TPN3/03372 TRNSPORTLE UILDING PERIODIC INSPECTION REPORT Issued in accordance withritish Standard 77-Requirements for Electrical Installations by an pproved Contractor enrolled with NICEIC, Warwick House, Houghton Hall Park, Houghton Regis, Dunstable LU ZX.. TRNSPORTLE UILDING MNUFCTURER Client / Excel Modular ddress: Compass House 7-9 Empringham Street Hull Unknown ddress: Unknown Purpose for which this report is required: E. EXTENT OF THE INSTLLTION ND ITTIONS OF INSPECTION ND TESTING Ú (see note below) Re-location of the unit and Modification works. Extent of the 0 Fixed Inspection and R +R2 at all EOL. ll Dead testing as no electrical permanent earth for testing. Functional test from a site generator. installation covered by this report: F. PRTICULRS OF THE PPROVED CONTRCTOR Trading Title: ddress: None greed limitations (including the reasons),if any, on the inspection and testing: I/We being the person(s) responsible for the inspection and testing of the electrical installation (as indicated by my/our signatures below), particulars of which are described above (see and C), having exercised reasonable skill and care when carring out the inspection and testing, hereby delcare that the information in this report, including the observations (see H) and the attached schedules (see M,N,O and P), provides an accurate assessment of the condition of the electrical installation taking into account the stated extent of the installation and the limitations of the inspection and testing (see E). I/We further declare that in my/our judgement, the said installation was overall in Ý a satisfactory condition (see I) at the time the inspection was carried out, and that it should be further inspected as recommended (see J). Ý (Insert "a satisfactory"or "an unsatisfactory",as appropriate) 82 eech Road Elloughton East Yorkshire Postcode: HU JY 030000 Û (see note below) G. DECLRTION eech Electrical Limited NICEIC Enrolment No: (Essential information) Model: name: EM000 Description: Mobile Unit Postcode: UNKNOWN Postcode: HU9 RP D. PURPOSE OF THE REPORT C. TRNSPORTLE UILDING DETILS. DETILS OF THE CLIENT ranch No: INSPECTION, TESTING ND SSESSMENT Y: REPORT REVIEWED ND CONFIRMED Y: *(See note below) Signature: Signature: (CPITLS) SIMON OWER Position: Electrician Date: 3/2/20 (CPITLS) GRY SLTER (Registered Qualified Supervisor for the pproved Contractor at F) Date: 3/2/20 Ú This Transportable uilding Periodic Inspection Report must be used only for reporting on the condition of an existing installation. Û The inspection and testing have been carried out in accordance with S 77, as amended. Cables concealed within trunking and conduits, or and conduits concealed under floors, and generally within the fabric of the transportable building, have not been visually inspected. * This Transportable uilding Inspection Report should be reviewed and confirmed by the registered Qualified Supervisor of the pproved Contractor responsible for issuing it. This form is based o nthe model Periodic Inspection Report shown in ppendix of S 77:200. Copyright Certsure LLP (May 203). Published by Certsure LLP. Certsure LLP operates the Elecsa & NICEIC brands. Please see the 'Notes for Recipients' on the reverse of this page. Page of
H. OSERVTIONS ND RECOMMENDTIONS FOR CTION TO E TKEN TPN3/03372 I. SUMMRY OF THE INSPECTION General condition of the installation: The installation is showing no signs of wear and tear. Referring to the attached schedules of inspection and test results, and subject to the limitations at E: There are no items adversely affecting electrical safety. or The following observations and recommendations are made. Item No Ú Code Note: If necessary, continue on additional page(s), which must be identified by the Transportable uilding Periodic Inspection Report serial number and page number(s). Evidence of alterations or additions: Yes Electrical Installation Certificate no. or previous Periodic Inspection Report no.: Date(s) of the inspection If yes, estimated age: years Date of previous inspection: Overall assessment of the installation Satifactory (Entry should read either 'Satisfactory' or 'Unsatisfactory' ) Ú Where observations are made, the inspector will have entered one of the following codes against each observation to indicate the action (if any) recommended:- J. NEXT INSPECTION (Enter interval in terms of years or months, as appropriate) Note: If necessary, continue on additional page(s), which must be identified by the Leisure ccommodation Vehicle Periodic Inspection Report serial number and page number(s).. 'requires urgent attention' or 3. 'requires further investigation' or I/We recommend that this installation is further inspected and tested after an interval of not more than: provided that any item at H which have been attributed a Recommendation Code (requires urgent attentionand Code 2 ( requires improvement) are remedied without delay and as soon as possible resectively. Items which have been attributed a Recommendation Code 3 should be actioned as soon as practicable (see H). 2. 'requires improvement' or 4. 'does not comply with S 77' Please see the reverse of this page for guidance regarding recommendations. Urgent remedial work recommended for Items: Corrective action(s) recommended for Items: K. TRNSPORTLE UILDING PRMETERS Nominal frequency: Nominal voltage UÒ/U: No of Phases: V/ V Maximum load per phase provision: cceptable system type(s): Hz Maximum tolerable fault current: Maximum tolerable upstream earth fault loop impendance, Z mps k É : T PRTICULRS OF TRNSPORTLE UILDING INSTLLTION Nominal voltage(s) U Main Switch UÒ Number of phases Type [S (EN)...] 240 0947-2 MC Protective measure(s) against electric shock: DS Voltage rating 240 Rated current, IÐ () Short-circuit capacity (k) 3 Main equipotential bonding to extraneous-conductive-parts: Water supply Gas supply This form is based on the model Periodic Inspection Report shown in ppendix of S77: 20. Published by the NICEIC a part of the scertiva Group Copyright Certsure LLP (May 203) Oil supply Transportable building structual steelwork (if any) Residual operating current IÜ Main protective bonding conductors: Other Material COPPER csa Please see the 'Notes for Recipients' on the reverse of this page. 0 Page 2 of
TRNSPORTLE UILDING PERIODIC INSPECTION REPORT SCHEDULES ÚSee note below SCHEDULE OF ITEMS INSPECTED dditional protection Protective measures against electric shock SELV Double or reinforced insulation Double or reinforced insulation asic protection Insulation of live parts Fault protection utomatic dis of supply Presence of earthing conductor Presence of danger notices Presence of circuit protective conductors Presence of main protective bonding conductors Presence of other warning notices,including presence of mixed wiring colours Labelling of protective devices, switches and terminals Identification of conductors Cables and conductors Selection of conductors for current carrying capacity and voltage drop Electrical seperation For one item of current-using equipment Presence of fire barriers, suitable seals and protection against thermal effects General Choice and setting of protective devices(for fault protection and/or overcurrent) Segregation of safety circuits Identification Presence of diagrams, instructions, circuit charts and similar information arriers or enclosures Routing of in prescribed zones Cables incoprporating earthing armour or sheath or run in an earthed wiring system,or otherwise protected against nails, screws and the like dditional protection by 30m RCD (where required, in premises not under the supervision of skilled or instructed persons) Connection of conductors of supplementary bonding Presence conductors Prevention of mutual detrimental influence of non-electrical services and Proximity other influences or and I and and II Segregation circuits of and II insulation used asic and fault protection Extra low voltage Cables and conductors (cont) Presence of residual current device(s) Erection methods Presence and correct location of appropriate devices for isolation and switching dequacy of access to switchgear and other equipment Particular protective measures for special installations and locations Connection of single-pole devices for protection or switching in line conductors only Correct s of accessories and equipment Selection of equipment and protective measures appropriate to external influences Selection of appropiate functional switching devices SCHEDULE OF CIRCUIT DETILS Circuit conductors: csa Operating current, IÜ Maximum Ö permitted by S 77 () (m). 0.4 98 MC. 2 Heater. 0.4 98 MC 0 4.0 3 Heater. 0.4 98 MC 0 4.0 4 Lighting. 0.4 98 MC 7.7 External Socket. 0.4 98 MC 20 2.30 Water Heater. 0.4 98 MC 2.87 cpc Number of points served Circuit number Live Max. dis time permitted by S 77 Skt Ring Final Reference method Type of wiring (see code) Rating RCD Type No Circuit designation S (EN) (s) SCHEDULE OF ITEMS TESTED Continuity of protective conductors Continuity of ring final circuit conductions Insulation resistance between live conductors Verification of phase sequence Operation of residual current device(s) Functional testing of assemblies Verification of voltage drop Insulation resistance between live conductors and earth Ú See note elow TPN3/03372
O (Other - please state) H Mineralinsulated SCHEDULE OF TEST RESULTS Circuit conductors: csa Maximum Ö permitted by S 77 (s) Operating current, IÜ Rating RCD () (m) S (EN) Type No Max. dis time permitted by S 77 cpc Number of points served Live Reference method Type of wiring (see code) Circuit number Circuit designation Circuit impedances Ring final circuits only (measured end to end) Insulation resistance ll circuits Line/Neutral Line/Earth RCD operating times at IÜ Neutral/Earth Ú at IÜ rã (Line) rð (Neutral) rå (cpc) Rã + Rå ()...4.7.22.23...2 CODES FOR TYPE OF WIRING C D E F G Thermoplastic Thermoplastic Thermoplastic Thermoplastic Thermoplastic Thermoplastic/Thermosetting/ insulated/ in in non in in non SW sheathed metallic conduitmetallic conduit SCHEDULE OF CIRCUIT DETILS
O (Other - please state) H Mineralinsulated Circuit impedances Ring final circuits only (measured end to end) Insulation resistance ll circuits Line/Neutral Line/Earth RCD operating times at IÜ Neutral/Earth Ú at IÜ rã (Line) rð (Neutral) rå (cpc) Rã + Rå Test instruments (serial numbers) used: Multi-functional Multi-functional Insulation resistance Insulation resistance Continuity Continuity () CODES FOR TYPE OF WIRING C D E F G Thermoplastic Thermoplastic Thermoplastic Thermoplastic Thermoplastic Thermoplastic/Thermosetting/ insulated/ in in non in in non SW sheathed metallic conduitmetallic conduit SCHEDULE OF TEST RESULTS RCD RCD Ú ll boxes must be completed.'' indicates that an inspection or a test was carried out and that the result was satisfactory.'x' indicates that the inspection or test w as carried out and the result w as unsatisfactory. '' indicates that an inspection or a test w as not applicableto the particular installation. '' indicates that exceptionally, a limitation agreed with the person ordering the work (as recorded in section E) prevented the inspection or test being carried out. This form is based on the model Electrical Inspection Certificate shown in ppendix of S77: 20. Published by the NICEIC a part of the scertiva Group Copyright Certsure LLP (May 203) Page of