LPP S STEMS WORKSHEET

Similar documents
CHAPTER 1. The LPP system has three design improvements over conventional systems that help overcome these problems. They are:

MANUAL FLOW CONTROL 2-1/2" - 18" QUICKSET FLOW CHART

Chapter 9 System Design Procedures

WAT305 Math Part 1 ABC Math

Grangeville Country Club Golf Course

SIZING THE WELL-X-TROL

Memorandum. Dr. Wilbert Odem, Dr. Paul Trotta, and Mr. Justin Ramsey. From: Timothy Mahon, Patrick Belsheim, and Ali Alrayyes.

A centrifugal pump consists of an impeller attached to and rotating with the shaft and a casing that encloses the impeller.

Office Use Only Fee Paid

Pumping Systems for Landscaping Pumps, Controls and Accessories. Mark Snyder, PE

FIRE LOGISTICS AND MATH EDUCATION A Rumpke Public Outreach Program

MATH AND MAINTENANCE FOR PUMPS AND BLOWERS TRAINING SEMINAR

DW Module 8: Distribution Answer Key

Dan Johnson, CBP Swim, Incorporated Lead Dog Aquatic Consulting

Swimming Pool Plans and Specification Report

MA PHIT- Wastewater Certificate Program

SELECTION & APPLICATION

Airblast Sprayer Calibration Worksheet

Fermilab MTF Cryogenic System & Vertical RF Cavity Test Facility. Yuenian Huang, on behalf of Fermilab, TD/TID May 11, 2006

MEMORANDUM. Investigation of Variability of Bourdon Gauge Sets in the Chemical Engineering Transport Laboratory

MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION

Asheville s Fairview Water System Improvements: from Modeling to Contract Documents. April 19, 2016 Meg Roberts, PE

"QM" DESIGNER'S GUIDE AMERICAN "PERC-RITE " SECONDARY TREATED DRIP SYSTEMS 1 ZONE or 2 ZONE -- SIMPLEX PATENT NO. 5,200,065 & 5,984,574B

SIZING OF WATER PIPING SYSTEM

OVERVIEW. Flow Coefficient C v. Operating Conditions. Specific Gravity

MICROMOUND DESIGNERS GUIDE

2.4 Gutter and Downspout Sizing and Location Calculations

Pressure Compensating (PC) Spray Stakes

APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM CHART A 1.2 FRICTION LOSSES FOR DISK-TYPE WATER METERS 1-1/2"

APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEMS CHART A-1 FRICTION LOSSES FOR DISK-TYPE WATER METERS 1-1/2"

appendix a recommended rules For sizing the water supply system PRE-PRINT Chart a 1.2 FriCtion losses For Disk-type water Meters

Agricultural Water: Part 2

METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE. NOTE: This method does not include all of the

STANDARD OPERATING PROCEDURES

Process Dynamics, Operations, and Control Lecture Notes - 20

Understanding and Compliance of the Virginia Graeme Baker Pool & Spa Safety Act

Certified Pool/Spa Operator Course Pool Calculations

PRODUCT INFORMATIONAL BULLETIN

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Rhode Island

PTF4 Pivotrol Pump (patented) version Dual Mechanism - Pressure Powered Pump

Jacksonville. Lake City. St Augustine. Ocala Daytona Beach. Leesburg. Orlando. Cape Canaveral. Lakeland Tampa Clearwater Bartow St Petersburg

This portion of the piping tutorial covers control valve sizing, control valves, and the use of nodes.

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

Ohio. Ohio. Design and Installation Manual for Quick4 Chambers in Ohio. Infiltrator Chambers in Ohio

EDUCTOR. principle of operation

Construction Dewatering

Assistant Lecturer Anees Kadhum AL Saadi

Pumping Apparatus Driver/Operator Apparatus Testing. Chapter Test. Directions: Write the correct letter on the blank before each question.

FOR WASTEWATER APPLICATIONS

TUTORIAL. NPSHA for those who hate that stuffy word. by Jacques Chaurette p. eng. copyright 2006

SIZING OF WATER PIPING SYSTEM

Septic Tank Buoyancy Control 101. David Lentz, P.E.

AUTOMATIC FLOW CARTRIDGES. Competition Analysis Not All Automatics Are Created Equal

STATIONARY SPRINKLER IRRIGATION SYSTEM

CHAPTER 5 CULVERT DESIGN

vanishing water how to use the table: Choose the stream width Choose the stream length based on the gravel depth

Valves. Controllers. Valves Two Types

DESIGN DATA. Dry 105a. September 5, 2008

Conversion: Feet, Metres, Paces, Chains

Hydraulic Engineering

maintaining storage tank dissolved oxygen levels utilizing gas transfer membranes

Effect of Perched Water Conditions in MSW Landfills: Considerations for Landfill Operators

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

Application Worksheet

ENGINEERING DATA. Engineering Data

DEVELOPMENT OF A ROBUST PUSH-IN PRESSUREMETER

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

Tanker Fill Tests. Evaluating Direct Fill Lines DeKalb County, Alabama. November 16, Tests DeKalb County, AL

Appendix B Harris County Standard Operating Procedure for Determining In Situ Hydraulic Performance of High Flow Rate Bioretention Media

Basic layout 2016 IRRIGATION-MART. Check (Non- Leak) Valve. Friction Fit. Sprinkler. Figure 1 - Hanging Sprinkler & Check Valve Assembly

APPLYING VARIABLE SPEED PRESSURE LIMITING CONTROL DRIVER FIRE PUMPS. SEC Project No

ESCONDIDO FIRE DEPT TRAINING MANUAL Section DRIVER OPERATOR Page 1 of 14 Hydraulics Revised

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

Water Hammer In Irrigation Systems 1

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

Your Bonus. Steps for doing the Homework. Make sure you convert to the correct units of measure:

Bore-Gard Installation - 1,000 ft. Perry, Oklahoma

BINDEX BFM INSTALLATION GUIDELINES

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

INSTRUCTOR GUIDE REFERENCES: PUMPING APPARATUS DRIVER/OPERATOR HANDBOOK, FIRST EDITION, IFSTA

PRESSURE DROP CHARTS

Write important assumptions used in derivation of Bernoulli s equation. Apart from an airplane wing, give an example based on Bernoulli s principle

Prince Edward Island. Prince Edward Island. Design and Installation Manual for Prince Edward Island. Infiltrator Chambers in

Des Plaines Fire Dept. Engineer Program

How to Select and Specify Mixers for Potable Water Storage Tanks

Centrifugal Pump Intro

Item 404 Driving Piling

Installation Instructions

Joint Expo 2012 February 7-8, 2012 BASIC HYDRAULICS

Injection Systems INSTALLATION AND OPERATING GUIDE HI FLO VERTICAL TANK SYSTEMS

PX4 P L A S T I C PX4 PERFORMANCE WIL T-02

1 PIPESYS Application

Essentials of Fire Fighting 6 th Edition Firefighter I

Water budgets of the two Olentangy River experimental wetlands in 2001

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL

Increasing Water-Use Efficiency Using Block-Zone Design on Tees

Practice Test FOR GAS POSITIONS APTITUDE BATTERY

Cash Valve TYPE KP PILOT OPERATED BACK PRESSURE VALVE. ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 9001 Certified

Essentials of Fire Fighting

Liquid Level Controllers

Transcription:

LPP S STEMS WORKSHEET ABSORPTION AREA STEP I Calculate daily waste flow. BDR House = Gallon per day (GPD) STEP 2. Determine loading rate (First page of soil profile) Loading Rate = GPD/Sq. Ft. STEP 3. Compute the total area needed for the absorption system using the equation: Area = Flow/Loading Rate Area = GPD/ GPD/Sq. Ft. = Sq. Ft. STEP 4. Determine total length of distribution lines. Spacing between lines must be 5 Ft. or more to prevent overloading. Divide total area by 5 to obtain the total length of the distribution lines. Total Length = Sq. Ft./5Ft. = Ft. **Individual lines must not extend more than 70 Ft. from the manifold (supply line) due to excessive friction loss. Length of Individual lines = Ft. SEPTIC TANK Size is the same as conventional system. PUMPING TANK The pumping tank shall provide one day for emergency storage, thus it shall be at least twice the volume of the daily waste flow. DOSING RATE Volume of Pumping Tank = GPD x 2 = Gal. The best starting values for calculations are a 5/32 inch hole diameter, 5 ft. hole spacing and a 3 ft. pressure head. 1

(dosing rate cont.) STEP 1. Calculate the number of holes. Number of holes = Length of Line/Hole spacing Ft./5 Ft./Hole Holes/Line Total Holes = Holes/Line x Lines Holes STEP 2. Determine the flow rate per hole. Use TABLE 2 (Attached). EXAMPLE: Flow rate for 3 Ft. pressure head and 5/32 inch holes = 0.50 gallon per minute (gpm). STEP 3. Calculate total dosing rate. Flow Rate/Hole = GPM Flow Rate/Line = GPM x Holes/Line = GPM Total Flow Rate = GPM/Hole x Holes (Total) = GPM Pump Required = GPM at Ft. of Head PUMP SELECTION STEP 1. Compute friction head. Use TABLE 3 for pipe friction. Friction Head = 1.2 (Pipe Friction) Pipe Friction ( Length of Supply Line/100 Ft.) x Ft. of Friction Loss per TABLE 3. Pipe Friction = Ft. Friction Head = 1.2 x Ft. (Pipe Friction) = Ft. STEP 2. Calculate Total Head Total Head = Elevation Head + Pressure Head + Friction Head Ft. + Ft. + Ft. = Ft. System requires GPM against Ft. Head 2

STEP 3. Select a pump of proper capacity. Consult the appropriate performance curve. DOSING VOLUME STEP 1. Calculate the minimum dosing volume. Use TABLE 4 to find volume of lateral lines. Volume Dose = Volume supply line + 5(Volume lateral lines) A. Supply line = Ft. of inch pipe Volume supply =( Ft./100 Ft.) x Gal. (see TABLE 4) = Gal. Lateral lines = Ft. of Inch pipe Volume lateral = ( Ft /100 Ft.) x Gal. (see TABLE 4) = Gal. C. Volume dosing = A Gal. + 5 ( B Gal.) BE CAREFUL: DO NOT DOSE MORE THAN THE TRENCHES CAN HOLD. Gal. EXAMPLE: 360 Ft. of 6 inch wide by 10 inch gravel depth will hold 336 gallons. 6 inches x 6 inches of gravel will hold 202 gallons. STEP 2. Select the dosing volume. * Dosing two to four time per day provides adequate resting time. STEP 3. Compute the depth of effluent pumped - use the equation. Dosing depth =(Volume dose/volume tank) x liquid depth CHECK VALVE CALCULATION Gal./dose/ Gal. tank) x Inches Inches *Use check valves ONLY when total storage volume of pipe is greater than 1/4 of total daily waste flow. 3

(check valve calculation cont.) STEP 1. Calculate storage volume Volume storage = Volume supply + Volume laterals STEP 2. Compare to 1/4 daily waste flow GPD x 1/4 = Gal. Gal. + Gal. Gal. Gal. compared to Gal. SAN-LPP 1 4

DESIGN SUMMARY SHEET Appendix 1. Design Specifications for Example LPP Prepare a copy of this sheet along with an accurate sketch for each LPP desiqned. Dadiy is ga. Septic tank size gal. Pumping tank size gal. Effluent loading rate gal./ft./day Absorption area ft. Total length of laterals ft. Lateral diameter in. Lateral configuration ft. lines Supply line length ft. Supply line diameter in. Manifold placement Hole size* in. Hole spacing ft. Number of holes Flow per hole gpm Total flow gpm Elevation head ft. Friction head Total head Pump requirements gnm @ ft. of head Storage volume in laterals gal. Storage volume in supply line cal. Total storage volume gal. Dosing volume gal. Dosing depth in. Check valve needed? *Data on hole size, spacing, pressure head and flow must be listed for each line for systems where lines are different (such as sloping lots). SAN-LPP2 (6-93)

DESIGN SUMMARY SHEET Aprendix 1. Design Specifications for E7carniple Prepare a copy of this sheet along with an accurate sketch for each LPP ned. cal. Septic tank size Pumping tank size gal Effluent loading rate gal./ft /day Absorption area ft. Total length of laterals ft. Lateral diameter in. Lateral configuration ft. lines Supply line length ft. Supply line diameter in. Manifold placement Hole size* Hole spacing ft. Number of holes Flow per hole gpm Total flow gpm Elevation head ft. Friction head ft. Total head ft. Pump requirements gpm @ ft. of head Storage volume in laterals gal. Storage volume in supply line gal. Total storage volume gal. Dosing volume gal. Dosing depth Check valve needed? *Data on hole size, spacing, pressure head and flow must be listed for each line for systems where lines are different (such as sloping lots). SAN-LPP2 (6-93)