CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

Similar documents
CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

D.B. Wilson Station CCR Landfill

TABLE OF CONTENTS LEGAL NOTICE

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

Notice of Intent to Close Inactive CCR Surface Impoundments

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

Amended Written Closure Plan

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

STRUCTURAL STABILITY ASSESSMENT

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

Coal Combustion Residuals Closure Plan

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

2016 Annual Inspection Report

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Closure Plan for CCR Surface Impoundments

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

HISTORY OF CONSTRUCTION

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

2017 Annual Inspection Report

2018 Annual Inspection Report

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

2016 Annual Inspection Report

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Amec Foster Wheeler 2016.

CCR Fugitive Dust Control Plan

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill

FUGITIVE DUST CONTROL PLAN

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

Effect of Perched Water Conditions in MSW Landfills: Considerations for Landfill Operators

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

2018 INSPECTION REPORT

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

PRELIMINARY STORM DRAINAGE REPORT

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

Trout Buffer Variance

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:..

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

FUGITIVE DUST CONTROL PLAN

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

Green CCR Surface Impoundment

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

Definitions as used in this Subchapter:

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

Environmental Management Strategy

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

CCR Closure Plan Ash Impoundment

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

Site Diary Campus Drive Relocation Project. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Does DFO Need to Review My Project?

APPENDIX J HYDROLOGY AND WATER QUALITY

CSU Channel Islands Lead Operations and Maintenance Program

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

BIOREACTOR LANDFILLS: GEOTECHNICAL ASPECTS OF STABILITY EVALUATION

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

Holding Pond Annual Inspection Report

JAP Additional Information Sheet

The Spartan Cap Athletic Field System

Holding Pond Annual Inspection Report

As temporary grade control facilities along waterways until final stabilization is established.

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

Appendix J: Q1-Highway 35 Route Construction Plan

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Hunters Point Naval Shipyard Environmental Remediation Program Overview

CHAPTER 4: BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL

FLAMMABLE AND COMBUSTIBLE LIQUIDS SELF INSPECTION CHECKLIST

Transcription:

CLOSURE PLAN CCR 257.102(b) Landfill Area Welsh Power Plant Pittsburg, Texas October, 2016 Prepared for : Southwest Electric Power Company Welsh Plant Pittsburg, Texas Prepared by: American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH 43215 GERS 16 097

Table of CONTENTS 1.0 OBJECTIVE... 4 2.0 DESCRIPTION OF THE CCR UNIT... 4 3.0 DESCRIPTION OF CLOSURE PLAN 257.102(b)(1)(i)... 4 4.0 CLOSURE IN PLACE 257.102 (b)(1)(iii)... 4 4.1 CLOSURE PERFORMANCE STANDARDS 257.102 (d)(1)... 4 4.2 DRAINING AND STABILIZING OF THE SURFACE IMPOUNDMENT 257.102(d)(2)... 5 4.3 FINAL COVER SYSTEM 257.102 (d)(3)... 5 5.0 ESTIMATE OF MAXIMUM CCR VOLUME 257.102 (b)(1)(iv)... 6 6.0 ESTIMATE OF LARGEST AREA OF CCR REQUIRING COVER 257.102 (b)(1)(v)... 6 7.0 CLOSURE SCHEDULE 257.102(b)(1)(vi)... 6 Page 3 of 6

1.0 OBJECTIVE This report was prepared by AEP- Geotechnical Engineering Services (GES) section to fulfill requirements of CCR 257.102(b) for Closure Plans of Existing CCR Units. 2.0 DESCRIPTION OF THE CCR UNIT The AEP J. Robert Welsh Plant is located in southern Titus County, approximately 8 miles northeast of Pittsburg, Texas, and approximately two miles northwest of Cason, Texas. It is owned and operated by Southwest Electric Power Company (SWEPCO). The facility operates a landfill for the disposal of CCR materials. The Welsh Landfill is a Class 2, Industrial Solid Waste Facility per the Texas Commission on Environmental Quality, Industrial Solid Waste Management Technical Guideline No. 3. 3.0 DESCRIPTION OF CLOSURE PLAN 257.102(b)(1)(i) [A narrative description of how the CCR unit will be closed in accordance with this section] The Welsh Landfill Area will be closed by closure in place. The closure will consist of re-grading the existing onsite materials and the installation of an impermeable cap with vegetative cover. The existing surface will be graded to achieve a gently sloping surface to promote surface water runoff. The re-graded surface will be covered with 3-ft of re-compacted clay soil material with a permeability of 1X10-7 or less and 18-inches of vegetative soil cover that is capable of sustaining native plant growth. The surface soil will be seeded and mulched to promote the growth of a vegetative cover. 4.0 CLOSURE IN PLACE 257.102 (b)(1)(iii) [If closure of the CCR unit will be accomplished by leaving the CCR in place, a description of the final cover system, designed in accordance with paragraph(d) of this section, and the methods and procedures to be used to install the final cover. The closure plan must also discuss how the final cover system will achieve the performance standards specified in paragraph (d) of this section.] The final cover system will consist of 3-ft of re-compacted clay soil material with a permeability of 1X10-7 cm/sec or less and 18-inches of vegetative soil cover that is capable of sustaining native plant growth. The final cover will be seeded and mulched to promote growth of a vegetative cover. The final cover slope will be a minimum of 2% and will convey water to a TPDES permitted outfall. 4.1 CLOSURE PERFORMANCE STANDARDS 257.102 (d)(1) 4.1.1 SECTION 257.102(d)(1)(i) [Control, minimize or eliminate, the maximum extent feasible, post-closure infiltration of liquids into the waste and releases of CCR, leachate, or contaminated run-off to the ground or surface waters or to the atmosphere.] The final cover system will cover the CCR material and will have a permeability that is less than or equal to the permeability of the natural subsoils and is no greater than 1 x 10-5 cm/sec. Page 4 of 6

4.1.2 SECTION 257.102(d)(1)(ii) [Preclude the probability of future impoundment of water, sediment, or slurry.] The final surface areas will be graded to a minimum slope 2% to prevent the ponding of surface runoff. Drainage features will be designed to have positive drainage. 4.1.3 SECTION 257.102(d)(1)(iii) [Include measures that provide for major slope stability to prevent the sloughing or movement of the final cover system during the closure and post-closure care period.] The final cover system will be gently graded with a minimum of 2% slope. The final configuration of the impoundment will meet the stability requirements to prevent the sloughing or movement of the final cover system during the closure and post-closure care period. 4.1.4 SECTION 257.102(d)(1)(iv) [Minimize the need for further maintenance of the CCR unit.] The landfill facility will be vegetated to prevent erosion. Maintenance of the final cover system will include mowing. 4.1.5 SECTION 257.102(d)(1)(v) [Be completed in the shortest amount of time consistent with recognized and generally accepted good engineering practices.] The CCR unit will be closed in a timeframe consistent with recognized and generally accepted good engineering practices. As the fill reaches the approved final grades, periodic closure activities may occur. 4.2 DRAINING AND STABILIZING OF THE SURFACE IMPOUNDMENT 257.102(d)(2) This section is not applicable to a landfill. 4.3 FINAL COVER SYSTEM 257.102 (d)(3) [If a CCR unit is closed by leaving CCR in place, the owner or operator must install a final cover system that is designed to minimize infiltration and erosion, and at a minimum, meets the requirements of paragraph (d)(3)(i) of this section, or the requirements of the alternative final cover system specified in paragraph (d)(3)(ii) of this section. The final cover system must be designed and constructed to meet the criteria in paragraphs (d)(3)(i)(a) through (D) of this section. The design of the final cover system must be included in the written closure plan.] Page 5 of 6

The final cover system will consist of 3-ft of re-compacted clay soil material with a permeability of 1X10-7 cm/sec or less and 18-inches of vegetative soil cover that is capable of sustaining native plant growth. The final cover will be seeded and mulched to promote growth of a vegetative cover. The final cover slope will be a minimum of 2% and will convey water to a TPDES permitted outfall. The final cover slope will be a minimum of 2% to accommodate settling and subsidence. 5.0 ESTIMATE OF MAXIMUM CCR VOLUME 257.102 (b)(1)(iv) [An estimate of the maximum inventory of CCR ever on-site over the active life of the CCR unit.] The estimated maximum CCR volume on-site is 2,740,000 Cubic Yards for the Landfill Area. 6.0 ESTIMATE OF LARGEST AREA OF CCR REQUIRING COVER 257.102 (b)(1)(v) [An estimate of the largest area of CCR unit ever requiring a final cover The largest area of the CCR unit requiring a final cover is 40 acres for the Landfill Area. 7.0 CLOSURE SCHEDULE 257.102(b)(1)(vi) [A schedule for completing all activities necessary to satisfy the closure criteria in the section, including an estimate of the year in which all closure activities for the CCR unit will be completed. The schedule should provide sufficient information to describe the sequential steps that will be taken to close the CCR unit, including identification of major milestones such as coordinating with and obtaining necessary approvals and permits from other agencies, the dewatering and stabilization phases of the CCR surface impoundment closure, or installation of the final cover system, and the estimated timeframes to complete each step or phase of the CCR unit closure. At this time there are currently no plans to close this CCR unit. Once the CCR unit requires closure a schedule to satisfy this section will be prepared. Page 6 of 6