CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Similar documents
PEDESTRIAN CROSSING TREATMENTS

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Draft North Industrial Area-Wide Traffic Plan

Complete Streets Funding Program Project Prioritization Plan

Downtown Signals Traffic Analysis

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

Broad Street Bicycle Boulevard Design Guidelines

NJDOT Complete Streets Checklist

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

F L E T C H E R A V E N U E

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

Transportation Planning Division

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

North Avenue Corridor Study

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd.

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Active Transportation Facility Glossary

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Designing for Pedestrian Safety in Washington, DC

Off-road Trails. Guidance

Pedestrian Road Safety Audit

GLOSSARY CROSSWALK. CROSSING TYPES

Hidden Oaks Elementary School

UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES

Station 1: Street & Sidewalk Upgrades

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team

Dra Design and Land Use Op ons Booklet

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Town of Windsor Pedestrian Crossing Guidelines

Hillsboro Tanasbourne Town Center

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

Lynchburg District Update

MEMORANDUM. Discussion of the planned crosswalk improvement on Mount Vernon Road near Stratham Drive

Traffic Engineering Update on Bike/Ped Topics. Marc Lipschultz, P.E. PTOE Central Office Traffic Engineering Division

Building Great Neighbourhoods QUEEN ALEXANDRA

CITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX

City of Vallejo Traffic Calming Toolbox

Central Avenue Bikeway Traffic and Safety Impact Assessment

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

COMMUNITY MEETING AGENDA

City of Birmingham Draft Multi-modal Transportation Plan

Welcome to the Quebec Alternatives Analysis Public Meeting

Citywide Sidewalk and Crosswalk Programs

Bicycle + Pedestrian Connectivity Gap Analysis

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Walk Friendly Communities Engineering Strategies. Carl Sundstrom Walk Friendly Communities Workshop Grandview, MO June 2015

INTERSECTION DESIGN. Bicycle Facility Workshop Intersections 4-1

APPENDIX 1 CIMA RECOMMENDED TREATMENTS

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

IMPLEMENTATION WORKBOOK

Orange Center Elementary School

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Edenbrook Hill Drive Traffic Calming Study

Roosevelt Estates Neighborhood Improvements

City of Scotts Valley CITY COUNCIL STAFF REPORT

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

State Street and Pierce Park Lane Intersection Concept Report

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Complete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program

WELCOME Public Information Centre

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Meadow Woods Elementary School

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Freeway ramp intersection study

Pedestrian & Bicycle Safety Innovations & Applications

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016

In response to your request for information on mid-block pedestrian crossing policies and guidelines, the following information is enclosed:

Derby Street. Project Updates. Salem, Massachusetts

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Fulton Market Streetscape

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Knox Street Complete Streets Project

Public Information Centre

APRIL 1, 2015 APWA CONFERENCE. TIM HANSEN, PE Chief Operating Officer AHBL, Inc. Project Designer

Water Street Promenade Engineering and Design Services

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Omaha s Complete Streets Policy

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Henderson Ave. Complete Streets Project

Alexander Ikefuna City of Charlottesville Director of Neighborhood and Development Services

Transcription:

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY Preliminary Recommendations October 2018 2014 HDR, Inc., all rights reserved.

PROJECT BACKGROUND WALKING AUDIT FINDINGS PROPOSED IMPROVEMENT CONCEPTS CONCEPT ROLL PLOTS DISCUSSION

PROJECT BACKGROUND

STUDY CORRIDOR CASSELBERRY ELEMENTARY SCHOOL N SOUTH SEMINOLE MIDDLE SCHOOL CASSELBERRY GREENWAY TRAIL CANNON WAY TRAIL CROSSING Project Limits

STUDY CORRIDOR - SIGNALS CASSELBERRY ELEMENTARY SCHOOL N SOUTH SEMINOLE MIDDLE SCHOOL CASSELBERRY GREENWAY TRAIL CANNON WAY TRAIL CROSSING

STUDY CORRIDOR PEAK HOUR TRAFFIC VOLUMES SOUTH SEMINOLE MIDDLE SCHOOL CASSELBERRY ELEMENTARY SCHOOL N CASSELBERRY GREENWAY TRAIL CANNON WAY TRAIL CROSSING AM PM

STUDY CORRIDOR SIDEWALK GAPS CASSELBERRY ELEMENTARY SCHOOL N SOUTH SEMINOLE MIDDLE SCHOOL CASSELBERRY GREENWAY TRAIL Sidewalk Gaps (East Side) CANNON WAY TRAIL CROSSING

STUDY CORRIDOR AREAS OF FOCUS Midblock Crossing CASSELBERRY ELEMENTARY SCHOOL N SOUTH SEMINOLE MIDDLE SCHOOL Signalized Intersection Improvement Golf Cart Crossing Bike Lane Transition Signalized Intersection Improvement Improve Sidewalk, Bike Lane Addition Improve Trail Crossing CASSELBERRY GREENWAY TRAIL Signalized Intersection Improvement CANNON WAY TRAIL CROSSING

WALKING AUDIT FINDINGS

WALKING AUDIT Took place June 19 th, 2018 8:00 AM 8:30 AM Introduction o Safety Briefing o Logistics o Purpose 8:30 AM 11:30 AM Walk Corridor o North to Crystal Bowl Circle o South to Marigold Road o Cannon Way Crossing Time Permitting o Back to South Seminole Middle School 11:30 AM - 12:00 PM Debrief o Key Observations o Project Next Steps

ARC COLLECTOR MAPPING

Difficult to navigate OBSERVATIONS Cannon Way Trail Crossing

Missing Pedestrian Signals Missing Crosswalk OBSERVATIONS Winter Park Dr and Wilshire Dr (signal)

OBSERVATIONS Winter Park Dr from Wilshire Dr to Lilac Rd Missing East Side Sidewalk

Bike Lane West Side Only Flush Sidewalk West Side Only OBSERVATIONS Winter Park Dr from Marigold Rd to Queens Mirror Cir S

Possible Stormwater Project NB Sharrow to Bike Lane Left Turn Lane Golf Cart Crossing SB Bike Lane transition to curb OBSERVATIONS Winter Park Dr and Queens Mirror Cir S (Unsignalized)

OBSERVATIONS Queens Mirror Cir S (Unsignalized) to Queens Mirror Cir N (Spur) Overgrown Vegetation Crowding Sidewalk

QUEENS MIRROR CIR SPUR Crosswalk Improvement Approx. 90ft to cross

Extensive Utilities Natural Golf Cart Path Limited corner space OBSERVATIONS Winter Park and Queens Mirror (Signal)

Utilities Driveway Apron in Sidewalk Limited Parkway Area OBSERVATIONS Queens Mirror Cir N (Signal) to Crystal Bowl Cir S (Signal)

Yield and Signal Control Limited Refuge OBSERVATIONS Winter Park and Crystal Bowl (Signal) - 1

Sidewalk at Driveway Apron Irregular Pedestrian Activation Button OBSERVATIONS Winter Park and Crystal Bowl (Signal) - 2

PROPOSED IMPROVEMENT CONCEPTS

CANNON WAY TRAIL CROSSING Clarify Route using positive guidance Maximize use of existing crossing Enhance Crossing Visibility with the use of Rectangular Rapid Flash Beacons (RRFBs) Adjust guidewire to the west to accommodate widening

CANNON WAY TRAIL CROSSING Existing Crossing Proposed Concept

WILSHIRE DR INTERSECTION Recommended Upgrades Casselberry Styled Decorative Fluted Mast Arms One Arm per Pole ADA Accessible Pedestrian Actuation Push Buttons at each crosswalk. o Follow FDOT Design Standard 17784 Rehabilitate All Corners o Maintain Existing Curb and Drainage o Update Curb Ramps (ADAAG 4.7 Curb Ramps) https://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-theada-standards/background/adaag#4.7 Consider Use of Leading Pedestrian Intervals

WILSHIRE DR INTERSECTION Existing Intersection Proposed Concept

WILSHIRE DR TO LILAC RD Sidewalk Connectivity Use available ROW on the east side of the roadway behind the utilities for an eight foot sidewalk New Curb Ramps o (ADAAG 4.7 Curb Ramps) https://www.access-board.gov/guidelines-and-standards/buildings-andsites/about-the-ada-standards/background/adaag#4.7

WILSHIRE DR TO LILAC RD Concept New 8ft Sidewalk

MARIGOLD ROAD TO QUEENS MIRROR CIR S Extending Greenway Trail North Use limited space in between the travelway and the utility poles to create a minimum 8ft wide shared path along the west side of the roadway Add curb to delineate the share use path Add open flumes to maintain existing drainage pattern Example Open Flume

MARIGOLD RD TO QUEENS MIRROR CIR S Existing Pathway New Curb and Gutter with Flumes New 8ft Sidewalk Proposed Concept

QUEENS MIRROR CIR S UNSIGNALIZED Golf Cart Crossings Manage convergence of sidewalk, bicycle lanes, and golf cars Improve visibility Introduce on-street bicycle facility

QUEENS MIRROR CIR S (UNSIGNALIZED) INTERSECTION Existing Intersection Proposed Concept

QUEENS MIRROR CIR SPUR Crosswalk Improvement Shorten Crosswalk by augmenting both curb lines Calm turning movements by redirecting the street to 90 degree angles No Southbound Right Turn Sign On Both Corners o Maintain Drainage o Update Curb Ramps (ADAAG 4.7 Curb Ramps) https://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-theada-standards/background/adaag#4.7

QUEENS MIRROR CIR (SPUR) Existing Crosswalk Proposed Concept

QUEENS MIRROR CIR N SIGNALIZED Recommended Upgrades Casselberry Styled Decorative Fluted Mast Arms One Arm per Pole ADA Accessible Pedestrian Actuation Push Buttons at each crosswalk. o Follow FDOT Design Standard 17784 All Corners o Update Curb Ramps (ADAAG 4.7 Curb Ramps) https://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-theada-standards/background/adaag#4.7 Continue Use of Exclusive Pedestrian Phase During School Hours

QUEENS MIRROR CIR N (SIGNAL) INTERSECTION Existing Intersection Proposed Concept

CRYSTAL BOWL CIR SIGNALIZED Recommended Upgrades Casselberry Styled Decorative Fluted Mast Arms One Arm per Pole ADA Accessible Pedestrian Actuation Push Buttons at each crosswalk. o Follow FDOT Design Standard 17784 All Corners o Update Curb Ramps (ADAAG 4.7 Curb Ramps) https://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-theada-standards/background/adaag#4.7 Continue Use Exclusive Pedestrian Phase

CRYSTAL BOWL CIR S (SIGNAL) INTERSECTION Existing Intersection Proposed Concept

ROLL PLOTS

WINTER PARK DRIVE South Section Concept

WINTER PARK DRIVE North Section Concept