PO Box 370 Phone: Swansea NSW 2281 Fax: AUSTRALIA Mobile: Web:

Similar documents
EZI-DRY Pty Limited ABN:

HYQUEST SOLUTIONS PTY LTD INSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE MODEL TB6

INSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE. MODEL TB3/0.1mm

Type BBS-03, BBS-05, BBS-06, BBS-25

INSTRUCTION MANUAL TIPPING BUCKET RAINGAUGE MODEL TB305-1MM

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

MAINTENANCE PROCEDURE FOR X 650

Rada-Presto TF2020 and TF2020S

APP pumps APP and APP Disassembling and assembling

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

12S 1st Stage. -Maintenance Procedure-

LIQUIP DRYBREAK COUPLER. API800 Series MAINTENANCE INSTRUCTIONS

INSTRUCTION MANUAL TIPPING BUCKET RAINGAUGE MODEL TB3

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

Pressure Dump Valve Service Kit for Series 2300 Units

PRESSURISED PAINT CONTAINER

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

1. CONDITIONS FOR USE 2. SAFETY

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

ATS430 turbidity sensor Retractable insertion assembly

HYQUEST SOLUTIONS PTY LTD INSTRUCTION MANUAL TIPPING BUCKET RAINGAUGE MODEL TB6

AIR COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: CHAMP 3 PART NO: LS0115

REPLACING THE FRONT RIM OF CROSSMAX SLR DISC, CROSSMAX SL DISC 07 AND CROSSMAX ST DISC WHEELS

HYQUEST SOLUTIONS PTY LTD INSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE MODEL TB4

Supplementary Operation, Assembly, Maintenance Manual for F3-42 model and optional attachments

BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

BPB26-1 AND SSPB26-1 PATIO BASE INSTALLATION INSTRUCTIONS

Maximum 0.85 MPa pressure setting Long-life, high flow perfect for balancer applications

System Pressure Manager Standard & System Pressure Manager Plus

Disassembling and assembling APP and APP 16-22

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

Pressure Dump Valve Service Kit for Series 3000 Units

SEries 29 Hydrant valves installation, operation & maintenance manual

HOME ASSEMBLY INSTRUCTIONS

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

Auto-Rewind Hose Reels INSTRUCTION MANUAL FOR OXY-LPG MODEL

24L AIR COMPRESSOR MODEL NO: TIGER 8/260 PART NO:

VULCAN GAS SALAMANDER MODEL SG-G

M03 WUNDATRADE. Heat Pump Manifold. Before you start: Check the contents. Optional. ...a division of WUNDA GROUP PLC

HORNE 20 THERMOSTATIC MIXING VALVE TYPE H-2003

WALL MOUNTED EMERGENCY EYE & EYE/FACE WASH HAND OPERATED

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

RG1200 Service and Repair Manual

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

3M Liqui-Cel EXF-10x28 Series Membrane Contactor with ANSI or JIS Connections with Integrated End Caps

Training. Testor Training Manual

HYDRAULIC MOBILE LIFTING TABLE

Encore PE 50-lb Feed Hopper

Rocky Mountain Instinct / Pipeline Alloy Frame Assembly Guide. Date: April 7, 2017

Training. tm PA90 Series - Lung Demand Valve

Two-stage valve type NE

Booster Pump PB4-60 Replacement Kits

Final Assembly Instructions Bikes with 16 Wheel Size

15ME-014 INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV. URL

Parts List. 7. Handlebars 8. Grips 9. Handlebar Stem 10. Front Brake 11. Front Wheel 12. Crank 13. Chain

INSTRUCTION MANUAL. January 23, 2003, Revision 0

EVO Solid Downtube. Operators Manual for Downtubes fitted with zinc plated springs June 2004

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

UNITY 2. Uni-DAAMS Manual. Version 1.3 (Changes to Section 1.1) March 2010

100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections

Service and Repair Manual

UltRo Dual Flow Reverse Osmosis Water System

bathrooms.com Concentric Thermostatic Shower Mixers Cleaning and Care Installation Manual Contents

DelVal Flow Controls Private limited

Replacement of Interchangeable Membrane

LIQUIP DRYBREAK COUPLER. LYNX Series MAINTENANCE INSTRUCTIONS

24L AIR COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: RANGER 7/240 PART NO: LS0913

Contents. Stainless Steel Side Block. 1.1 Separating the Side Block. Stainless Steel Side Block Reassembly of. Assembly from the Helmet Shell

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: RT

Pressure Relief Valve DHV 718

Lock-N-Load. Bullet Feeder

AVK SERIES 601, 602, 603 & 605 UNIVERSAL COUPLINGS, ADAPTORS & END CAPS INSTALLATION, OPERATION & MAINTENANCE MANUAL

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Constant Pressure Crude Oil Container Model CPCCP

ENERGY BLADE 3K4. Energy Blade Installation Instructions

BELT DRIVE INDOOR CYCLING BIKE SF-B1712 USER MANUAL

SERVICE MANUAL LEGEND FIRST STAGE

VOLUMATIC WATER REGULATOR

Installation Instructions

24L AIR COMPRESSOR MODEL NO: TIGER 11/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

2-port seat valves PN25 with externally threaded connections

STATEMENTS OF FACT BENCH BG-4 CONTEST. 1. A positive pressure leak could be caused by a leakage in or at device components.

TECHNICAL INFORMATION

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

Preliminary filter Precision measurement chamber Flow meter Instruction manual

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

Contents. REX Regulator and Oral Nasal. 1.1 Regulator Performance Kirby Morgan Tools for the REX REX Regulator

NHR Powder Feed Hopper

Operating Procedure TITON SUBSEA BOLT TENSIONER

1.0 - OPENING AND CLOSING THE DOOR

30T A/Manual Hydraulic Shop Press

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

INSTALLATION & MAINTENANCE INSTRUCTION

Floor Drinking Systems

Transcription:

EZI-DRY Pty Limited ABN: 98 114 507 443 PO Box 370 Phone: 0249711993 Swansea NSW 2281 Fax: 0249135490 AUSTRALIA Mobile: 0427587900 Web: www.ezi-dry.com.au Email: ezidry@exemail.com.au INSTRUCTION MANUAL Silica Gel Breathers Part #: TMS-10, TMS-15, TMS-20, TMS-25 6

WARNING The EZI-DRY Silica Gel breathers are designed to be installed on electrical transformers. This work environment is hazardous and correct safety procedures should be in place and adhered to before attempting to install or remove these breathers. These instructions should be read in conjunction with any local safety regulations and work procedures. These instructions are only to be used for the correct installation, dismantling and assembly of the EZI-DRY breather. The silica gel in these breathers requires specific personal protective equipment to be used when dismantling and handling the contents. Consult the appropriate MSDS before dismantling. EZI-DRY Pty Ltd can recoend a suitable breather size for the required oil content but the purchaser should make their own determination for correct sizing. The use of these breathers outside these instruction guidelines may cause injury to personnel and/or damage to the equipment it is attached too. Please consult EZI-DRY Pty Ltd if these breathers are to be used in a manner outside these guidelines. 1

TABLE OF CONTENTS WARNING... 1 INSTALLING and REMOVAL INSTRUCTIONS... 3 Installing... 3 Removal... 3 DISMANTLING and ASSEMBLY... 4 Dismantling... 4 Assembly... 6 SPECIFICATIONS... 7 Table 1. Large Breather Specifications... 7 Table 2. Adaptor... 8 DESIGN INFORMATION... 8 Table 3. Air Flow Pressure Tests... 8 SIZING... 9 2

INSTALLING AND REMOVAL INSTRUCTIONS CAUTION. These units are designed to mount onto electrical transformers. Dangerous voltages May be present in the vicinity of the mounting point. Ensure all local safety procedures and statutory regulations are carried out, prior to mounting and/or removal of breather and parts. These instructions are suitable for all of these models, TMS-10, TMS-15, TMS-20 and TMS-25. All models are similar in design, the length and number of separation discs is the only variance from unit to unit. (See Table 1) The breathers have been designed to mount into the adaptor (quick connect fitting Picture 1 & 2) which is supplied with each unit. The adaptor may be manufactured from acetyl plastic (standard on all units) or stainless steel depending on requirements. These fittings are manufactured to fit a ¾ BSP breather pipe. (1 BSP are available) The adaptor should be fitted onto the correct breather pipe on the transformer. Thread tape or sealer may be required to ensure no leakage occurs. Tighten adaptor until it is seated (approx 16 onto thread) Do not over tighten as this may damage the adaptor. Picture 1 Acetyl Adaptor Picture 2 Stainless Steel Adaptor Installing The breather unit is now ready to mount. The adaptor has a seating washer inside for correct sealing. Screw the breather into the adaptor and rotate anti-clockwise approx 1 ¼ turns until you can feel the breather male fitting meet the sealing washer. The breather is now installed. No further installation procedures are required. Removal The removal of the breather only requires the clockwise rotation of the breather in the adaptor. When removing, be sure to hold the weight of the breather by placing a hand under the base when rotating clockwise to ensure the secure removal without dropping. 3

DISMANTLING AND ASSEMBLY Dismantling The dismantling will require an area that is clean and tidy, preferably on a work bench at the correct working height. Use some form of blocking (approx 40 in height) so that the breather can be placed upside down onto the blocking and the male screw fitting is clear of the bench top and provides a flat stable area for the breather to sit on. Ensure that the work is carried out over a large containment vessel in case the silica gel is accidentally spilled. At this stage it would be a good idea to measure the distance between the separation discs so as to have an idea of placement when re-filling. Full dismantling should now be done in conjunction with Picture 3. 1. Remove stainless steel circlip from base (item P). 2. Remove black disc by placing a wire in one of the holes to remove (item O). 3. Remove filter pad and replace if contaminated (item N). 4. Remove valve system by using pliers to clamp one of the wings to pull out. Check O-ring on the valve and replace in required (items L & M). 5. Remove the base by placing both hands on either side of the Plexiglas tube and push up with your thumbs (item H) ensuring you maintain firm pressure on the Plexiglas with both your hands. It may require a tap with a rubber mallet on the lip if this does not work. Ensure the breather Plexiglas is held firmly in some manner when doing this. 6. Remove the fine white filter material and check for contamination. Replace if required. (item G) 7. The silica gel can now be emptied into a container. Ensure you have a large enough container to work over as the Plexiglas tube can now come out of the head and spill silica gel everywhere. The separation discs should come out with the weight of the silica gel. 8. Remove the Plexiglas tube and clean as required. The Plexiglas tube can be cleaned with Methylated spirits or Turpentine. Use a non abrasive cloth. Do not use thinners or petroleum products as they could damage the Plexiglas. (Always test cleaner on a small section of Plexiglas prior to use) 9. Check O-ring in the head piece and clean or replace if necessary. All O-rings should be cleaned and re-coated with a suitable silicon grease or lubricant before assembly. 4

DISMANTLING AND ASSEMBLY Assembly 1. The head piece (item A) should be placed on the stable blocking material and the O-ring placed into position. 2. Place cleaned Plexiglas tube (item B) into head piece. The Plexiglas tube is only sitting loosely in the head while filling. Always hold down Plexiglas when filling with the silica gel. 3. Fill the first section with silica gel. Use measurements obtained prior to dismantling or refer to Table 1. 4. Insert the disc which has the vent holes in the outer edge (item E) in place. 5. Fill the second section. Insert the inner hole disc and continue to follow this sequence and using the correct number of discs (Table1) alternating from outer hole disc to inner hole disc until the silica gel is approximately 15 from the top of the Plexiglas. This allows room to tighten down base to required position. Temporarily place base (item H) in place without O-ring ( item I) to test for required gap. Remove base and replace O-ring. 6. Place fine white filter on shaft and then place base into position. Gently tap down the base so that the Plexiglas is in position and over the sealing O-ring. (item I) The base should now be hard up against the Plexiglas tube. 7. Tighten down base with the stainless steel spring washer in place and the 10 nut (item K, J). Do not over tighten. Nut should be close to flush with top of 10 shaft (item D) 8. Install valve system with o-ring in place (item L, M) 9. Install filter pad. Replace if contaminated (item M) 10. Place black disc with holes in centre into position (item O) 11. Place stainless steel circlip in place (item P) The breather is now ready for mounting. 6

Table 1. Large Breather Specifications Part # Silica Gel Content kg Dimension A SPECIFICATIONS Dimension B Dimension C Separators D # Separator Spacing TMS-10 3.8 247 272 190 2 58 TMS-15 5.6 347 372 190 2 70 TMS-20 7.9 447 472 190 3 94 TMS-25 9.2 547 572 190 4 95 7

SPECIFICATIONS Table 2. Adaptor Part # Dimension A Dimension B TMS001 45 45 ¾ Thread Size C inch DESIGN INFORMATION These re-chargeable breathers have been designed with a reed valve system in place of the typical oil bath system. The reeds are designed to operate under normal air flow conditions generated by the expansion and contraction of the transformer oil within the transformer. Typical operation of the reed valve is <2 kpa. Each breather is pressurised to 10 kpa and tested for leakage prior to dispatch. (See Table 1 for typical airflow and pressure) TABLE 3. AIR FLOW PRESSURE TESTS Product Flow Rate Pressure ID L/min kpa TMS-10 TMS-15 TMS-20 TMS-25 20 <1 50 <3 20 <1.5 50 <3 20 <2 50 <4 20 <2 50 <5 These test results may not be indicative of the breather that is purchased as settling of the silica gel in transport can cause further compaction which may alter these results. This testing was carried out in a workshop environment with a Key Instruments Flow meter & pressure gauge at 21 C. 8

SIZING There is no standard for the selection of silica gel quantity to oil quantity. Most manufacturers use approximately 1kg /3000 litres of oil. The design of the EZI-DRY breathers and in field testing combined with evidence has shown that the size of the EZI-DRY breather (silica gel quantity) can be reduced by up to 50% when compared to the standard oil bath breather with the same silica gel quantity. There are many factors which can affect the size selection for a transformer, some being: Maintenance inspection intervals. Local environmental conditions.(temperature range, rainfall, humidity) Transformer loading characteristics (oil temperature range/duration). Oil content (in relation to expansion and contraction quantities with temperature changes). When selecting the Silica gel breather size for your transformer, all of these factors should be considered and combined with any other relevant site conditions. EZI-DRY Pty Ltd can suggest a particular size breather, but the purchaser and installer must take the responsibility for correctly sizing the breather. 9