REACTIVATION AND RIPARIAN RESTORATION PROJECT THREE CREEKS CONFLUENCE OPEN SPACE: PRELIMINARY DESIGN CONCEPT #1 J O R D A N R I V E R 900 WEST

Similar documents
FRANKLIN RANCH COMMUNITY PARK

Fulton Market Streetscape

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Chapter 3: Multi-Modal Circulation and Streetscapes

Clarkson Walkability Audit: Results and Recommendations Summary

Hennepin County Transportation Department

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access

NJDOT Complete Streets Checklist

Raleigh Park Open House #2 Summary (5/23/17)

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MISSISSIPPI EAST BANK TRAIL

Southcote Road Improvements Class Environmental Assessment Study

Community Open House December 13, A project of the Green Infrastructure Center, supported by Skeo Solutions

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Welcome to the Sellwood Bridge Project Open House!

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

Introduction Parks Open Space Standards Recreation & Open Space Land Use Design Principles

Downtown Connector Trail

Observations and Ideas: Toomer s Corner Streetscape Improvements

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

TREASURE VALLEY WEST industrial park

Financial Project ID No(s).: and ETDM No(s).: and 14181

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Chapter 4: Funding and Implementation

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Streetscape: Core Shopping District

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Waikanae River Environmental Strategy. 12. Arapawaiti/Otaihanga Reach

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Getting the facts 8th Street Pedestrian Bridge Preferred Option

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

Active Transportation Rail to River Corridor. Community Meeting - Segment A

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

STREETSCAPE CONCEPTS

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

WELCOME. City of Eden Prairie West 70 th Street

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Lawrence Avenue Streetscape Concepts August 30, 2011

LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT

HANGING ROCK STATE PARK EXPANSION MASTER PLAN PHASE TWO INITIAL CONCEPTS INSTRUCTIONS

S T A T I O N A R E A P L A N

2012 PRIORITY TRANSPORTATION PROJECTS

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Austin Avenue Bridges Project. Public Meeting Summary

XI TERMINAL A TER T A W

JAP Additional Information Sheet

Option W: N. Washington Street Project

Hospital Link Project Project Update November 2017

Neil Street Plaza Placemaking Plan

Culpeper District. Albemarle County Monthly Report September, 2011

Knox Street Complete Streets Project

Lincoln Highway Streetscape Plan Concept Plan

TRANSPORTATION NEEDS ASSESSMENT

including shade trees; Recommend minimum 13 ft total sidewalk

Trail Feasibility. 1. Introduction FINAL. October What s inside?

RZC Appendix 8A Marymoor Subarea Street Requirements

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

Culpeper District. Albemarle County Monthly Report October, 2011

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Montco 2040 Implementation Grant Program Award Summary

Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017

The Colosseum Court at Mediterra

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

NATIONWIDE PERMIT ACTIONS OCTOBER - DECEMBER Action Type Project Name Closure Method County State SPA NWP

TLC GRANT K / WATER STREETSCAPE ENHANCEMENTS WILL HANDSFIELD, AICP TRANSPORTATION DIR, GEORGETOWN BID

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

4.13 TRANSPORTATION AND CIRCULATION

AN EARTHWORK HILL, RINGED WITH SEATING AND SHAPED TO SLOPE DOWN TO THE RIVER, FORMS THE CENTERPIECE TO A NEW SOCIAL PIER. A WOOD SEATING TERRACE

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

MARTIN LUTHER KING JR. WAY

STREETSCAPE CONCEPT PLAN

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

Introduction. North 12 th Complete Street Project Overview

Complete Streets. Designing Streets for Everyone. Sarnia

HELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

CITY OF WARRENVILLE MEMO

LAKE-TO-LAKES TRAIL. City Planning Commission October 7, 2014

CITY OF SOUTH DAYTONA

US287 Asset Inventory Loveland. Figure 6-1 Loveland Bridges and Traffic Signals

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Ocean Park Boulevard Green Street Project Community Workshop

Transcription:

JORDAN RIVER PARKWAY TRAIL DECORATED SHIPPING CONTAINER STORAGE COMMUNITY ART SPACE / EVENT VENUE STALL PARKING LOT / EVENT STAGING "THREE CREEKS OPEN SPACE" SIGN 9 FISHING PIER PLAZA FOOT BRIDGE OVER WETLAND OUTLET LAZY CREEKS WETLAND CROSSWALK AND RAMPS PICNIC SHADE STRUCTURE PRELIMINARY DESIGN CONCEPT #

JORDAN RIVER PARKWAY TRAIL DECORATED SHIPPING CONTAINER STORAGE COMMUNITY ART SPACE / EVENT VENUE STALL PARKING LOT / EVENT STAGING "THREE CREEKS OPEN SPACE" SIGN 9 FISHING PIER PLAZA FOOT BRIDGE OVER WETLAND OUTLET LAZY CREEKS WETLAND CROSSWALK AND RAMPS PICNIC SHADE STRUCTURE PRELIMINARY DESIGN CONCEPT #

JORDAN PARK FREMONT AVENUE LEGEND EXISTING PROPERTY LINE BEND IN THE RIVER PARK EXISTING PARCEL EXISTING FENCE (TO BE REMOVED) EXISTING PEDESTRIAN CROSSING EXISTING ASPHALT TRAIL EXISTING CONCRETE TRAIL EXISTING BRIDGE PROPOSED FLOOD CONTROL ACCESS PROPOSED PROPERTY BOUNDARY FENCING PROPOSED PEDESTRIAN BRIDGE TH SOUTH TRAILHEAD MODESTO PARK MODESTO AVENUE CALIFORNIA AVENUE SEE FOCUS AREA PENNY WISE SLCAP HEAD START WESEMAN PARK LUCY AVENUE PROPOSED PARKING LOT PROPOSED CANNON GREENS PRELIMINARY DESIGN CONCEPT # SORENSON MULTI-CULTURAL CENTER 0 00 00

JORDAN RIVER PARKWAY TRAIL RIVER KEEPER OFFICES COMMUNITY GATHERING PLAZA STALL PARKING LOT / EVENT STAGING "THREE CREEKS OPEN SPACE" SIGN 0 9 0 FOOT WIDE CRUSHER FINES TRAIL ' X 0' ICONIC SUSPENSION BRIDGE CROSSWALK AND RAMPS WITH PEDESTRIAN ACTUATED SIGNALS DAYLIGHTED SOUTH CULVERT CREEK 0 FOOT BRIDGE OVER RIPARIAN WETLAND DECORATED SHIPPING CONTAINER STORAGE PEDESTRIAN CROSSING SIGNALS PRELIMINARY DESIGN CONCEPT #

JORDAN RIVER PARKWAY TRAIL RIVER KEEPER OFFICES COMMUNITY GATHERING PLAZA STALL PARKING LOT / EVENT STAGING "THREE CREEKS OPEN SPACE" SIGN 0 9 0 FOOT WIDE CRUSHER FINES TRAIL ' X 0' ICONIC SUSPENSION BRIDGE CROSSWALK AND RAMPS WITH PEDESTRIAN ACTUATED SIGNALS DAYLIGHTED SOUTH CULVERT CREEK 0 FOOT BRIDGE OVER RIPARIAN WETLAND DECORATED SHIPPING CONTAINER STORAGE PEDESTRIAN CROSSING SIGNALS PRELIMINARY DESIGN CONCEPT #

JORDAN PARK FREMONT AVENUE LEGEND EXISTING PROPERTY LINE BEND IN THE RIVER PARK EXISTING PARCEL EXISTING FENCE (TO BE REMOVED) EXISTING PEDESTRIAN CROSSING EXISTING ASPHALT TRAIL EXISTING CONCRETE TRAIL EXISTING BRIDGE PROPOSED FLOOD CONTROL ACCESS PROPOSED PROPERTY BOUNDARY FENCING PROPOSED STREAMBANK RESTORATION TH SOUTH TRAILHEAD MODESTO PARK MODESTO AVENUE CALIFORNIA AVENUE SEE FOCUS AREA PENNY WISE SLCAP HEAD START WESEMAN PARK LUCY AVENUE PROPOSED LANDSCAPE BERMING PROPOSED PEDESTRIAN BRIDGE PROPOSED PEDESTRIAN TRAIL PROPOSED PARKING LOT PROPOSED CANNON GREENS PRELIMINARY DESIGN CONCEPT # SORENSON MULTI-CULTURAL CENTER 0 00 00

SHADY PLAZA FLEX SPACE DECORATED SHIPPING CONTAINER STORAGE FOOD TRUCK / MAINTENANCE ACCESS JORDAN RIVER PARKWAY TRAIL 0 FOOT WIDE CRUSHER FINES TRAIL THREE CREEKS DELTA OVERLOOK PEDESTRIAN CROSSING SIGNALS ARTIFICIAL THREE CREEKS DELTA 0 FOOT BRIDGE OVER DELTA ENERGY DISSIPATER PLANTER OVERLOOK PLATFORM CROSSWALK AND RAMPS WITH PEDESTRIAN ACTUATED SIGNALS OVERHEAD ARTISTIC FEATURE OVERHEAD ARTISTIC FEATURE SUPPORT PRELIMINARY DESIGN CONCEPT #

SHADY PLAZA FLEX SPACE DECORATED SHIPPING CONTAINER STORAGE FOOD TRUCK / MAINTENANCE ACCESS JORDAN RIVER PARKWAY TRAIL 0 FOOT WIDE CRUSHER FINES TRAIL THREE CREEKS DELTA OVERLOOK PEDESTRIAN CROSSING SIGNALS ARTIFICIAL THREE CREEKS DELTA 0 FOOT BRIDGE OVER DELTA ENERGY DISSIPATER PLANTER OVERLOOK PLATFORM CROSSWALK AND RAMPS WITH PEDESTRIAN ACTUATED SIGNALS OVERHEAD ARTISTIC FEATURE OVERHEAD ARTISTIC FEATURE SUPPORT PRELIMINARY DESIGN CONCEPT #

JORDAN PARK FREMONT AVENUE LEGEND EXISTING PROPERTY LINE BEND IN THE RIVER PARK EXISTING PARCEL EXISTING FENCE (TO BE REMOVED) EXISTING PEDESTRIAN CROSSING EXISTING ASPHALT TRAIL EXISTING CONCRETE TRAIL EXISTING BRIDGE PROPOSED FLOOD CONTROL ACCESS PROPOSED PROPERTY BOUNDARY FENCING PROPOSED STREAMBANK RESTORATION TH SOUTH TRAILHEAD MODESTO PARK MODESTO AVENUE CALIFORNIA AVENUE SEE FOCUS AREA PENNY WISE SLCAP HEAD START WESEMAN PARK LUCY AVENUE PROPOSED LANDSCAPE BERMING PROPOSED PEDESTRIAN BRIDGE PROPOSED PEDESTRIAN TRAIL PROPOSED PARKING LOT PROPOSED CANNON GREENS PRELIMINARY DESIGN CONCEPT # SORENSON MULTI-CULTURAL CENTER 0 00 00