North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

Similar documents
Last Reval. Tax Rate Equiv

FBA as % % Non- % Vehicl. Net Tax. Tax Value to Sales Adj. Tax. Fd Bal Avail Gen Fd Exp. Tax Rate

SALES ASSESSMENT RATIO STUDIES AS OF JANUARY 1, 2013

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009

Certificates of Participation, Qualified Zone Academy Bonds, Qualified School Construction Bonds, and other Special Indebtedness for Schools

Collaborative Partnerships: A Strategy for Improving Community Health Presented by: Ed Johnson, RLA, ASLA

20 indicators of wellness health, youth behavior and safety, education, and economic development.

Review of DRAFT STIP. January 18, 2017 MPO Meeting

15A NCAC 10B.0203 DEER (WHITE-TAILED) (EFFECTIVE UNTIL JULY 31, 2018) (a) Open Seasons (All Lawful Weapons) for hunting deer: (1) Deer With Visible

Report to the North Carolina General Assembly

NCHSAA Women s First Round Basketball Playoff: 1A Overall Seed. Game W/L/T. School Name. 1 East Surry 32 North Stanly Hayesville

SYSTEM LEVEL TEACHER TURNOVER REPORT

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

Secondary Road Program

Review of DRAFT STIP. January 5, 2017 TCC Meeting

A: PLANNED P ROJECTS PROJECTS

28,618 people joined the 2017 Holiday Challenge.

DRAFT HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaze Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex

north carolina safe routes conference building a path to the future

TEACHER TURNOVER REPORT. Annual Report on the Reasons Teachers Leave

NCHSAA Women s First Round Basketball Playoff: 4A Overall Seed. Game W/L/T. School Name. 1 Northwest Guilford 32 Bye 16 North Mecklenburg

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

Freeway ramp intersection study

STREET AND HIGHWAY PLAN

U-4918A Research Park Boulevard Transportation Improvements from Rams Drive to Third Street 1.0

HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaze Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex

2012 PRIORITY TRANSPORTATION PROJECTS

39,004 people joined the 2018 Holiday Challenge. That represents a 36% increase in participation from 2017.

HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaza Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Project Description Tier Goal Previous SPOT Rank

HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaza Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Table of Contents SURVEY SALARY DATA EMPLOYEE BENEFITS

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FDOT Treasure Coast Traffic Report

LEA Name School Name XDX XD Total 4A CLASSIFICATION

FDOT Treasure Coast Traffic Report

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

Setting the Stage for Complete Streets

Financial Project ID No(s).: and ETDM No(s).: and 14181

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

WINSTON-SALEM URBAN AREA MPO BICYCLE & PEDESTRIAN PROGRAM. Greg Errett City of Winston-Salem DOT September 14, 2011

2040 Long Range Plan Projects Draft October 2011

TOWN OF CHAPEL HILL Town Council Special Meeting 405 Martin Luther King Jr Blvd, Chapel Hill, NC :00 P.M., OCTOBER 30, 2014

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Planning Division

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Parewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18

Welcome to the Sellwood Bridge Project Open House!

Based on data collected in the fall of 2005

TRASBURG RANSPORTATION

March 17, Dear Colleagues of the Joint Legislative Oversight Committee on the NC Lottery,

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

FINAL VOLLEYBALL SEEDING

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Pedestrian Crash Facts

State Route 160 (Blue Diamond Highway)

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway

Status February Transportation Priority Projects in Chester County

John Kirk Road Proposed Thoroughfare Plan Amendment

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division

Roadway Project Recommendations:

FAMPO RESOLUTION 18-34

WELCOME. City of Eden Prairie West 70 th Street

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

Applications for Funding

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

Culpeper District. Albemarle County Monthly Report September, 2011

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Annual Listing of Obligated MPO Projects

Route 79/Davol Street Corridor Study

Project Description Form 6V

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX L: COST ESTIMATING TOOLS

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

The Year Ahead: Virginia Department of Transportation Northern Virginia District

MALL CROSSING STUDY. Testing the Effectiveness Of the 4th Street East Crossing. For: City of Charlottesville Neighborhood Development Services

Project Description Form 8EE

KC Scout Kansas City s Bi-State Transportation Management Center

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

Transportation Action Plan. Transportation & Planning Committee March 14, 2016

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

Transcription:

Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare US 64 Bridge No. 9 B-5181 Bridge Painting N/A $4,500,000 $0 $4,500,000 Jul-09 1 Chowan Various Bridge No. 26, 27, 28, & 30 N/A B-5184 Bridge Painting N/A $840,000 $0 $840,000 Jul-09 1 Perquimans US 17 SR 1302 SR 1101 R-5150 Strengthen Pavement 7.2 $4,000,000 $0 $4,000,000 Jul-09 1 Perquimans NC 37 Culvert No. 6 N/A B-5182 Replace Bridge With Aluminum Box Culvert N/A $500,000 $0 $500,000 Aug-09 1 Washington NC 45/99 Bridge No. 1 N/A B-5183 Replace Bridge With Aluminum Box Culvert N/A $350,000 $0 $350,000 Aug-09 1 Hertford NC 561 NC 11 Northampton Co. R-5151 Widening, Resurfacing 10.1 $2,580,000 $0 $2,580,000 Aug-09 1 Hertford US 13 Bridge #12 & Bridge #25 B-5018 Replace Bridges N/A $3,000,000 $0 $3,000,000 Oct-09 Totals: $19,080,000 $0 $19,080,000 Page 1 of 11

Division Four Highway Intrastructure Program Summary 4 Wayne Goldsboro N/A N/A U-5016 Computerized Signal System N/A $3,550,000 $0 $3,550,000 Aug-09 4 Wilson US 264 at Old Stantonsburg Road N/A N/A R-4737 New Interchange N/A $1,000,000 $3,300,000 $4,300,000 Nov-09 4 Johnston NC 42 SR 1010 R-5152 Intersection Improvements N/A $500,000 $0 $500,000 Dec-09 Totals: $5,050,000 $3,300,000 $8,350,000 Page 2 of 11

Division Five Highway Intrastructure Program Summary 5 Wake I-440 Glen Eden US 1 I-5125 Bridge Painting 5.0 $1,200,000 $0 $1,200,000 Apr-09 5 Wake I-440 I-40 Interchange I-40/US 1-64 I-5124 Install ITS Devices 16.0 $400,000 $0 $400,000 Jun-09 5 Wake US 264 US 64 Nash County LIne R-5123 Mill, Resurface 3.0 $2,500,000 $0 $2,500,000 Apr-09 5 Durham SR 1978 SR 1926 (Angier SR 2095 (Page Road (Old Page Road) Avenue) Extension) U-5124 Patch, Resurface 1.0 $150,000 $0 $150,000 Jun-09 5 Granville Oxford (US 158 Bypass) US 15 US 158 Business U-5125 Patch, Resurface 3.0 $500,000 $0 $500,000 Jun-09 5 Durham US 501 Bypass SR 1443 (Horton Road) Hudson Street U-5126 Mill, Resurface 1.9 $900,000 $0 $900,000 Jun-09 5 Durham SR 1321 (Hillandale- Fulton Street) I-85 SR 1320 (Erwin Road) U-5127 Mill, Resurface 1.3 $350,000 $0 $350,000 Jun-09 5 Wake US 401 SR 2044 (Ligon Mill Road) SR 2226 (Jonesville Road) R-2814A Widening 2.2 $13,900,000 $0 $13,900,000 Dec-09 5 Durham Wake I-540 & I-40 I-540 WB I-40 WB R-2000AF Interchange Improvements 2.0 $5,700,000 $0 $5,700,000 Jan-10 5 Wake SR 1011 (N. Salem SR 1010 (Center St.) St.) intersection N/A U-5118 Install Traffic Signal N/A $110,000 $0 $110,000 TBD 5 Wake Various N/A N/A EL-5100 Bicycle/Pedestrian projects N/A $2,682,295 $0 $2,682,295 TBD 5 Granville NC 50 Study I-540 Creedmoor Planning Boundary U-9999B Corridor Planning Study N/A $200,000 $0 $200,000 TBD 5 Wake Capital Area Transit (Raleigh) N/A N/A TD-4729 Transit Facility N/A $4,000,000 $0 $4,000,000 N/A 5 Durham Various N/A N/A U-4726 Bicycle/Pedestrian Projects N/A $4,449,200 $0 $4,449,200 TBD Totals: $37,041,495 $0 $37,041,495 Page 3 of 11

Division Seven Highway Infrastructure Program Summary 7 Guilford Bicentennial Construct Phases IV and V of West Market Street Ballinger Road EL-5101 Greenway Bicentennial Greenway 1.9 $600,000 $0 $600,000 Jun-09 7 Orange Corridor Upgrade to Include SR 1107 (Old NC 54 SR 1106 (Stroud Ln.) U-3100B Bicycle, Pedestrian, and Fayetteville Rd.) Transit Accommodations 0.5 $1,500,000 $0 $1,500,000 Sep-09 7 Orange Chapel Hill Signal System N/A N/A U-4704 Signal System Upgrade N/A $4,875,000 $0 $4,875,000 Sep-09 7 Orange Various N/A N/A U-4726 Bicycle/ Pedestrian Projects N/A $1,509,026 $0 $1,509,026 TBD 7 Chapel Hill Morgan Creek Greenway, Phase N/A N/A EL-4601 Construct Greenway N/A $300,000 $0 $300,000 TBD I Totals: $8,784,026 $0 $8,784,026 Page 4 of 11

Division Eight Highway Infrastructure Program Summary 8 Lee 8 Lee US 421 / NC 87 (Sanford Bypass) Endor Iron Furnace Greenway NC 42 NC 87 R-2417C Freeway on New Location 1.8 $25,100,000 $0 $25,100,000 Dec-09 Kiwanis Family Park Boone Drive EB-4981 Construct Greenway 1.5 $500,000 $0 $500,000 Jul-09 8 Chatham US 15-501 Cole Park Plaza Vicinity Orange County Line U-4726 8 Chatham NC 751 SR 1731 (O'Kelly Church Rd.) N/A SF-4908I Streetscaping/Landscaping/ Pedestrian Facilities on East and/or West Side of US 15-501 in Cole Park Area North to County Line - Using Existing Curb and Gutter, Serving Existing Commercial and UNC Park and Ride Lot Install Signal and Left-turn Lanes N/A $245,255 $0 $245,255 TBD N/A $486,000 $0 $486,000 TBD Totals: $26,331,255 $0 $26,331,255 Page 5 of 11

Division Nine Highway Infrastructure Program Summary 9 Davidson I-85 MM 100 N/A K-4905 Renovate Rest Area N/A $2,400,000 $0 $2,400,000 Aug-09 Totals: $2,400,000 $0 $2,400,000 Page 6 of 11

Division Ten Highway Infrastructure Program Summary (MILES) 10 Union Faith Church Rd & Unionville-Indian Trail Rd in Indian U-5109 Intersection Improvements N/A $400,000 $0 $400,000 May-09 Trail 10 Mecklenburg Concord Rd/E Rocky River Rd in U-5136 Construct Roundabout N/A $600,000 $0 $600,000 Jun-09 Davidson 10 Mecklenburg Charlotte U-5133 ITS Expansion - Upgrade and Expand Traffic Signal and N/A $4,000,000 $0 $4,000,000 Jul-09 Management System 10 Anson SR 1627 Bridge # 307 and #308 B-4409 / B-4410 Replace Bridges N/A $3,300,000 $0 $3,300,000 Jul-09 10 Mecklenburg Bridges along I-77 Nations Ford Rd Catawba Ave I-5128 Bridge Painting N/A $1,500,000 $0 $1,500,000 Jul-09 10 Union NC 16/NC 75 Intersection in U-5135 Intersection Improvements N/A $550,000 $0 $550,000 Aug-09 Waxhaw 10 Mecklenburg Various R-4436JD, JE, JF, JG Stormwater Improvements N/A $525,000 $0 $525,000 Sep-09 10 Mecklenburg NC 73 US 21 NC 115 R-2632AA Widen to Multi-lanes 1.2 $18,000,000 $0 $18,000,000 Sep-09 10 Mecklenburg Toby Creek greenway NC 49 at Harris Blvd Mallard Creek EB-5120 Construct Greenway 2.0 $1,250,000 $0 $1,250,000 Jun-09 Totals: $30,125,000 $0 $30,125,000 Page 7 of 11

Division Eleven Highway Infrastructure Program Summary 11 Wilkes NC 16 N SR 1559 (Old NC 16) Ashe County line R-5153 Pavement Rehab and Guardrail 5.5 $1,500,000 $0 $1,500,000 Jul-09 11 Ashe NC 16 NC 88 Virginia State Line R-5154 Pavement Rehab and Guardrail 13.1 $2,000,000 $0 $2,000,000 Jul-09 11 Alleghany NC 93 US 221 SR 1337 (Mt. Carmel Rd) R-5156 Pavement Rehab 5.1 $600,000 $0 $600,000 Jul-09 11 Alleghany NC 93 SR 1337 (Mt. Carmel Rd) Virginia State Line R-5157 Pavement Rehab 5.1 $650,000 $0 $650,000 Jul-09 11 Avery NC 194 US 221 US 19 E R-5158 Widening and Pavement Rehab 4.2 $800,000 $0 $800,000 Jul-09 11 Caldwell US 321 SR 1178 (Hibriten Dr SE) SCL Lenoir U-5141 Pavement Rehab 6.9 $575,000 $0 $575,000 Jul-09 11 Surry Bridges over I-77 Bridges #210, 211, 214 B-5185 Paint Bridge Girders N/A $450,000 $0 $450,000 Aug-09 11 Surry US 52 Stokes County Line SR 1815 (Cooke School Rd) R-5155 Pavement Rehab 12.6 $3,500,000 $0 $3,500,000 Aug-09 11 Surry Bridges over I-77 Bridges #87,120,147,167,168,187 B-5186 Paint Bridge Girders N/A $1,250,000 $0 $1,250,000 Aug-09 11 Surry I-77 Bridges #198, 204, 208 B-5187 Paint Bridge Girders N/A $800,000 $0 $800,000 Aug-09 11 Surry I-77 MM 88.4 MM 90 I-5130 Pavement Rehab 1.6 $300,000 $0 $300,000 Sep-09 11 Yadkin I-77 Iredell County Line South of SR 1125 (Asbury Church Rd) I-5129 Pavement Rehab 3.2 $1,500,000 $0 $1,500,000 Oct-09 11 Alleghany NC 18 SR 1173 (Tayson Rd) SR 1138 (Osborne Rd) R-5160 Add Left Turn Lane and Realign SR 1138 N/A $750,000 $0 $750,000 Oct-09 (Osborne Rd) 11 Wilkes NC 115 US 421 Iredell County Line R-5159 Widening and Pavement Rehab 9.3 $5,000,000 $0 $5,000,000 Dec-09 Totals: $19,675,000 $0 $19,675,000 Page 8 of 11

Division Twelve Highway Infrastructure Program Summary I-77 SB Rest Area Stormwater 12 Iredell R-4436 LD N/A $200,000 $0 $200,000 Sep-09 Basin, Mooresville 12 Widen to Multi-lanes 1.1 $34,248,531 $0 $34,248,531 Iredell Brawley School Rd Centre Church Rd I-77 R-3833 B Oct-09 12 Enhancements on Project N/A $151,469 $0 $151,469 12 Gaston Carolina Tread Trail Downtown Gastonia Highland Rail-Trail EB-5119 Bike/Ped System 0.2 $850,000 $0 $850,000 Sep-09 Totals: $35,450,000 $0 $35,450,000 Page 9 of 11

Division Thirteen Highway Infrastructure Program Summary 13 Buncombe I-40 MP 59 MP 67 I-5131 Pavement Rehab 8.0 $12,000,000 $0 $12,000,000 Dec-09 Totals: $12,000,000 $0 $12,000,000 Page 10 of 11

Division Fouteen Highway infrastructure Program Summary 14 Cherokee NC 141 US 64 US 74 R-5161 Pavement Rehabilitation 8.0 $3,500,000 $0 $3,500,000 Sep-09 14 Polk I-26 MP 61 MP 71 I-5100 Pavement Rehabilitation 10.0 $10,000,000 $0 $10,000,000 Dec-09 Totals: $13,500,000 $0 $13,500,000 Page 11 of 11