Site 1180_042 Kekaulike Mall. Bikeshare Hawaii. Location: ewa side of Kekaulike Mall makai of Hotel Street. Power Source: solar

Similar documents
Parking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way.

Bike Share Locations 1-18

PROJECT KEY TYPICAL SECTION 1 =60

Complete Streets. Complete Streets and other City Initiatives. City & County Initiatives. Honolulu Complete Streets Program

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

UDC Street Cross Sections

Montgomery County Life Sciences Center. LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Complete Streets Funding Program Project Prioritization Plan

Proposed Mural. Ninth St. Proposed Sitting Area. Proposed Bump-out. Bike Lane and Buffer Zone. Proposed Trees and Sitting Area.

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

PUBLIC REALM MASTER PLAN

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Clarkson Walkability Audit: Results and Recommendations Summary

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version

Pre-Construction Meeting

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

83 AVENUE PRE-CONSTRUCTION MEETING

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Memorandum. Sunday, July 13, Saturday, July 19, 2014

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Pedestrian and Bicycle Improvements in Balboa Park Station Area

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Lawrence Avenue Streetscape Concepts August 30, 2011

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Gerald Desmond Bridge Replacement: The Severance of a Major Bicycling and Ped Route

Potential Bicycle Facility on Bayou Street Mobile, Alabama

Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

KAKAAKO MAUKA AREA ACCESS, CIRCULATION, AND MOBILITY ASSESSMENT REPORT PREPARED FOR: HAWAII COMMUNITY DEVELOPMENT AUTHORITY

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

CITY OF LANCASTER PROPOSED NEW PROJECTS

What Is a Complete Street?

River Road Healthy Neighborhood Walkabout October 15, 2016

STREETSCAPE CONCEPT PLAN

See Figure 38, Existing Nonmotorized Connections.

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Sebastopol Charter School Traffic Management Plan

Waipio Point Access Road Acessible Path Concept Site Plan. Waipahu Aloha Clubhouse

6.4 RECOMMENDED IMPROVEMENTS

CURBSIDE ACTIVITY DESIGN

MEDIAN DESIGN example median A

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

RE: Natomas Landing (P99-091)

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

The Friends of St. Patrick of Hawaii P.O. Box 2178, Honolulu, HI

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Chapter 4: Funding and Implementation

Functional, Preliminary Design and Detailed Design

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

PenPlace SPRC #6. September 27, DRAFT

Appendix B - Street Sections

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

Pavement Rehabilitation & Buffered Bike Lane

APPENDIX 1 CIMA RECOMMENDED TREATMENTS

Chapter BICYCLE PARKING REQUIREMENTS

Option W: N. Washington Street Project

REDEVELOPMENT OPPORTUNITY! FOR SALE

Broad Street Bicycle Boulevard Design Guidelines

Right-of-Way Standards

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

MEMORANDUM Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec

Illustrated Principles of Good Planning

Right-of-Way Standards

FIRE & LIFE SAFETY STANDARD

15 April CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility

CIRCULATION, PARKING AND ALTERNATIVE TRANSPORTATION PLANS

Why invest in the 1 Street S.W. Corridor?

12/13/2018 VIA

February 11, 2016 TPO Board Presentation

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Fulton Market Streetscape

RZC Appendix 8A Marymoor Subarea Street Requirements

ROUNDABOUTS/TRAFFIC CIRCLES

Healthy Corridor Audit Tool

East Burke Transportation, Safety and Capacity Improvements

STREETSCAPE CONCEPTS

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

The Commonwealth of Massachusetts Executive Office of Health and Human Services Commission for the Blind 48 Boylston Street, Boston, MA

TRANSPORTATION COMMISSION Agenda Staff Report

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

C A M P U S W I D E G U I D E L I N E S S T R E E T F U R N I T U R E

CONTEXT SENSITIVE STREETS STANDARDS COMMITTEE

4 GENERIC COST ESTIMATING TOOL

Make CSUN Shine Brighter: Pedestrian and Vehicular Traffic Improvement Initiative. Progress Update February 21, 2013

Derby Street. Project Updates. Salem, Massachusetts

Kailua, Hawaii. October 2015

MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.20, 9.38

Transcription:

Station located on the ewa side of Kekaulike Mall makai of Hotel Street 24 18 wide clear space remains for pedestrians and maintenance/emergency vehicles 40 Location: ewa side of Kekaulike Mall makai of Hotel Street Type: off-street station on pedestrian mall Owner: City and County of Honolulu DPR Size: 15 docks and 1 kiosk Orientation: bikes pull toward the center of the mall (left) Installation notes: Place station adjacent to the street existing street lights and planter; station would be adjacent to street light utility covers. Date: 4/16/18 Site 1180_042 Kekaulike Mall

Station located in the parking lot on the mauka side of Nimitz Highway ewa from Kekaulike Street 50 Location: mauka side of Nimitz Highway ewa from Kekaulike Street Type: off-street station in private property Owner: HART Size: 19 docks and 1 kiosk Orientation: bikes pull toward the sidewalk Installation notes: Place station adjacent to the sidewalk; would replace 2 existing vehicular parking stalls. Date: 12/18/17 Site 1180_041 Nimitz and Kekaulike

Station located on the ewa side of Dr. Sun Yat Sen Mall 20 from stairs 25 from existing station location 40 17 Location: ewa side of Dr. Sun Yat Sen Mall Type: off-street station on pedestrian mall Owner: City and County of Honolulu DPR Size: 15 docks and 1 kiosk Orientation: bikes pull toward the center of the mall (right) Installation notes: Move existing station 25 further into the mall/away from the Dr. Sun Yat Sen statue. Date: 4/16/18 Version: 002 Site 1268_041 Dr. Sun Yat Sen Mall

Station located in the parking restricted area on the mauka side of Pauahi Street diamond head from River Street Station 6 from curb 18 80 20 to crosswalk Location: mauka side of Pauahi Street diamond head from River Street Type: on-street in a parking restricted area Owner: City and County of Honolulu DTS Size: 31 docks and 1 kiosk Orientation: bikes pull toward the street Installation notes: Install station 6 from the curb and 20 from the crosswalk. Date: 4/16/18 Site 1180_044 Pauahi and River

Station located in a parking restricted bulbout area on the makai side of Pauahi Street ewa of Maunakea Street Station 6 from curb 40 7 7 50 from stop line to end of bulbout Station 5 from stop line Location: makai side Pauahi Street ewa of Maunakea Street Type: on-street in a parking restricted area Owner: City and County, DTS Size: 15 docks, 1 kiosk Orientation: bikes pull toward the street Installation notes: Install station 6 from the curb and 5 from the stop line Date: 3/22/18 Site 1180_043 Pauahi and Maunakea

Station located in the hardscape area on the mauka side of the Civic Center Path near the Kalanimoku Building Bikes pull in/out into the aisles between the station and the rock wall or naupaka Trim naupaka to edge of concrete 28 27 6 3 11 6 17 6 3 KALANIMOKU BUILDING Keep aisle clear for maneuvering bikes Location: mauka side of the Civic Center Path near the Kalanimoku Building Type: Private property Owner: State of Hawaii, DAGS Size: 21 docks, 1 kiosk Station: back to back U station with 90-degree docks Orientation: bikes pull to the right and left Installation notes: Place the end of the station against the edge of the concrete and grass; trim the naupaka to align with the edge of the concrete. Date: 4/9/18 Site 0987_031 Civic Center Path (Kalanimoku Building)

Station located on the makai side of the Civic Center Path behind the Hawaii State Library Remove bike rack Remove dead hibiscus plant 3 from irrigation box 65 HAWAII STATE LIBRARY Location: makai side of the Civic Center Path behind the Hawaii State Library Type: Private property Owner: State of Hawaii, DAGS Size: 25 docks, 1 kiosk Orientation: bikes pull towards the walkway Installation notes: Station installed in grass adjacent to the walkway; station 3 from irrigation box Date: 4/9/18 Site 0986_041 (Alt. 1) Civic Center Path (State Library)

Station located on the makai side of the Civic Center Path behind the Hawaii State Library Remove bike rack Remove dead hibiscus plant 3 from planter 40 HAWAII STATE LIBRARY Location: makai side of the Civic Center Path behind the Hawaii State Library Type: Private property Owner: State of Hawaii, DAGS Size: 15 docks, 1 kiosk Orientation: bikes pull towards the walkway Installation notes: Station installed in grass and the existing concrete pad adjacent to the walkway; remove bike rack and dead hibiscus plant Date: 4/9/18 Site 0986_041 (Alt. 2) Civic Center Path (State Library)

Station adjacent to and partially on the sidewalk on the diamond head side of Nuuanu Avenue mauka of Vineyard Blvd Place station 18 from curb 60 4 6 Location: diamond head side of Nuuanu Avenue mauka of Vineyard Blvd. Type: Station adjacent to and partially on sidewalk Owner: City and County of Honolulu DTS Size: 23 docks, 1 kiosk Orientation: bikes pull toward the sidewalk Installation notes: Place station 18 from the curb; station will encroach 18 into the sidewalk, but 4 6 clear space will remain. Date: 01/10/17 Site 1269_041 Queen Emma Gardens