PLANT RISK ASSESSMENT REPORT

Similar documents
PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT

University College Dublin Machinery/Equipment Risk Assessment Template

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2

RISK ASSESSMENT. Bobcat Skid Steer Loader. Series F & G (incl. S Models) For. SSL Version 2

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM

Material Lift Risk and Hazard Management

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SAFETY MANAGEMENT SYSTEM

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

SAFE WORK METHOD STATEMENT SWMS No Version

4.1 The Vice-Chancellor and University Executive Committee

Safe Work Method Statement

TECHNICAL INFORMATION SHEET 17. Revision 1 : 2016 MODEL RISK ASSESSMENT FOR THE MANUAL HANDLING OF GAS CYLINDERS

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

Plant Hazard Identification and Risk Assessment

Hazard Identification and Risk Management

Manually Propelled Risk and Hazard Management

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

Plant Hazard Identification and Risk Assessment

PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA)

in Australian Workplaces

Static, Hazard & Risk Assessment of Mobile Plant

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

Risk and Hazard Management

PLANT/EQUIPMENT/ASSET HAZARD REPORT

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

Hazard Management Making your workplace safer

Risk and Hazard Management

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Risk and Hazard Management

Recognition, Evaluation, and Control of Hazards

Runabout Risk and Hazard Management

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details.

Hazard & Risk Management

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

Safe Work Method Statement

Accident/Incident Reporting and Investigation Procedures

SAFE WORK METHOD STATEMENT Part 1

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT

Product Risk Assessment

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

WORK METHOD STATEMENT STRUCTURAL STEEL

Faculty/School: Pharmacy Initial Issue Date: Oct Dr. Alpesh Patel and Padmaja Dhanvate

Safe Work Method Statement (SWMS)

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0

Risk and Hazard Management

Prevention of Falls and Working at Heights

This guidance explains what hazards and risks are and provides an overview of requirements under the Health and Safety at Work Act 2015 (HSWA).

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

HAZARD RECOGNITION EVALUATION and CONTROL

HAZARD MANAGEMENT PROCEDURE

ONSITE PLANT ASSESSMENT: PH: MOBILE PLANT RISK ASSESSMENT 2010.

PLANT/EQUIPMENT/ASSET HAZARD REPORT

SAFE WORK METHOD STATEMENT CARPENTER

Procedure: Confined space safety

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0

Conducting An Effective. Welcome!

Safe Work Method Statement

How severely could the risk hurt someone?

Preventive Maintenance

Contractor OHS Induction. AOHS-05-GUI September 2016

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

HAZARD RECOGNITION EVALUATION & CONTROL. Procedure No. HR-405-PR-2 Division Human Resources. Supersedes n/a Board Policy Ref.

SAFE WORK METHOD STATEMENT

PLANT RISK ASSESSMENT WORKSHEET (PRA)

Confined Space Management

SH&EWMS No.: FC-QLD-017 Revision Date: July 2017 Revision Due: July 2018

Print this activity then complete it and keep it as evidence in your folder, or portfolio.

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019

SOP. Working in Confined Spaces

HS329 Risk Management Procedure

The University of British Columbia Department of Earth, Ocean and Atmospheric Sciences Hazard Identification and Risk Assessment for Field Activities

A31. Ride-on-Roller. Cleraune Plant Training June 09 1

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

Safe Work Method Statement Tasks

SH&EWMS No.: F-C-QLD-14 Revision Date: July 2018 Revision Due: July 2019

THICKNESSER RISK ASSESSMENT (U003ra)

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Accident /Incident/Injury Report & Investigation Form

Faculty/School: Faculty of Pharmacy Initial Issue Date: Oct 2016

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw

Safety Audit/Risk Assessment

Occupational Health & Safety

LONE WORKING HEALTH AND SAFETY GUIDANCE

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

S31 Opening Statement Working at Height

Transcription:

PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/201-03 Assessment Date: 5 th June 2012 Company: Wacker Neuson Plant Type: Twin Drum Rollers Assessment Purpose: Operational risks associated with the plant as it stands On site Operational risks associated with the plant as it stands Desk top analysis Access Systems Modification/s Other : Group assessment of plant type Assessed by: Darren Husson VEHTEC Pty Ltd SECTION 2: PLANT SUMMARY Preamble: This assessment is designed to encompass the Wacker Neuson range of Twin Drum Rollers. This range feature articulated steering and can be configured with water spays. The rollers can be adjusted for high or low compaction rates and front or twin drum frequency/exciter operation. This document is intended to highlight Occupational Health Safety and Welfare related risks that may present during on site set up and operation and has been conducted in accordance with the OHS&W Legislation 2010 Part 3 Division 3.3 Is the plant designed for its intended use? Yes No Final Sign off by Employer/Owner - All actions/recommendations complete Has the plant been modified from the original design? Yes No Is the plant in good working condition? Yes No Is action required before the plant can be safely used? Yes No Has the required action / remedy been undertaken? Yes N/A Name: Position: Signed: Date: Prepared by VEHTEC Pty Ltd www.vehtec.com.au Page 1 of 10

Photographs are for illustrative purposes only. Functions, layout, engines and bodies will vary between models Prepared by VEHTEC Pty Ltd www.vehtec.com.au Page 2 of 10

SECTION 3: RISK ANALYSIS LIKELIHOOD AND CONSEQUENCES Table 1. Measure of Likelihood Table 2. Measure of Consequences or Impact Level Description Detail Level Description Detail A B Almost Certain Likely The event is expected to occur in most circumstances The event will probably occur in most circumstances 1 Insignificant No injuries, low financial loss 2 Minor C Moderate The event should occur at some time 3 Moderate D Unlikely The event could occur at some time 4 Major E Rare The event may occur only in exceptional circumstances 5 Catastrophic First Aid treatment, on site release immediately contained, medium financial loss Medical treatment required, on site release contained with outside assistance, high financial loss Extensive injuries, loss of production capability, off site release with no detrimental effects, major financial loss Death, toxic release off site with detrimental effect, huge financial loss Likelihood Insignificant 1 Table 3. Risk Analysis Matrix Minor 2 Consequences Moderate 3 Major 4 Catastrophic 5 A (Almost certain) S S H H H B (Likely) M S S H H C (Moderate) L M S H H D (Unlikely) L L M S H E (Rare) L L M S S *Only hazards with a risk deemed higher than low need to be controlled Legend: H= High risk, detailed research and management planning required. S= Significant risk, senior management attention needed. Continuous review. M= Moderate risk, management responsibility. Periodic review L= low risk, manage by routine procedures. Periodic review to ensure risk does not increase.. Prepared by VEHTEC Pty Ltd www.vehtec.com.au Page 3 of 10

SECTION 4: HAZARD IDENTIFICATION Hazard Item N o Hazard Item Observation Detail 1 Plant in its current state has potential to cause injury/illness due to: Hazard L C Risk 1.1 Entanglement (Bystander involved with roller drum/s unlikely excellent visibility of roller from Operators platform) No 1.2 Puncturing No 1.3 Cutting (Operator/bystander caught in the lowering of engine cover action) Yes D 3 M 1.3a (When ROPS is folded down or deployed) Yes D 3 M 1.4 Stretching (Accessing operators platform Low floor height or good access steps fitted) Yes D 2 L 1.5 Stabbing No 1.6 Trapping (Operator/bystander caught in the lowering of engine cover action) Yes D 3 M 1.6a (Plant tipping or rolling over in steep/uneven terrain or when operated close to excavations/trenches etc) Yes D 4 S 1.7 Abrasion No 1.8 Engulfment No 1.9 Crushing (Crush zone when turning) (Transport lock to be in place when undertaking maintenance in crush zone and power to be isolated) Yes D 3 M 1.9a (Plant tipping or rolling over in steep/uneven terrain or when operated close to excavations/trenches etc) Yes D 4 S 1.10 Shearing No 1.11 Tearing (Accessing operators platform Low floor height or good access steps fitted) Yes D 2 L 1.12 Asphyxiation No 1.13 Slips, Trips (Wet or muddy steps when boarding /alighting) (Low floor height or good access steps fitted) Yes D 2 L 1.14 Falls (Operator falling from operator platform during operation extremely unlikely Seat belt to be worn at all times) Yes D 2 L 1.15 Falling Objects No 1.16 Expelled Parts No 2 Plant in its current or intended state has the potential to create a hazardous condition due to: 2.1 Pressured Content (Burst hydraulics line lines are well protected within base units design) No 2.2 Explosion (No smoking near plant or when refuelling) Yes D 2 L 2.3 Radiation N/A 2.4 Vapour N/A 2.5 Dust (Open operator platform Water bar to be used if fitted when required to reduce hazard) Yes B 1 M 2.6 Moisture (Operator to be managed by SOP and/or Employers/Owners policy) Yes D 1 L 2.7 Gases (Exhaust is directed away from operator platform. Not to be used in confined space) Yes D 2 L 2.8 Fire No 2.9 Vibration (Roller is suspended via rubber mounts to control exposure to vibration) Yes A 2 S Prepared by VEHTEC Pty Ltd www.vehtec.com.au Page 4 of 10

2.10 Electricity No 2.11 Friction No 2.12 Ice Formation No 2.13 Laser Beams No 2.14 Hot and Cold Parts (Engine when performing maintenance checks, checks to be undertaken when plant is cold. Never perform maintenance when plant is hot. Exhaust system outlet may reach high temperatures at times.) Yes E 2 L 2.15 Temperature Extremes (Operator to be managed by SOP and/or Employers/Owners policy) Yes D 2 L 2.16 Noise (Low db levels) (Operator required to wear appropriate PPE) Yes D 2 L Yes / No / N/A 3 Manual handling requirements have been assessed as acceptable (Lifting points fitted and clearly identified with decals. Operators manual indicates static weight and method to ensure safe lift) Yes 4 Repetitive, forceful, awkward, sustained movements have been minimised/ eliminated Yes 5 The current guard (s) and their condition are adequate for this plant (Designed for application) Yes 6 Is the guarding appropriate for all work requirements (Designed for application) Yes 7 Operator controls are located for ease of use by operators Yes 8 Operator controls are identified and marked appropriately Yes 9 Emergency stops are clearly marked Yes 10 Emergency stops are located at the most likely place (s) for emergency use Yes 11 The power source of the plant has been designed, constructed, installed, protected, maintained as to minimise the risk of harm to employees. (Plant to be maintained as per Operators Manual) Yes 12 There is provision to lock out the plant, and dissipate energy Yes 13 Access platforms/ladders/handrails are provided Yes 14 Access to moving parts from the platform can be performed safely N/A 15 Access platforms/ladders/handrails provide secure, non slipping access Yes 16 Lighting is adequate for plant operation, maintenance and cleaning at any time (RD12 has no external lighting fitted. Use of RD12 in low/failing light is subject to site environment lighting) Yes 17 Noise levels have been assessed as below 85dB(A) (Operator required to wear appropriate PPE) No A 2 S 18 Personal Protective Equipment (PPE) has been provided for safe operation of this plant (Users responsibility) N/A 19 PPE requirements are signposted (Adequate decals fitted) Yes 20 There is provision for safe cleaning of this plant (NB Subject to availability of cleaning devices) N/A 21 Safe access to areas to be cleaned has been provided N/A 22 There is provision for easy and safe scrap removal Yes 23 The plant has the potential to jam/block (Mechanical failure or incorrect application) Yes C 1 L 24 A safe system of work has been established to remove jam/blockage (Block/jam only to be cleared by trained or experienced persons. Plant to be isolated in terms of operating manual) (Employers/Owners assessment required) N/A 25 Safe system of work has been established for any sample retrieval N/A 26 There is adequate provision to properly service and routinely grease and oil the plant (Plant to be maintained by appropriately Yes Prepared by VEHTEC Pty Ltd www.vehtec.com.au Page 5 of 10

trained personnel in terms of operators manual) 27 Safe systems of work have been established for hazards associated with any necessary maintenance of the plant (Employers/Owners responsibility) N/A 28 The rigidity and stability of the plant and supporting structure is adequate. (Plant to be operated within its capabilities and with regard to recommended operating environs as detailed within the Yes Operators manual) 29 The environment in which the plant is situated has been assessed for its interrelationship with this plant as acceptable (Employers/Owners Responsibility) N/A 30 Ventilation and/or other air flow needs are adequate (Open Operators platform) Yes 31 Static electricity hazards have been assessed and controlled N/A 32 Workplace substances associated with the use of the plant have been assessed N/A 33 Authorised entry systems for the plant and surrounds have been established N/A 34 The upstream and downstream effects of malfunction or unscheduled stoppage of the plant have been considered (Employers/Owners responsibility) N/A Prepared by VEHTEC Pty Ltd www.vehtec.com.au Page 6 of 10

Moderate SECTION 5: RISKS AND CONTROLS Summary of Hazards Identified and solution(s) to adequately manage the respective risk. Hazard Item No Level of Risk Action Required / Comments Hazard General access, maintenance and operation of the Twin Drum Rollers can cause cutting, trapping and crushing hazards. Action Required Nil Comments Incorrect use of the plant or operation in the incorrect environment poses a physical risk to the operator and bystanders.. The plant is well signed with warning and instruction decals. Responsible Person Operator Due Date 1.3 1.3a 1.6 Controls Care is to be taken when deploying or folding down the ROPS as per Operators manual written instructions. Operator are to use the safety strut (where fitted) when opening the engine cover for inspection, servicing or maintenance. Actioned by: Operator is to perform a Jobsite Safety Analysis (JSA) prior to operation. Work Zone Traffic Management (WZTM) procedures need to be implemented prior to operation. Operators are to start, operate and maintain the plant in terms of the manufacturer s instructions and keep clothes and limbs clear of the plant at all times when in operation. Verified by: Revised Risk Assessment With the above controls in place the risk is considered controlled. Prepared by VEHTEC Pty Ltd www.vehtec.com.au Page 7 of 10

Moderate Significant Hazard Rollover of the Twin Drum Rollers can cause trapping and crushing hazards. Action Required Nil Comments Incorrect use of the plant or operation in the incorrect environment poses a physical risk to the operator and bystanders. The plant is well signed with warning and instruction decals. Responsible Person Operator Due Date Controls Operator is to perform a Jobsite Safety Analysis (JSA) prior to operation. Work Zone Traffic Management (WZTM) procedures need to be implemented prior to operation. 1.6a 1.9 1.9a Operator to keep bystanders away during starting and operation. Prior to starting the plant, the operator is to ensure that both they and the plant are on stable level ground and start the plant as per the operator s manual. Operators are to start, operate and maintain the plant in terms of the manufacturer s instructions and keep clothes and limbs clear of the plant at all times. Actioned by: When operating on slopes or hills, always operate the plant up and down hills rather than from side to side. NEVER operate the plant sideways on slopes. The plant may roll over, even on stable ground. Always use caution when operating near the edges of pits, trenches or platforms. Check to be sure ground surface is stable enough to support the weight of the plant and operator and ensure there is no danger of the plant sliding, falling or tipping. Verified by: Revised Risk Assessment With the above controls in place the risk is considered controlled. Prepared by VEHTEC Pty Ltd www.vehtec.com.au Page 8 of 10

Low Moderate Significant Hazard Dust, noise and vibrations Action Required Nil Comments Twin Drum rollers can create dust through the compaction process. The plant is well signed with warning and instruction decals. Responsible Person Operator Due Date 2.5 2.6 2.7 2.9 17 Controls Operators are to be completely familiar with the Operators manual prior to use of the plant. Appropriate ear protection and breathing masks are to be used as required by the end users assessment of the operational environment and in terms of Employers/Owners policies. Actioned by: Operators are to regularly have breaks from the activity in terms of Employers/Owners management policies. Revised Risk Assessment With the above controls in place the risk is considered controlled. Verified by: SECTION 6: CONTROL MEASURES AND TRAINING Control Measures Pre-Operation A Standard Operating Procedure (SOP) should be developed for the correct use of the plants systems prior to deployment. Complete familiarisation of the Operators Manual and all systems shall be considered Mandatory. The plant is intended for relatively flat ground deployment only and for specific compaction activities. Modifications Any modification to the factory unit should be strongly considered to ensure that it will not have any detrimental effect to the stability, safety or operation of the plant. Modifications should only be undertaken by suitably qualified or experienced persons. Prepared by VEHTEC Pty Ltd www.vehtec.com.au Page 9 of 10

Attachments Transportation Operational Risk Work Zone Traffic Management Only OEM attachments (or those authorised by the OEM) should be used on the plant. Non authorised attachments may affect the safety and stability of the plant when in operation. When transporting the Rollers, transport lock to be engaged. Safe engagement of transport lock on will require two (2) persons. When roller is required to be towed, hydraulic oil bypass valve is fitted and to be closed as per the instructions detailed within Operators manual. Designated lifting points are fitted and indentified. Operator s manual details how to safely lift and weights of rollers. This risk assessment does not negate the requirement of the operator/supervisor to conduct an operational risk assessment of this piece of plant for its intended use and its interface with the operators and the suitability of this piece of plant to integrate and complete the required task. This document has been prepared with due care, however cannot be considered complete given the limited knowledge of the intended operational environment for which the plant has been selected. This risk assessment has been prepared with the knowledge that effective Work Zone Traffic Management (WZTM) systems will be employed in line with AS1742.3, OHS&W Regulations 2010, Road Traffic Act 1971 and internal Standard Operating Procedures. Continuous Review Operator Competencies This document is not intended to be static, nor is it intended to be considered complete for all situations. This document forms the basis to allow the Employer/Owner of the asset to have an informed position. A system of continuous review should be embraced in line with Management Policies. Formal Qualifications: Competency Assessed Skills: General Training Instruction: Experience: Standard Work Procedure (s): Must comply with the regulations enforced by the WorkSafe authority within the state that the plant is being operated. Skills must comply with the requirements of the guidelines established by the relevant state based WorkSafe authority and assessed by the state WorkSafe body s authorised assessor. On the job training by qualified Operator As appropriate and assessed (as above) To be developed by the employer/owner SECTION 7: PLANT INSPECTIONS, MAINTENANCE AND TESTING Inspection, Maintenance and Testing Requirements Manufacturers Operator and Service manuals as supplied with the plant Servicing and Maintenance Daily checks as per operators handbook *This is not a definitive list and may need to be revised over time Frequency Refer Operator Manual As per Manufacturers guidelines Daily before use Prepared by VEHTEC Pty Ltd www.vehtec.com.au Page 10 of 10