Chincoteague National Wildlife Refuge and Wallops Island National Wildlife

Similar documents
James River National Wildlife Refuge, Prince George County, VA; Final. Comprehensive Conservation Plan and Finding of No Significant Impact for

San Luis Valley National Wildlife Refuge Complex, CO; Availability of Record of

[FWS R4 R 2015 N236]; [FXRS S3 167 FF04R02000] Theodore Roosevelt and Holt Collier National Wildlife Refuges, Mississippi Final

Hunting, Fishing, Recreational Shooting, and Wildlife Conservation Opportunities and Coordination with States, Tribes, and Territories

[FWS R1 ES 2015 N076; FXES FF01E00000] Endangered and Threatened Wildlife and Plants; Revised Draft Recovery Plan for

Endangered and Threatened Wildlife and Plants; Recovery Plan for the. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce the

[NPS-IMR-GRSA-24169; PPWONRADE2, PMP00EI05.YP0000] Ungulate Management Plan Draft Environmental Impact Statement, Great

The National Wildlife Refuge System. The National Wildlife Refuge System

A. PURPOSE B. BACKGROUND

Notice of Availability of the Draft Transportation Plan and Environmental Impact

U.S. Fish and Wildlife Service Native American Crosscut Funding

[Docket No. FWS R7 NWRS ; FF07R00000 FXRS Obligation

General Regulations for Areas Administered by the National Park Service and the Fish and Wildlife Service

[FWS HQ MB 2018 N052; FXMB123109WEBB0 167 FF09M25100; OMB. Agency Information Collection Activities; Submission to the Office of

APPENDIX Region 6 Inland Area Contingency Plan Compliance with Section 7 of the Endangered Species Act

United States Department of the Interior

[Docket No. FWS HQ MB ; FF09M FXMB123209EAGL0L2] Eagle Permits; Removal of Regulations Extending Maximum Permit Duration of

Endangered and Threatened Wildlife and Plants; Listing the Southern White Rhino

United States Department of the Interior

National Oceanic and Atmospheric Administration. Notice of Intent to Prepare an Environmental Impact

UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION [RC0ZCUPCA0, 155R0680R1, RR ]

United States Department of the Interior

Trapping on Public Lands: National Wildlife Refuges

[Docket No. FWS HQ IA ; FXIA FF09A300000] Draft Environmental Assessment; Dallas Zoo Management; Dallas, Texas

Public Consultation Document

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF DELAWARE

[Docket No. FWS-HQ-ES ; FF09E FXES111609C0000] Endangered and Threatened Wildlife and Plants; Regulations for Candidate

[FWS R6 ES 2017 N031; FF06E FXES111606C0000] Endangered and Threatened Wildlife and Plants; Enhancement of Survival Permit

\ cc&/ TIME REQUIRED: JL i/

[Docket No. FWS R6 ES ; FXES FF09E42000] Endangered and Threatened Wildlife and Plants; Removing the Greater Yellowstone

Appendix H RESPONSES TO PUBLIC COMMENTS

United States Department of the Interior

PROPOSED RULEMAKING GAME COMMISSION

Fisheries Off West Coast States; Coastal Pelagic Species Fisheries; Amendment to

Claimed statutory authorities and roles in the Bison Management Plan for the State of Montana and Yellowstone National Park

[FWS R5 FR 2018 N053; FF05F FXFR ; OMB Control. Agency Information Collection Activities; Submission to the Office of Management

Big Cypress National Preserve. Hunting Management Plan /

National Wildlife Refuge System

United States Department of the Interior

2018 Season Waterfowl Hunter Survey Summary. Presented by Josh Richardson, Sr. Biologist Oklahoma Department of Wildlife Conservation

Wildlife Hazard Mitigation Policy, Plan and Procedure. May

VDOT BICYCLE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT April 2017

Sport Hunting. Decision Document Package. for. St. Marks National Wildlife Refuge. Contents. 4. Compatibility Determination

BIKE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT. November 2006

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

United States Department of the Interior

Living Beaches: Integrating The Ecological Function Of Beaches Into Coastal Engineering Projects and Beach Management

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

FINAL ENVIRONMENTAL IMPACT STATEMENT ON RESIDENT CANADA GOOSE MANAGEMENT Questions and Answers

Notice of Intent to Prepare an Environmental Impact Statement and Management

[Docket No. FWS HQ IA ; FXIA FF09A30000] Foreign Endangered Species; Receipt of Permit Applications

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

Summary report on all harvested species on Patuxent Research Refuge from September 1 - January 31, 2017 Deer Harvest

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric

Audit Report. Department of the Interior Office of Inspector General

[FWS R6 ES 2015 N103; FXES FF06E00000] Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric

[FWS R5 ES 2015 N021; FXES FF05E00000] Endangered and Threatened Wildlife and Plants; Draft Recovery Plan for the Gulf

Protecting Biodiversity

[Docket No. FWS R2 ES ; FXES FF02ENEH00] Endangered and Threatened Wildlife and Plants; Mexican Wolf Draft Recovery

AUDIT REPORT. Department of the Interior Office of Inspector General

National Oceanic and Atmospheric Administration. Fisheries of the Caribbean, Gulf of Mexico, and South Atlantic;

DRAFT RULE Specific Regulations for Wildlife Management Areas North Central Region Agenda Item 12A December 13, 2018

Controlled Take (Special Status Game Mammal Chapter)

[Docket No. FWS R6 ES ; FXES C6-178-FF09E42000]

Agreement Between the Government of Canada and the Government of the United States of America on the Conservation of the Porcupine Caribou Herd

CHAPTER 1 PURPOSE OF AND NEED FOR ACTION

Atlantic Highly Migratory Species; Atlantic Bluefin Tuna Fisheries. AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Access Fund Comments to Zion National Park Backcountry Management Plan/Environmental Assessment

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Preserving Biological Diversity for Future Generations

AUDIT U.S. FISH AND WILDLIFE SERVICE WILDLIFE AND SPORT FISH RESTORATION PROGRAM GRANTS

National Oceanic and Atmospheric Administration. Fisheries of the Caribbean, Gulf of Mexico, and South Atlantic;

[Docket No. FWS HQ IA ; FXIA FF09A30000] Endangered Species; Marine Mammals; Receipt of Applications for Permit

Chagrin River TMDL Appendices. Appendix F

U.S. Fish & Wildlife Service West Virginia Field Office 694 Beverly Pike Elkins, WV. ATTN: Project Review Request

International Fisheries; Pacific Tuna Fisheries; Revised 2018 Commercial Fishing

[Docket No. FWS HQ IA ; FXIA FF09A30000] Endangered Foreign Species and Protected Marine Mammals; Receipt of Permit

Beyond Park Boundaries: Connecting Communities to Trails International Trail Symposium May 9, 2017

Naskapi Perspective on Caribou Harvesting

RED RIVER NATIONAL WILDLIFE REFUGE

Case Study: Transportation Plan Environmental Impact Statement. National Park Service U.S. Department of the Interior

A new vision for the Birds Directive & The Positive Role of Hunting

Coastal Wetlands Protection Act. Fisheries Management, Marine Sanctuaries and Closures

make people aware of the department s actions for improving the deer population monitoring system,

Guided hunt in maryland

Natural Resource Statutes and Policies. Who Owns the Wildlife? Treaties. Federal Laws. State Laws. Policies. Administrative Laws.

Endangered Species Emergency Consultation

Operational Policy. Queensland Parks and Wildlife Service. Mountain biking in QPWS managed areas. Visitor Management. 1 Purpose

Santa Clara Valley Habitat Conservation Plan/ Natural Community Conservation Plan

Endangered and Threatened Wildlife and Plants; 90-Day Findings for Five Species

Natural Resource Statutes and Policies

PLANNING TO KEEP WELLFLEET SPECIAL

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Horseshoe Slough Nuna K óhonete Yédäk Tah é Habitat Protection Area Management Plan

Overview Of the USFWS, NWRS, And. Friends Program

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Mount Snow Disc Golf Course and Mountain Bike Race Course Project

[Docket No. FWS HQ IA ; FXIA FF09A30000] Endangered Species; Marine Mammals; Receipt of Applications for Permit

Transcription:

This document is scheduled to be published in the Federal Register on 09/11/2015 and available online at http://federalregister.gov/a/2015-21925, and on FDsys.gov Billing Code 4310-55 DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS R5 R 2015 N090] [BAC-4311-K9-S3] Chincoteague National Wildlife Refuge and Wallops Island National Wildlife Refuge, Accomack County, Virginia; Final Comprehensive Conservation Plan and Environmental Impact Statement AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability; final comprehensive conservation plan and environmental impact statement. SUMMARY: We, the U.S. Fish and Wildlife Service, announce the availability for review of our final comprehensive conservation plan (CCP) and environmental impact 1

statement (EIS) for Chincoteague National Wildlife Refuge (NWR, refuge) and Wallops Island NWR. The CCP/EIS describes how we propose to manage both the staffed 14,032-acre Chincoteague NWR and the unstaffed 373-acre Wallops Island NWR over the next 15 years. DATES: We will sign a record of decision no sooner than 30 days after the publication of this notice. ADDRESSES: You may view, obtain, or request CD-ROM copies of the final CCP/EIS by any of the following methods. Agency Web site: Download a copy of the document at http://www.fws.gov/refuge/chincoteague/what_we_do/conservation.html. E-mail: Send requests to northeastplanning@fws.gov. Include Chincoteague NWR in the subject line of your e-mail. U.S. Mail: Thomas Bonetti, Natural Resource Planner, U.S. Fish and Wildlife Service, 300 Westgate Center Drive, Hadley, MA 01035. In-Person Viewing or Pickup: Visit during regular business hours at refuge headquarters, 8231 Beach Road, Chincoteague Island, VA 23336. To view comments on the final CCP-EIS from the Environmental Protection Agency (EPA), or for information on EPA s role in the EIS process, see EPA s Role in the EIS Process under SUPPLEMENTARY INFORMATION. 2

FOR FURTHER INFORMATION CONTACT: Thomas Bonetti, Natural Resource Planner, 413-253-8307 (phone); northeastplanning@fws.gov (e-mail). 3

SUPPLEMENTARY INFORMATION: Introduction With this notice, we continue the CCP process for Chincoteague NWR and Wallops Island NWR, which we began by publishing a notice of intent in the Federal Register (75 FR 57056) on September 17, 2010. For more about the initial process and the history of the refuges, see that notice. On May 15, 2014, we announced the release of the draft CCP/EIS to the public and requested comments in a notice of availability in the Federal Register (79 FR 27906). We subsequently extended the public comment period in another notice in the Federal Register (79 FR 41300) on July 15, 2014. In addition, EPA published a notice announcing the draft CCP and EIS (79 FR 29759; May 23, 2014), as required under section 309 of the Clean Air Act (CAA) (42 U.S.C. 7401 et seq.). We now announce the final CCP and EIS. Under the CAA, EPA also will announce the final CCP and EIS via the Federal Register. EPA s Role in the EIS Process The EPA is charged under section 309 of the Clean Air Act to review all Federal agencies EISs and to comment on the adequacy and the acceptability of the environmental impacts of proposed actions in the EISs. EPA also serves as the repository (EIS database) for EISs prepared by Federal agencies and provides notice of their availability in the Federal Register. The EIS Database provides information about EISs prepared by Federal agencies, as well as EPA s comments concerning the EISs. All EISs are filed with EPA, which publishes a notice of availability on Fridays in the Federal Register. 4

The notice of availability is the start of the 45-day public comment period for draft EISs, and the start of the 30-day wait period for final EISs, during which agencies are generally required to wait 30 days before making a decision on a proposed action. For more information, see http://www.epa.gov/compliance/nepa/eisdata.html. You may search for EPA comments on EISs, along with EISs themselves, at https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search. We completed a thorough analysis of impacts on the human environment in the final CCP/EIS, and responded to public comments. The CCP will guide us in managing and administering the refuges for 15 years. Alternative B, as we described in the final CCP/EIS, is our preferred alternative. Background The CCP Process The National Wildlife Refuge System Administration Act of 1966 (16 U.S.C. 668dd-668ee) (Refuge Administration Act), as amended by the National Wildlife Refuge System Improvement Act of 1997, requires us to develop a CCP for each NWR. The purpose for developing a CCP is to provide refuge managers with a 15-year plan for achieving refuge purposes and goals and contributing to the mission of the National Wildlife Refuge System. CCPs should be consistent with sound principles of fish and wildlife management, conservation, legal mandates, and our policies, as well as respond to key issues and public concerns. In addition to outlining broad management direction on conserving wildlife and their habitats, CCPs identify wildlife-dependent recreational opportunities available to the public, including opportunities for hunting, fishing, wildlife 5

observation and photography, and environmental education and interpretation. We will review and update the CCP at least every 15 years, in accordance with the Refuge Administration Act. CCP/EIS Alternatives We evaluated three alternatives for managing Chincoteague NWR and Wallops Island NWR; alternative B is our preferred alternative. Based on feedback on the draft CCP/EIS, some modifications have been made to alternative B and are summarized below. A full description of all alternatives, including changes to our preferred alternative, can be found in the final CCP/EIS at the sources identified in ADDRESSES. Changes to Alternative B, the Service s Preferred Alternative The assigned area, consisting of the 1-mile recreational beach, associated parking, and new Visitor Contact Station, would extend south 1 more mile to the terminus of Swan Cove Trail (2 miles total), thus doubling the length of the assigned area. Over sand vehicles (OSV) and hiking access would continue via Beach Road across Toms Cove south to Fishing Point September 16 through March 14. A new ½-mile, OSV zone to facilitate the six priority uses (March 15 through September 15) would be developed south of new recreational beach, and added to the new assigned area. We would continue current management of the Overwash and Hook area for shorebirds until the new recreational beach is established, at which time the March 15 through September 15 closure would go into effect. 6

We will keep current biking access open via Swan Cove Trail and will not propose an alternative bike route north to the relocated public beach (from Wildlife Loop to Mallard (C Dike)). The Service Road would continue to be open year-round to hikers north to the refuge/national Seashore boundary. A section of the Affected Environment (Chapter 3) on cultural resources was inadvertently left out of the draft CCP/EIS. This section, which has been coordinated with the Virginia Department of Historic Resources, is included in the final CCP/EIS. Other features of Alternative B Alternative B would continue established habitat and wildlife management strategies but focus them in light of the new goals and vision established by the CCP. The alternative balances habitat management, public use and access, and administration of the refuge. We would continue to preserve approximately 2,650 acres of wetland impoundments, but make adjustments in accordance with a new impoundment management plan that takes into account various factors, such as the habitat needs of black ducks and monarch butterflies, climate change and natural coastal processes, and relocated beach access and parking. The refuge would continue to protect and enhance the wilderness character of the 1974 proposed wilderness area, and there would be no change in its size (1,300 acres) or location. In recognition of the vulnerability of the current parking, the refuge would develop and implement a site design plan for parking and access to a new beach location, 7

approximately 1.5 miles north of the existing beach. We are committed to working with the National Park Service (NPS) and others to future design, refine, and analyze beach relocation infrastructure in a separate National Environmental Policy Act document. Over the next 15 years, the refuge would maintain and, where possible, expand current hunting opportunities by including additional species, extending hours, and providing special events. The refuge would add mourning doves, light geese, and nonmigratory Canada goose hunting opportunities to the refuge s migratory bird hunting program. Additionally, the refuge would allow migratory bird hunting on Federal holidays within the Commonwealth of Virginia hunting seasons. The refuge would also add turkeys to the big game hunting program and pursue development of a trapping program for furbearers. The refuge would continue sika hunting and would conduct research to identify a desired population size. The refuge would pursue partnerships to enhance land conservation, environmental education, and interpretation on the Delmarva Peninsula. The Chincoteague ponies have a strong cultural tie to the community, and the refuge would implement a Chincoteague pony management plan that meets multiple objectives: visitor viewing, habitat management, and pony health. The refuge would allow grazing of the current pony population, with a maximum pony herd size of 150, per the management agreement with the Chincoteague Volunteer Fire Company. Public Availability of Documents You can view or obtain the final CCP/EIS as indicated under ADDRESSES. 8

Comments During the public comment period, a total of 236 emails and 94 letters were received, including official comments from the town of Chincoteague, the Chincoteague Chamber of Commerce, The Nature Conservancy, NPS, Environmental Protection Agency, various departments from the Commonwealth of Virginia, and other local interest groups. In addition a petition was submitted supporting Alternative A plus, an alternative with elements of both alternative A and B, with approximately 600 individuals signing. Another petition supporting the preferred alternative (alternative B) was submitted with 112 individuals signing. We held two public open house meetings in Chincoteague, and additional meetings in Melfa, Virginia, and Pocomoke City, Maryland. As part of the public involvement process, we held a public hearing on June 26, 2014, in Chincoteague with 28 people formally raising a variety of issues and concerns. We evaluated all the letters and e-mails sent to us during that comment period, along with comments recorded at our public hearing, and addressed all substantive comments. A summary of those comments and our responses to them is included in the final CCP/EIS as appendix R. 9

Next Steps We will document the final decision in a record of decision, which will be published in the Federal Register after a 30-day wait period that begins when EPA announces this final CCP-EIS. For more information, see EPA s Role in the EIS Process. Dated: August 18, 2015. Deborah Rocque Acting Regional Director, Northeast Region U.S. Fish and Wildlife Service [FR Doc. 2015-21925 Filed: 9/10/2015 08:45 am; Publication Date: 9/11/2015] 10