing the entrance channel borrow area (2014 aerial photography; Wang et al., 2016). March 2017, Page 11 of 20

Alternative 5: Extend the south jetty at Blind Pass. This alternative investigates the potential application of a structural option, as seen in Figure 6. Figure 6. Graphic illustrating an extension of the south jetty as discussed in Alternative 5 (Wang et al., 2016). March 2017, Page 12 of 20

Alternative 6: Extend both structures at Blind Pass. This alternative investigates an aggressive structural option, illustrated in Figure 7. Figure 7. Graphic illustrating an extension of both the Treasure Island terminal groin and the south jetty as discussed in Alternative 6 (Wang et al., 2016). The following factors were considered in the evaluation of the four inlet management alternatives for Blind Pass: 1) potential influence on the wave field in the vicinity of the inlet; 2) potential influence on tidal flow patterns; 3) potential influence on erosion or accretion trends along the adjacent beaches; 4) potential influences on erosion and deposition patterns in the channel; 5) potential influences on erosion and deposition patterns over the ebb shoal and therefore sand bypassing; and 6) for alternatives including dredging, the in-filling rate and resulting dredging interval. Alternative 4 involves re-dredging the Blind Pass entrance channel borrow area (see Figure 5) that was dredged in 2010 and placing the dredged sand on Upham Beach. It also considers the 2010 fill placement north of Blind Pass on Sunset Beach with dredged sand from John s Pass. Since there is active sand transport within the Blind Pass entrance channel dredge area, the infilling rate is relatively high at 35,000 cubic yards per year. The study results determined that the dredge area would re-fill in six years and therefore would have a six-year maintenance March 2017, Page 13 of 20

dredging requirement. Alternative 4 did not have a significant adverse influence on either the ebb or flood tidal flow patterns through the inlet and over the ebb shoal, as compared to the baseline case. The dredging had only a minor influence on the nearshore wave field along the adjacent beaches. Alternative 4 was subsequently recommended as the management option for Blind Pass. Alternatives 5 and 6 involved structural modifications to the terminal groin north of Blind Pass and the jetty on the south side of Blind Pass. Alternative 5 (Figure 6) extended the south jetty by 230 feet. Alternative 5 was determined to have minimal influence on the hydrodynamics and morphodynamics of the inlet and adjacent beaches, and therefore, was not recommended as an inlet management option because its cost could not be justified by its minimal benefits. Alternative 6 extended the terminal groin north of Blind Pass and the Blind Pass south jetty by 230 feet each, and like Alternative 5, did not involve any dredging or fill placement. Alternative 6 was determined to have a significant beneficial influence on the tidal flow patterns through the inlet channel. However, based on model output, the flow changes did not result in significantly different channel infilling rates; therefore, maintenance dredging would still be necessary. The extended terminal groin and south jetty might result in development of an impoundment fillet on the adjacent beaches, and consequently, some accretion at Upham Beach. However, these extensions may have negative effects on beaches farther away from the inlet on Long Key. Alternative 6 was therefore not recommended because the benefit did not appear to justify the high cost of jetty construction and the potential adverse impact on the beaches south of Blind Pass. Updated Sediment Budget through 2015 (Wang et al, 2016) Pursuant to Section 161.142, Florida Statutes, dredging within an inlet system, including its shoals, should result in the placement of all beach quality sand on adjacent eroding beaches to balance the sediment budget between the inlet and adjacent beaches. A sediment budget is a balance of the volumes (or volume rate of change) for sediments entering and leaving a tidal inlet system and its adjacent beaches. A sediment budget quantifies the natural longshore sediment transport by waves and tides to and from the inlet, the entrapment of longshore sediment by the inlet channel and the ebb and flood shoals, and the mechanical bypassing of sediment, typically by a hydraulic dredge, from the inlet to the adjacent beaches or nearshore. Sediment transport volumes and pathways are unique to each inlet as influenced by regional geology, March 2017, Page 14 of 20

morphological characteristics, wave and tide conditions, and sediment characteristics and supply. A sediment budget is determined by comparing two or more surveys of an inlet system, including its channel, ebb and flood shoals, and the adjacent beaches. The inlet management study for Blind Pass conducted an updated survey in 2014 of the inlet system to compare with a prior survey in 2010 (Figure 8). Figure 8. Blind Pass channel and ebb shoal surveyed in 2014 using a multi-beam system (Wang et al., 2016). Inlet sediment management requires implementation of sediment bypassing protocols that are based on the latest available data and analysis in order to balance the sediment budget. An updated sediment budget for Blind Pass was developed for the period between 2010 and 2014 after the last dredging at both John s Pass and Blind Pass in 2010 and associated beach nourishment on Treasure Island and Long Key, and before the beach nourishments on Treasure Island and Long Key in 2014 (Wang et al., 2016). In addition, Sand Key beach to the north of the John s Pass and Blind Pass system was nourished in 2012. Therefore, this updated sediment March 2017, Page 15 of 20

budget is influenced by the artificial sand supply from the 2010 Treasure Island and Long Key beach nourishments and 2012 Sand Key nourishment. Since the beaches in the study area are nourished regularly and the budget period incorporates a large portion of a beach nourishment cycle, this updated sediment budget should represent a typical situation inclusive of artificial sand supplies from beach nourishments. For this sediment budget, the coast directly affected by Blind Pass has been divided into the beach and inlet cells as shown in Figure 9. Beach erosion and accretion have been measured by comparing the surveys of October 2010 and June 2014, which has yielded the volume losses and gains for each of the beach and inlet cells. To the north of Blind Pass, Sunset Beach between R140 and R143 lost an annualized 12,000 cubic yards per year of sediment between October 2010 and June 2014. During the same period, to the south of Blind Pass, Upham Beach between R144 and R146 lost an annualized 31,000 cubic yards per year of sediment. These losses were offset by gains within the Blind Pass system, including the channel and the ebb shoal. Specifically, the Blind Pass channel from the entrance at the inlet jetties, extending into the inlet interior, saw an annualized gain during the same period of 31,000 cubic yards per year of sediment. Outside the entrance to Blind Pass, i.e., the ebb shoal, there was an annualized gain for the same period of 68,000 cubic yards per year. Combining the Blind Pass channel and ebb shoal gains equals 99,000 cubic yards per year, which is more than double the 43,000 cubic yards per year needed to offset the losses north and south of Blind Pass. The Blind Pass entrance channel borrow area, which includes the channel between the terminal groin north of Blind Pass and the Blind Pass south jetty and extending offshore approximately 500 feet as discussed in alternative 4 (see Figure 5), holds a sufficient quantity of beach quality sand to be periodically dredged and placed north and south of Blind Pass. An annualized excess of sediment gained within the ebb shoal of about 56,000 cubic yards per year may be expected to substantially contribute to the growth of the ebb shoal. Over time, as the ebb shoal continues to grow, notwithstanding the removal of 43,000 cubic yards per year from the Blind Pass entrance channel borrow area, natural bypassing of sediment may be expected to increase to Upham Beach to the south of Blind Pass. The enhancement of natural bypassing would reduce the cost of maintaining the beach nourishment of Long Key using mechanical sand bypassing. March 2017, Page 16 of 20

Figure 9. Annualized sediment budget at Blind Pass based on field data collected from October 2010 to June 2014 (aerial photography 2014; Wang et al., 2016). March 2017, Page 17 of 20

Recommended Inlet Management Plan Strategies The Department staff recommends the following inlet management strategies be adopted to meet the requirements of Chapter 161, Florida Statutes. Future inlet management activities shall be consistent with the following four strategies. 1) A comprehensive beach and inlet hydrographic monitoring program shall be conducted to evaluate the performance and impact of existing sand bypassing and nourishment projects and to periodically update the inlet sediment budget. Discussion A comprehensive beach and inlet hydrographic monitoring program is the most important element to manage the sediment at Blind Pass. Topographic and bathymetric surveys provide reliable data to estimate the volumetric impact of the inlet on adjacent beaches and to establish a sand placement protocol that complies with Section 161.142, Florida Statutes. The current approved inlet monitoring program conducted by Pinellas County provides sufficient monitoring data. 2) Sand bypassing shall be performed from the Blind Pass entrance channel borrow area to the adjacent gulf-fronting beaches both to the north and to the south of the inlet within designated critically eroded areas between FDEP Reference Monuments R136 and R148. The quantity of fill to be placed in each area shall be based on observed beach erosion patterns and quantities documented through the monitoring protocol of Strategy #1 above. Discussion The Sunset Beach nourishment project (R136-R143) north of Blind Pass and the Upham Beach nourishment project (R144-R148) south of Blind Pass are the beach erosion areas directly impacted by Blind Pass. 3) The initial target inlet sand bypassing quantities shall be 31,000 cubic yards per year to the south of the inlet and 12,000 cubic yards per year to the north. These target quantities may be modified based on a minimum of four years of monitoring indicating a change in the sediment budget. In the interim, should the volume of sand accumulating in the Blind Pass entrance channel borrow area exceed these quantities, the additional sand may be dredged and placed on the adjacent beaches to extend the life of the adjacent beach restoration projects. March 2017, Page 18 of 20

Discussion Treasure Island (R126-R143) to the north and Long Key (R144-R166) to the south of Blind Pass are currently designated critically eroded beach segments (FDEP, 2016) and federally-authorized beach restoration projects. 4) The source of sediment for meeting the target sand bypassing quantities in Strategy #3 above shall be the Blind Pass entrance channel borrow area. Acceptable beach quality sand may also be obtained from inland sand mines or offshore sources to supplement the target sand bypassing quantities or to facilitate development and growth of the Blind Pass ebb shoal. Discussion The area typically dredged for sand bypassing is the Blind Pass entrance channel borrow area. This does not exclude acceptable quality inland sand mines or offshore sources when determined necessary to supplement or facilitate the target sand bypassing quantities or develop the inlet ebb shoal. March 2017, Page 19 of 20