Document How to Set Single Stage Press Pressures

Similar documents
MADILL 24.7" 365 TILT SET-UP PROCEDURE WITH REXROTH VALVE ON MACHINE

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

OPERATING AND MAINTENANCE MANUAL

MANUAL BE SERIES Test Benches

Hydraulic Reliability & Preventive Maintenance Report

SINGER MODEL 106/206-RPS-L&H

Linde Hydraulics Corporation, P.O. Box 82, Canfield, Ohio 44406

Inverse Proportional Pressure-Relief Cartridge, Size 10

accidents which arise due to non-observance of these instructions and the safety information herein.

PRESSURE ADJUSTMENT Main pressure adjustment

OPERATION MANUAL NTF-15

Flexfence Swaging Unit. Product Manual. Release 02/16.

256 Pneumatic Pressure Indicator

Operating Instructions for: PQ120 Pump Series. PQ120 Series Pump SPX

Model 130M Pneumatic Controller

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

Pressure Dump Valve Service Kit for Series 2300 Units

OPERATION MANUAL NTF-60 Plus

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

Safety Section. DANGER: Never enter bin unless all power is locked out and another person is present. Rotating augers can kill or dismember!

Operating Manual. Model BAC-30RT30/BAC-30DC

APPS-160 Gen 2 User Manual

Operating Instructions Models and Hydrostatic Test Pumps

MODEL 840 AIR HYDRAULIC PUMP INSTRUCTION

RC 195 Receiver-Controller

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

SPECIFICATIONS TABLE Maximum Air Pressure 115 PSI Air Tank Capacity 20 Gallons

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

AIR DRIVE ROLL FEED CARTON STAPLER MODEL: H-1031 MANUAL

HS653 Negative Pressure Ventilation Controller

Elevator Concepts ltd. by Wurtec Krause Riverview, MI Fax:

Lesson 6: Flow Control Valves

1 HP / 1.6 GALLON AIR COMPRESSOR OPERATING MANUAL

2 GALLON TWIN STACK AIR COMPRESSOR W/ HOSE REEL

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

Technical

DRS4-RM Manual. Set Up Instructions for DRS4 Series Single Tank

Model 106 DPI "Micro-switch" Installation and Operating Instructions

Tex-914-K, Calibrating Motorized Gyratory-Shear Molding Asphalt Press

Instruction Manual Updated 7/26/2011 Ver. 2.2

Instructions for High Altitude Conversion

Proportional Pressure-Relief Cartridge Valve, Size 2...4

OPERATING INSTRUCTIONS FOR HTWP21 SERIES AIR DRIVEN TORQUE PUMPS

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

Discharge Relief Valve Operation & Maint.

WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE

Technical

DBML-60/80 Squeeze Tool

Inverse Prop. Pressure-Relief Cart., Size 2 4

170-CG Feed Unit SPONGE-JET USER MANUAL. Sponge-Jet, Inc. (USA) 14 Patterson Lane Newington, NH

HPB25 Hydraulic Paving Breaker

R E D I C O N T R O L S

Propane Conversion Kit Instructions

Budget Range Operators Handbook

Inverse Proportional Pressure-Relief Cart., Size 2 4

Pressure Differential Automatic Manifold For LPG. PDH1000 Series. LPG Installation & Operations Instructions

Copyright, 2005 GPM Hydraulic Consulting, Inc.

Operating Instructions Models 36200, , 46200, Hydrostatic Test Pumps

Inoxair. Repair Manual. Content. Edition: 12/2010. Subject to technical changes for reasons of the continous development.

NGP-250/500 Nitrogen Generator Quick Start Guide

RP series Rotor Pumps

Proportional Pressure-Relief Cartridge Valve, Size 2...4

Inverse Proportional Pressure-Relief Cart., Size 2 4

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

ACCESSORY KIT INSTALLATION INSTRUCTIONS

2 HP / 4 GALLON AIR COMPRESSOR OPERATING MANUAL

3/8" Dr. Air Butterfly Impact Wrench

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

1. ABOUT THE PRODUCT:

NTF-230 OPERATION MANUAL

OPERATION. Estimated kerf width compensation. HPR260 Manual Gas Instruction Manual 4-9

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

ACCESSORY KIT INSTALLATION MANUAL

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Operator: Save these instructions for future use!

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

LV LOADER DIRECTIONAL CONTROL VALVES INSTALLATION & USER GUIDE

Models: C62/63/64-A/D

RIX COMPRESSORS. MICROBOOST Owner s Manual CONFIGURATION A MB-115 MB-230. November 21, 2002 APPLICABILITY [ A]

PRESSURE TEST PUMP OPERATING & MAINTENANCE INSTRUCTIONS. Model No: PTP100. Part No: GC01/09

Model: 43T. Bermad Pressure Relief Valve

Operator: Save these instructions for future use!

Assembly-, installation- and maintenance instruction manual for bladder accumulators IBV / EBV , top reparable

VACUUM REGULATORS CONTENTS

Techcon Systems TS1254 Pressure Pot

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

170-SJ Feed UnitTM 470-SJ Feed UnitTM

Part IV: Troubleshooting

Installation Instructions

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

RASP RX3 Feed UnitTM SPONGE-JET USER MANUAL. Sponge-Jet, Inc. (USA) 14 Patterson Lane Newington, NH

PDY TON HYDRAULIC CRIMPING TOOL WARNING

100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

Operator: Save these instructions for future use!

Transcription:

Published Document Number: IIFUUC01 Specified Date: 20040701 As-of Date: 20040701 Access Date: 20040701 Depth: detail Applicability: not used Language Code: ENG01, Purpose: publication, Format: 1colA Document How to Set Single Stage Press Pressures POST OFFICE BOX 400, KENNER, LOUISIANA 70063-0400, U.S.A.

IIFUUC01 (Published) Book specs- Dates: 20040701 / 20040701 / 20040701 Lang: ENG01 Applic: not used How to Set Single Stage Press Pressures 1. Testing for a working pump and proportional valve Before preparing to get press pressures, remove the power from machine, and check that the proportional valve is fully operational by screwing a plug into the horsepower valve outgoing oil port (Figure 3). This simulates a fully closed proportional valve. The hose end does not have to be plugged. Turn the machine on and watch the top pressure gauge. System should pressurize to maximum system psi (Table 1) under the following conditions: The system relief is set above the maximum system psi (indicated by an amperage draw at or above the motor nameplate rating). If the amperage draw is significantly lower than the nameplate rating, the horsepower valve second stage is set too low. See Step 2 in Setting amperage draw at higher pressures. The pressure compensator is set at or above the maximum psi (indicated by an amperage draw below the motor nameplate rating). The pump is not damaged. The first stage of the horsepower valve is adjusted for full rated amperage (Figure 5). Table 1: Pump Reference Table Press model rating Pump manufacturer Maximum system psi MP1603 35 Bar Kawasaki 4600 MP1604 50 Bar Kawasaki 4350 If the pump pressurizes to maximum system psi during this procedure, but fails to reach maximum system psi during the Verify that machine reaches full system pressure procedure, then check for a faulty proportional valve and/or incorrect voltage output to the proportional valve. 2. Setting idle pressure adjustment Adjust idle pressure to 400 psi at the idle pressure adjustment (Figure 5). Set pressure by turning idle pressure adjustment until system pressure gauge (top gauge) needle rises above 400 psi then reverse adjustment until pressure drops back to 400 psi. If the idle pressure will not adjust, unplug the DBET card. Unplugging this card removes all voltage from the proportional valve. If machine idles, then test card voltages and associated wiring. If idle pressure still cannot be adjusted then inspect valves and piping. 3. Setting horsepower valve first stage Note 1: The ram relief valve (Figure 4) can be adjusted with the system pressurized. 1. Disconnect the ram up proximity switch. 2. Raise ram with 7 (output 7). Continue holding ^key during this step. 3. Start by screwing the ram relief valve adjustment all the way in, then backing out the adjustment one-half turn. Continue adjusting relief until pressure reaches the following value on the ram gauge (middle gauge): 35 bar machines- 1200 psi for 60 cycle, 1350 psi for 50 cycle. 50 bar machines- 625 psi for 60 cycle, 750 psi for 50 cycle.

4. Observe motor amperage draw. 5. If necessary, loosen the big nut on the horsepower valve first stage (Figure 5) and adjust the allen screw to full rated amperage. 6. Secure big nut. 4. Verify that machine reaches full system pressure Note 2: The system relief valve (Figure 4) can not be adjusted with the system pressurized. Release pressure, adjust relief valve then repressurize. Note 3: The pressure compensator valve can be adjusted with the system pressurized. 1. Load goods in the can. 2. Lower ram using 9 (output 9). Hold & key during step. 3. Verify press reaches maximum system psi (top gauge). If system pressure goes over the maximum system psi (Table 1), then the system pressure compensator (Figure 5) is set too high, and must be backed out while observing the top pressure gauge. If system pressure won't reach maximum system psi, but does pressurize, verify that the system relief valve (Figure 4) is not releasing pressure prematurely as follows: 4. Verifying that the system relief valve is not releasing pressure prematurely, Release the & key. Turn the system relief valve adjustment in one turn clockwise, then depress the & key again and observe the top pressure gauge. 1. If the top gauge shows increased pressure, then repeat the above step until the maximum system psi (Table 1) is reached. 2. If the top gauge does not show increased pressure after turning the system relief adjustment, then slowly screw in the pressure compensator (Figure 5) then depress &, while observing the top pressure gauge. 5. If the system will not pressurize, then check if the bypass valve is closing (by checking that the LED is on?) Check wiring for errors if bypass valve is not closing. Cap the valve connection to simulate closed valve. 5. Setting amperage draw at higher pressures (Horsepower valve second stage) 1. Back out the system relief valve (Figure 4) about one turn. Stop, then hold the & key while observing the pressure gauge and motor amperage. Repeat this step until the system maintains approximately 3600-3700 psi. If motor amperage draw is too high at this pressure, loosen the small nut on the horsepower valve (second stage) and slowly turn the allen screw counterclockwise to lower the amperage draw. 2. If motor amperage draw is too low at this pressure, slowly turn the allen screw clockwise to increase amperage draw then lock down the setting. 3. Screw pressure relief valve adjustment in one-half turn, setting the system relief valve above maximum system psi. 6. Verify the system pressure compensator valve setting (Figure 5) 1. Using 9, depress the & key and observe the top pressure gauge and motor amperage.

2. System should reach maximum system psi and motor amperage drop. 7. Setting the system relief valve 1. After verifying the system pressure compensator is set, the system relief valve (Figure 4) must be set slightly higher than maximum system psi. 2. After setting the system pressure compensator, back out the system relief valve adjustment one turn, then pressurize the system and observe gauge. Repeat, backing out the system relief valve until system pressure drops below maximum system psi. This indicates that the system relief valve is now controlling the system pressure. Set the system relief slightly higher than maximum system psi by turning the system relief valve in a half a turn, and locking down adjustment. 8. Setting the ram relief valve (Figure 4) 1. Disconnect the upper proximity switch. 2. Raise ram and using mode 7, hold the ^ key. 3. Watch the system pressure gauge and motor amperage while turning in the ram relief valve (Figure 4). 4. The ram relief should reach 1200 psi. 5. Motor amperage draw can exceed nameplate rating by one or two amps. 6. Test by raising ram. Ram should reach 1200 psi. 7. Reconnect upper proximity switch. 9. Setting the can relief valve (Figure 4) 1. Disconnect the can up proximity switch. 2. Raise can and maintain up key depressed. 3. Watch the can pressure gauge (bottom gauge) while adjusting the can relief valve. 4. Continue adjusting can relief until it reaches 800 psi. 5. Test by raising can. Can should reach 800 psi. 6. Reconnect the can up proximity switch. 10. Set the Pre-Fill Valve 1. Load machine with goods. 2. Using mode 9, hold the & while watching the system pressure gauge (top gauge). 3. Adjust the prefill valve relief until prefill pressure gauge indicates 2000 psi. 11. Adjusting the Proportional Valve Ramp Down Adjustment Check to see if the DBET card proportional valve circuit returns the pump swash plate to the vertical position quickly after a press cycle. Damaging vibrations result if the circuit returns the plate too slowly, Note 4: Two testers are required for the following system test and adjustment. 1. Load machine with damp laundry.

2. One tester stands on top of the machine and holds the two hydraulic lines at the points indicated in Figure 1. 3. The other tester operates the machine in manual mode while watching the system pressure gauge carefully. 4. System pressure should climb smoothly until the press reaches maximum system psi. 5. Release the pressure. System pressure should drop smoothly to idle pressure. 6. If the tester on top of the machine hears chattering noises and feels vibrations in the hydraulic tubing, and the tester watching the system pressure gauge notices that the system pressure drops abruptly to 0 then bounces back to 2500 to 3500 psi, then adjust the DBET ramp down adjustment as follows: a. Turn the ramp down adjustment (Figure 2) approximately 20 turns clockwise. b. Test machine again. Continue adjustment until chattering and pressure spikes are minimized. Figure 1: Where to hold pipes for chattering test Figure 2: DBET card (ramp down adjustment)

Figure 3: Outgoing oil port for 35 Bar Machines

. How to Set Single Stage Press Pressures Figure 4: System and can relief for All Machines System and can relief 7 Legend 7. System relief 8. Can relief 9. Ram relief Ram relief 9

How to Set Single Stage Press Pressures Figure 5: Kawasaki pump adjustment and pre-fill valve Horsepower first and second stage adjustments Idle and system pressure compensator adjustment Prefill valve pressure gauge and relief Legend 1. 2. 3. 4. 5. 6. 7. First stage adjustment Second stage adjustment Idle pressure adjustment System pressure compensator adjustment Prefill regulator pressure gauge Prefill regulator relief valve Prefill pilot valve electrical connector (LED within). End of IIFUUC01