Small Single Family Residential Another project by Copper Canyon Partners, LLC. January 2018

Similar documents
WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

PASCO COUNTY, FLORIDA INTEROFFICE MEMORANDUM. REFERENCES: Land Development Code, Planner II

64' - 4" +- 12' - 6" 124 RETAINING WALLS SEE CIVIL DWGS. LEVEL REAR YARD PROPOSED MAIN FLOOR F.F. 113' 18 3" +- (E) HOUSE TO BE REMOVED COV' PORCH

5 CIRCULATION AND STREET DESIGN

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES

Your story begins here. SINGLE-FAMILY HOMES (FS)

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Midway City Council 15 January 2019 Regular Meeting. Homestead Villas / Preliminary Approval

State Route 28 Shared Use Path & Safety/Stormwater Enhancements Public Information Meeting

This chapter describes the proposed circulation system and transportation alternatives associated with

TRAFFIC IMPACT ANALYSIS For Bradfield Elementary School In Highland Park, Texas

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

SECTION 3 STREET DESIGN

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Application of a Complete Street

Giles Run Connector Road

Hidden Oaks Elementary School

Meadow Woods Elementary School

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

August 3, Bay Trail Connection With The Community

San Bernardino County Non-Motorized Transportation Plan - Chapter 5

City of Walnut Creek TELEGRAPH AVENUE BART LINE SELF-GUIDED TOD TOUR 19TH STREET BART STATION

Table #6 VISION CHARACTERISTICS

Edenbrook Hill Drive Traffic Calming Study

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

Single Family Detached District Summary of Allowable Uses

12/13/2018 VIA

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Zoning District Minimum Minimum MINIMUM SETBACKS Maximum Maximum % Lot Area Lot Width Front Yard Rear Yard Side Yard Corner Lot (street side yard)

COMMERCIAL COASTAL WOODS RETAIL & COMMERCIAL NEW SMYRNA BEACH FOR SALE & FOR LEASE ANDY HAWKINS BRETT HARTUNG FOR MORE INFORMATION:

ACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP / PP-07-16/ RZ-12-16/ CPA-01-16/ A-07-16

Fleetwood Enclave Transportation Impact Assessment

SENIOR ASSISTED LIVING FACILITY BASE LINE, HIGHLAND, CA

REPORT DP Development Approval & Planning Policy Department

Classification Criteria

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Sixth Line Development - Transit Facilities Plan

studio 646 ARCHITECTURE, LLC

Bridges and Arizona Crossings

Driveway Design Criteria

November 13, Planning and Land Development Regulation Commission (PLDRC)

PEDESTRIAN SAFETY, MOBILITY & CONTEXT IMPROVEMENT STUDY

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

W DR NE. Ranchlands Phase 3A2 Plan

Access Management in the Vicinity of Intersections

Town of Flower Mound Master Transportation Plan Update

Chapter 5 Future Transportation

Preliminary Engineering Study

The following is submitted together with the plans and application for the staff and plan commission consideration of approval.

GENTILE GLAS HOLLOWAY O 'MAHONEY&Associates, tnc.

BPP / SUB

Vicinity Map. Proposed Roosevelt Street Sidewalk Project OVERLAND ROAD TO CASSIA STREET W ROSE HILL ST W ALBION ST S OWYHEE ST W CASSIA ST

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

Windy Ridge Elementary School

Access Management Guidelines February 2013 THE CITY OF

Chapter Five: Transportation Plan

Paoli Road Improvement Feasibility Study

Chapter 13 ORANGE COVE

SAFE ROUTES TO SCHOOL

Fencing Guidelines Ranches HOA, Eagle Mountain, Utah

APPENDIX C SANITARY SEWER PEAK DESIGN FACTOR

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

CITY OF ELK GROVE TRAILS COMMITTEE

FOR SALE SOMI LAND DOWNTOWN SOUTH MIAMI MIXED-USE DEVELOPMENT SITE EXCLUSIVELY PRESENTED BY:

122 Avenue: 107 Street to Fort Road

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Committed to Service

Traffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018

Public Workshop #2. September 14, 2016

801 FASSLER AVENUE PACIFICA, CA

Orange Center Elementary School

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

FALL 2014 WORKSHOPS TAKEAWAYS

The current document is revised based on the comments received on:

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

287 TENTATIVE MAP APPROVED LOTS

Access requests to County streets and roadways are processed through one of the following methods:

8 LOT SUBDIVISION NEAR FINAL MAP

Waterford Lakes Small Area Study

Public Information Centre

Report. Typical Sections. City of Middleton, WI

Building Great Neighbourhoods LANSDOWNE

Kewanee ee Way. Byrd Ave N (0.6 Mile) Bassett t Creek Dr. Crestview Ave. Rice Lake. Nature Area. Wasatch La. Mary Hills. Bonnie La.

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

CONNECTING PEOPLE TO PLACES

ASSISTED LIVING OR POTENTIAL 8 LOT RESIDENTIAL SUBDIVISION ACRES

HILLSDALE/US101 BICYCLE/PEDESTRIAN BRIDGE PROJECT

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

Transportation. Our Parker community. will develop and sustain. a safe, convenient and. efficient transportation. system incorporating

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Clackamas County Comprehensive Plan

COUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA (707) FAX (707)

STATEMENT of POLICY and PROCEDURE

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP)

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

Transcription:

Small Single Family Residential nother project by Copper Canyon Partners, LLC January 208

Table of Contents Copper Canyon Project Location...3 Illustrative Site Plan...9 Circulation Plan...0 Illustrative Cross-Sections... Preliminary rchitectural Theme...3 Illustrative Street Scene...4 Preliminary Plot Plan...5 Elevations & Floor Plans...6 COPPER CNYON Table of Contents 2

Regional Map COPPER CNYON PROJECT LOCTION Distance From Reno RENO SPRKS Carson City, NV 32 NORTH SHORE THOE CRSON CITY North Shore Tahoe, C/NV 49 SOUTH LKE THOE South Lake Tahoe, C/NV 60 NP VLLEY SCRMENTO Sacramento, C 35 Napa/Sonoma, C 93 SN FRNCISCO San Francisco, C 222 SN JOSE San Jose, C 255 Monterey/Carmel, C 325 MONTEREY CRMEL COPPER CNYON Project Location 3

Vicinity Map COPPER CNYON PROJECT LOCTION fernley sparks Copper Canyon reno sparks city limits Reno city limits Tahoe reno industrial center COPPER CNYON Project Location 4

Sparks City Limit & Project Location Map Pa rk wa y COPPER CNYON PROJECT LOCTION Sparks City Limit S. D n a dre 8 The Foothills at Wingfield Village 9 2 0 Golden Eagle Regional Park 3 rater Way E. P FS 28 4 5 7 Loop Rd Project rea ES 29 6 ta Vis lom 2 Sa Blvd. on Cir. 4 25 6 7 3 TC 30 8 26 24 sparks 5 22 2 20 23 9 reno N /5/7 NOTE: The plans shown on this page are conceptual and are intended to be for illustrative purposes. COPPER CNYON SITE PLN 7 L Street Modesto, C 95354 866.526.424 www.mve.net SPRKS, NEVD Project Management Civil/Structural Engineering Urban Design Land Planning Entitlements Right-of-Way/Permitting Surveying Construction Staking Graphics Providing services in California and Nevada. COPPER CNYON Project Location 5

Example Project in Sparks, NV COPPER CNYON PROJECT LOCTION The Foothills at Wingfield Village COPPER CNYON Project Location 6

Example Project in Sparks, NV COPPER CNYON PROJECT LOCTION N Gaja S Gaja B Panther Creek Dr. S Gaja B S Gaja B ltesino Drive Viader Drive B B rtadi Drive Sportoletti Drive N Latour S Latour COPPER CNYON Project Location 7

Example Layout for Pad 4 COPPER CNYON PROJECT LOCTION S. D ndrea Parkway 9 3 2 8 0 LND USE DESCRIPTION intermediate density residential (idr) CREGE 5 ac IDR UNITS/CRE 0.2 units/acre TOTL NUMBER OF LOTS 520 lots E. Prater Way 4 FS 28 5 7 Loop Rd ES 29 Vista Blvd. Salomon Cir. 2 6 4 5 6 25 3 7 TC 30 26 24 22 2 23 20 8 9 N /5/7 7 L Street Modesto, C 95354 866.526.424 www.mve.net COPPER CNYON SITE PLN SPRKS, NEVD Project Management Civil/Structural Engineering Urban Design Land Planning Entitlements Right-of-Way/Permitting Surveying Construction Staking Graphics NOTE: The plans shown on this page are conceptual and are intended to be for illustrative purposes. COPPER CNYON Project Location 8

N Copper Canyon ILLUSTRTIVE SITE PLN 8 FS 28 9 GROSS CRE TOTL LDR LOTS.4 9.2 26.7 2.22 0.24.8 6.98.87 3.44 9.47 43.44 7.04 50.9 8.06 7.69 0.54 4.68 53. 3.68 2.78 7.28 3.45 6.68 2.0 5.68 4.0.64.29 4.35 2.78 0.4 3.06 2.22.97 2.2 0.68 2.49 6.98.87 3.44.2 0.59 0.0 43.54 7.04 50.9 8.06 7.69 0.54 4.68 53. 3.68 2.78 7.28 3.45 6.68 2.0 5.68 4.0 860.46 860.46 0.00 0.00 4 4 424.02 87.6 295.63 55 47 48 23 55 65 07 MDR LOTS HDR UNITS DENSITY DU/ CRE 290 504 4 4.937 5.53 5.540 5.796 5.37 5.503 6.30.58.98.50.993.647 9.899 0.963 2.483 2.523.989.504.956 3.309.40.04 43.43 42.0 48.239 3 4 09 52 82 504 98 96 32 76 6 44 37 83 38 C CF PRKS* FS ES TC 600 2,983,068.774 avg 4.0 30.6* 2 6 4 0.5 3.2 4.0 23 5 0.08 0.09.07 0.52.5 0.87 0.32 0.83 0.46 0.09.92 3.60.4 20 dr e 3.63 2.6 0.47 0.74.2 5.43 7 4 ES 29 LEGEND 22 3 Low Density Residential (LDR) - 3 to 6 DU/C Medium Density Residential (MDR) - 0 to 4 DU/C High Density Residential (HDR) Min. 24 DU/C Commercial (C) Community Facility (CF) 26 2 Way OPEN SPCE wy a Pk 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 28 29 30 TOTL DEV. RE C. r E. Pr a t e n D land use summary 7 8 5 3 S. 9 6 2 0 25 Loop Rd Salomon. Ci r Vista Blvd TC 30 24 ES FS TC Elementary School Fire Station Transit Center Roadway (Open Space) Undisturbed rea (Open Space) Revegetated rea (Open Space) Drainage Feature rea (Open Space) Trail System (Open Space) Water Tank (Open Space). Roundabout (Open Space) N *The park acreage is included within the developable area acreage. NOTE: The plans shown on this page are conceptual and are intended to be for illustrative purposes. COPPER CNYON Illustrative Site Plan 9

Copper Canyon CIRCULTION PLN S. D NDRE PRKWY PLESNT VIEW DR. LEGEND 4 Lane Low ccess Control rterial (Public) 4 Lane Low ccess Control rterial (Private) 4 Lane Moderate ccess Control rterial (Public) 2 Lane Collector (Private) Roundabout (Private) PRTER WY LOOP ROD SLOMON CIRCLE VIST BLVD. COPPER CNYON PKWY N Entryway (Private) Internal Subdivision Streets (Private) COPPER CNYON Circulation Plan 0

2 Lane Collector (Private) Copper Canyon ILLUSTRTIVE CROSS-SECTIONS S. D NDRE PRKWY LEGEND PLESNT VIEW DR. 4 Lane Low ccess Control rterial (Public) 4 Lane Low ccess Control rterial (Private) 4 Lane Moderate ccess Control rterial (Public) 2 Lane Collector (Private) Roundabout (Private) Entryway (Private) Internal Subdivision Streets (Private) PRTER WY LOOP ROD SLOMON CIRCLE VIST BLVD. COPPER CNYON PKWY N 6.0 SIDE WLK 6.5 BIKE LNE 2 75 5 MEDIN 2 6.5 BIKE LNE 6.0 SIDE WLK 0.5 0.5 4 Lane Low & 4 Moderate Lane Low ccess Control Control rterial rterial (Private) (Public & Private) 4.0 BIKE LNE.0 30.0 CL.0 4.0 BIKE LNE 0.95 4.0 BIKE LNE 0.95.0 70.0 4.34 MEDIN 45 5 MEDIN 0.95.0 0.95 4.0 BIKE LNE 5.0 SIDE WLK 4.0 BIKE LNE 4.0 BIKE LNE 5.0 SIDE WLK 2.0 2.0 2 Lane Collector (Private) 4 Lane Moderate ccess Entryway Control rterial (Private) (Public) COPPER CNYON Illustrative Cross-Sections

Copper Canyon ILLUSTRTIVE CROSS-SECTIONS S. D NDRE PRKWY LEGEND PLESNT VIEW DR. 4 Lane Low ccess Control rterial (Public) 4 Lane Low ccess Control rterial (Private) 4 Lane Moderate ccess Control rterial (Public) 2 Lane Collector (Private) Roundabout (Private) Entryway (Private) Internal Subdivision Streets (Private) PRTER WY LOOP ROD SLOMON CIRCLE VIST BLVD. COPPER CNYON PKWY N 25.0 CL 2.5 2.5 0.5 0.5 2.0 2.0 PCC Rolled Curb & Gutter PCC Rolled Curb & Gutter 25 Street Cross Section (Private) 37.0 0.5 RVEL LNE 0.0 PUE 0.0 PUE 4.0 SIDE WLK 8.0 PRKING 2.0 0.5 0.5 2.0 0.0 PUE 2.0 PCC Rolled Curb & Gutter Local Residential Street (Private) PCC Rolled Curb & Gutter PCC Rolled Curb & Gutter Private) COPPER CNYON Illustrative Cross-Sections 2

Preliminary rchitectural Theme COPPER CNYON TUSCN Builders of the Tuscan style historically used natural materials found in Northern Italy. More rural in style, these homes typically contain bold elements enhanced with stone, stout massings, and a low roofline. NOTE: The plans shown on this page are conceptual and are intended to be for illustrative purposes. COPPER CNYON Project 3

Illustrative Street Scene COPPER CNYON Traditional Product Street Scene lley Loaded Street Scene NOTE: The plans shown on this page are conceptual and are intended to be for illustrative purposes. COPPER CNYON Project 4

Preliminary Plot Plans COPPER CNYON NOTES Plot Plans Not to Scale Side Yard - 4 min. - Corner lot street side setback is 0 min. to Right-of-Way lley Loaded Product fronting Paseo lley Loaded Product fronting Street 5 min. Rear Yard Traditional Product 5 35-50 40 Paseo and Open Space Easement 20 min. to Residence 35-50 20 min. to Residence STREET 35-50 Side Yard Building Envelope 4 4 Side Yard Side Yard 4 4 Side Yard Side Yard 4 4 Side Yard 2 Car Garage 75-0 Typical Lot Depth Building Envelope 75-0 Lot Depth Building Envelope 75-0 Lot Depth 0 min. to Dwelling Driveway 20 min. to Garage 2 Car Garage 2 Car Garage 5 min. Driveway 5 min. Driveway STREET/COURT LLEY LLEY COPPER CNYON Project 5

Traditional Product Elevations and Floor Plans COPPER CNYON Plan - Two Story Plan B - Two Story Plan C - Two Story Plan D - Two Story LUNDRY DINING DINING KITCHEN MSTER MSTER BDRM KITCHEN MSTER BDRM MSTER KITCHEN DINING LIVING MSTER DINING KITCHEN UP LIVING CLOSET BDRM 3 BDRM 4 DOWN UP ENTRY LIVING PWDR LUNDRY DOWN BDRM 4 BDRM 3 PWDR LUNDRY UP ENTRY BDRM 3 LUNDRY BDRM 2 MSTER BDRM DOWN LIVING 2 CR GRGE W/H PNTRY PWDR MSTER BDRM 3 DOWN MSTER BDRM LUNDRY 2 CR TNDEM GRGE PWDR LOFT BDRM 2 2 CR GRGE UP ENTRY BDRM 2 ENTRY BDRM 2 2 CR GRGE DRIVEWY PORCH DRIVEWY DRIVEWY st Floor +750 s.f. 2nd Floor +660 s.f. Main Floor - st Floor 728 s.f. 2nd Floor 94 s.f. Main Floor - st Floor 450 s.f. 2nd Floor 82 s.f. Main Floor - st Floor 770 s.f. 2nd Floor 950 s.f.,40+ s.f.,642+ s.f.,262+ s.f.,728+ s.f. NOTE: The plans shown on this page are conceptual and are intended to be for illustrative purposes. COPPER CNYON Project 6

lley Loaded Elevations and Floor Plans COPPER CNYON Plan E - Two Story Plan F - Two Story Plan G - Two Story Plan H - Two Story TRSH DRIVEWY PTIO DRIVEWY DRIVEWY UP DRIVEWY KITCHEN MSTER BDRM MSTER BED MSTER BDRM 3 MSTER STUDY OR BDRM 5 2 CR GRGE LIVING DINING ENTRY PORCH LUNDRY BDRM 3 BDRM 2 LOFT OR BDRM 4 MSTER 2 CR GRGE REF. DINING KITCHEN PNTRY LIVING UP PWDR ENTRY RISED PORCH BED 2 2 OPT. BED/LOFT DOWN WIC LUNDRY POWDER KITCHEN DINING 2 CR GRGE LIVING UP ENTRY RISED PORCH BDRM 2 ON DESK MSTER BDRM POWDER KITCHEN DINING 2 CR GRGE LIVING UP ENTRY RISED PORCH BDRM 3 BDRM 2 ON DESK MSTER MSTER BDRM Main Floor - st Floor 880 s.f.,955 + s.f. 2nd Floor 075 s.f. Main Floor - st Floor 60 s.f.,60+ s.f. 2nd Floor 000 s.f. Main Floor - st Floor 575 s.f.,200+ s.f. 2nd Floor 625 s.f. Main Floor - st Floor,050 s.f.,675 + s.f. 2nd Floor 625 s.f. NOTE: The plans shown on this page are conceptual and are intended to be for illustrative purposes. COPPER CNYON Project 7