NOTES OF MEETING AIRPORT ROAD (KING STREET TO HUNTSMILL DRIVE) ENVIRONMENTAL ASSESSMENT (EA) COMMUNITY WORKING GROUP (CWG) ORIENTATION SESSION

Similar documents
Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

Welcome Environmental Assessment Airport Road from King Street to Huntsmill Drive. Public Information Centre No. 1 June 4, 2018 Please sign in

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Highway 56 Traffic Study Rymal Road to Cemetery Road

Southcote Road Improvements Class Environmental Assessment Study

Welcome to the Open House

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

Casablanca Boulevard & GO Station Access

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.

WELCOME TO OPEN HOUSE # 1 June 14, 2017

TRANSPORTATION NEEDS ASSESSMENT

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

to the Public Information Centre for the Downtown Traffic Study

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

IBI Group November 5, 2012

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

Sustainable Transportation Initiatives and Plans in Caledon

Ann Arbor Downtown Street Plan

Transportation Master Plan Advisory Task Force

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

City of Waterloo Complete Streets Policy

Executive Summary Route 30 Corridor Master Plan

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Durham Region Long Term Transit Strategy

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

Active Transportation Infrastructure Investment A Business Case

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Sixth Line Development - Transit Facilities Plan

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Welcome. Background. Goals. Vision

Executive Summary... iv

Eastern PA Trail Summit October 1, 2018

Public Works and Infrastructure Committee. General Manager, Transportation Services

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Tonight is for you. Learn everything you can. Share all your ideas.

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

WELCOME Public Information Centre

Why invest in the 1 Street S.W. Corridor?

Public Information Centre

Journey to Excellence. Building Markham s Future Together MARCH 24, 2015 HIGHWAY 407 TO HIGHWAY 7 MAIN STREET MARKHAM

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

Comments The Plan for Port Whitby

2014 Review/2015 Business Plan

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

CITY OF ABBOTSFORD TRANSPORTATION AND TRANSIT MASTER PLAN

Living Streets Policy

Plant City Walk-Bike Plan

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

122 Avenue: 107 Street to Fort Road

Bank Street Widening Class EA Study Leitrim Road to Rideau Road. Gloucester South Seniors Centre, 4550 Bank Street

Active Transportation in Niagara-on-the-Lake

River Road - Proposed Road Safety Enhancement Measures

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Welcome. If you have any questions or comments on the project, please contact:

TYSONS CORNER BICYCLE MASTER PLAN

Service Business Plan

Johnwoods Street Closure Summary Response

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Terwillegar Drive Expressway Draft Concept Plan

Chapter 5. Complete Streets and Walkable Communities.

Appendix O. Assessment of Bicycle Facility Alternatives

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Edenbrook Hill Drive Traffic Calming Study

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

List of Display Boards

Florida Redevelopment Association 2015 Annual Conference

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road

Bicycle Master Plan Goals, Strategies, and Policies

County of Simcoe Transportation Master Plan

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Implementing Active Transportation (AT) Facilities in Small Communities

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

Thursday, May 18, p.m. Kortright Hills Public School Library, 23 Ptarmigan Drive, Guelph

Ocean Park Boulevard Green Street Project Community Workshop

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Transcription:

NOTES OF MEETING AIRPORT ROAD (KING STREET TO HUNTSMILL DRIVE) ENVIRONMENTAL ASSESSMENT (EA) COMMUNITY WORKING GROUP (CWG) ORIENTATION SESSION Thursday, November 30, 2017 6:00 p.m. 8:00 p.m. Caledon Community Complex, Banquet Hall A, 6215 Old Church Road, Caledon East Present: Absent: Observers: ITEM 1. Welcome and Introductions Region of Peel: Sally Rook (Manager, Infrastructure Programming & Studies), Sonya Bubas (Project Manager) and Asha Saddi (Facilitator and EA communication lead) CWG Members: Jackie Teunissen, Errol Munn, David Kerr, Ken Singh, Wayne Noble, Bob Cannon, David Caravaggio, Doug Maskell, Romeo Barbosa, Andrew Pearce, Don Cardwell and Dan Lightfoot Neil Marr and two other members Ben Steffen and Eric Gunter All were welcomed to the CWG Orientation Session for the Airport Road EA and members were congratulated for being selected to participate on the CWG. The Region of Peel (Region) staff were introduced: Asha Saddi - CWG Facilitator and EA communication lead Sonya Bubas - Project Manager for the EA, and Sally Rook - Manager, Infrastructure Programming and Studies Members confirmed that a 6p.m. start for meetings worked well. All correspondence between the CWG and Project Team are to be forwarded to Asha Saddi. Replies will be sent to all members, in the interest of openness and transparency. Notes will be taken at each meeting to record ideas and discussion, and forwarded to members in draft for confirmation and comment. Requests for changes must be submitted within two weeks of distribution, after which the notes will be posted to the project website. All were advised that meeting notes will include the names of members. There were no objections to including the names of members. Roundtable introductions of members took place with comments on their interest to become part of the CWG: A property owner interested in rebuilding property for commercial use A property owner interested in improving Airport Road and increasing the attractiveness of the corridor A property owner interested in learning more about the project A resident interested in improvements following a pedestrian fatality on the roadway A local resident interested in traffic on Airport Road A resident involved in the Town of Caledon s Cycling Task Force and Secondary Plan; interested in safety for cycling, including walking trails in the Secondary Planning area A long term local resident with engineering experience on similar projects; can add value to the EA work A business owner interested in attracting more businesses to the Town and beautifying the area between the sidewalks and structures A long term local resident suggested there is conflict between transportation and a thriving community; interested in safety and the environment A local property owner interested in traffic A resident concerned for traffic safety and vacant buildings A local resident involved in Eco-Caledon; concerned for trucks passing through the Town All comments by Observers will be recorded as public comments and not as part of the CWG discussions. 1

2. Opening Remarks All were informed of the agenda, which would provide: An overview of the project and EA process Role of the CWG and how it fits into the EA A PowerPoint presentation to summarize the above information (see attached) The CWG Facilitator is committed to: Ensure everyone s voice is heard Treat everyone equal Help everyone feel comfortable to participate Keep the discussion on topic The CWG is expected to: Treat everyone equal Participate Respect each other s viewpoints Bring thoughts and ideas to the CWG meetings - not agendas Allow one person to speak at a time CWG does not have a voting status; CWG will make recommendations to the Project Team, who in turn will make decisions based on the EA process. CWG members are project Ambassadors who will liaise with community members for input and in so doing the personal viewpoints of CWG members will not represent the viewpoint of CWG as a whole. All were asked to review, sign and return the photo consent form; the forms could be returned during or following the Session. The Region provided an overview of the Airport Road EA: Study Area The EA will examine improvements to Airport Road from 100m north of King Street to 300m north of Huntsmill Drive, in the Town of Caledon. The study area is approximately 7.5km in length and is a major two lane arterial road. Background Recommendations from the following studies led to the need for this EA to examine improvements to Airport Road: 1) Long Range Transportation Plan Update (2012) identified the need for widening Airport Road from 2-4 lanes between King Street and Huntsmill Drive and recommended improvements for active transportation facilities 2) Caledon East Feasibility Studies (2015) determined sufficient capacity on Airport Road, indicating no need for widening and recommended: a) Traffic calming to reduce speed, and b) Upgrading Olde Base Line Road to a truck route; The Region will complete a separate feasibility study to examine Olde Base Line Road as a potential future truck route. 3) Airport Road EA from Mayfield Road to King Street (2015) recommended road widening to 5 lanes, two roundabouts and active transportation (e.g. paved shoulders in rural areas and bike lanes in urban areas). The current EA will tie in to the proposed intersection improvements (roundabout) at King Street. 4) Caledon East Community Improvement Plan (2014) encourages revitalization and community improvement, safe pedestrian crossings and active transportation 5) Peel Sustainable Transportation Strategy (Draft, 2017) is looking at pedestrian improvements on Airport Road from Cranston Drive to Leamster Trail and proposed pedestrian and cycling networks Is the Toronto and Region Conservation Authority (TRCA) involved in the study? The TRCA is participating through the Technical Advisory Committee (TAC). When is the Airport Road EA from north of Mayfield Road to north of King Street going to construction and why is it a 5 lane widening? Construction is anticipated to begin in 2022. It is a 4 lane widening and the fifth lane will be a centre turning lane. Study Purpose The purpose of the study is to examine the need for improvements on Airport Road from King Street to Huntsmill Drive, specifically: 2

Long-term improvements related to planned future growth Intersection improvements including roundabouts Traffic calming measures Active Transportation improvements Streetscaping to support the Caledon East Community Improvement Plan and the Region s Streetscaping Toolbox Update (2017) The Region s project consultant, IBI Group, will complete technical studies for the EA, including the transportation and traffic analysis This study will not be considering road widening for additional through lanes along Airport Road When the study reviews the traffic along Airport Road, in its analysis the results should not have negative impacts on the community. The EA will be looking at transportation issues and the impacts to the environment. Environment encompasses all natural, social, economic and cultural impacts. What makes Airport Road a goods movement route? The use of the road by trucks; Goods movement is important to Peel s economy. Traffic congestion causes delays in moving goods which in turn results in high costs for the Peel economy. Airport Road is designated as a truck route. When the Town authorizes permits for gravel trucks does it also approve the truck route? Why are trucks not able to go down Highway 10 instead of across Caledon East? The Region has contacted the Town of Caledon to get more information. Some members expressed concern about road safety, given increased traffic. Pedestrians and in particular seniors were experiencing difficulty crossing the road safely and it would be helpful to have the Police address this. A fatality had also resulted when a resident crossed the road to pick up mail from the mail box located across the road just north of King Street. The Region pointed out that the Region had consulted with Canada Post in the previous EA (Mayfield to King) and Canada Post said they will be converting from rural delivery to super mailboxes for the area. Municipal Class EA This EA is a two-year study, following the Municipal Class EA process 1 for Schedule C projects, and has an anticipated completion date in 2019 The Schedule C Class EA study process has 4 phases: Phase 1: Problem and/or Opportunity the results of the transportation and traffic analysis will contribute to the Problem and Opportunity Statement for this EA, which will be reviewed at the next CWG meeting Phase 2: Identify and assess Alternative Solutions to the Problem and/or Opportunity Phase 3: Develop and assess Alternative Design Concepts to implement the Preferred Solution Phase 4: Document the planning process in an Environmental Study Report for a 30-day public review period TAC will meet twice during the study: at Phases 2 and 3. The CWG will meet after each TAC meeting. The next CWG meeting is anticipated to be held in February/March 2018. The Region will also consult with the public twice during the study through a Public Information Centre (PIC): at Phases 2 and 3. Will the TRCA and the [agency representing the] Oak Ridges Moraine be consulted? The Region has to follow agency approval systems and agencies were invited to review the Study s Terms of Reference. Parts of the study area may cross a portion of the Oak Ridges Moraine, Greenbelt, and Niagara Escarpment Planning Area, which will be considered in the EA. To date, the Niagara Escarpment Commission has indicated an interest in participating on the TAC and the TRCA is included. Are representatives from the Town of Caledon on this study? The Town sits on the TAC. The TAC and CWG meetings are held separately. The Project Team can share the information from the TAC meetings with the CWG. The CWG requested a representative from the Town to attend a future CWG meeting. The Group felt it would be beneficial to have a Town representative to be available. The Region has invited Town of Caledon representatives to attend the next CWG meeting. 1 Municipal Engineers Association, Municipal Class Environmental Assessment (2000, last amended in 2015) 3

Consultation Plan The Region will reach out to the public, technical agencies, Indigenous groups and area municipalities, such as the Town of Caledon through: Public notices (e.g., the Notice of Study Commencement mailed to agencies and the public in September) PICs TAC meetings CWG meetings Region of Peel Project website and Twitter account Technical Studies The Consultant Team will complete 11 technical studies for this EA, as outlined on slide 9 of the presentation. In response to questions: 1. The Transportation and Traffic Analysis was recently initiated and the results will be reviewed at the next meeting. This study will contribute to the Problem and Opportunity Statement, which will also be reviewed at the next meeting together with the existing conditions of the study area 2. The Air Quality and Noise Assessments will consider the existing conditions and assess the potential future conditions with and without the project 3. The Cultural and Built Heritage Assessment will confirm the heritage sites in the study area 4. The Natural Environment Assessment will assess the potential impacts on watercourses and vegetation communities Which studies will be completed for the next CWG meeting in February/March 2018? The Transportation and Traffic Analysis will be completed before the next meeting and the results will be discussed at that time. Transportation The portion of Airport Road in the study area serves local traffic, through traffic and is a truck route The study corridor includes the communities of Caledon East and Mono Road Development is pushing northerly from the southern limits Limited space within the right-of-way Is there an opportunity for the road improvements that come out of this study to be completed with the construction that will take place in 2022 on Airport Road? This will be dependent on the EA and construction timings: this EA is anticipated to be completed in 2019 after which there is an approval period for the EA recommendation. The following construction timing includes two years for detailed design, a year for utility relocations, if required, and two years for property acquisition, if required. Funds for construction are allocated for 2023 in the current 10 year Capital Budget. 4. CWG Roles & Responsibilities The CWG consists of 15 members who are property owners, residents, business owners, farmers, employers and people who work in the area. The CWG Terms of Reference: Provide input to help the Project Team identify a solution for the study area that meets the needs of the community and is technically and financially sound a. Share knowledge of the study area, road users and community character b. Be informed and engaged by asking questions throughout the study c. Receive information from community members as issues and ideas come together and serve as Ambassadors between the Project Team and the community The CWG meetings will engage members with varied interests that represent the views of the community in a more in-depth level of discussion than is normally available through the PIC. 5. Group Discussion CWG members discussed their: Affiliations members represented: Residents Property owners, and Cycling Task Force for the Town of Caledon Interests members expressed their interests as: 1. Beautification, environment safety, improvement for appearance 2. Commercial development 4

5. Group Discussion 3. Further project understanding 4. Pedestrian, cycling (active transportation) / connectivity (Cranston to Core Village) 5. Improvements considered in context 6. Active transportation for cycling and walking (trails) 7. Good planning Concerns members expressed their concerns as: 1. Overall economic health of the Village 2. Safety related to: Widening of the road Mail box location along the roadway (south of Caledon East) Trails and trees on the side of the road 3. Traffic speed reduction 4. Traffic flow at peak periods that lead to congestion 5. Infrastructure not keeping up with development 6. Reduction of truck traffic 7. Reduction of noise 8. Good planning in safety 6. Next Steps The Region outlined the next steps for the project: 1. Identify the Problem and/or Opportunity Statement, which will result from reviewing the: Transportation and Traffic Analysis, and Existing environmental conditions 2. Identify Alternative Solutions Assess the alternative solutions Meet with the CWG The Region outlined the next steps from the session: Draft meeting notes will be circulated to all members for confirmation Members will reply with requests for changes, if any, within two weeks of distribution 7. Closing Remarks The CWG has an important role in the EA. It is the link between the Project Team and the community and helps identify opportunities and issues to be considered in the EA. Members were thanked for their participation and for contributing their time to this session. 5