Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Similar documents
Summary of Comments Public Information Meeting Wieuca Road at Phipps Boulevard Intersection Improvements June 7, 2017

Glenn Avenue Corridor Traffic Operational Evaluation

DUNBOW ROAD FUNCTIONAL PLANNING

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Board of Supervisors February 27, 2017

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Harrah s Station Square Casino

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Intersection Traffic Control Feasibility Study

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

PennDOT ICE Policy An Introduction

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Chapter 4 Traffic Analysis

#!! "$% ##! &! # '#! % $ #!

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Project Description Form 8EE

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Giles Run Connector Road

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

Washington St. Corridor Study

MEMORANDUM. Our project study area included the following locations:

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Welcome to the Quebec Alternatives Analysis Public Meeting

TAKOMA METRO STATION

King Soopers #116 Thornton, Colorado

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

LOOP 360 IMPROVEMENT STUDY

Route 7 Corridor Study

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Proposed Action, Purpose and Need Technical Memorandum

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Gateway Transportation Study

Recommendations. Central Salem Mobility Study

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Transportation Impact Study for Abington Terrace

Welcome. If you have any questions or comments on the project, please contact:

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

Appendix D: Concept Screening

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

TRAFFIC IMPACT ANALYSIS

Marina Loft (DRC 51-R-12)

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Welcome! San Jose Avenue Open House August 25, 2015

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Traffic Study North Shore School District 112

Shockoe Bottom Preliminary Traffic and Parking Analysis

THIS PAGE LEFT BLANK INTENTIONALLY

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

6.4 RECOMMENDED IMPROVEMENTS

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

Central Avenue Bikeway Traffic and Safety Impact Assessment

5.0 Roadway System Plan

EXHIBIT R1. Neighborhood Cul-de-Sac Implementation

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

ROUNDABOUT SOLUTIONS FOR COMPLEX TRAFFIC ENVIRONMENTS

Terwillegar Drive Expressway Draft Concept Plan

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Pedestrian & Bicycle Safety Innovations & Applications

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Financial Project ID No(s).: and ETDM No(s).: and 14181

Alexander Ikefuna City of Charlottesville Director of Neighborhood and Development Services

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

Gene Dillon Elementary School Traffic Study Division Street Site

Highway 111 Corridor Study

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

South End Transportation Study. Public Meeting. January 31, 2019 Welcome. Public Meeting. January 10, 2018 WELCOME

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Station 1: Street & Sidewalk Upgrades

Operational Comparison of Transit Signal Priority Strategies

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

State Street and Pierce Park Lane Intersection Concept Report

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

Figure 5A: Diagram of Crashes, May 2005 to May 2008 (Part 1)

3.0 PROJECT DESCRIPTION

Transcription:

MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October 27, 2015 This purpose of this study was to evaluate existing traffic conditions along the Wieuca Road / Phipps Boulevard corridor and develop concepts to alleviate traffic congestion and improve safety in anticipation of several major new developments along the corridor. In particular, the Phipps Boulevard at Wieuca Road intersection was found to have the greatest capacity and safety improvement needs along the corridor. This intersection, shown in Figure 1, serves as a gateway to the North Buckhead residential neighborhood and is adjacent to multiple high traffic-generating sites, including Phipps Plaza and Lenox Square shopping malls, and the Park Avenue high rise condominium tower. Planned developments, including a second residential tower, a large mixed-use development, and executive hotel will be located on parcels at or in close proximity to this intersection. Once built, these developments are expected to generate additional trips and add to the area s existing congestion. In addition to long queues and traffic delays, the intersection s current design has several safety issues. These issues include limited sight-distance for left-turning vehicles on both Phipps Boulevard approaches, and safety concerns for pedestrians crossing Wieuca Road and its free-flow northbound movement. 1

Figure 1: Study Intersection Methodology Multiple design concepts were developed to improve traffic operations at this intersection and along both Phipps Boulevard and Wieuca Road. These concepts were developed with the site s limited rightof-way and the construction time table of the new buildings in mind, as stakeholders wanted to mitigate the additional traffic from the apartments and hotel. Projects that would result in significant right-ofway impacts would likely face additional hurdles that would lengthen the project s delivery. Prior to evaluating these concepts, traffic counts and signal timing data were collected at 7 intersections around the site to better understand existing traffic patterns. These intersections are listed below and illustrated in Figure 2. 1. Phipps Boulevard at Lenox Road 2. Phipps Boulevard at Alexander Road 3. Phipps Boulevard at Longleaf Drive 4. Wieuca Road at Old Ivy Road 5. Wieuca Road at Phipps Boulevard 6. Wieuca Road at Longleaf Road 7. Wieuca Road at Peachtree Road 2

Figure 2: Project Data Collection & Evaluation Locations The traffic counts were then balanced and factored to their projected 2017 volumes, which is the opening year of the apartments, mixed use building, and hotel. These balanced, factored volumes were then used to calibrate the BCID mesoscopic travel demand model. This model, which had been developed previously for BCID, includes parcel-level land use and trip generation data, and thus, as part of this project, the land use of the future development parcels was updated to reflect their completion in 2017. The model then calculated the corresponding impact of these developments on local traffic volumes to use in evaluating the proposed design alternatives. Figure 3: Proposed Northbound Left Turn Lane at Longleaf Drive Prior to developing the design concepts, a northbound leftturn lane was proposed at the Wieuca Road at Longleaf Drive intersection to provide northbound Wieuca Road access to the new hotel. The turn lane improvement is shown in Figure 3. This left-turn lane can be constructed within the existing curb and requires no new right-of-way. The proposed design adds a median while maintaining southbound access to Wieuca Road Baptist Church and continues right-in, right-out access from Longleaf Drive (west side of Wieuca Road) and the church driveway (east side of Wieuca Road). 3

Alternatives After determining the projected 2017 traffic volumes, three alternatives for the intersection of Phipps Boulevard at Wieuca Road were developed to improve operations and safety. The alternatives were evaluated with respect to traffic operations, safety improvements, and right-of-way impacts. Alternative 1 Alternative 1 would add an exclusive southbound right-turn lane from Wieuca Road onto westbound Phipps Boulevard, convert Wieuca Road from a two-lane to a three-lane cross section between Phipps Boulevard and Old Ivy Road, and add a protected northbound Wieuca Road left-turn signal phase for safer access to Park Avenue. These modifications, shown in Figure 4, would improve traffic flow on northbound and southbound Wieuca Road north of Phipps Boulevard and improve the safety of northbound left turning vehicles. Alternative 1 would also add a second signal to the Wieuca Road free flow northbound movement to improve pedestrian safety, as shown in Figure 4. Alternative 1 was projected to have minimal roadway and right-of-way impacts and cost approximately $250,000 to construct. Figure 4: Alternative 1 Inset (see Appendix for full page concepts) 4

Alternative 2 Alternative 2 would widen Wieuca Road between Phipps Boulevard and Old Ivy Road to a 4-lane cross section, as illustrated in Figure 5. At the intersection, Alternative 2 maintains the southbound Wieuca Road right-turn bay proposed in Alternative 1, but modifies the northbound Wieuca Road free-flow lane to include a Hawk pedestrian signal. Alternative 2 would thus increase roadway capacity north of Phipps Boulevard and improve pedestrian safety for those crossing Wieuca Road. The additional capacity added by the fourth Wieuca Road lane north of Phipps Boulevard would, however, increase roadway and right-ofway impacts. Alternative 2 was projected to cost approximately $1 million to construct. Figure 5: Alternative 2 Inset (see Appendix for full page concepts) Alternative 3 Alternative 3 would convert the existing Wieuca Road at Phipps Boulevard signalized intersection into a multi-lane roundabout, as shown in Figure 6. Alternative 3 is projected to provide the greatest congestion and safety benefit with the least impact to Wieuca Road north of Phipps Boulevard. In addition, the roundabout s design mitigates the existing intersection s sight-distance issues and allows pedestrians to safely cross each leg of the roundabout at crosswalks. Alternative 3 is projected to cost approximately $2 million to construct. The roundabout design is typically safer for pedestrian/bicycle crossing, especially on the approach Figure 6: Alternative 3 Inset (see Appendix for full page concept) 5

legs. On the departure legs, if needed, a Hawk pedestrian signal or other treatment can be installed in the future if pedestrian crossing is observed to be a safety concern. The costs for any such future signal treatment are not included in the approximately $2 million construction cost. Preferred Alternative Alternative 3 was selected as the preferred alternative by the project stakeholders due to its multitude of potential benefits, which include: The greatest potential for traffic operations improvements as compared to Alternatives 1 and 2 Mitigation of sight distance issues and improved pedestrian safety crossing Wieuca Road Limited impacts to Wieuca Road and residential community north of Phipps Boulevard Ability to serve as a signature gateway to the neighborhoods and control speeds To aid in visualizing how traffic would flow through the roundabout, Vissim micro-simulation models were created to illustrate traffic operations in the 2017 AM and PM peak hours. The models incorporated the projected traffic volumes output by the calibrated travel demand model, which included the impact of the planned developments. These micro-simulation models demonstrated that the roundabout would successfully accommodate the additional traffic volumes projected to be generated by the additional development in all but the most congested PM peak hour of the day. Next Steps With the selection of a roundabout as the preferred alternative, additional work remains to finalize its final design, footprint, and property impacts. Once implemented, the roundabout should provide congestion relief and improved vehicular and pedestrian safety for the residents and employees of North Buckhead. First however, the following steps need to be undertaken as the next steps in this endeavor: Development of traffic projections for design (horizon year) Confirmation of preferred alternative and project limits Development of Concept Layout of Preferred Alternative (color on aerial photography) Preparation of conceptual construction cost estimate Public involvement / public information meetings / stakeholder information meetings Development of survey database including Right of Way and property information Conduct environmental screening Perform Subsurface Utility Engineering (SUE) survey (Quality Level B, as per FHWA recommendation for an urban project) Preliminary Plans including updated cost estimate Right of Way Plans Final Plans including updated cost estimate Permitting Land Disturbance, Lane closures/ Right of Way Permits 6

APPENDICES 7

Alternative 1: New Southbound Right-turn Lane & Northbound Signal Head. 3340 Peachtree Rd NE 8

Alternative 2: New Southbound Right-turn & Northbound Through Lanes. 3340 Peachtree Rd NE 9

Alternative 3: Multi-approach, Hybrid Roundabout. 10

DRAFT 3340 Peachtree Rd NE Cost Benefit Table Alt Description Peak Hour Traffic Issues Potential property and/or environmental impacts Bicycle & Pedestrian Accessibility Preliminary Estimate of Costs* 1 Add SB right turn bay; add signal for NB Wieuca Creates traffic queues on Northbound Wieuca Road Least impact to property; addition of right turn lane across pocket-park frontage Pedestrians have signalized access point to cross northbound Wieuca Approx. $250K 2 Add one lane to Wieuca up to Old Ivy); Restripe NB Wieuca between Phipps and Old Ivy Creates potential weaving issues on Northbound Wieuca Road (between Phipps Boulevard signal & Old Ivy Road intersection) Greatest impact along Wieuca between Phipps and Old Ivy to add turn lane Pedestrians still must cross free-flow northbound lane; HAWK signal recommended Approx. $1M 3 Multi-Lane Roundabout Satisfies peak hour demands Some impact to pocket park, residential tower property Pedestrians cross each leg of roundabout in safer environment Approx. $2M * Very rough cost estimate based on limited project data; it does not include costs for right-of-way or any major environmental / utility impacts; may change as analysis moves further through the screening process 11